Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Configuration Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

The ERSDT Software Quality Assurance Plan Practices and Development Environment Setup for RASCAL 5

This document includes the information pertaining to the practices of the Emergency Response Software Development Team (ERSDT) for the RASCAL software project. The content includes information regarding: 1) Software Quality Assurance. 2) Project Management. 3) Configuration Management. 4) Development Standards. 5) Third-Party Software. 6) Verification and Validation. The information contained in this report is considered living documentation. The information contained in this report was assembled from multiple documents and content management systems.

97 MATHEMATICS AND COMPUTING↗

Light Water Reactor Sustainability Program: Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

97 MATHEMATICS AND COMPUTING↗

Nuclear analysis generic requirements for fusion applications of radiation shielding - 25639

Radiation shielding engineering and associated nuclear analysis plays an important role in design, operation, maintenance and decommissioning of nuclear fusion devices. Requirements adopted in current analyses are investigated versus basic principles of requirement management and verification and validation aspects. An assessment is proposed to derive applicable product and process requirements from safety principles and transversal function requirements. V and V aspects are extended to cover input and output data. It is concluded that beyond the progress on computational capabilities and technical quality of fusion neutronics shielding analysis, there is the need to develop the underlying procedures and requirement management to satisfy configuration management, quality assurance and safety demonstration needs. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

MiniDAQ-3: Providing concurrent independent subdetector data-taking on CMS production DAQ resources

The data acquisition (DAQ) of the Compact Muon Solenoid (CMS) experiment at CERN, collects data for events accepted by the Level-1 Trigger from the different detector systems and assembles them in an event builder prior to making them available for further selection in the High Level Trigger, and finally storing the selected events for offline analysis. In addition to the central DAQ providing global acquisition functionality, several separate, so-called “MiniDAQ” setups allow operating independent data acquisition runs using an arbitrary subset of the CMS subdetectors. During Run 2 of the LHC, MiniDAQ setups were running their event builder and High Level Trigger applications on dedicated resources, separate from those used for the central DAQ. This cleanly separated MiniDAQ setups from the central DAQ system, but also meant limited throughput and a fixed number of possible MiniDAQ setups. In Run 3, MiniDAQ-3 setups share production resources with the new central DAQ system, allowing each setup to operate at the maximum Level-1 rate thanks to the reuse of the resources and network bandwidth. Configuration management tools had to be significantly extended to support the synchronization of the DAQ configurations needed for the various setups. We report on the new configuration management features and on the first year of operational experience with the new MiniDAQ-3 system.

Amoiridis, Vassileios↗

Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Can a radiological event impact a criticality safety program: Lessons learned at WIPP - 14350

Any accident at a nuclear facility impacts all departments involved in the operation of the facility. The radiological release that occurred on February 14, 2014 has halted all waste disposal operations at the Waste Isolation Pilot Plant (WIPP) and has resulted in detailed reviews of all safety management programs. This paper describes the initial reactions to the event, criticality issues with recovery operations, corrective actions for the criticality safety program from independent reviews, and the importance of configuration management to criticality safety. The nature, location, and timing of the event resulted in significant delays in determining the cause of the event. During this time multiple theories on the initiator of the event were postulated including and inadvertent criticality event. However, the timing of the event, average fissile gram equivalent (FGE) loading of waste containers compared to analyzed FGE loads, and isotopic analysis of fixed air samples taken during the event proved it was not an inadvertent criticality event. Recovery activities such as replacing contaminated high efficiency particulate (HEPA), filters and disposing of site generated waste have also been reviewed to prevent criticality safety issues. Post event corrective actions in all departments have impacted how future operations at WIPP will be conducted, including corrective actions for the criticality safety program. The event has also proven the importance of configuration management and the effect a change can have on a process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Towards Software Bill of Materials in the Nuclear Industry

