Conceptual Modeling Framework for E-Area PA HELP Infiltration Model Simulations

A conceptual modeling framework based on the proposed E-Area Low-Level Waste Facility (LLWF) closure cap design is presented for conducting Hydrologic Evaluation of Landfill Performance (HELP) model simulations of intact and subsided cap infiltration scenarios for the next E-Area Performance Assessment (PA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

E-Area LLWF Vadose Zone Model: Probabilistic Model for Estimating Subsided-Area Infiltration Rates

A probabilistic model employing a Monte Carlo sampling technique was developed in Python to generate statistical distributions of the upslope-intact-area to subsided-area ratio (Area UAi /Area SAi ) for closure cap subsidence scenarios that differ in assumed percent subsidence and the total number of intact plus subsided compartments. The plan is to use this model as a component in the probabilistic system model for the E-Area Performance Assessment (PA), contributing uncertainty in infiltration estimates.

97 MATHEMATICS AND COMPUTING↗

Impact of Different Vegetative Cover Scenarios on Infiltration Rates for the E-Area PA Intact Case

This memorandum addresses the effects of vegetative cover type (bamboo versus Bahia grass) and the timing of pine tree intrusion on intact infiltration rate for the proposed E-Area Low-Level Waste Facility (LLWF) closure cap system. It builds upon earlier reports whose purpose is to lay the foundation for the infiltration data package that will be assembled during the next revision of the E-Area LLWF Performance Assessment (PA).

54 ENVIRONMENTAL SCIENCES↗

Intact Infiltration Model Design Check for E-Area LLWF

A design check will be performed on the infiltration-rate time profile for the intact case for the proposed E-Area Low-Level Waste Facility (LLWF) final closure cap design.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Subsidence Infiltration Model Design Check for E-Area LLWF

A design check will be performed on the revised Python-based probabilistic subsidence infiltration model for the proposed E-Area Low-Level Waste Facility (LLWF) final closure cap design.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Limited-In-Scope Comparison of Subsidence Scenarios For 3D Vadose Zone PORFLOW Trench Models

This technical memorandum summarizes the results from two separate sequences of 3D PORFLOW vadose zone flow and contaminant transport models that were used to test the impact of different spatial distributions of subsidence boundary conditions. More specifically, the two simulation setups used a general conceptual model for an engineered trench (ET): one with a subsided region specified in the center of the trench and one with a subsided region located at the end of the trench. Both subsided regions had the same geometric specifications (e.g., length, width, orientation), but used water infiltration rate boundary conditions that appropriately accounted for surface runoff and lateral drainage from the adjacent upslope intact regions of the final closure cap. Because of the substantially higher water infiltration rate associated with the subsided region at the end of the trench, this geometry produced higher absolute peak fluxes to the water table for all six radionuclides that were simulated. However, the slower release rate of the centrally located subsided hole geometry produced a higher flux to the water table in the time period subsequent to the absolute peak. A third model was implemented as a control, where the water infiltration rate that corresponds to the centrally located subsided region was applied at the end of the trench to highlight the purely geometric effects. The results show that a higher water infiltration rate produces a sharper peak, while a lower infiltration rate leads to a broader peak. A centrally located hole impacts more of the waste zone, producing a higher peak when an equal infiltration rate is applied. These generalized qualitative differences, and their impacts on the overall modeling workflow (i.e., from vadose zone models to limits and dose calculations), should receive appropriate consideration during the development of conceptual models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Structural Determinants Underlying Discrimination Between Substrate and Solvent in β-Phosphoglucomutase Catalysis

