Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Corridor”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

ObstacleSense: Low-Power Neuromorphic Vision for Corridor Obstacle Awareness in Low-Level ADAS

The automotive industry’s pursuit of Level 5 autonomy is constrained by substantial perception-compute power requirements, often reaching 1, 000 + watts in full autonomy stacks. Reducing this energy burden requires rethinking perception not only at the high-end autonomy level, but also at the foundational Advanced Driver Assistance Systems (ADAS) level where low-power, safety-critical sensing can have broad impact. Neuromorphic vision provides a promising starting point: HD Dynamic Vision Sensors (DVS) can operate below 100 mW at the sensor level by reporting only asynchronous brightness changes. However, low-power sensing alone is insufficient if downstream perception reintroduces dense, energy-intensive computation. In particular, many event-driven object-detection pipelines still rely on CNN backbones, while purely spiking alternatives often trade away accuracy or ignore deployment constraints. We introduce ObstacleSense, a highly compact, CNN-free hybrid ANN–SNN framework for Level 0–1 forward-corridor obstacle awareness. Instead of performing full-scene object detection with a convolutional feature backbone, ObstacleSense targets the safety-critical question of whether the ego corridor is occupied and how far the nearest obstacle is. The architecture combines polarity-conditioned event encoding, lightweight temporal spiking dynamics, axial spatial mixing, and coarse-to-fine range estimation within a regular fixed-grid compute pattern. This design avoids the dense CNN backbone commonly used in event-based detection while maintaining a small state footprint suitable for eventual small-FPGA deployment. Before hardware mapping, we evaluate the software implementation using a model-side power proxy derived from MACs, weight and activation traffic, and spiking state updates under shared FP16 assumptions. On simulated CARLA event corpora, the deployment-oriented model achieves 0.9464 objectness F1, 0.9978 grid-level mAP, and 0.8987 m distance Mean Absolute Error at an estimated 1.92 mW proxy cost, while maintaining performance on unseen generalization test sequences.

Johnson-Scott, Zac [ORNL]↗

Pajarito Corridor Office Space Management Tool

The Pajarito Corridor Office Space Management tool is a reference used to assess and inform the management of the current portfolio of workstations and office space planning along the Pajarito Corridor. This work is in collaboration with the Associate Laboratory Directorate for Weapons Production (ALDWP)/Strategic Planning Office.

97 MATHEMATICS AND COMPUTING↗

Republic of Korea–United States Green Shipping Corridor Prefeasibility Study: Cargo Flows

This prefeasibility study, as a part of the decarbonization efforts through the Mission Innovation Zero Emission Shipping Mission, was conducted to provide a high-level assessment of the opportunities and challenges in planning and implementing green shipping corridors between major commercial seaports in the United States of America (USA) and the Republic of Korea (ROK). For each country, three major ports were included in the scope of this study: Seattle, Tacoma, and Everett (all in Washington State) for the USA and Busan, Ulsan, and Masan for the ROK. This prefeasibility study report focuses on describing operation characteristics of major vessel and cargo flows between the two countries. Vessel shipments directly affect energy use and demand. Therefore, it is critically important to understand which major vessel types and cargo types are operated or transported within the selected scope and to identify potential target segments for green shipping. Furthermore, this prefeasibility study also discusses limitations and additional assessments that need to be further analyzed in the next stage of the feasibility study. The summary findings and observations discussed in this report are not intended to be used to determine the final target corridors, but to guide later, deeper assessments of their potential impacts and challenges. In the following section, the data sources used in this study are discussed. Section 0 shows the overall vessel trades between the USA and ROK, considering all ports in the two countries. Then, a more detailed analysis by vessel type and cargo flow is presented in Sections 3–6 based on only the three-to-three ports between the two countries. Finally, Section 7 summarizes the findings with suggested target segmentations for the vessel types and discusses other limitations to be considered during the later feasibility stage.

