Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Communication Protocol”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Microreactor Automated Control System - Digital Twin Models and Advanced Control Systems Updates

Automation of control systems is expected to be important in the economic and safe operation of microreactors. Therefore, there is a need to develop and demonstrate automated control for microreactors, along with the development of testbeds for this purpose. This report provides updates on the status of a nonnuclear microreactor automated control system (MACS)—a real-time, hardware-in-the-loop testbed for non-nuclear testing of microreactor control system automation. A real-time hardware-in-the-loop testbed incorporates the realistic dynamics of physical systems into control system development and testing. The collaborative effort between Oak Ridge National Laboratory (ORNL) and Idaho National Laboratory (INL) resulted in the development of a prototypic microreactor plant-level digital twin that includes the reactor and a balance of plant system. Advanced control strategies were incorporated to demonstrate testing of control automation solutions. The gRPC communication protocol, which was implemented in the hardware-in-the-loop testbed by INL, was coupled to a digital twin model developed using the TRANsient Simulation Framework of Reconfigurable Models (TRANSFORM) library in Modelica. This digital twin simulation was tested with the ViBRANT hardware for realistic feedback and visual representation of control action in real time. A modular Python client structure was developed to manage functional mock-up unit-based simulation and real-time gRPC communication. Hardware-in-the-loop testing indicated that the modeled reactor—a natural-convection, molten-salt coolant loop configuration—responds well to control of drum positioning for modulation of reactor core power, as well as system-level control and downstream demand changes. Ongoing research is focused on integrating additional control algorithms that utilize data from newly included sensors within the MACS hardware testbed, as well as demonstrating and assessing the performance of the different automated control algorithms on multiple additional operational scenarios.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Overview and Commentary on Applying the Coordinated Vulnerability Disclosure Process to Photovoltaic System Devices

The rapid expansion of photovoltaic (PV) systems, particularly inverters, has introduced new cybersecurity challenges that threaten both local operations as well as the broader electrical grid’s stability. PV inverters, integrated into critical energy infrastructure are potential targets for cyber attacks due to vulnerabilities in firmware, remote access systems, and communication protocols. The Coordinated Vulnerability Disclosure (CVD) process, as defined by the Cybersecurity and Infrastructure Security Agency (CISA), provides a framework for identifying, reporting, and addressing these vulnerabilities in a transparent and collaborative manner. This report outlines the CVD process as it applies to PV systems, detailing the roles of key stakeholders, such as manufacturers, grid operators, and security researchers. The report also highlights specific challenges in managing vulnerabilities for new and legacy PV systems, which includes those introduced by insecure communications and third-party supply chain components. By adhering to the CVD process, the PV industry can mitigate cybersecurity risks, ensure regulatory compliance, and maintain consumer trust, while safeguarding the operational resilience of the energy grid. Ultimately, the effective coordination of vulnerability management is crucial for securing the future of PV systems within the critical electric grid infrastructure landscape.

14 SOLAR ENERGY

Controller Hardware-in-the-Loop Evaluation of a Microgrid Controller for a Microgrid System with Multiple Grid-Forming Inverters

This paper presents the laboratory evaluation of a commercial Microgrid Management System (MGMS) implemented in the real-world Bronzeville Microgrid which features a futuristic scenario with high renewable energy integration and the use of multiple Grid-Forming (GFM) inverters. The primary objective of the performance evaluation for the MGMS is to assess the MGMS's capability to dispatch GFM units, including a GFM PV unit and two GFM battery units, to maintain the system stability and ensure economic operation, thus guaranteeing the microgrid's resilience during prolonged outages and dynamic events. The laboratory controller hardware-in-the-loop provides realistic testing environment through detailed electromagnetic transient modeling of the microgrid system, hardware MGMS, and standard communication protocols (DNP3). The CHIL evaluation shows how the MGMS effectively manages the GFM inverters, highlighting its performance in maintaining stability, reliability, and survivability in a microgrid environment with a high penetration of renewable energy sources.

controller hardware-in-the-loop

Hardware-in-the-Loop Evaluation for Potential High Limit Estimation-Based PV Plant Active Control