The {Beta}-phosphoglucomutase ({Beta}-PGM) of the haloacid dehalogenase enzyme superfamily (HADSF) catalyzes the conversion of {Beta}-glucose 1-phosphate ({Beta}G1P) to glucose 6-phosphate (G6P) using Asp8 of the core domain active site to mediate phosphoryl transfer from {Beta}-glucose 1,6-(bis)phosphate ({Beta}G1,6bisP) to {Beta}G1P. Herein, we explore the mechanism by which hydrolysis of the {Beta}-PGM phospho-Asp8 is avoided during the time that the active site must remain open to solvent to allow the exchange of the bound product G6P with the substrate {Beta}G1P. On the basis of structural information, a model of catalysis is proposed in which the general acid/base (Asp10) side chain moves from a position where it forms a hydrogen bond to the Thr16-Ala17 portion of the domain-domain linker to a functional position where it forms a hydrogen bond to the substrate leaving group O and a His20-Lys76 pair of the cap domain. This repositioning of the general acid/base within the core domain active site is coordinated with substrate-induced closure of the cap domain over the core domain. The model predicts that Asp10 is required for general acid/base catalysis and for stabilization of the enzyme in the cap-closed conformation. It also predicts that hinge residue Thr16 plays a key role in productive domain-domain association, that hydrogen bond interaction with the Thr16 backbone amide NH group is required to prevent phospho-Asp8 hydrolysis in the cap-open conformation, and that the His20-Lys76 pair plays an important role in substrate-induced cap closure. The model is examined via kinetic analyses of Asp10, Thr16, His20, and Lys76 site-directed mutants. Replacement of Asp10 with Ala, Ser, Cys, Asn, or Glu resulted in no observable activity. The kinetic consequences of the replacement of linker residue Thr16 with Pro include a reduced rate of Asp8 phosphorylation by {Beta}G1,6bisP, a reduced rate of cycling of the phosphorylated enzyme to convert {Beta}G1P to G6P, and an enhanced rate of phosphoryl transfer from phospho-Asp8 to water. The X-ray crystal structure of the T16P mutant at 2.7 {angstrom} resolution provides a snapshot of the enzyme in an unnatural cap-open conformation where the Asp10 side chain is located in the core domain active site. The His20 and Lys76 site-directed mutants exhibit reduced activity in catalysis of the Asp8-mediated phosphoryl transfer between {Beta}G1,6bisP and {Beta}G1P but no reduction in the rate of phospho-Asp8 hydrolysis. Taken together, the results support a substrate induced-fit model of catalysis in which {Beta}G1P binding to the core domain facilitates recruitment of the general acid/base Asp10 to the catalytic site and induces cap closure.

08 HYDROGEN↗

Hanford Site Beryllium Program: Past, Present, and Future - 12428

The U.S. Department of Energy (DOE) has a long history of beryllium use because of the element's broad application to many nuclear operations and processes. At the Hanford Site beryllium alloy was used to fabricate parts for reactors, including fuel rods for the N-Reactor during plutonium production. Because of continued confirmed cases of chronic beryllium disease (CBD), and data suggesting CBD occurs at exposures to low-level concentrations, the DOE decided to issue a rule to further protect federal and contractor workers from hazards associated with exposure to beryllium. When the beryllium rule was issued in 1999, each of the Hanford Site contractors developed a Chronic Beryllium Disease Prevention Program (CBDPP) and initial site wide beryllium inventories. A new site-wide CBDPP, applicable to all Hanford contractors, was issued in May, 2009. In the spring of 2010 the DOE Headquarters Office of Health, Safety, and Security (HSS) conducted an independent inspection to evaluate the status of implementation of the Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP). The report identified four Findings and 12 cross-cutting Opportunities for Improvement (OFIs). A corrective action plan (CAP) was developed to address the Findings and crosscutting OFIs. The DOE directed affected site contractors to identify dedicated resources to participate in development of the CAP, along with involving stakeholders. The CAP included general and contractor-specific recommendations. Following initiation of actions to implement the approved CAP, it became apparent that additional definition of product deliverables was necessary to assure that expectations were adequately addressed and CAP actions could be closed. Consequently, a supplement to the original CAP was prepared and transmitted to DOE-HQ for approval. Development of the supplemental CAP was an eight month effort. From the onset a core group of CAP development members were identified to develop a mechanism for assuring that consensus was achieved on products developed as part of the CAP and the closure process. The original CAP was developed based on a large number of actions developed from the HSS report. This was essentially a 'bottoms up' approach. The revised CAP development team concluded that a more holistic, process-based approach was appropriate to assure that the resulting deliverable resulted in a best-in-class product. Consequently, issues and recommendations contained in the HSS report were grouped into 11 program areas, specific product deliverables were identified within each of the program areas, and a work breakdown structure (WBS) was logically applied to number the groupings. While the revised approach to product development utilizes a more holistic, 'top down' approach, the intent was still to incorporate specific recommendations and address specific issues contained in the HSS report. Through implementation of this new approach, a collaborative team has been established that works together using a consensus process for ensuring product completion. Benefits of the new approach include building a level of trust amongst all parties, quality of the products have improved, and acceptance by all parties of what action will truly meet the intent of the deficiency and make the beryllium program stronger. Open dialogue occurs amongst the core Be CAP team members, Hanford contractors, and DOE. It has been a learning process and will continue to be one, but everyone shares the common goal of reducing worker exposure to beryllium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Device For a Containment Vessel in a Small Gram Quantity Shipping Package