42 ENGINEERING↗

National Zero-Emission Freight Corridor Strategy

The United States has committed to decarbonizing freight transportation by advancing the deployment of commercial zero-emission medium- and heavy-duty vehicles (ZEMHDVs) and infrastructure. It is pursuing this goal by leveraging historic federal and private investments, policies, and partnerships. Through the U.S. National Blueprint for Transportation Decarbonization1 and the Global Memorandum of Understanding for Zero-Emission Medium- and Heavy-Duty Vehicles,2 the United States has committed to identifying viable pathways and implementation actions that promote at least 30% ZE-MHDV sales by 2030, with a goal of 100% by 2040. These actions, along with the investments laid out in the Bipartisan Infrastructure Law and Inflation Reduction Act, put the nation on a path to advancing transportation and infrastructure solutions that are better for freight movement, our communities, the environment, and the economy. Providing ubiquitous and convenient access to electric vehicle (EV) charging and hydrogen refueling along our nation’s freight corridors, and at truck depots within freight hubs, is key to successfully deploying ZE-MHDVs. Consistent with its charge in the Bipartisan Infrastructure Law, 3 the Joint Office of Energy and Transportation (Joint Office), in collaboration with the U.S. Department of Energy (DOE), Department of Transportation, and the Environmental Protection Agency, has developed the National Zero-Emission Freight Corridor Strategy (Strategy). The Strategy guides infrastructure deployment to meet growing market demands; catalyze public and private investment; and support utility and regulatory planning and action at local, state, and regional levels.

33 ADVANCED PROPULSION SYSTEMS↗

lllinois Storage Corridor CarbonSAFE Phase III: Pre-drilling Site Assessment: Prairie State Generating Company

The Illinois Storage Corridor project will drill a stratigraphic test well as part of the Illinois Storage Corridor CarbonSAFE Phase 3 project near the Prairie State Generating Company coal-fired power plant near Marissa, Illinois. The pre-drilling site evaluation has considered the primary target reservoirs, the Potosi Dolomite and St. Peter Sandstone, and primary seal, the Maquoketa Group. Data to be collected from the well include core, fluid samples, in situ well tests, geophysical logs intended to provide information on lithologic, geomechanical, and geophysical characteristics to determine the feasibility for the geologic sequestration of 50 million metric tons or more of injected carbon dioxide. The planned drilling site has been evaluated using available subsurface geologic data and analyses from the Illinois Basin. These data provide lithologic and structural information, shallow groundwater resource distribution, location of known nearby wellbores, and regional drilling characteristics. The data were used to generate geologic structure and isopach maps for the target reservoir and caprock strata and for prognosing the tops of major lithologic units to aid drilling and coring procedures. The regional analyses indicate that no known structural features are expected to negatively impact the target storage reservoir or caprock. No protected and sensitive areas, groundwater resources, or existing resource development are expected to be impacted by the proposed well drilling activities. The well is planned to be drilled to a total depth of approximately 5,600 feet (1,707 m) and terminate in the Precambrian. Cores (up to 5 intervals) will be collected from the Maquoketa Group, confining units above the St. Peter Sandstone, St. Peter Sandstone, confining units of the Potosi Dolomite and the Potosi Dolomite. Water samples will be attempted to be collected from the St. Peter Sandstone and Potosi Dolomite. Potential impact on drilling progress is a lost circulation zone in the Potosi Dolomite, which has been demonstrated to have intermittent cavernous porosity from karstification elsewhere in the Illinois Basin. This document also presents a preliminary coring and sampling program, proposed logging suite, and well testing program, all of which will be reviewed during drilling.

01 COAL, LIGNITE, AND PEAT↗

Illinois Storage Corridor CarbonSAFE Phase III: Stakeholder Engagement and Outreach Plan

