Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Spitzer Space Telescope in-orbit checkout and science verification operations

Spitzer Space Telescope, the fourth and final of NASA's great observatories, and the first mission in NASA's Origins Program was launched 25 August 2003 into an Earth-trailing solar orbit. The observatory was designed to probe and explore the universe in the infrared. Before science data could be acquired, however, the observatory had to be initialized, characterized, calibrated, and commissioned. A two phased operations approach was defined to complete this work. These phases were identified as In-Orbit Checkout (IOC) and Science Verification (SV). Because the observatory lifetime is cryogen-limited these operations had to be highly efficient. The IOC/SV operations design accommodated a pre-defined distributed organizational structure and a complex, cryogenic flight system. Many checkout activities were inter-dependent, and therefore the operations concept and ground data system had to provide the flexibility required for a 'short turn-around' environment. This paper describes the adaptive operations system design and evolution, implementation, and lessons-learned from the completion of IOC/SV.

space verification

A guide to onboard checkout. Volume 1: Guidance, navigation and control

The results are presented of a study of onboard checkout techniques, as they relate to space station subsystems, as a guide to those who may need to implement onboard checkout in similar subsystems. Guidance, navigation, and control subsystems, and their reliability and failure analyses are presented. Software and testing procedures are also given.

Source record

Space shuttle propulsion systems on-board checkout and monitoring system development study (extension). Volume 1: Summary and technical results

An analysis was conducted of the space shuttle propulsion systems to define the onboard checkout and monitoring function. A baseline space shuttle vehicle and mission were used to establish the techniques and approach for defining the requirements. The requirements were analyzed to formulate criteria for implementing the functions of preflight checkout, performance monitoring, fault isolation, emergency detection, display, data storage, postflight evaluation, and maintenance retest.

Source record

Skylab checkout and launch operations at KSC

Checkout and launch operations for the four Skylab flights, plus checkout for a fifth vehicle on rescue status during the last mission, were complex and demanding. Preparations began well before the launch of the last Apollo moon mission in December 1972, and had to be performed without interference with the ongoing program. Three major new flight modules were used in Skylab, each of which imposed specific requirements on Kennedy Space Center. A major facilities modification program resulted in the ability to launch the three Saturn IB Skylab vehicles from Saturn V facilities. This provided large cost savings, but imposed the usual problems caused by first-time use of a new system.

Moser, R. E.

Analytical procedures for flutter model development and checkout in preparation for wind tunnel testing of the DAST ARW-1 wing

A study to develop analytical procedures to be used in the checkout and calibration of a flutter wind tunnel model of the DAST ARW-1 wing equipped with a flutter suppression device is reported. The methods used to obtain a realistic simulation of the structural inertial and aerodynamic properties of the wing, the hydro-electro-servo actuator used for flutter suppression, a prediction of the open loop flutter speed at a fixed Mach number (.897), a procedure for checkout and calibration using the method frequency response of a wing mounted accelerometer, and an analytical representation of a reduced state approximation of the overall system are described.

Pines, S.

Automation of checkout for the shuttle operations era

The Space Shuttle checkout is different from its Apollo predecessor. The complexity of the hardware, the shortened turnaround time, and the software that performs ground checkout are outlined. Generating new techniques and standards for software development and the management structure to control it are implemented. The utilization of computer systems for vehicle testing is high lighted.

Anderson, J. A.

Unexpected/expected results from the Langley 20-Inch Supersonic Wind Tunnel during initial checkout

NASA Langley's 20-Inch Supersonic Wind Tunnel is currently undergoing shakedown tests. The facility operates over the supersonic Mach number range of 1.4 to 5.0 with Reynolds number per foot variation of approximately 500,000 to 20 million. Checkout runs have been conducted at Mach numbers of 1.4, 2.8, and 5.0 over the entire operational mass flow and total pressure envelope. Data were recorded for total temperature characteristics, Rigimesh pressure drop characteristics, and for the switching exhaust system. Data recorded and observations made during checkout are discussed.

Dillon, James L.

Development of an automated checkout, service and maintenance system for a Space Station EVAS

The development of a new operational system for the Space Station will minimize the time normally spent on performing on-orbit checkout, servicing, and maintenance of an extravehicular activity system of the Space Station. This system, the Checkout, Servicing, and Maintenance System (COSM), is composed of interactive control software interfacing with software simulations of hardware components. The major elements covered in detail include the controller, the EMU simulator and the regenerative life support system. The operational requirements and interactions of the individual elements as well as the protocols are also discussed.

