Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contracting Document”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Final report on the MAGARC software consulting support contract (WFO No. 15904) for ITER magnet safety assessment

he ITER (not an acronym but Latin for "the Way”) International Organization (IO) is building a large-scale scientific experiment that is now under construction in Cadarache, France. The ITER Tokamak fusion reactor aims to demonstrate that it is possible to produce energy from fusion. The ITER’s power output goal is to deliver ten times the power it consumes. During its operational lifetime, ITER will test key technologies necessary for the next step: the demonstration fusion power plant that will prove that it is possible to capture fusion energy for commercial use. General information on the ITER project can be found at http://www.iter.org. The ITER reactor’s superconducting magnet systems create ~41GJ of stored magnetic field energy when fully energized. The consequences of such energy dissipating via electrical arcs under faulted conditions gives rise to safety concerns even though these fault events are extremely unlikely. As part of the ITER licensing procedure, and as a result of such safety concerns, this contract was established to benchmark a developing magnet safety analysis tool at Culham Centre for Fusion Energy against the MAGARC computer code. MAGARC was developed by the U.S. Idaho National Laboratory (INL) under the ITER Engineering Design Activity (EDA) Project and was applied to produce previous analyses, in order to support magnet fault and safety assessment for the ITER design description document. This contract report documents the completion of requested modifications to the MAGARC code by the ITER IO, a time-step size sensitivity analysis with MAGARC during an unmitigated quench event, a comparison of the modeling approaches taken in developing MAGARC and the CCFE analysis package, and the data required for the benchmarking activity for these codes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

Mckay, Charles↗

Analysis of Lidar Remote Sensing Concepts

An orbiting coherent Doppler lidar for measuring winds is required to provide two basic pieces of data to the user community. The first is the line of sight wind velocity and the second is knowledge of the position at which the measurement was made. In order to obtain this data for targets of interest to the atmospheric community the instrument must also have a level of backscatter sensitivity sufficient to achieve the goal. Sensitivity analyses for the line of sight velocity and position requirements for two lidar instruments, one with a nadir angle of 30 deg. in a 300 km altitude, 58 deg. inclination orbit and the second for a 45 deg. nadir angle instrument in a 833 km altitude , 89 deg. inclination orbit are performed. The issues relating to the backscatter sensitivity of a coherent lidar have been well documented previously and are not discussed here other than to identify a space-specific issue that does not typically need to be considered for ground and aircraft based coherent lidars. Section 2 and appendices A1 and A2 document these sensitivity analyses. This contract was intended to develop requirements for a space shuttle (STS) based coherent lidar however, shortly after the award of this contract NASA MSFC won the SPARCLE program to put a coherent Doppler lidar on STS. Consequently much of the work conducted under this contract has been documented within the development of the SPARCLE project documentation. The relevant portions of the SPARCLE documentation are identified in section 3.0 and included in appendices A3 and A4. Section 4.0 briefly outlines miscellaneous other activities that occurred under this contract.

Spiers, Gray D.↗

FY11 Level-2 Milestone 3953: TLCC2 contract awarded

This report documents completion of FY11 L2 milestone No.3953-TLCC2 contract award. This milestone was scheduled for completion on 3/31/11 and was completed on 4/14/11. There is a separate milestone (3856), due at the end of the fiscal year, concerned with installation of the first LLNL SU and early user access. Efforts related to this tri-lab L2 milestone started early in 2010 with the development of tri-lab requirements for the second ASC capacity system procurement. The SOW was then developed along with necessary RFP paperwork and sent to HQ/DOE for their review prior to being released. There was significant delay in getting this step completed which led to this milestone being put at risk for several months. However, once the RFP was approved and released we were able to get the procurement back on track with aggressive proposal response and review timelines.

97 MATHEMATICS AND COMPUTING↗

Water Meter Measurement and Verification Best Practice

This measurement and verification (M&V) best practice provides recommended procedures for energy service companies to validate the performance of water metering projects that are executed with water providers under energy performance contracts. This document covers metering projects such as advanced metering infrastructure and automatic meter reading technology. This best practice outlines the basic components of the M&V plan, provides potential performance metrics to consider for metering systems, and describes the procedures to use to verify project performance.