The Stakeholder Engagement and Outreach Plan provides a comprehensive framework for engaging stakeholders of the Illinois Storage Corridor (ISC) project. The ISC project is a CarbonSAFE Phase III project designed to facilitate commercial deployment of carbon capture, utilization, and storage (CCUS) in Illinois. The project aims to establish a multi-industry carbon storage corridor through development of storage sites near the One Earth Energy (OEE) ethanol production facility in north-central Illinois and the Prairie State Generating Company (PSGC) coal-fired power plant in south-central Illinois, with combined annual CO 2 capture ultimately exceeding 8.6 million tons per year. Stakeholder engagement is recognized as a critical component for successful CCUS deployment, alongside technical and economic considerations. As an emerging technology, CCUS may not be well understood by the general population, and lack of public awareness can lead to opposition that poses significant barriers to project development. This plan addresses this challenge through systematic stakeholder identification, analysis, planning, and implementation of engagement actions. The plan is structured around four main sections: Communication, Stakeholder Analysis, Stakeholder Engagement, and Environmental Justice. Activities will be conducted under Tasks 1 and 4 of the project's Statement of Project Objectives, with two key subtasks: (1) developing a stakeholder analysis and engagement plan through face-to-face meetings, facilitated discussions, and surveys; and (2) implementing stakeholder engagement and public outreach activities including meetings, open houses, and permit hearings. The Illinois State Geological Survey (ISGS) will manage engagement activities following DOE-NETL best practices, focusing on providing objective, fact-based information about CCUS and the ISC project. A comprehensive Communication Plan establishes protocols for media contacts, site visits, and crisis communications. The stakeholder analysis follows a structured workflow process divided into Pre-feasibility and Feasibility phases, incorporating contextual understanding, assessment, data collection, and analysis. Key stakeholder groups include government bodies, educational organizations, conservation and environmental groups, agricultural communities, and religious organizations. The plan addresses common stakeholder questions regarding project risks, benefits, safety, property values, liability, and environmental impacts. Recommendations emphasize developing clear messaging, creating informational materials, and preparing to address both project-specific and broader environmental concerns to ensure transparent communication and build stakeholder support throughout project implementation.

25 ENERGY STORAGE↗

Illinois Storage Corridor - CarbonSAFE Phase III: Policy, Regulatory, Legal and Permitting Characteristics; Subtask 5.5

The Illinois Storage Corridor (ISC) project aims to advance the commercial development and implementation of carbon capture and storage (CCS) technologies within a region in Illinois of suitable geology for carbon dioxide (CO 2 ) storage in deep saline aquifers. The project partners have annual emissions greater than 6.5 million tonnes per year; storage hubs are being explored at two sites—one near the One Earth Energy facility in east-central Illinois, and one near the Prairie State Generating Company campus in southwest Illinois. To implement the technology, legal, policy, and economic considerations must be explored. The United States Environmental Protection Agency (US EPA) administers the Underground Injection Control (UIC) program and is responsible for issuing Class VI permits to construct and operate CO 2 injection wells, i.e., a UIC Class VI well permit is required to inject CO 2 into the subsurface for geologic sequestration. The largest consideration of the Class VI well requirements is to protect underground sources of drinking water (USDWs). Additionally discussed are considerations for Class VI permits relating to public engagement. Besides permitting, property rights to storage sites, subsurface pore spaces, and areas for pipeline transportation must be secured. Pore space rights is still a novel concept being explored and not yet addressed by the Illinois legislature. It is believed that surface property rights are required for the subsurface pore space below, so long as there is not a separated mineral estate in the subsurface. Illinois legislature has addressed securing rights-of-way for CO 2 transportation, allowing for easements and the exercise of eminent domain to secure such rights. Economically, the incentives for CCS are ever-expanding. Recently, the federal government broadened the availability and increased the dollar-amounts for the § 45Q tax credits for geological storage of carbon oxides. Congress has also authorized the Advanced Industrial Facilities Development Program which allocates billions of dollars in funds to installing technology at industrial facilities to reduce greenhouse gas emissions. On the state level, Illinois has had its own incentives for CCS projects since 2009 and expanded its emission-related goals again in 2021. The law enacted in 2021 specifically creates a commission to explore implementing CCS at Prairie State Generating Company, a partner on the Illinois Storage Corridor project.

