Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Configuration planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Configuration Management Plan

The Los Alamos Neutron Science Center (LANSCE) is located at Technical Area 53 (TA-53) at Los Alamos National Laboratory (LANL) in Los Alamos, New Mexico. LANSCE is driven by an 800 megaelectronvolt (MeV) proton accelerator that delivered its first beam in 1972. The LANSCE accelerator is unique in that it accelerates both H– (to full energy of 800 MeV) and H+ ions (up to 100 MeV currently but has accelerated high-power H+ beam to 800 MeV in the past) and supports five separate experimental areas that operate simultaneously, with each having different timing and beam current requirements. Many of the LANSCE accelerator front-end components date back to original commissioning in 1972, including the ion sources, Cockcroft-Walton (CW) generators, and the Drift Tube LINAC (DTL), which accelerates the beam up to 100 MeV.

43 PARTICLE ACCELERATORS↗

U1108 performance model

A model of Univac 1108 work flow has been developed to assist in performance evaluation studies and configuration planning. Workload profiles and system configurations are parameterized for ease of experimental modification. Outputs include capacity estimates and performance evaluation functions. The U1108 system is conceptualized as a service network; classical queueing theory is used to evaluate network dynamics.

Trachta, G.↗

Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)

The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.

Niewoehner, Kevin R.↗

Document Configuration Management (DCM) Team Weapon Product Definition Group

Document Configuration Management (DCM) is the ongoing process of identifying and managing changes to deliverables and other work products. ALDW’s Document Configuration Plan provides a systematic, standardized process for the configuration management of documents to ensure that the most current and/or appropriate documents are being used, that any canceled or superseded document is properly processed, and that both a clear history and traceability of previous revisions are available.

99 GENERAL AND MISCELLANEOUS↗

Polar Drive Ignition Campaign: Conceptual Design

The Laboratory for Laser Energetics (LLE) at the University of Rochester is proposing a collaborative effort with Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratories (LANL), the Naval Research Laboratory (NRL), and General Atomics (GA) with the goal of developing a cryogenic polar drive (PD) ignition platform on the National Ignition Facility (NIF). The scope of this proposed project requires close discourse among theorists, experimentalists, and laser and system engineers. This document describes how this proposed project can be broken into a series of parallel independent activities that, if implemented, could deliver this goal in the 2017 timeframe. This Conceptual Design document is arranged into two sections: mission need and design requirements. Design requirements are divided into four subsystems: (1) A point design that details the necessary target specifications and laser pulse requirements; (2) The beam smoothing subsystem that describes the MultiFM 1D smoothing by spectral dispersion (SSD); (3) New optical elements that include continuous phase plates (CPP's) and distributed polarization rotators (DPR's); and (4) The cryogenic target handling and insertion subsystem, which includes the design, fabrication, testing, and deployment of a dedicated PD ignition target insertion cryostat (PD-ITIC). This document includes appendices covering: the primary criteria and functional requirements, the system design requirements, the work breakdown structure, the target point design, the experimental implementation plan, the theoretical unknowns and technical implementation risks, the estimated cost and schedule, the development plan for the DPR's, the development plan for MultiFM 1D SSD, and a list of acronym definitions. While work on the facility modifications required for PD ignition has been in progress for some time, some of the technical details required to define the specific modifications for a Conceptual Design Review (CDR) remain to be defined. In all cases, the facility modifications represent functional changes to existing systems or capabilities. The bulk of the scope yet to be identified is associated with the DPR's and MultiFM beam smoothing. Detailed development plans for these two subsystems are provided in Appendices H and I; additional discussion of subsystem requirements based on the physics of PD ignition is given in Section 3. Accordingly, LLE will work closely with LLNL to develop detailed conceptual designs for the PD-specific facility modifications, including assessments of the operational impact of implementation (e.g., changing optics for direct rather than indirect-drive illumination and swapping from a hohlraum-based ITIC to one that supports PD). Furthermore, the experimental implementation plan represents the current best understanding of the experimental campaigns required to achieve PD ignition. This plan will evolve based on the lessons learned from the National Ignition Campaign (NIC) and ongoing indirect-drive ignition experiments. The plan does not take the operational realities of the PD configuration into account; configuration planning for the proposed PD experiments is beyond the scope of this document.