SRNL has been chartered by DOE Environmental Management (DOE-EM) to develop a new Type B shipping package for Small Gram Quantities (SGQ) of radioactive material. Design a containment vessel (CV) closure device that will reduce the operation time and improve the ease-of- use for Operations Personnel. The Containment Vessel (CV) includes a closure lid cap with spring shaft and locking tabs, multiple disc springs, and vessel with integral locking ring. The CV is assembled by aligning the tabs on the lid cap with the openings in the locking ring. Next, the lid cap is pushed down to compress the disc springs. Finally, the lid is rotated 45-degrees to locking location. When released, the tabs are secured against the locking ring. Disc springs (e.g. Belleville washers, coned-disc springs, Belleville spring, etc.) exert axial loads on the mating parts when compressed. The orientation of the disc springs can be configured to change the deflection and axial loads for specific designs. In addition to securing the lid cap to the vessel, the compressed disc springs can be used to apply a load to a containment seal (e.g. o-ring). A prototype of the CV closure was 3D printed to evaluate the locking mechanism design and functionality. A test plan will be developed to evaluate the mechanical properties (i.e. compression forces) and functionality of the CV closure design.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Justification for Use of the HELP Model to Estimate Infiltration Rates for the E-Area Low-Level Waste Facility Performance Assessment

Whiteside et al. conducted an in-depth literature review and performed basic infiltration model simulations to evaluate the Hydrologic Evaluation of Landfill Performance (HELP) model against five alternative computational codes utilizing the Richards equation for variably-saturated flow. Of the five alternatives considered (LEACHM, UNSAT-H, SVFlux, HYDRUS-2D3D, and VADOSE/W), only HYDRUS-2D3D and VADOSE/W were selected for further evaluation, which consisted of a side-by-side comparison versus HELP of calculated infiltration rates through a one-layer soil column with two percent slope.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applied Science Investigations to Facilitate Closure of the F-Area and H-Area Seepage Basins

This report provides a roadmap of applied science studies that will facilitate reaching long term monitoring end state corrective actions for groundwater contamination at the F-Area Seepage Basins and the H-Area Seepage Basins at the Savannah River Site in Aiken, SC. The F-Area and H-Area Seepage Basins are waste units on the Savannah River Site in Aiken, SC at which low-level radioactive solutions were disposed into unlined basins, resulting in groundwater contamination. The current contaminants of interest in the groundwater are tritium, iodine-129, strontium-90, uranium isotopes and nitrate. Remediation at both sites has continued since 1988, consisting of closure and capping of the basins, operation of a groundwater pump-and-treat system from 1997 to 2004, and replacement of this system with a comprehensive in situ attenuation-based remedy. This report was requested by the U.S. Department of Energy - Office of Environmental Management in consultation with the Savannah River National Laboratory and Savannah River Nuclear Solutions - Area Completions Projects to provide a scientific basis for proactively addressing groundwater issues that may need to be resolved prior to final corrective actions at the F-Area and H-Area Seepage Basins.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ex-situ Heat Treatment of TEM Foils in a Custom Titanium Fixture: A Case Study on Ni-based Superalloy

The advancement of microstructural characterization at the nanoscale is critical to understanding the microstructural evolution and performance of engineering materials. Transmission electron microscopy (TEM) plays a vital role in such investigations, particularly when coupled with controlled ex- and in-situ experiments. In this study, we introduce a novel method for ex-situ heat treatment (HT) of TEM foils using a custom-designed fixture, made from pure titanium, and vacuum furnace to inhibit oxidation. This approach ensures precise temperature control and minimal sample contamination during HT, critical for substructural characterization and analysis of metallic materials. The fixture consists of a titanium base with three slits, for three sample foils, and a titanium cap for closure. The entire assembly is placed in a vacuum heat treatment furnace with high vacuum capability to prevent oxidation. To validate the effectiveness of the setup, precipitation behavior and microstructural changes were studied in an IN725 variant heat-treated at 500°C for 1 hour and 282 variant heat-treated at 700°C for 1 hour, as case studies.

electron microscopy↗

Final Closure of the Maxey Flats Low-Level Radioactive Waste Disposal Site - 16088

