Pressure data from Cranfield CO2 Thermosiphon test
Pressure data recorded using PANEX pressure gauges at the bottom of wells CFU31-F2 and CFU31-F3.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Pressure data recorded using PANEX pressure gauges at the bottom of wells CFU31-F2 and CFU31-F3.
Southeast Regional Carbon Sequestration Partnership (SECARB): LEssons Learned
Southeast Regional Carbon Sequestration Partnership (SECARB): LArge scale sequestration projects
Southeast Regional Carbon Sequestration Partnership (SECARB): CCS in the US
Southeast Regional Carbon Sequestration Partnership (SECARB): CCS in the US
Southeast Regional Carbon Sequestration Partnership (SECARB): CCS in the US
Southeast Regional Carbon Sequestration Partnership (SECARB): CCS in the US
Risk Assessment (RA) of RCSP Phase 3 sites is a DOE requirement and valuable to DOE’s program because this process encourage careful consideration of elements that could damage an individual project, or if severe ,damage credibility and public commercial acceptance of the sequestration process. Poor outcomes even from small projects can have negative consequences larger than the cost to the individual project. In addition, practice in risk assessment compared to project evolution is needed as part of the confidence-building toward future large scale, long term industrial activities.
This study evaluates the potential of carbon dioxide-enhanced oil recovery (CO2-EOR) to reduce greenhouse gas emissions without compromising oil production goals. A novel, dynamic carbon lifecycle analysis (d-LCA) was developed and used to understand the evolution of the environmental impact (CO2 emissions) and mitigation (geologic CO2 storage) associated with an expanded carbon capture, utilization and storage (CCUS) system, from start to closure of operations. EOR operational performance was assessed through CO2 utilization rates, which relate usage of CO2 to oil production. Because field operational strategies have a significant impact on reservoir engineering parameters that affect both CO2 storage and oil production (e.g., sweep efficiency, flood conformance, fluid saturation distribution), we conducted a scenario analysis that assessed the operational and environmental performance of four common and novel CO2-EOR field development strategies. Each scenario was evaluated with and without stacked saline carbon storage, an EOR/storage combination strategy where excess CO2 from the recycling facility is injected into an underlying saline aquifer for long-term carbon storage. The dynamic interplay between operational and environmental performance formed the basis of our CCUS technology analysis. The results showed that all CO2-EOR evaluated scenarios start operating with a negative carbon footprint and, years into the project, transitioned into operating with a positive carbon footprint. The transition points were significantly different in each scenario. Water-alternating-gas (WAG) was identified as the CO2 injection strategy with the highest potential to co-optimize EOR and carbon storage goals. The results provide an understanding of the evolution of the system’s net carbon balance in all four field development strategies studied. The environmental performance can be significantly improved with stacked storage, where a negative carbon footprint can be maintained throughout the life of the operation in most of the injection scenarios modelled. This information will be useful to CO2-EOR operators seeking value in storing more CO2 through a carbon credit program (e.g., the 45Q carbon credit program in the USA). Most importantly, this study serves as confirmation that CO2-EOR can be operationally designed to both enhance oil production and reduce greenhouse gas emissions into the atmosphere.
Explore the source record for details and available documents.
Southeast Regional Carbon Sequestration Partnership: Impact of Relative Permeability Uncertainty on CO2 Trapping Mechanisms
Abstract not provided.