54 ENVIRONMENTAL SCIENCES↗

Development of Emergency Vehicle Preemption Strategies on Smart Corridors in a Digital Twin Environment

Emergency Response Vehicles (ERVs), such as firetrucks, ambulances, etc. operate with the purpose of saving lives and mitigating property damage. As such, ERV travel-time reductions may result in significant benefits to the community. A common strategy to improve travel times is Emergency Vehicle Preemption (EVP). EVP seeks to reduce ERV delays by providing the right-of-way to ERVs as they approach an intersection. This study proposes a new Dynamic Preemption strategy that determines the need for preemption prior to the ERV reaching the vicinity of the intersection, utilizing real-time data streams. This paper evaluates the effectiveness of some existing and proposed preempt control strategies using a digital twin testbed consisting of a series of signalized intersections on an urban arterial in Georgia. The best EVP strategy maximizes the improvement in ERV travel time while minimizing the adverse effect of preemption on the traffic in conflicting directions. Therefore, this study evaluates both the positive impact of EVP on the ERV as well as the adverse impact on the cross-street traffic. The study found that the potential exists for significant improvements in ERV travel time with the proposed Dynamic Preemption strategy, with minimal impact to the conflicting traffic. For the simulation corridor there was a 20% reduction in the ERV travel times with the implementation of the Dynamic Preemption strategy, compared to traditional EVP practices.

Roy, Somdut [Georgia Institute of Technology]↗

CCS Opportunity Along the Gulf Coast Corridor

The Gulf Coast corridor, onshore and offshore, from Corpus Christ to the Mississippi River presents a high concentration of CO2 from industrial sources and excellent storage reservoirs in the underlying Cretaceous and Tertiary sands. Analysis of the technical, geologic, economic and social aspects of this CCS opportunity is necessary for successful deployment of CCS technology and eventual attainment of NetZero goals. Presentation at the Offshore Technology Conference (OTC) held in Houston, Texas, May 6-9, 2024.

Grant, Timothy↗

Inventory of Clean Energy Education and Workforce Programs in Connecticut's I-91 Corridor

This document reports on the findings of an inventory of the educational and workforce development resources in a four-county area on the I-91 corridor in Connecticut. The overarching goal of this exercise is to help the local workforce leaders in Bridgeport, Connecticut to optimize their training programs to support the county's clean energy transition. The inventory generally finds that Fairfield County, where Bridgeport is located, lacks adequate education and training programs compared to other surrounding counties with similar populations. More than half of Fairfield County's programs occur through high school or career technical education programs, suggesting that there are minimal opportunities for workers who are not currently high school students. Much of the existing focus within Fairfield County is on general construction or plumbing and electrical skills. There is room to expand by offering more programs focusing on energy efficiency and renewable energy skills. The document outlines some potential next steps and questions for consideration for the local workforce leaders in Bridgeport. Bridgeport is a city located within Fairfield County in southwestern Connecticut. It is the largest city in Connecticut with an estimated population of 150,000. Through the Department of Energy-funded Communities LEAP program, NREL conducted an analysis of existing education and workforce development (EWD) programs located in Fairfield County that align with (or could support) the worker pipeline for occupations related to building energy efficiency (EE), renewable energy (RE), and clean energy manufacturing. The analysis also looked at EWD offerings in other counties in Connecticut as a point of comparison.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Illinois Storage Corridor, CarbonSAFE Phase III: UIC Class VI Permitting Plan