This paper validates the efficacy of an artificial intelligence (AI)-based photovoltaic (PV) plant control and optimization approach in enabling PV plants as accountable grid reliability service providers. The validation is performed in a realistic laboratory controller-hardware-in-the-loop environment, leveraging accurate PV plant modeling and standard industrial communication protocols. Through simulations that account for diverse weather conditions and active control scenarios, the results highlight the superior performance of the AI-based solution in comparison to a state-of-the-art reference-control grouping-based approach. Such a finding contributes to mitigating the risk of overcurtailment and uninstructed deviations of active PV plant controls, and offers practical guidance for its field deployment. Furthermore, it establishes a standardized testing framework for comparing various PV active control strategies.

hardware-in-the-loop

Zero-day Attack Detection in Digital Substations Using In-Context Learning

In this paper, we address the critical challenge of detecting zero-day attacks in digital substations that employ the IEC-61850 communication protocol to ensure the security and reliability of modern power systems. While many heuristic and machine learning (ML)-based methods have been proposed for attack detection in IEC-61850 digital substations, generalization to unknown or zero-day attacks remains a challenge. We propose an approach that leverages the in-context learning ability of transformer architecture, which enables the model to learn from a few examples of a new task without explicit retraining. Our experiments on the IEC-61850 dataset demonstrate that the proposed method achieves more than 87% detection accuracy on zero-day attacks while the existing baselines fail. We believe this work has the potential to enhance the security of digital substations by enabling the effective detection of zero-day attacks.

LIu, Chen-Ching [Virginia Tech] (ORCID:00000002894

Reconfigurable Network Slicing Orchestration in Network Function Virtualization Compatible Operational Technology Environment

The ongoing transition to Industry 4.0, which is characterized by increased inter-connectivity of cyber-physical systems, requires having time-sensitive, high throughput, and secure transfer of critical data in industrial sites. In this context, network slicing emerges as a critical tool to ensure timely data delivery by provisioning the network resources to cater to specific applications’ requirements and mitigating potential cyber attacks. To address these challenges, this paper aims to tackle two key questions essential for the successful implementation of network slicing in industrial environments. First, it investigates architectural considerations for developing a network infrastructure capable of supporting network slicing functionalities effectively. The proposed approach significantly improves deployment efficiency over traditional manual configurations. Second, it delves into the automated orchestration process, elucidating the steps and components involved in transitioning from a static network management approach to dynamically leverage network function virtualization schemes for creating network slices in ad-hoc manner. The system demonstrates high throughput suitable for production-level solutions and maintains exceptionally low latency, making it ideal for ultra-reliable low-latency communications. Even with increased network demands, the system remains stable, with effective Quality of Service (QoS) management, ensuring reliable performance under varying conditions. The proposed architecture outlines the necessary components, services, and communication protocols required for a production-level orchestrator for network segmentation in SCADA environments.

Rodiles Delgado, Brian G.

UrbanScaping: Community Spatial Data Visualization & Analytics

Evaluating the electrification potential of buildings through retrofitting is crucial for reducing carbon emissions and the carbon footprint of built environments. This study leverages the Automatic Building Energy Modeling (AutoBEM) software, integrating the Model America database to create an urban context-based spatial analysis platform for community engagement and development. We selected Camp Hill Borough, PA, as a case study to analyze building-specific energy performance and evaluate the electrification potential of each building by switching to different Heating, Ventilation, and Air Conditioning (HVAC) systems and measurement components. The simulation results generated by the workflow provide retrofitting suggestions to help mitigate the carbon footprint as well as energy saving statistics of buildings. Additionally, the developed web-based interface serves as a community engagement platform, allowing residents to provide feedback and further develop interactive communication protocols. The outcomes of this project offer a baseline for community electrification planning and contribute to the design of low-carbon communities.

Chowdhury, Shovan [ORNL]

EnergyPlus Model Context Protocol Server (EnergyPlus-MCP) v0.1

EnergyPlus-MCP is the first open-source Model Context Protocol server specifically designed for EnergyPlus building energy simulation. This innovative software enables AI assistants and other applications to interact programmatically with EnergyPlus through a standardized, secure interface, eliminating traditional technical barriers in building energy modeling. The software provides specialized tools across five functional domains: server management, model configuration and loading, comprehensive building component inspection, systematic model modification, and simulation execution with results visualization. Key features include automated HVAC system discovery and topology mapping, advanced schedule analysis, intelligent model validation, and interactive visualization capabilities. EnergyPlus-MCP's layered architecture ensures robust separation between protocol communication and domain expertise, enabling scalable deployment across organizations, educational institutions, and research teams. Unlike direct LLM approaches that suffer from inconsistent results and security gaps, EnergyPlus-MCP provides validated, reliable interactions while maintaining scientific rigor. This democratizes sophisticated building energy analysis, making EnergyPlus accessible to broader audiences through conversational interfaces and streamlined workflows.

