Refractory Materials for Flame Deflector Protection System Corrosion Control: Flame Deflector Protection System Life Cycle Cost Analysis Report

A 20-year life cycle cost analysis was performed to compare the operational life cycle cost, processing/turnaround timelines, and operations manpower inspection/repair/refurbishment requirements for corrosion protection of the Kennedy Space Center launch pad flame deflector associated with the existing cast-in-place materials and a newer advanced refractory ceramic material. The analysis compared the estimated costs of(1) continuing to use of the current refractory material without any changes; (2) completely reconstructing the flame trench using the current refractory material; and (3) completely reconstructing the flame trench with a new high-performance refractory material. Cost estimates were based on an analysis of the amount of damage that occurs after each launch and an estimate of the average repair cost. Alternative 3 was found to save $32M compared to alternative 1 and $17M compared to alternative 2 over a 20-year life cycle.

Calle, Luz Marina↗

H 2 Production Pathways Cost Analysis (2016 - 2021) (Final Report)

This final report documents cost analysis conducted for the Department of Energy over a five year period (2016 to 2021) pertaining to hydrogen production and delivery system components, focusing on the key remaining challenges of the technology pathways within the Hydrogen Production and Delivery sub-program portfolio. A particular focus was placed on electrolysis for the generation of hydrogen. The effort primarily used the H2A discounted cash flow computational model as a tool to project hydrogen cost ($/kgH 2 ) and determine status improvements resulting from technology advancements. The effort also considered cost as a function of production volume, employed error bars to illustrate uncertainties in the cost estimates, and utilized sensitivity analyses to show the potential for cost reductions. The project examined a range of hydrogen production and delivery related systems. These included WireTough wire-wrapped pressure vessels for hydrogen storage, proton exchange membrane (PEM) electrolysis, solid oxide electrolysis (SOE), anion exchange membrane (AEM) electrolysis, photoelectrochemical (PEC) electrolysis, solar thermochemical hydrogen (STCH) production, the cost of energy transmission, and a study on the necessary price of hydrogen to produce competitively-priced electricity via fuel cell conversion.

08 HYDROGEN↗

Cost Analysis of Complex Radiation Therapy for Patients With Head and Neck Cancer

Purpose: This cost analysis aimed to prospectively assess differences in costs between TomoTherapy and volumetric modulated arc therapy (VMAT) in patients with head and neck cancer. Methods and Materials: Economic data were gathered from a multicenter study. However, randomization was not possible due to the availability of equipment. Costs were calculated using the microcosting technique from the hospital's perspective (in 2013 euros), and the time horizon was radiation therapy. Only resources that entered the hospital production process and which were likely to vary between the strategies being compared were considered. Acute adverse events observed within the time horizon were also assessed. Results: The cost analysis was based on a total of 173 patient treatments given between 2010 and 2012 in 14 French cancer centers: 73 patients were treated with TomoTherapy, 92 with VMAT RapidArc, and 8 with VMAT SmartArc. Estimated costs of SmartArc were removed from the comparison due to the small sample size. The mean ± SD cost per patient of the treatment planning phase was €314 (±€214) for TomoTherapy and €511 (±€590) for RapidArc. Mean costs ± SD per patient of irradiation reached €3144 (±€565) for TomoTherapy and €1350 (±€299) for RapidArc. The most sensitive parameter of irradiation was the annual operating time of accelerators. Ninety-five percent confidence intervals for the mean costs of irradiation were €3016 to €3272 for TomoTherapy and €1281 to €1408 for RapidArc. The number of acute adverse events during radiation therapy was not significantly different between strategies. Conclusions: TomoTherapy appeared to be more expensive than RapidArc mainly due to the higher price of the accelerator, the higher costs of maintenance, and the longer duration of treatment sessions. Because strategies were not significantly different in clinical effect, RapidArc appeared to be the strategy to be recommended at this stage of knowledge.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

New technologies for solar energy silicon - Cost analysis of dichlorosilane process

A reduction in the cost of silicon for solar cells is an important objective in a project concerned with the reduction of the cost of electricity produced with solar cells. The cost goal for the silicon material is about $14 per kg (1980 dollars). The process which is currently employed to produce semiconductor grade silicon from trichlorosilane is not suited for meeting this cost goal. Other processes for producing silicon are, therefore, being investigated. A description is presented of results obtained for the DCS process which involves the production of dichlorosilane as a silicon source material for solar energy silicon. Major benefits of dichlorosilane as a silicon source material include faster reaction rates for chemical vapor deposition of silicon. The DCS process involves the reaction 2SiHCl3 yields reversibly SiH2Cl2 + SiCl4. The results of a cost analysis indicate a total product cost without profit of $1.29/kg of SiH2Cl2.