The Illinois Storage Corridor (ISC) project evaluated two distinct sites to determine the feasibility of commercial-scale CO₂ storage at each. The project leveraged the region's exceptional geological characteristics, particularly the well-characterized Cambro-Ordovician Storage Complex, to enable permanent geological storage of more than 50 million tonnes of CO₂ over 30 years. The two storage sites are located at One Earth Energy (OEE) facility in northcentral Illinois and Prairie State Generating Company (PSGC) in southcentral Illinois. Once operational, these facilities will combine to capture and store more than 6.5 million tonnes of CO₂ per year, positioning the ISC among the largest carbon storage regions globally. Preliminary homogeneous dynamic modeling based on regional and site-specific reservoir characteristics indicates promising injection capabilities at both locations. For the OEE site, modeling predicts a maximum allowable injection rate of 3.7 MTPA, with a baseline scenario of 1.7 MTPA over 30 years producing a CO₂ plume radius of 1.4 miles at end of injection. For the PSGC site, incorporating recent well data, modeling indicates a single-well maximum injection rate of 2.1 MTPA, with a plume radius of 4.2 miles at end of injection for the 60 MT over 30 years scenario. The primary objective of this CarbonSAFE Phase III project is to develop and submit Class VI Underground Injection Control (UIC) permit applications to the U.S. Environmental Protection Agency Region 5. The permitting plan outlines comprehensive site characterization, Area of Review delineation, monitoring programs, well construction designs, financial responsibility provisions, and post-injection site care procedures necessary to demonstrate safe, permanent CO₂ storage protective of underground sources of drinking water. Three UIC Class VI permit applications for the OEE site were submitted to EPA in October 2022 and are progressing through technical review, with final permit decision projected by June 2026. Through five rounds of Requests for Additional Information and responses, the applications have been refined to address computational modeling, area of review delineation, well integrity, monitoring protocols, and financial assurance requirements. For the PSGC site, finalized characterization and permitting documentation was delivered directly to the facility in July 2023 due to business constraints precluding formal federal regulatory submission. This comprehensive permitting effort builds upon extensive prior subsurface evaluations and demonstration projects that have confirmed the feasibility of widespread commercial-scale carbon storage in the region.

01 COAL, LIGNITE, AND PEAT↗

CCS Opportunity Along the Gulf Coast Corridor

The Gulf Coast corridor, onshore and offshore, from Corpus Christ to the Mississippi River presents a high concentration of CO2 from industrial sources and excellent storage reservoirs in the underlying Cretaceous and Tertiary sands. Analysis of the technical, geologic, economic and social aspects of this CCS opportunity is necessary for successful deployment of CCS technology and eventual attainment of NetZero goals. This is the conference paper accompanying an oral presentation made at the Offshore Technology Conference (OTC) held in Houston, Texas, May 6-9, 2024.

Grant, Timothy↗

Providing Levelized Cost and Waiting Time Inputs for HDV Hydrogen Refueling Station Planning: A Case Study of U.S. I-75 Corridor

Widespread use of diesel fuels in freight transportation leads to greenhouse gas (GHG) emissions that play an important role in air pollution. The air pollution, as well as the energy crisis, drives the transition from diesel fuel to cleaner and more energy-efficient fuels such as hydrogen fuels. With such a transition, the strategic planning and optimization of supporting refueling infrastructure along the national highway for heavy-duty vehicles (HDVs) become a necessity. Cost and service level are two essential factors to be considered in hydrogen refueling station location and capacity optimization. The service level in this study is assessed by the delay (waiting time) at fueling stations as well as the fueling demand fulfilled. To this end, this study presents a methodology to provide waiting time (delay) and levelized hydrogen fuel cost inputs under different station configurations (number of dispensers and fill rates) for hydrogen refueling station planning. Determining the station configurations based on the trade-off between the two inputs is further discussed. Particularly, this study points out that the levelized cost and waiting time are affected by hourly demand patterns and estimates the two inputs under different peak hour fueling demand scenarios. The results suggest that, with the same daily demand, the cost, as well as the waiting time, increases obviously with the peak hour demand. In the case study, the cost grows at least 30% when the peak hour visit frequency of the daily total visits increases from 5% (evenly distributed pattern) to 10% (the most common pattern for existing diesel fueling stations along I-75). Accounting for this peak hour effect in hydrogen refueling station planning is recommended. Overall, the waiting time model and cost analysis provide key inputs for optimizing hydrogen refueling station location and configurations based on anticipated refueling demand patterns. The paper is the second in a series that aims to build a comprehensive modeling plan and optimize hydrogen refueling infrastructure along the Interstate 75 (I-75) corridor for HDVs.