Li, Han [Lawrence Berkeley National Laboratory (LB

Dual Event Generator Support (dual-evg-support) v1.0

Dual Event Generator Support is an EPICS support module that implements the communication protocol to interface with the Dual EVG projects (already open source at https://github.com/BerkeleyLab/LBNL-Dual-EVG).

Russo, Lucas [Lawrence Berkeley National Laborator

Building a controlled-NOT gate between polarization and frequency

By harnessing multiple degrees of freedom (DoFs) within a single photon, controlled quantum unitaries, such as the two-qubit controlled-NOT ( cnot ) gate, play a pivotal role in advancing quantum communication protocols such as dense coding and entanglement distillation. In this work, we devise and realize a cnot operation between polarization and frequency DoFs by exploiting directionally dependent electro-optic phase modulation within a fiber Sagnac loop. Alongside computational basis measurements, we validate the effectiveness of this operation through the synthesis of all four Bell states in a single photon, all with fidelities greater than 98%. This demonstration opens new avenues for manipulating hyperentanglement across these two crucial DoFs, marking a foundational step toward leveraging polarization-frequency resources in fiber networks for future quantum applications.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC

Large-Scale Hydrogen Storage Cyber Risk Assessment

Hydrogen storage systems may become more widely deployed throughout the country, and so it is possible that individual and interconnected systems will be exposed to cyber-attacks. These events can cause physical and financial harm to employees, people in the vicinity of the facility, and the company that owns the facility. The two main ways bad actors may access information or control from a hydrogen storage facility are through information technology and operations technology devices, the former of which refers to data and information from networked devices and the latter of which refers to onsite controls for the physical system. Both types of entryways into the system should be considered when companies conduct cyber risk assessments and when regulators develop or revise relevant codes and standards. This report analyzes cybersecurity risks associated with a generic hydrogen storage system by outlining the system's purpose and the importance of its cybersecurity. The hydrogen storage system architecture and communication protocols are provided to understand potential cyber vulnerabilities. Later, an event tree analysis is performed on hydrogen operation to identify system weaknesses by outlining potential attack scenarios. This report also identifies critical cyber assets related to different hydrogen operations followed by an examination of potential threats, and the impact of cyber assets on those operational assets.

08 HYDROGEN

Large-Scale Hydrogen Storage Cyber Risk Assessment

Hydrogen storage systems are becoming more widely deployed throughout the country, and as their presence continues to grow, it is possible that individual and interconnected systems will be exposed to cyber-attacks. These events can cause physical and financial harm to employees, people in the vicinity, and to the company that owns the facility. The two main mechanisms malicious actors may access information or control from a hydrogen storage facility are through information technology and operations technology devices, the former of which refers to data and information from networked devices and the latter of which refers to onsite controls for the physical system. Both types of entryways into the system should be considered when facility managers conduct cyber risk assessments and when regulators develop or revise relevant codes and standards. This report analyzes cybersecurity risks applicable to a wide variety of hydrogen storage systems by outlining the system's purpose and the importance of its cybersecurity. The hydrogen storage system architecture and communication protocols are provided to understand potential cyber vulnerabilities. Later, an event tree analysis is performed on hydrogen operation to identify system weaknesses by outlining potential attack scenarios. This report also identifies critical cyber assets related to different hydrogen operations followed by an examination of potential threats, and the impact of cyber assets on those operational assets.