Abeles, Fred J.

SRMAFTE facility checkout model flow field analysis

The Solid Rocket Motor Air Flow Equipment (SRMAFTE) facility was constructed for the purpose of evaluating the internal propellant, insulation, and nozzle configurations of solid propellant rocket motor designs. This makes the characterization of the facility internal flow field very important in assuring that no facility induced flow field features exist which would corrupt the model related measurements. In order to verify the design and operation of the facility, a three-dimensional computational flow field analysis was performed on the facility checkout model setup. The checkout model measurement data, one-dimensional and three-dimensional estimates were compared, and the design and proper operation of the facility was verified. The proper operation of the metering nozzles, adapter chamber transition, model nozzle, and diffuser were verified. The one-dimensional and three-dimensional flow field estimates along with the available measurement data are compared.

Dill, Richard A.

Applying Boeing Commercial Airplane automated test and checkout techniques to reusable space propulsion systems

Automated test and checkout computer tools that have been developed for commercial and military aircraft are presently shown to be applicable to reusable launch vehicle and spacecraft propulsion systems, for the sake of reductions in maintenance personnel and calendar time. Attention is given to the potential uses of the Programmable Engine Tester and the Integrated Functional Test System in the context of SSME problems. It is found that while direct application of existing automated checkout systems would be difficult, future spacecraft propulsion technology can be designed for integral operation with such systems.

Wilkinson, Calvin L.

Design and Checkout of a High Speed Research Nozzle Evaluation Rig

The High Flow Jet Exit Rig (HFJER) was designed to provide simulated mixed flow turbojet engine exhaust for one- seventh scale models of advanced High Speed Research test nozzles. The new rig was designed to be used at NASA Lewis Research Center in the Nozzle Acoustic Test Rig and the 8x6 Supersonic Wind Tunnel. Capabilities were also designed to collect nozzle thrust measurement, aerodynamic measurements, and acoustic measurements when installed at the Nozzle Acoustic Test Rig. Simulated engine exhaust can be supplied from a high pressure air source at 33 pounds of air per second at 530 degrees Rankine and nozzle pressure ratios of 4.0. In addition, a combustion unit was designed from a J-58 aircraft engine burner to provide 20 pounds of air per second at 2000 degrees Rankine, also at nozzle pressure ratios of 4.0. These airflow capacities were designed to test High Speed Research nozzles with exhaust areas from eighteen square inches to twenty-two square inches. Nozzle inlet flow measurement is available through pressure and temperature sensors installed in the rig. Research instrumentation on High Speed Research nozzles is available with a maximum of 200 individual pressure and 100 individual temperature measurements. Checkout testing was performed in May 1997 with a 22 square inch ASME long radius flow nozzle. Checkout test results will be summarized and compared to the stated design goals.

Castner, Raymond S.

An Overview of the Process for Pre-Launch Checkout and Transition Activities in Support of the International Space Station (ISS) Payload Operations Integration Center

The objective of this paper is to provide future ISS scientists and/or engineers with an overview of the coordination process for the preparation and implementation of the pre-launch checkout and transition activities as observed from the Marshall Control Flight Center (MSFC) Payload Operations Integration Center perspective. This includes 4 major phases: (1) Verification and validation of the new command and telemetry databases that are needed for new payload experiments and new onboard formats; (2) Integration testing of the new ground control software and hardware; (3) Final internal and external pre-launch checkouts with cadre and experiment teams; (4) Performance of the actual synchronized transition between MSFC, Johnson Space Center (JSC), and ISS onboard configuration to new onboard software, ground software, and databases.

Digesu, Sam

Dawn Ion Propulsion System - Initial Checkout After Launch

The first 80 days after launch of the Dawn mission were dedicated to the checkout of the spacecraft with a major emphasis on the ion propulsion system. All three ion thrusters, all three thruster-gimbal assemblies, both power processor units, both digital interface and control units, and the entire xenon feed system were completely checked out and every component was found to be in good health. Direct thrust measurements agreed well with preflight expected values for all three thrusters over the entire throttle range. Thruster electrical operating parameters and power processor units efficiencies also agreed well with preflight expected values based on acceptance test data. Two of the three ion thrusters were fully checked out within 30 days after launch. Checkout of all three thrusters was completed 64 days after launch. Deterministic thrusting with the IPS began on December 17, 2007.

electric propulsion