Large, modern industrial facilities often incorporate thousands of digital assets in their operational technology. Regulated facilities, such as nuclear power plants (NPPs), maintain robust cybersecurity and configuration management programs that often use bills of materials (BOMs) for these assets, including make, model, and version of hardware, firmware, and software. However, these BOMs typically capture only first- or second-tier information provided by the original equipment manufacturer (OEM). Unfortunately, as indicated by the increasing number and sophistication of software supply chain attacks, this level of detail is insufficient for identifying all the potential vulnerabilities and risks in software applications. Software BOMs (SBOMs) provide detailed enumeration of components and dependencies within the product or devices, including firmware. SBOMs can be combined with vulnerability data sources and vendor vulnerability attestations to improve vulnerability management and enable rapid identification of affected components when new software vulnerabilities are discovered. Ideally, SBOMs are created by the OEM prior to installation. However, since this practice is not yet commonplace and since NPPs are typically slow to adopt new technology, most NPPs do not incorporate SBOMs into their asset or configuration management programs. Fortunately, SBOMs can be generated by NPPs on existing digital assets to provide further insight into risk management decisions. This report provides an overview of the current SBOM ecosystem and recommends guidance on how to get started in a “crawl, walk, run” manner to develop and implement a sustainable SBOM program for digital assets in an NPP.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

INL transient reactor restart progress

The United States Department of Energy (DOE) has authorized resumption of transient testing and the restart of the Transient Reactor Test (TREAT) facility. The TREAT reactor was used from 1959 to 1994 to conduct more than 2800 nuclear fuel transient tests prior to being placed in standby in 1994. The plant was extensively upgraded shortly before it was placed in standby. Present day assessments revealed that a sound infrastructure remains at the plant. The assessments included extensive walk-downs and subsequent functional testing. The testing was broad in scope, but ensured that any plant operability issues, including age related degradation were discovered and resolved. The primary age related degradation found was capacitors in Reactor Trip System and Automatic Reactor Control System power supplies. The majority of low voltage power supplies required replacement. Although minimal degradation was evident, in some cases elastomers such as hydraulic hoses were preemptively replaced to take advantage of the existing maintenance window and ensure future reliable operation. Configuration management has been extensively reviewed and the plant components re-labeled using modern standards. The re-labeling required extensive work including updates to plant drawings and procedures. The plant organization has been established to restart the reactor and will subsequently seamlessly transition to reactor operations. For the restart effort, the operating organization is being supplemented by subcontractors including some personnel who were involved in TREAT historical operations. During 2015 and the first half of 2016 substantial progress has been made to renew reactor systems and infrastructure, update procedures and configuration management documents, and put in place a qualified operating organization. Reactor startup is anticipated no later than 2018. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Instrumentation, Information and Control (II&C) Research and Development Facility Buildout and Project Execution of LWRS II&C Pilot Projects 1 and 3

The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II&C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II&C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive results in plant status control, information management, knowledge management, and 'Real-Time-Truth' as it relates to the current plant conditions. The following report includes two attachments; each attachment represents Pilot Project 1 and 3. The two attachments also provide a report on two distinct milestones that were completed and are described below: M3L11IN06030307 - Complete initiation of two pilot projects. Complete initiation of pilot projects on real-time configuration management and control to overcome limitations with existing permanent instrumentation and real-time awareness of plant configurations; two candidate projects that consider low-cost wireless technology for in situ configuration monitoring and candidate technologies and an information architecture for outage management and control will be initiated with utilities. M3L11IN06030309 - Complete data collection, R&D plans, and agreements needed to conduct the two pilot projects. Complete data collection conducted at pilot project utilities to support real-time configuration management and outage control center pilot studies conducted; R&D plan for pilot projects produced and needed agreements established to support R&D activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Warewulf 3.0

Warewulf is a scalable systems management suite originally developed to manage large high-performance Linux clusters. Focused on general scalable systems management, it includes a framework for system configuration, management, provisioning/installation, monitoring, event notification, and more via a modular plugin architecture. Install the components and features you need or leverage the existing system configuration stored within Warewulf to create custom solutions to meet your performance needs. One of the goals of the project is to grow the project by allowing other organizations and developers to contribute back to the project under an open source BSD license. We have been successful with gaining support within the open source community already and have contributors and support in not only the government and academic space but also the commercial sector (e.g. Intel). Being both open source and vendor neutral puts Warewulf in a unique position to be supported and utilized as an open standard in High Performance Computing (HPC). Warewulf is an active member of various HPC initiatives and groups and is considered one of the most utilized, extensible and scalable clustering toolkits available.