08 HYDROGEN

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION

Real-time evaluation of cybersecurity threats to DER inverter grid-support functions

In this project we aim to contribute to the understanding of the type and severity of potential cybersecurity attacks to the grid-support functionalities of DER systems interconnected to the AC distribution grid via inverters. Our preliminary work focused on developing a small-scale testbed allowing to study cybersecurity threats to an isolated photovoltaic-battery system using a real-time simulator (Typhoon HIL602+) with a real DNP3 communication connection over TCP/IP, allowing for safe and efficient monitoring and manipulation of data traffic between the simulated hardware and supervisory control and data acquisition (SCADA) system. In this project we propose to expand upon this development by utilizing a) a recently acquired NovaCor RTDS (Real Rime digital Simulator) to emulate the DER-inverter-grid topology including main grid-support functions as defined by IEEE Std. 1547-2018, and b) an industrial control and automation device to enable realistic evaluation of control functions and utilization of communication protocols for real-time data transmission.

24 POWER TRANSMISSION AND DISTRIBUTION

Performance Evaluation of Intelligent Solar Control Software Through Hardware-in-the-Loop (CRADA Final Report)

Recent research has highlighted the potential for solar to act as a zero-marginal-cost and zero-emission flexibility resource on the bulk power system when operated with advanced control systems. To increase the performance of these systems, leading technologies, including machine learning (ML) and hierarchical inverter set point allocation, have been developed by Latimer Controls, Inc. to estimate the headroom of large PV plants for grid operation and control; however, these technologies lack comprehensive validation under real-world application scenarios. Latimer Controls, Inc. received two voucher awards for research at a national laboratory from the Department of Energy American Made Solar Prize Round 6. The National Renewable Energy Laboratory (NREL) was selected to collaborate with Latimer staff to conduct a performance evaluation of Latimer PV control software. The NREL team will develop a hardware-in-the-loop (HIL) testbed to perform testing and validation of the Latimer PV control technology in a de-risked yet realistic testbed environment. Latimer and NREL worked together to analyze the test data, draw conclusions from the results, and disseminate the resulting scientific findings. In this CRADA work, we propose to test and validate the real-world application of the Latimer Control solution in an HIL environment. We evaluate the performance of different flexible solar technologies in responding to automatic generation control signals in a closed-loop fashion. In particular, a data-driven potential high limit (PHL) estimation is developed for large solar plants to accurately estimate their headroom so that they have fast and short-time regulation and control capability to participate in grid services and respond to grid signals in real time (e.g., AGC). This PHL estimation algorithm is embedded in a hardware power plant controller (PPC) and tested with an IEEE-39 bus system model developed in RTDS. To account for the varying cloud conditions and diverse inverter dispatches, we developed a 135-MW PV plant with detailed modeling of 27 individual PV modules and inverters using RTDS. The real-world communications used in such big plants, such as ModBus TCP/IP for inverter level and DNP3 for plant level, were developed to emulate the real-world applications in big PV plants. The ML-based PHL estimation method is tested under nine separate weather scenarios against the ‘reference-control’ solution, hereafter referred to as the baseline solution. The baseline method reserves a subset of inverters (reference group) to operate at their PHL at all times and dispatches only the remaining inverters (control group) at curtailed levels to fulfill the flexibility need. Despite being successfully piloted by NREL in California in 2017 and Chile in 2020, there exist two gaps in the state of the art to fully unlock the flexibility of PV plants: a. There is a trade-off between the PHL estimation accuracy and the flexibility range. b. There lacks granularity in the PHL estimation to capture the variation across inverters. The Latimer solution seeks to address these gaps by applying machine learning methods to improve PHL estimation accuracy while accounting for variability at every inverter. Performance metrics were taken from the 2023 Georgia Power CARES utility-scale RFP. The results demonstrate that the ML-based approach outperforms the traditional baseline method in PHL estimation accuracy for 7 of 9 scenarios. The average PHL error across the nine scenarios was 7.40% for the ML-based method, 2.06% less than the 9.46% PHL error average across scenarios that was exhibited by the baseline method. Additionally, the PHL error was below 5% for at least 95% of the testing interval for 3 of 9 tested intervals with the ML approach, whereas it did not achieve this metric for any of the baseline tests. Overall, simulation results indicate the superior performance of an ML-based approach compared to the conventional baseline reference-control approach, showcasing its potential to support grid stability and operational efficiency. This laboratory HIL testing using real PPC, representative power system simulation models in real-time with detailed PV plant and inverter models, and real-world communication protocols gives us confidence that this machine learning based PHL estimation algorithm works well in the hardware PPC and therefore de-risks future field commissioning. The end goal of this project is to advance grid technology to address the grid operation challenges brought by solar plant’s variability and uncertainties in power generation.