42 ENGINEERING↗

SU-G-201-09: Evaluation of a Novel Machine-Learning Algorithm for Permanent Prostate Brachytherapy Treatment Planning

Purpose: A novel, automated, algorithm for permanent prostate brachytherapy (PPB) treatment planning has been developed. The novel approach uses machine-learning (ML), a form of artificial intelligence, to substantially decrease planning time while simultaneously retaining the clinical intuition of plans created by radiation oncologists. This study seeks to compare the ML algorithm against expert-planned PPB plans to evaluate the equivalency of dosimetric and clinical plan quality. Methods: Plan features were computed from historical high-quality PPB treatments (N = 100) and stored in a relational database (RDB). The ML algorithm matched new PPB features to a highly similar case in the RDB; this initial plan configuration was then further optimized using a stochastic search algorithm. PPB pre-plans (N = 30) generated using the ML algorithm were compared to plan variants created by an expert dosimetrist (RT), and radiation oncologist (MD). Planning time and pre-plan dosimetry were evaluated using a one-way Student’s t-test and ANOVA, respectively (significance level = 0.05). Clinical implant quality was evaluated by expert PPB radiation oncologists as part of a qualitative study. Results: Average planning time was 0.44 ± 0.42 min compared to 17.88 ± 8.76 min for the ML algorithm and RT, respectively, a significant advantage [t(9), p = 0.01]. A post-hoc ANOVA [F(2,87) = 6.59, p = 0.002] using Tukey-Kramer criteria showed a significantly lower mean prostate V150% for the ML plans (52.9%) compared to the RT (57.3%), and MD (56.2%) plans. Preliminary qualitative study results indicate comparable clinical implant quality between RT and ML plans with a trend towards preference for ML plans. Conclusion: PPB pre-treatment plans highly comparable to those of an expert radiation oncologist can be created using a novel ML planning model. The use of an ML-based planning approach is expected to translate into improved PPB accessibility and plan uniformity.

60 APPLIED LIFE SCIENCES↗

Configuration evaluation and criteria plan. Volume 1: System trades study and design methodology plan (preliminary). Space Transportation Main Engine (STME) configuration study

The System Trades Study and Design Methodology Plan is used to conduct trade studies to define the combination of Space Shuttle Main Engine features that will optimize candidate engine configurations. This is accomplished by using vehicle sensitivities and engine parametric data to establish engine chamber pressure and area ratio design points for candidate engine configurations. Engineering analyses are to be conducted to refine and optimize the candidate configurations at their design points. The optimized engine data and characteristics are then evaluated and compared against other candidates being considered. The Evaluation Criteria Plan is then used to compare and rank the optimized engine configurations on the basis of cost.