Kurtzer, GregoryM.↗

The Benefits of a Software Bill of Materials Program at Nuclear Facilities

Software supply chain attacks are becoming increasingly more prevalent in both information communications technology and operational technology environments. Often, a supplier or other entity discloses vulnerability information about software components and subcomponents used in a digital asset, but an asset owner is unable to quickly ascertain if the vulnerable component is installed in their facility. The generation and use of a software bill of materials (SBOM) for installed digital assets can enable an asset owner to quickly identify if and where a component is used, allowing them to evaluate the risk and determine necessary risk treatments. The integration of an SBOM program into a nuclear facility not only improves vulnerability management and risk management processes, it also benefits asset and configuration management, cybersecurity, and supply chain programs. This paper reviews the U.S. Department of Energy Office of Nuclear Energy Cybersecurity Crosscutting Technology Development program’s work on integrating an SBOM program into a nuclear facility. It also provides a discussion on the benefits of such a program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Performance Potential of Mixed Data Management Modes for Heterogeneous Memory Systems

Many high-performance systems now include different types of memory devices within the same compute platform to meet strict performance and cost constraints. Such heterogeneous memory systems often include an upper-level tier with better performance, but limited capacity, and lower-level tiers with higher capacity, but less bandwidth and longer latencies for reads and writes. To utilize the different memory layers efficiently, current systems rely on hardware-directed, memory -side caching or they provide facilities in the operating system (OS) that allow applications to make their own data-tier assignments. Since these data management options each come with their own set of trade-offs, many systems also include mixed data management configurations that allow applications to employ hardware- and software-directed management simultaneously, but for different portions of their address space. Despite the opportunity to address limitations of stand-alone data management options, such mixed management modes are under-utilized in practice, and have not been evaluated in prior studies of complex memory hardware. In this work, we develop custom program profiling, configurations, and policies to study the potential of mixed data management modes to outperform hardware- or software-based management schemes alone. Our experiments, conducted on an Intel ® Knights Landing platform with high-bandwidth memory, demonstrate that the mixed data management mode achieves the same or better performance than the best stand-alone option for five memory intensive benchmark applications (run separately and in isolation), resulting in an average speedup compared to the best stand-alone policy of over 10 %, on average.

Effler, Chad↗

Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EMP Attachment 2: DOE-SC PNNL Site Data Management Plan

This Data Management Plan (DMP) describes the data management processes and activities under the Pacific Northwest National Laboratory (PNNL) Site Environmental Monitoring Plan. The activities currently in the Plan are limited to offsite environmental surveillance of PNNL Site radiological releases to the air. The DMP provides guidance on data capture, processing and transmittal, and database configuration management. The requirements for the PNNL Site Environmental Monitoring (SEM) Database and associated records are documented in order to assure that vital data are recorded accurately, stored in a manner that retains data integrity, and are suitable for analyst to use. Protocols and procedures must ensure the data will be adequate and robust.

99 GENERAL AND MISCELLANEOUS↗

System and method for merging clusters of wireless nodes in a wireless network

A system includes a first cluster having multiple first wireless nodes. One first node is configured to act as a first cluster master, and other first nodes are configured to receive time synchronization information provided by the first cluster master. The system also includes a second cluster having one or more second wireless nodes. One second node is configured to act as a second cluster master, and any other second nodes configured to receive time synchronization information provided by the second cluster master. The system further includes a manager configured to merge the clusters into a combined cluster. One of the nodes is configured to act as a single cluster master for the combined cluster, and the other nodes are configured to receive time synchronization information provided by the single cluster master.

97 MATHEMATICS AND COMPUTING↗

SAPHIRE 8 Software Quality Assurance Oversight

The software quality assurance oversight consists of updating and maintaining revision control of the SAPHIRE 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, SDP Interface Training Manual, and the SAPHIRE 8, "New Features and Capabilities Overview".

42 ENGINEERING↗