Southeast Regional Carbon Sequestration Partnership (SECARB): CCS in the US
Contents include the following presentations: 1) SECARB Phase III Early Test Cranfield, MS; 2) SECARB Phase III Early Test at Cranfield, March 9, 2010; 3) Update on Results of SECARB "Early" Test of Monitoring Large Volume Injection at Cranfield; 4) Progress Update SECARB "Early" Test Monitoring 3.5 Million Tons at Cranfield, March 7, 2012; 5) Cranfield Geophysical Monitoring Status and Results, March 8, 2012; 6) Large Volume CO 2 Injection at Cranfield, Early Field Test of the SECARB Phase III–Near-Surface Monitoring, March 7, 2012; 7) Shallow Groundwater Study at the Cranfield Site, March 12, 2013; 8) Subsurface Monitoring Studies–Results and Integration, March 12, 2013; 9) Review of the Petrophysics for the Cranfield Phase III Project, March 12, 2013; 10) Geomechanics at Cranfield, March 5, 2014; 11) Gulf Coast Carbon Center Near-Surface Update, March 4-5, 2014; 12) Monitoring Design Best Practices, March 5, 2014; 13) Assessing Impacts of CO 2 Leakage on Groundwater Quality and Monitoring Network Efficiency–Case Study at a CO 2 -EOR site, March 11, 2013; 14) Near-surface Stratigraphy and Geophysics, March 11, 2015; 15) Update on Reservoir Modeling and Final Testing and P&A Underway, March 11, 2013; 16) SECARB Early Test Retrospective; 17) Fluid Source Attribution at CCS and CO 2 -EOR Sites, March 8, 2016; 18) SECARB "Early Test" at Cranfield, March 8-9, 2017; 19) Analysis of Seismic Time-Lapse Observations at Cranfield; 20) SECARB Phase III Cranfield Project (Early Test), March 8, 2018; 21) Enhanced Analytical Simulation Tool (EASiTool) Dynamic Capacity Estimation; 22) Net Carbon Negative Oil Mass Accounting–Cranfield Case Study; 23) Knowledge Sharing; 24) Advancing Toward Commercialization Final Stages of the Early Test; 25) CO 2 EOR Feasibility in SECARB Region Limited by CH 4 ; 26) Understanding of CO2 Migration and Entrapment–Cranfield Site
The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and The Bureau of Economic Geology (BEG), at the University of Texas at Austin, managed all activities associated with the Early Test field site near Cranfield, Mississippi (the Early Test or Cranfield Project). BEG was assisted in the management of site activities by Sandia Technologies (Sandia). BEG and Sandia implemented reporting procedures that included monthly and quarterly technical progress reports, as well as periodic reporting on key field activities. Subsequent sections of this report catalog the field activities and are organized in a semiannual chronology. The Cranfield Project was located approximately 12 miles east of Natchez, Mississippi. Denbury Onshore, LLC, began operating a commercial CO 2 flood of the field (using the subsurface injection of CO 2 for EOR) in June 2008. Carbon dioxide from the Jackson Dome, a natural source near Jackson, Mississippi, was delivered to the Cranfield oilfield via pipeline. Beginning in October 2008, the SECARB Early Test team characterized the surface and subsurface of the Cranfield site. During the field test CO 2 was injected into the lower Tuscaloosa Formation, a regionally extensive saline formation with the potential to hold millions of tons of CO 2 emissions. By January 2015, the team injected more than 11 million metric tons of CO 2 and monitored a total stored CO 2 mass of 5,326,975 metric tons. SECARB’s study operations occurred in four integrated research program areas within Cranfield field: (1) the High Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” Carbon dioxide injection activities were conducted at the HiVIT and the DAS. Figure 1.1-1 provides a depiction of the DAS.
The SECARB Cranfield Early Test Project was designed to safely demonstrate large-scale, long-term CO 2 injection and storage in a CO 2 -enhanced oil recovery (EOR) operation and associated saline reservoir. Storage during EOR operations has the potential to offset commercial costs, holding a significant promise for future large-scale deployment in the southeastern United States. Denbury Onshore LLC began CO 2 -EOR operations in July 2008 at the Cranfield oilfield located east of Natchez, Mississippi (Figure 1). The location offered an ideal setting to investigate storage monitoring at a commercial CO 2 -EOR operation. The field team, led by the Gulf Coast Carbon Center of the Bureau of Economic Geology at the University of Texas at Austin, deployed the largest suite of monitoring, verification, accounting (MVA) technologies to collect data to assess long-term CO 2 utilization and storage. The CO 2 injection interval is within the 3,000-meter-deep fluvial lower Tuscaloosa Formation, a large and regionally extensive saline reservoir, at a broad four-way structural closure that defines the Cranfield oilfield. Tests were conducted in the oil-producing area as well as in the non-oil-producing brine aquifer. The CO 2 used during EOR operation was transported via pipeline from the Jackson Dome, a natural source of CO 2 . The study focused on four integrated research areas: (1) the High-Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” CO 2 injection occurred at the HiVIT and the DAS (Figure 2 and Figure 3). The DAS was located down-dip of the oil-water interface of the Cranfield oilfield. The well layout included one injection well and two down-dip observation wells. The team was the first of the regional partnerships to monitor more than 1 million metric tons of CO 2 . At the end of the project, the team monitored more than 11 million metric tons of CO 2 injected and 5 million metric tons of CO 2 stored. The Cranfield Project was the fifth project worldwide, and the first such project in the United States, to reach this CO 2 injection volume while being monitored to demonstrate storage effectiveness.