14 SOLAR ENERGY

Next Generation Sensor Development (CRADA Final Report)

B. Project Scope This was a collaborative effort between Lawrence Livermore National Security, LLC (LLNS), as manager and operator of Lawrence Livermore National Laboratory (LLNL) and The Federal Reserve Bank of San Francisco ("FRBSF" or "Participant"), to research and develop advanced processing techniques to measure the fitness and authenticity of U.S. currency. The FRBSF previously partnered with LLNL to evaluate end-of-life predictions, review sensor requirements, develop communications protocols, and perform thermal analysis. These Strategic Partnership Projects (SPP) included SPP No. L20960 - Federal Reserve Currency Technology Office Studies, SPP No. L15900 - Development of a Common Detector Interface (CDI 2.0) Specification and Hardware Simulators, and SPP No. L15610 - Limited Design Review of a Second-Generation E-Material Authentication Sensor (EMAS2).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF

Testing, Calibration, and UxS Integration of the Kromek GR1 Plus CZT Gamma Spectrometer

Collecting radiation measurements can be a hazardous task, especially in the presence of highly active sources. Various scenarios necessitate source search, classification, and quantification, often with limited or no a priori information. Activities such as disaster mitigation, emergency response, environmental monitoring, and site remediation may involve dangerous radioactive sources. In these situations, there is a pressing need for remote monitoring capabilities that protect human operators from potential harm and enhance adherence to the principle of “As Low as Reasonably Achievable” (ALARA) for radiation doses. The first step toward achieving remote radiation measurement capabilities is the remote operation of a radiation sensor. Once this milestone is reached, the next challenge is to integrate this remote sensing capability into suitable actuation agents, collectively referred to as uncrewed systems (UxS). These systems include familiar platforms such as robotic quadrupeds, aerial multirotor vehicles, and ground vehicles, any of which may be teleoperated, act autonomously, or utilize a combination of both. A critical factor in achieving remote radiation sensing is the availability of data from the appropriate sensor. Many commercially available radiation sensors have closed-source documentation for their communication protocols. Typical end-user products are often self-contained, handheld devices designed for manual measurement scenarios. While there are commercial off-the-shelf (COTS) integrations of radiation sensors with UxS available for purchase, these solutions are typically tailored for specific use cases and may not meet the requirements of different applications. This paper discusses efforts to remotely acquire radiation measurements from a small form-factor CZT gamma spectrometer. Sandia National Laboratories has successfully demonstrated the initial capability to integrate low size, weight, and power (SWaP) gamma spectroscopy into various UxS, alongside co-located GPS data logging and sensor calibration and qualification. With remote gamma spectroscopy achieved, the stage is set for UxS integration of this capability.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND

Virtual Power Plant Architecture and Resilient Design

Virtual Power Plants (VPPs) represent a fundamental shift in electric grid operations, aggregating distributed energy resources (DERs) such as solar panels and battery storage to deliver utility-scale grid services traditionally provided by centralized power plants. This report examines the unique architectural, operational, and digital assurance considerations that distinguish VPPs from conventional utility infrastructure as they scale from pilot projects to mainstream deployment across the United States. While VPPs offer significant opportunities for grid modernization and enhanced flexibility, their distributed, multi-stakeholder architecture introduces distinct security challenges that differ fundamentally from traditional generation facilities. The analysis identifies risks in VPP operations, including device-level security gaps, platform vulnerabilities, and communication protocol weaknesses that create expanded attack surfaces compared to centralized power plants. Through examination of real-world incidents and emerging threat patterns, the report demonstrates how some VPPs' reliance on consumer-owned devices, public internet infrastructure, and complex vendor ecosystems require new approaches to digital assurance and operational security. The findings provide practical guidance for utilities, regulators, and aggregators to implement robust security frameworks and operational best practices essential for maintaining grid reliability as VPP deployment accelerates under the Federal Energy Regulatory Commission (FERC) Order 2222 and related regulatory initiatives.

24 - POWER TRANSMISSION AND DISTRIBUTION