42 ENGINEERING↗

Wind Turbine Gearbox Condition Monitoring Vibration Analysis Benchmarking Datasets

Wind turbine condition monitoring (CM) can potentially help the wind industry reduce turbine downtime and operation and maintenance (O&M) cost. NREL CM research has investigated various condition-monitoring techniques such as acoustic emission (AE specifically stress wave), vibration, electrical signature, lubricant and debris monitoring based on the Gearbox Reliability Collaborative dynamometer and field tests, and other test turbines and resources accessible by NREL. During the past several years, NREL CM research has shown that there are very few validation and verification efforts on commercial wind turbine CM systems. One of the reasons might be limited benchmarking datasets accessible by stakeholders. To fill this gap, NREL executed a data collection effort. The targeted users of these datasets include those investigating vibration-based wind turbine CM research, evaluating commercially available vibration-based CM systems, or testing prototyped vibration-based CM systems. NREL collected data from a healthy and a damaged gearbox of the same design tested by the GRC. Vibration data were collected by accelerometers along with high-speed shaft RPM signals during the dynamometer testing. The healthy gearbox was only tested in the dynamometer. The damaged gearbox was first tested in the dynamometer and later sent to a wind farm close to NREL for field testing. In the field test, it experienced two loss-of-oil events that damaged its internal bearings and gear elements. The gearbox was brought back to NREL and it was retested in the dynamometer with CM systems deployed under controlled loading conditions that would not cause catastrophic failure of the gearbox. The objective of releasing these datasets to the public along with information about the real damage that occurred to the damaged gearbox is to provide the wind industry with some benchmarking datasets. These datasets will benefit research, development, validation, verification, and advancement of vibration-based wind condition-monitoring techniques. By accessing this data you acknowledge the terms outlined in the "License Information" document. Please contract Shawn Sheng (NREL) if you have any questions on the data or would like to collaborate on publications based on the datasets.

Array↗

Standardization and program effect analysis (Study 2.4). Volume 3: Design-to-cost analysis

The program procedures that were incorporated into an on-going "design-to-cost" spacecraft program are examined. Program procedures are the activities that support the development and operations of the flight unit: contract management, documents, integration meetings, engineering, and testing. This report is limited to the program procedures that were implemented, with emphasis on areas that may depart from normal satellite development practices.

Shiokari, T.↗

Technical guide on documentation requirements for open market contract acquisitions of information resources

A guide is presented to assist requestors in formulating and submitting the required Complete Package for Information Resources (IR) acquisitions. Advance discussions with cognizant procurement personnel are strongly recommended for complex IR requirements or for those requestors new to the acquisition process. Open Market means the requirement either is not available on GSA Schedule Contract or exceeds the $300,000 threshold and/or the quantity Maximum Order Limitation of the GSA Schedule Contract. Only open market contract acquisitions (i.e., in excess of the $25,000 small purchase threshold), are addressed.

Shaw, Asa L., Jr.↗

Aircraft/Air Traffic Management Functional Analysis Model: Technical Description

The Aircraft/Air Traffic Management Functional Analysis Model, Version 2.0 (FAM 2.0), is a discrete event simulation model designed to support analysis of alternative concepts in air traffic management and control. FAM 2.0 was developed by the Logistics Management Institute (LMI) under a National Aeronautics and Space Administration (NASA) contract. This document provides a technical description of FAM 2.0 and its computer files to enable the modeler and programmer to make enhancements or modifications to the model. Those interested in a guide for using the model in analysis should consult the companion document, Aircraft/Air Traffic Management Functional Analysis Model, Version 2.0 Users Manual.

Etheridge, Melvin↗

Aircraft/Air Traffic Management Functional Analysis Model: User's Guide - Version 2.0

The Aircraft/Air Traffic Management Functional Analysis Model, Version 2.0 (FAM 2.0), is a discrete event simulation model designed to support analysis of alternative concepts in air traffic management and control. FAM 2.0 was developed by the Logistics Management Institute (LMI) a National Aeronautics and Space Administration (NASA) contract. This document provides a guide for using the model in analysis. Those interested in making enhancements or modification to the model should consult the companion document, Aircraft/Air Traffic Management Functional Analysis Model, Version 2.0 Technical Description.