Liu, Yuandong↗

Pillars of Innovation Across Southeast Idaho & the Interstate-15 Corridor

Since 1949, Idaho National Laboratory (INL) has been home to developing civilian and defense nuclear reactor technologies and managing spent nuclear fuel. Today, INL is the nation’s nuclear energy research laboratory, sustaining the safe and efficient operation of existing reactors, powering science in space, and breaking ground on the future fleet of advanced nuclear reactors. INL is only one of many rising technology resources in the region, however. Along the Interstate 15 (I-15) corridor, technology and cybersecurity industries and intellectual assets are rapidly expanding. Creating an innovation hub in this region would unite capabilities to solve current and future challenges in nuclear reactor sustainment and expanded deployment, integrated fuel cycle solutions, integrated energy systems, advanced materials and manufacturing for extreme environments, and secure and resilient cyber-physical systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Heavy-Duty Hydrogen Fueling Station Corridors

Developing zero-emissions fueling corridors requires assessment of technologies that may be utilized in the M/HDV sector. BEVs and FCEVs are leading choices of zero emissions technology and work is required to understand how infrastructure may be deployed and at what cost to facilitate M/HDV decarbonization goals.

class 6↗

Minimizing Ground Risk in Cellular-Connected Drone Corridors With mmWave Links

Unmanned Aircraft Systems (UASs) have been receiving significant interest and support from academia, industry, and regulatory bodies over the past decade due to their various use cases. To safely integrate UAS operations into the national airspace, particularly overpopulated regions, the risk posed to ground users, buildings, and vehicles due to unmanned aerial vehicle (UAV) flight should be minimized. This risk can be represented by a numerical metric, which we refer to in this article as the “ground risk.” Many UAS applications also depend on the presence of a reliable wireless communication link between the UAV and a control station for the transmission of UAV position, surveillance video, UAV payload commands, and other mission-related data. Such wireless communication requirements also need to be considered in the design of UAS operations. In this article, we consider both these aspects and study the design of nonintersecting trajectories for UAS operations to minimize ground risk, subject to constraints on the wireless signal strength and geometry of the trajectory, specified in terms of: 1) an enclosing cylinder within which the trajectory must lie and 2) an integrated angular change along the UAV's trajectory. The performance of a computationally expensive optimal algorithm is compared with that of a computationally faster heuristic approach within the dense urban environment of Manhattan, NY, USA. Performance evaluation using ray-tracing simulations shows that the heuristic approach performs close to the optimal algorithm at a reduced computation cost. In conclusion, this research can be utilized to make UAS operations safe and reliable and accelerate their adoption.

99 GENERAL AND MISCELLANEOUS↗

WHONDRS River Corridor Sediment and Water Geochemistry and In Situ Sensor Data from Machine-Learning-Informed Sites across the Contiguous United States (v6)