This paper describes the final closure remedy for the former Maxey Flats Low-Level Radioactive Waste Disposal Site (MFDS), the challenges presented at the site due to the condition of the disposal facility and waste, and their resolution through comprehensive geo-synthetic design. The MFDS is an inactive landfill located in Kentucky on a ridge surrounded by a buffer zone. Historically, waste disposal occurred without reducing voids or without compacting the placed waste. Settlement and water management issues led to releases of radioactive contamination into surrounding waters, resulting in the closure of the facility in 1977. The final closure remedy consists of 1) development and implementation oversight of a sump abandonment design to ensure no direct pathways for infiltrating water to contact the waste and 2) development and implementation oversight of the Final Closure Period (FCP) cap design. Challenges successfully addressed by the FCP scope included: Abandon sumps to minimize storm water migrating into the waste; Address potential existing groundwater waste interaction; Maximum use of on-site cap construction materials; Design cap to fit very restricted site footprint; Assess and address potential isolated differential settlement; Maximize passive storm water management; Provide alternative site access during construction. The FCP remedy and resultant design satisfies these challenges through use of layers of geo-grid-reinforced soil and geo-synthetic materials, contours and slopes that minimize the quantities of construction materials while maximizing the use of available material, probabilistic subsidence modeling, an integrated storm water management system ensuring the slow release of storm water into receiving streams, and a dedicated construction haul road system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Report for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada, Revision 0. with ROTC 1

This Closure Report provides the documentation for closure of the Area 3 Landfill Complex Corrective Action Unit (CAU) 424. The site is located on the Tonopah Test Range, approximately 225 kilometers (140 miles) northwest of Las Vegas, Nevada. The purpose of this CR is to: Document the closure activities and provide the information collected, as recommended in the CADD. (DOE, 1998a) and proposed in the CAP (DOE~ 1998b ); Provide a Post-Closure Inspection Plan; Obtain a Notice of Completion from the NDEP; Recommend the movement of CAU 424 from Appendix III to Appendix IV of the FFACO.

54 ENVIRONMENTAL SCIENCES↗

Closure for milliliter scale bioreactor

A closure for a microreactor includes a cap that is configured to be inserted into a well of the microreactor. The cap, or at least a portion of the cap, is compliant so as to form a seal with the well when the cap is inserted. The cap includes an aperture that provides an airway between the inside of the well to the external environment when the cap is inserted into the well. A porous plug is inserted in the aperture, e.g., either directly or in tube that extends through the aperture. The porous plug permits gas within the well to pass through the aperture while preventing liquids from passing through to reduce evaporation and preventing microbes from passing through to provide a sterile environment. A one-way valve may also be used to help control the environment in the well.

Klein, David L↗

Completion of the Operational Closure of Tank 18F and Tank 19F at the Savannah River Site by Grouting - 13236

Radioactive waste is stored in underground waste tanks at the Savannah River Site (SRS). The low-level fraction of the waste is immobilized in a grout waste form, and the high level fraction is disposed of in a glass waste form. Once the waste is removed, the tanks are prepared for closure. Operational closure of the tanks consists of filling with grout for the purpose of chemically stabilizing residual material, filling the tank void space for long-term structural stability, and discouraging future intrusion. Two of the old-style single-shell tanks at the SRS have received regulatory approval confirming waste removal had been completed, and have been stabilized with grout as part of completing operational closure and removal from service. Consistent with the regulatory framework, two types of grout were used for the filling of Tanks 18F and 19F. Reducing grout was used to fill the entire volume of Tanks 18F and 19F (bulk fill grout) and a more flowable grout was used to fill equipment that was left in the tank (equipment fill grout). The reducing grout was added to the tanks using portable grout pumps filled from concrete trucks, and delivered the grout through slick lines to the center riser of each tank. Filling of the two tanks has been completed, and all equipment has been filled. The final capping of riser penetrations brings the operation closure of Tanks 18F and 19F to completion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Knowledge based ranking algorithm for comparative assessment of post-closure care needs of closed landfills

Post-closure care (PCC) activities at landfills include cap maintenance; water quality monitoring; maintenance and monitoring of the gas collection/control system, leachate collection system, groundwater monitoring wells, and surface water management system; and general site maintenance. The objective of this study was to develop an integrated data and knowledge based decision making tool for preliminary estimation of PCC needs at closed landfills. To develop the decision making tool, 11 categories of parameters were identified as critical areas which could affect future PCC needs. Each category was further analyzed by detailed questions which could be answered with limited data and knowledge about the site, its history, location, and site specific characteristics. Depending on the existing knowledge base, a score was assigned to each question (on a scale 1-10, as 1 being the best and 10 being the worst). Each category was also assigned a weight based on its relative importance on the site conditions and PCC needs. The overall landfill score was obtained from the total weighted sum attained. Based on the overall score, landfill conditions could be categorized as critical, acceptable, or good. Critical condition indicates that the landfill may be a threat to the human health and the environment and necessary steps should be taken. Acceptable condition indicates that the landfill is currently stable and the monitoring should be continued. Good condition indicates that the landfill is stable and the monitoring activities can be reduced in the future. The knowledge base algorithm was applied to two case study landfills for preliminary assessment of PCC performance.