Bair, E. K.↗

NASA's Space Launch System Marks Critical Design Review

With completion of its Critical Design Review (CDR) in 2015, NASA is deep into the manufacturing and testing phases of its new Space Launch System (SLS) for beyond-Earth exploration. This CDR was the first in almost 40 years for a NASA human launch vehicle and marked another successful milestone on the road to the launch of a new era of deep space exploration. The review marked the 90-percent design-complete, a final look at the design and development plan of the integrated vehicle before full-scale fabrications begins and the prelude to the next milestone, design certification. Specifically, the review looked at the first of three increasingly capable configurations planned for SLS. This "Block I" design will stand 98.2 meters (m) (322 feet) tall and provide 39.1 million Newtons (8.8 million pounds) of thrust at liftoff to lift a payload of approximately 70 metric tons (154,000 pounds). This payload is more than double that of the retired space shuttle program or other current launch vehicles. It dramatically increases the mass and volume of human and robotic exploration. Additionally, it will decrease overall mission risk, increase safety, and simplify ground and mission operations - all significant considerations for crewed missions and unique, high-value national payloads. The Block 1 SLS will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on an uncrewed flight beyond the moon and back and the first crewed flight around the moon. The current design has a direct evolutionary path to a vehicle with a 130t lift capability that offers even more flexibility to reduce planetary trip times, simplify payload design cycles, and provide new capabilities such as planetary sample returns. Every major element of SLS has hardware in production or testing, including flight hardware for the Exploration 1 (EM-1) test flight. In fact, the SLS MPCV-to-Stage-Adapter (MSA) flew successfully on the Exploration Flight Test (EFT) 1 launch of a Delta IV and Orion spacecraft in December 2014. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Singer, Chris↗

Early Spacelab missions

NASA has issued payload flight assignments for the first three Spacelab missions. The first two of these missions will have dual objectives, that of verifying Spacelab system performance and accomplishing meaningful space research. The first of these missions will be a joint NASA and ESA mission with a multidisciplinary payload. The second mission will verify a different Spacelab configuration while addressing the scientific disciplines of astrophysics. The third assigned mission will concentrate on utilizing the capabilities of Spacelab to perform meaningful experiments in space applications, primarily space processing. The paper describes these missions with their objectives, planned configuration and accommodation.

Pace, R. E., Jr.↗

Initial Results of Heuristic Guided Orbit Selection for a Low Frequency Radio Interferometric Spacecraft Constellation

A constellation of radio telescope spacecraft can leverage interferometry to accurately image distant objects throughout the universe, but mission design must balance among many interrelated constraints. In particular, the number of craft and the selection of time-varying orbital parameters play a pivotal role in determining what interferometric baselines are feasible with respect to different targets, and thus drives the breadth and quality of data available to the constellation. The large combinatorial orbit configuration space and competing concerns present a challenging problem that is not well addressed by traditional mission design processes. This paper describes application of automated optimization methods to help direct mission design effort to the most promising dynamic constellation geometries: those that achieve broad interferometric coverage but remain cost-effective and resilient to failures. Several automatic heuristic-driven optimization algorithms representing complementary search strategies were created to explore among concrete constellation configuration plans. Evaluation of each candidate constellation plan was accelerated by efficiently combining precomputed caches of orbital and interferometric data. Results indicate that leveraging automated optimization for constellation mission design is both practical and illuminating: generated solutions provided both evidence for existing design intuitions as well as fresh insights into novel configurations.

Hernandez, Sonia↗

Factors in International Space Station Integration Feasibility Assessments

The International Space Station, ISS, is a growing vehicle. The ISS configuration changes internally and externally with each ISS flight. Each flight adds resources and capabilities such as docking/berthing ports, power, stowage volume, heat rejection, and data processing capability. The configuration, capabilities and performance characteristics of the vehicle will be in flux until assembly complete. At the same time the knowledge about what is required to support humans involved in long duration space flight is also being greatly expanded. In addition to the changes occurring on-orbit, the situation on the ground is also very dynamic. Proposals for new ISS elements, proposed deletions of elements, changes to the ISS requirements, and changes to the planned configuration are always under evaluation. Furthermore, budgetary issues have driven the need to explore alternative options for the ISS . This environment has made the role of the technical integrator in the ISS program unique in that the baseline against which proposals are evaluated is always changing. The nature of the International Space Station Program adds another dimension to the integrators task. ISS program activities are spread across several centers: KSC, MSFC, GRC, DFRC, ARC and JSc. There are six International Partners/participants each with their own unique organizations. The prime contractor is in Texas, California and Alabama. And, the Space Shuttle Program as the launch vehicle provider is another major interface. In spite of the fluidity of the technical baseline, projections and organizational complexity, in the course of evaluating proposals and producing feasibility assessments there are factors, which frequently emerge as significant. These factors tend to be the limiting conditions when they come into play. The finite resources, which tend to limit the options for ISS are: upmass, life support and crew rescue capability, crew time, utilities, exercise equipment, and docking/berthing ports. Upmass requirements need to be developed for each option proposed. Short term and long term impacts to upmass are the result of the implementation and long term operations. The upmass requirements need to be met by the existing launch vehicles and any change in flight rate will be a significant cost driver. In addition, when any item is brought to the ISS careful consideration must be given to the on-board stowage and crew time available to unpack, transfer, stow and use these items. If stowage is not available then something must be returned, use of non-standard stowage negotiated or the item in question stays on the ground. Additional crew time requirements will impact available utilization time or crew off-duty time. When the human element is affected, such as, by increasing the number of crew members or changing the duration of the crew stay (longer or shorter) there is an additional set of factors that come into play. The main considerations are: rescue capability, exercise requirements and availability of equipment, resupply, and life support capability.