This dataset supports a broader study examining hyporheic zone respiration rates to improve predictive models at a contiguous United States (CONUS) scale. The CONUS-Scale Model-Sample Study (CM) was designed following ICON (integrated, coordinated, open, and networked) principles to facilitate a model-experiment (ModEx) iteration approach, leveraging crowdsourced sampling across the CONUS. New machine learning models were created every month to guide sampling locations. Data from the resulting samples were used to test and rebuild the machine learning models for the next round of sampling guidance. Sampling began in April 2022 and ended in October 2023. In addition to the widely distributed CONUS sites, a more spatially focused sampling occurred in the Yakima River Basin, WA in summer 2022. Data from this more spatially intensive sampling occurred under the label “Second Spatial Study (SSS)” and were also included in the machine learning models. Other data types collected from SSS that were not part of CM were published in a separate data package (https://data.ess-dive.lbl.gov/view/doi:10.15485/1969566). This data package was originally published in February 2023. It was updated in June 2023 (v2; new and modified files); December 2023 (v3; new and modified files); June 2024 (v4; new and modified files); April 2024 (v5; new and modified files); and September 2025 (v6; modified files). See the change history section in the readme for more details. For details on how to navigate data packages generated by this project, see https://data.ess-dive.lbl.gov/portals/PNNLRiverCorridorSFA/About. This dataset is comprised of two folders of field photos and videos, one folder of raw Fourier transform ion cyclotron resonance mass spectrometry (FTICR-MS) data and one main data folder containing (1) file-level metadata; (2) data dictionary; (3) field metadata; (4) readme; (5) international generic sample number (IGSN) mapping file; (6) field protocols; (7) a subfolder with sample data; and (8) a subfolder with sensor data. The sample data subfolder contains (1) surface water and sediment dissolved organic carbon (DOC, measured as non-purgeable organic carbon, NPOC) data and averages; (2) surface water and sediment total nitrogen data and averages; (3) surface water major cations and anions and averages; (4) sediment grain size data; (5) sediment iron (II) data and averages; (6) wet sediment mass, dry sediment mass, water mass, and wet sediment volume in incubation and sediment ICR vials; (7) sediment incubation respiration rate data and averages; (8) normalized respiration rate data and averages; (9) methods codes; (10) sediment specific surface area; (11) sediment percent carbon and nitrogen; (12) sediment gravimetric moisture and averages; (15) sediment X-ray diffraction (XRD) data; (16) sediment adenosine triphosphate (ATP) and averages; (17) a subfolder with sediment incubation respiration data, scripts, and plots; (18) surface water and sediment FTICR methods; and (19) a subfolder of 9.4 Tesla (9.4T) FTICR-MS data. This folder contains five subfolders, one containing the sediment .xml data files, one containing the water .xml files, one containing the sediment CoreMS output files, one containing the water CoreMS output files, and the other containing instructions and scripts for processing the files in CoreMS (https://github.com/EMSL-Computing/CoreMS).The sensor data subfolder contains (1) a subfolder with miniDOT dissolved oxygen and temperature data and plots; (2) miniDOT dissolved oxygen and temperature summary data; and (3) miniDOT installation methods. All files are .csv, .pdf, .R, .xml, .d, .html, .Rmd, .py, .cal, .json, .jpg, .jpeg, .png, .mov, or .mp4. CORRECTION: Carbon and nitrogen content are reported as percentages. The current column headers "01395_C_percent_per_mg" and "01397_N_percent_per_mg" are incorrect. These should read "01395_C_percent" and "01397_N_percent" and will be corrected in the next version of this data package. We thank the United States Forest Service, Washington Department of Fish and Wildlife, Washington Department of Natural Resources, Cowiche Canyon Conservatory, Washington State Parks and Recreation Commission (Scientific Research Permit #210901), and the Confederated Tribes and Bands of the Yakama Nation for access to field locations where the samples labeled “SSS” were collected. We also thank the Yakama Nation Tribal Council and Yakama Nation Fisheries for working with us to facilitate sample collection and optimization of data usage according to their values and worldview. WHONDRS consortium members were asked to provide any acknowledgments for the collection of samples labeled “CM” and the following is a list of acknowledgments that were submitted with their corresponding Site IDs: (MART) Research activities were conducted in part on the Wind River Experimental Forest within the Gifford Pinchot National Forest; (MP- 100379) Philadelphia is part of Lenapehoking, the ancestral homelands of the Lenape peoples; (MP-102398) Land surveyed is the ancestral homelands of the Nookhose'iinenno (Arapaho), Tsis tsis'tas (Cheyenne), and Nuuchu (Ute); (MP-100749 and MP- 100747) Georgia Coastal Ecosystem LTER, OCE-1832178; (SP-70 and SP-72) Eastern Shoshone, Shoshone-Bannock; (MP- 102944) Funded by Oregon Watershed Enhancement Board. On the traditional lands of the Confederated Tribes of the Siletz, Confederated Tribes of the Grand Rhonde, and the Clatsop-Nehalem Confederated Tribe; (MP- 100607) Holiday Creek is located on the traditional territory of the Monacan Indian Nation; (SP-45) Lafayette Blue Springs State Park; (MP-102420) NSF DEB-2016749; (MP-100019) New Hampshire Agriculture Experiment Station; (SP-35) Rayonier (land owner; https://www.rayonier.com/); (MP- 101276) US Department of Energy, Office of Science, Biological and Environmental Research, Subsurface Biogeochemical Research, Watershed Dynamics and Evolution SFA at ORNL; (MP- 103224) Watershed Dynamics and Evolution SFA at ORNL; (MP- 101584) Traditional lands of the Oceti Sakowin (Dakota, Lakota, Nakoda) and Anishinaabe Peoples.

54 ENVIRONMENTAL SCIENCES↗