Yaws, C. L.↗

The basics of least cost analysis for archaeological applications

Here we report that Least Cost Analysis (LCA) is a geospatially focused quantitative approach that can help archaeologists better understand how people may have moved across a landscape. At its core is the assumption that humans make decisions about movement as fully rational actors with complete knowledge of the landscape, attempting to minimize the cost of that movement as they travel from one location to another. LCA is most often used to construct a small number of hypothetical routes between locations of interest and, when used effectively, can even lead to the creation of entire transportation networks. Desktop GIS software packages, both commercial and open source, make running LCA relatively straightforward, but that does not necessarily mean that the output is informative or accurate. The following tutorial is designed to expose the reader to the foundational steps required to complete an LCA workflow, along with the scientific rationale behind each step and how to avoid potential pitfalls that one might run into along the way. Finally, relevant literature is cited throughout the tutorial in order to provide context for the technical methods that underpin available tools, to suggest various ways that LCA can be used to solve archaeological problems, and to show the art of the possible.

58 GEOSCIENCES↗

NECAP 4.1: NASA's energy-cost analysis program user's manual

The Enery Cost Analysis Program (NECAP) is a powerful computerized method to determine and to minimize building energy consumption. The program calculates hourly heat gain or losses taking into account the building thermal resistance and mass, using hourly weather and a "response factor' method. Internal temperatures are allowed to vary in accordance with thermostat settings and equipment capacity. A simplified input procedure and numerous other technical improvements are presented. This Users Manual describes the program and provides examples.

Jensen, R. N.↗

Cost Analysis of Heavy-Duty Vehicle Proton Exchange Membrane Fuel Cell Stationary Power Plants

Heavy-duty PEM fuel cells could be a low-cost, low emission alternative to combustion turbines for re-electrifying hydrogen if used as part of a long duration grid energy storage systems. Many studies expect heavy duty PEM fuel cell production costs to reduce as manufacturing volumes ramp up and their expected durability of 25,000-30,000 hours aligns well with a 30-year life for hydrogen seasonal energy storage plants that would likely operate less than 10% of the year. The labor, material, and equipment costs associated with installing PEM fuel cells and their required balance of plant for stationary applications have not been thoroughly explored, however. This study performs a detailed design and cost analysis of a 100 MW stationary PEM fuel cell power plant, capturing costs such as cooling, power electronics, pipes, valves, fittings, cabling, conduit, concrete foundations, buildings, and land. It employs methods consistent with NLR's solar PV benchmarking cost analysis and annual technology baseline to derive the total installed costs of stationary PEM fuel cell plants that utilize heavy duty PEM fuel cells.

08 HYDROGEN↗

Component Cost Analysis of Large Scale Systems

The ideas of cost decomposition is summarized to aid in the determination of the relative cost (or 'price') of each component of a linear dynamic system using quadratic performance criteria. In addition to the insights into system behavior that are afforded by such a component cost analysis CCA, these CCA ideas naturally lead to a theory for cost-equivalent realizations.

Skelton, R. E.↗

On the feasibility of benefit-cost analysis applied to remote sensing projects

The following step-wise procedure for making a benefit-cost analysis of using remote sensing techniques could be used either in the limited context of California water resources, or a context as broad as the making of integrated resource surveys of the entire earth resource complex on a statewide, regional, national, or global basis. (1) Survey all data collection efforts which can be accomplished by remote sensing techniques. (2) Carefully inspect the State of California budget and the Budget of the United States Government to find annual cost of data collection efforts. (3) Decide the extent to which remote sensing can obviate each of the collection efforts. (4) Sum the annual costs of all data collection which can be equivalently accomplished through remote sensing. (5) Decide what additional data could and would be collected through remote sensing. (6) Estimate the value of this information. It is not harmful to do a benefit-cost analysis so long as its severe limitations are recalled and it is supplemented with socio-economic impact studies.

Merewitz, L.↗

Hydrogen Storage System Cost Analysis (2017-2021) (Final Report)

This final technical report summarizes hydrogen storage system cost analysis results from 2017-2021. Results include onboard hydrogen storage system costs for light-duty vehicles, medium-duty vehicles, heavy-duty vehicles, class 8 long haul trucks, and passenger buses. Multiple storage systems are included, primarily focusing on compressed and cryo-compressed hydrogen in Type 3 and Type 4 storage systems. Additional analysis includes large-scale gaseous and liquid hydrogen storage at refueling stations in tube trailers and Dewars; advanced materials-based storage systems such as metal organic frameworks and metal hydrides; and a baseline setting analysis of compressed natural gas storage systems in support of the Institute for Advanced Composites Manufacturing Initiative (IACMI). Analyses were primarily conducted using a Design for Manufacture and Assembly ® methodology, which is a bottom-up process-based approach to estimating factory costs. Multiple annual production rates are reported to project high-volume costs relevant to mature markets.