Watson, Patricia M.↗

SAPHIRE 8 Software Quality Assurance Oversight

The software quality assurance oversight consists of updating and maintaining revision control of the SAPHIRE 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, SDP Interface Training Manual, and the SAPHIRE 8, "New Features and Capabilities Overview".

42 ENGINEERING↗

Neutron Absorber Plate Characterization Plan for Criticality Experiments Design

After being used in nuclear installations, depleted fuel can still be highly reactive and must be handled securely to prevent any radiological or criticality concerns. In particular, spent fuel from use in nuclear power reactors must be stored and transported in specifically designed containers using neutron absorber materials to prevent criticality. Various neutron absorber material types exist and are manufactured by various entities, as thoroughly described in the Handbook of Neutron Absorber Materials for Spent Nuclear Fuel Storage and Transportation Applications written by EPRI. Presently, one of the most modern and most widely used types of neutron absorber material contains particles of boron carbide, or B 4 C, embedded in aluminum matrix: Boralcan, manufactured by Rio Tinto. It is very important for the community to know as much as possible about such neutron absorber materials. Therefore, in the recent years, a US Department of Energy National Nuclear Security Administration–Nuclear Criticality Safety Program funded project initiated design of an experiment that places Boralcan neutron-absorbing plates in an established critical assembly using low-enriched uranium fuel at the Sandia Pulsed Reactor Facility/Critical Experiments (SPRF/CX) apparatus at Sandia National Laboratories. The goal of the experiment is to produce high-quality benchmark data to submit to the International Criticality Safety Benchmark Evaluation Project (ICSBEP), for use in validating calculational tools and nuclear data by criticality safety analysts. The project, named IER-554, is currently in its final design stage, following a successful preliminary design. In the work documented in the design study, ten critical configurations using Boralcan neutron absorber plates were designed, and the experiment was proven to be feasible, with a predicted low k eff uncertainty around 100 pcm. An overview of the modeled cutout of the critical assembly with a Boralcan plate is shown in Figure 1, representing one of the configurations planned for the critical experiments. Before the plates are inserted in the critical assembly, it is necessary to know more about their composition and uniformity. This summary focuses on the plate characterization plans. Each plate will undergo (1) neutron transmission measurements at different locations to determine the 10 B areal density and (2) an in-depth x-ray computed tomography (XCT) examination to obtain the exact Sizes and distribution of the B4C powder particles inside the plates. In parallel, plate modeling studies are performed with a goal to determine the validity of the currently used approximation of modeling the neutron absorber plates as a homogeneous mixture of Aluminum 1100 alloy and B4C— instead of explicitly modeling the B4C particles. By using the experimental 10 B areal density measurements, and the exact size and location of the B4C particles obtained by XCT, a plate model can theoretically be built that reproduces the plate with extremely high fidelity. The results of this modeling study could increase the confidence of the criticality safety community in its modeling methods when using this type of neutron absorber material, and the industry could use these validations to change the boron loading credit limits from the U.S. Nuclear Regulatory Commission standard review plan for dry cask storage of spent nuclear fuel. The modeling calculations are performed with SCALE 6.3.0 using the KENO V.a sequence for criticality calculations with the ENDF/B-VIII.0 continuous-energy cross section library.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CFD Analysis of Mixing Characteristics of Several Fuel Injectors at Hypervelocity Flow Conditions