Etheridge, Melvin↗

SEDSAT

Under this contract the Students for the Exploration and Development of Space Satellite number One (SEDSAT-1 or just SEDSAT) was completed and launched on 24-Oct-98. It achieved nominal orbit and activated its transponders after Delta II separation. Telemetry has indicated the internal systems are normal. However, SEDSAT has not responded to subsequent uplink commands. Telemetry has continued to be received allowing evaluation of bus performance and attempts at anomaly resolution. Anomaly resolution will continue during 1999 subsequent to the end of this contract. This final report documents activities under the contract period.

Source record↗

Recognizing and Assigning Risks and Responsibilities Using the Risk, Responsibility, and Performance (RRP) Matrix

The Risk, Responsibility, and Performance Matrix (RRP Matrix) is the energy savings performance contract (ESPC) document that focuses on 16 areas of risks and responsibilities in an ESPC project. The RRP Matrix summarizes and documents the contractor (energy service company, i.e., ESCO) and ordering agency’s agreements about allocating risks and responsibilities – to the ESCO, to the ordering agency, or shared. Ordering agencies and ESCOs should be mindful, however, that the ESCO remains responsible for achieving energy savings guaranteed under the ESPC, notwithstanding the allocations of risks, responsibilities, and performance.

Walker, Christine↗

Energy Storage Financing: Advancing Contracting in Energy Storage

The lack of standard financing contracts and supporting documents is inhibiting the growth of the energy storage industry. A number of firms are actively developing proprietary contract structures, resulting in a variety of unique attributes. This leaves the market disjointed for 3 rd party financing groups looking to scale their lending. Lack of commonality and harmonization between developer and lenders raises project execution costs and causes delays in financing. Of special concern, projects based on emerging technologies are finding an increasing uphill climb for equal consideration by developers and lenders, leaving their potential commercialization in peril. This study will evaluate the development of standardi7ed contracts to reduce the cost and contract approval time, learning from success in renewable energy project development. The goal of this study is to determine the key requirements for standard contracts in the emerging energy storage market, and suggest avenues for possible industry led development.

25 ENERGY STORAGE↗

Publications of the JPL Solar Thermal Power Systems Project 1976 Through 1985

Bibliographical listings are documentation products associated with the Solar Thermal Power Systems Project carried out by the Jet Propulsion Laboratory from 1976 to 1986. Documents are categorized as conference and journal papers, JPL external reports, JPL internal reports, or contractor reports (i.e., deliverable documents produced under contract to JPL). Alphabetical listings by titles are used in the bibliography itself to facilitate location of the document by subject. Two indexes are included for ease of reference; an author index; and a topical index.

Panda, P.↗

Level-2 Milestone 5213. CTS-1 Contract Award Completed

This report documents the fact that the first commodity technology (CT) system contract award, CTS-1, has been completed. The description of the milestone is: Based on Tri-Lab CTS-1 process and review, LLNL successfully awards the procurement for the next-generation Tri-Lab Linux CTS-1. The milestone completion criterion is: Signed contract. The milestone was completed on September 24th. 2015.

97 MATHEMATICS AND COMPUTING↗

Transient Efficiency Flexibility and Reliability Optimization of Coal-Fired Power Plants: Model-Predictive Control Library Development (Report)

This document pertains to the reporting requirements of DOE contract FE-0031767. The document covers the development of a model predictive control (MPC) library for implementing MPC for a general dynamic system. The library is implemented in a standardized manner in Matlab/Simulink, where core functions on model prediction, linearization and formulation and solution of a quadratic programming (QP) optimization problem is done in the core library - independent of the specific application. The user can provide the application-specific dynamic model in continuous and discrete time, to rapidly implement and test the MPC performance in a desktop simulation. The MPC optimization objective and constraints are also easily configured via an Excel file to allow iterative refinement as needed. Finally, the MPC library enables a rapid deployment to a target environment through auto C-code generation and containerization. The MPC library works seamlessly with the model based estimation (MBE) library to obtain the overall output feedback control solution. In this program, the reduced order model (ROM) of a coal-fired power plant (CFPP) is used to implement and test the MPC solution.

01 COAL, LIGNITE, AND PEAT↗