08 HYDROGEN↗

Benefit Cost Analysis of Improved Forecasting for Day-Ahead Hourly Regulation Requirements

A benefit cost analysis (BCA) of the Day-Ahead Regulation Prediction (DARP) tool found substantial savings to providing an improved forecast of the California Independent System Operators (CAISO) reserve requirements for regulation services with increasing amounts of solar generation. DARP predicts day-ahead reserve requirements for Regulation Up (Reg Up) and Regulation Down (Reg Down) using the balancing authority’s Area Control Error (ACE) and actual frequency. The BCA approach statistically estimated the price-quantity relationships for Reg Up and Reg Down. The estimated changes in Regulation reserve prices along with the estimated changes in day-ahead reserve requirements, forecast by DARP, provide a cost savings estimate. The results indicate that more savings were found for reducing Reg Up than reducing Reg Down purchases. A similar approach may be used to estimate savings from improved forecasting of reserves for other ancillary services, or to estimate benefits from other forecasting tools and methodologies.

Ancillary Services, Benefit Cost Analysis, Frequen↗

Cost analysis of oxygen recovery systems

Report is made of the cost analysis of four leading oxygen recovery subsystems which include two carbon dioxide reduction subsystems and two water electrolysis subsystems, namely, the solid polymer electrolyte and the circulating KOH electrolyte. The four oxygen recovery systems were quantitatively evaluated. System characteristics, including process flows, performance, and physical characteristics were also analyzed. Additionally, the status of development of each of the systems considered and the required advance technology efforts required to bring conceptual and/or pre-prototype hardware to an operational prototype status were defined. Intimate knowledge of the operations, development status, and capabilities of the systems to meet space mission requirements were found to be essential in establishing the cost estimating relationships for advanced life support systems.

Yakut, M. M.↗

Technical & Programmatic Solutions for DPC Direct Disposal: Engineering Cost Analysis Support - Scoping

This memo describes the engineering technical and costing analysis support needed for identifying and evaluating technical and programmatic solutions for spent nuclear fuel (SNF) in dual-purpose canisters (DPCs), and the resources planned to provide that support. The Technical and Programmatic Solutions (T&PS) work scope is intended to identify and evaluate the range of feasible options available for DPC direct disposal, considering the range of DPC designs in the existing fleet and a range of generic geologic disposal concepts. It will also identify changes to the way DPCs are loaded, and/or additional hardware that could be installed in DPCs as they are loaded, to improve disposability (chiefly, post closure criticality control). These two thrusts are the focus of engineering support to the work package.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Benefit-Cost Analysis for Utility-Facing Grid Modernization Investments: Trends, Challenges, and Considerations

In recent years, many electric utilities have submitted grid modernization plans for review by state public utility commissions. A central objective of these plans is to demonstrate that grid modernization investments will provide net benefits to customers, be reasonable and be in the public interest. The plans typically include some form of benefit-cost analysis, but the assumptions, methodologies and frameworks vary considerably between utilities. This report: -Describes utility-facing technologies and projects for modernizing distribution systems, including interdependencies of grid components -Highlights benefit-cost considerations related to grid modernization -Summarizes recent trends in benefit-cost analysis for grid modernization based on a review of 21 plans by U.S. electric utilities -Discusses challenges state public utility commissions face in reviewing utility plans and provides options for addressing challenges

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modal cost analysis for simple continua

The most popular finite element codes are based upon appealing theories of convergence of modal frequencies. For example, the popularity of cubic elements for beam-like structures is due to the rapid convergence of modal frequencies and stiffness properties. However, for those problems in which the primary consideration is the accuracy of response of the structure at specified locations, it is more important to obtain accuracy in the modal costs than in the modal frequencies. The modal cost represents the contribution of a mode in the norm of the response vector. This paper provides a complete modal cost analysis for simple continua such as beam-like structures. Upper bounds are developed for mode truncation errors in the model reduction process and modal cost analysis dictates which modes to retain in order to reduce the model for control design purposes.

Hu, A.↗

Benefit cost analysis in federal agency R and D program formulation

Benefit-cost analysis is defined and some government investment criteria are discussed in relation to federal agency research and development program planning. The benefits of applied research and development are examined on the basis of a decision tree approach, and R and D project selection is considered, with attention paid to the multi-attribute problem.

Greenberg, J. S.↗