CFD analysis is presented of the mixing characteristics and performance of three fuel injectors at hypervelocity flow conditions. The calculations were carried out using the VULCAN-CFD solver and Reynolds-Averaged Simulations (RAS). The high Mach number flow conditions match those proposed for the planned experiments conducted as a part of the Enhanced Injection and Mixing Project (EIMP) at the NASA Langley Research Center. The EIMP aims to investigate scramjet fuel injection and mixing physics, improve the understanding of underlying physical processes, and develop enhancement strategies and functional relationships relevant to flight Mach numbers greater than eight. Because of the high Mach number flow considered, the injectors consist of a fuel placement device, a strut; and a fluidic vortical mixer, a ramp. These devices accomplish the necessary task of distributing and mixing fuel into the supersonic cross-flow albeit via different strategies. Both of these devices were previously studied at lower flight Mach numbers where they exhibited promising performance in terms of mixing efficiency and total pressure recovery. For comparison, a flush-wall injector is also included. This type of injector generally represents the simplest method of introducing fuel into a scramjet combustor, however, at high flight Mach number conditions, the dynamic pressure needed to induce sufficient fuel penetration may be difficult to achieve along with other requirements such as achieving desired levels of fuel-to-air mixing at the required equivalence ratio. The three injectors represent the baseline configurations planned for the experiments. The current work discusses the mixing flow field behavior and differences among the three fuel injectors, mixing performance as described by the mixing efficiency and the total pressure recovery, and performance considerations based on the thrust potential.

Drozda, Tomasz G.↗

The sensitivity of Cherenkov telescopes to dark matter and astrophysical anisotropies in the diffuse gamma-ray background

In this article, the capability of present (H.E.S.S., MAGIC, VERITAS) and planned (CTA) ground-based Cherenkov telescope systems for detecting angular anisotropies in the diffuse gamma-ray background is investigated. Following up on a study of the impact of instrumental characteristics (effective area, field of view, angular resolution, and background rejection efficiency), the first part examines the influence of different observational strategies, i.e. whether a single deep observation or a splitting over multiple shallow fields is preferred. In the second part, the sensitivity to anisotropies generated by self-annihilating dark matter is studied for different common dark matter models. We find that a relative contribution of ∼ 10% from dark matter annihilation to the extra-galactic diffuse gamma-ray background can be detected with planned configurations of CTA. In terms of the thermally-averaged self-annihilation cross section, the sensitivity of CTA corresponds to values below the thermal freeze-out expectation (σv) = 3 × 10{sup −26} cm{sup 3} s{sup −1} for dark matter particles lighter than ∼ 200 GeV. We stress the importance of constraining anisotropies from unresolved astrophysical sources with currently operating instruments already, as a novel and complementary method for investigating the properties of TeV sources.

79 ASTRONOMY AND ASTROPHYSICS↗

October 2019 SAPHIRE 8 Software Quality Assurance Oversight Status Report

The software quality assurance oversight consists of updating and maintaining revision control of the System Analysis Program for Hands-on Integrated Reliability Evaluations (SAPHIRE) Version 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE Version 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, Significance Determination Process (SDP) Interface Training Manual, and the SAPHIRE 8 “New Features and Capabilities Overview.” These documents are referred to and can be transmitted upon request of the Nuclear Regulatory Commission (NRC) Contracting Officer’s Representative (COR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