Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Chance constraint optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

34 records · Page 2

Joint Chance-Constrained Dynamic Programming

This paper presents a novel dynamic programming algorithm with a joint chance constraint, which explicitly bounds the risk of failure in order to maintain the state within a specified feasible region. A joint chance constraint cannot be handled by existing constrained dynamic programming approaches since their application is limited to constraints in the same form as the cost function, that is, an expectation over a sum of one-stage costs. We overcome this challenge by reformulating the joint chance constraint into a constraint on an expectation over a sum of indicator functions, which can be incorporated into the cost function by dualizing the optimization problem. As a result, the primal variables can be optimized by a standard dynamic programming, while the dual variable is optimized by a root-finding algorithm that converges exponentially. Error bounds on the primal and dual objective values are rigorously derived. We demonstrate the algorithm on a path planning problem, as well as an optimal control problem for Mars entry, descent and landing. The simulations are conducted using a real terrain data of Mars, with four million discrete states at each time step.

Ono, Masahiro↗

Analytic Neural Network Gaussian Process Enabled Chance-Constrained Voltage Regulation for Active Distribution Systems with PVs, Batteries and EVs

This paper proposes an analytic neural network Gaussian process (NNGP)-based chance-constrained real-time voltage regulation method for active distribution systems with photovoltaics (PVs), batteries, and electric vehicles (EVs). NNGP can utilize historical measurement data to achieve real-time probabilistic node voltage estimation through Bayesian inference. Then, NNGP is fully analytically embedded into the optimal power flow model to perform voltage regulation and adapt to various topological changes. The uncertainties of voltage estimations are easily considered via the chance constraint, and it has been shown that the adoption of this chance constraint can significantly improve the reliability of voltage regulation under various scenarios. The comparison results with other methods, carried out on a real 759-node distribution system located in western Colorado, U.S., show that the proposed method can achieve accurate voltage estimation across different topologies and reliably perform voltage regulation considering PVs, batteries, and EVs.

active distribution systems↗

Mixed-Strategy Chance Constrained Optimal Control

This paper presents a novel chance constrained optimal control (CCOC) algorithm that chooses a control action probabilistically. A CCOC problem is to find a control input that minimizes the expected cost while guaranteeing that the probability of violating a set of constraints is below a user-specified threshold. We show that a probabilistic control approach, which we refer to as a mixed control strategy, enables us to obtain a cost that is better than what deterministic control strategies can achieve when the CCOC problem is nonconvex. The resulting mixed-strategy CCOC problem turns out to be a convexification of the original nonconvex CCOC problem. Furthermore, we also show that a mixed control strategy only needs to "mix" up to two deterministic control actions in order to achieve optimality. Building upon an iterative dual optimization, the proposed algorithm quickly converges to the optimal mixed control strategy with a user-specified tolerance.

Ono, Masahiro↗

Microgrid Tiered Circuits Effects for a Planned Housing Community in Puerto Rico

Puerto Rico faced a double strike from hurricanes Irma and Maria in 2017. The resulting damage required a comprehensive rebuild of electric infrastructure. There are plans and pilot projects to rebuild with microgrids to increase resilience. This paper provides a techno-economic analysis technique and case study of a potential future community in Puerto Rico that combines probabilistic microgrid design analysis with tiered circuits in building energy modeling. Tiered circuits in buildings allow electric load reduction via remote disconnection of non-critical circuits during an emergency. When coupled to a microgrid, tiered circuitry can reduce the chances of a microgrid's storage and generation resources being depleted. The analysis technique is applied to show 1) Approximate cost savings due to a tiered circuit structure and 2) Approximate cost savings gained by simultaneously considering resilience and sustainability constraints in the microgrid optimization. The analysis technique uses a resistive capacitive thermal model with load profiles for four tiers (tier 1-3 and non-critical loads). Three analyses were conducted using: 1) open-source software called Tiered Energy in Buildings and 2) the Microgrid Design Toolkit. For a fossil fuel based microgrid 30% of the total microgrid costs of 1.18 million USD were calculated where the non-tiered case keeps all loads 99.9% available and the tiered case keeps tier 1 at 99.9%, tier 2 at 95%, tier 3 at 80% availability, with no requirement on non-critical loads. The same comparison for a sustainable microgrid showed 8% cost savings on a 5.10 million USD microgrid due to tiered circuits. The results also showed 6-7% cost savings when our analysis technique optimizes sustainability and resilience simultaneously in comparison to doing microgrid resilience analysis and renewables net present value analysis independently. Though highly specific to our case study, similar assessments using our analysis technique can elucidate value of tiered circuits and simultaneous consideration of sustainability and resilience in other locations.

building energy modeling↗

Team Formation and Communication Restrictions in Collectives

A collective of agents often needs to maximize a "world utility" function which rates the performance of an entire system, while subject to communication restrictions among the agents. Such communication restrictions make it difficult for agents which try to pursue their own "private" utilities to take actions that also help optimize the world utility. Team formation presents a solution to this problem, where by joining other agents, an agent can significantly increase its knowledge about the environment and improve its chances of both optimizing its own utility and that its doing so will contribute to the world utility. In this article we show how utilities that have been previously shown to be effective in collectives can be modified to be more effective in domains with moderate communication restrictions resulting in performance improvements of up to 75%. Additionally we show that even severe communication constraints can be overcome by forming teams where each agent of a team shares the same utility, increasing performance an additional 25%. We show that utilities and team sizes can be manipulated to form the best compromise between how "aligned" an agent s utility is with the world utility and how easily an agent can learn that utility.

Agogino, Adrian K.↗

Optimal celestial bodies for dark matter detection

A wide variety of celestial bodies have been considered as dark matter detectors. Which stands the best chance of delivering the discovery of dark matter? Which is the most powerful dark matter detector? We investigate a range of objects, including the Sun, Earth, Jupiter, Brown Dwarfs, White Dwarfs, Neutron Stars, Stellar populations, and Exoplanets. We quantify how different objects are optimal dark matter detectors in different regimes by deconstructing some of the in-built assumptions in these search sensitivities, including observation potential and particle model assumptions. We find new constraints and future sensitivities across a range of dark matter annihilation final states. We quantify mediator properties leading to detectable celestial-body energy injection or Standard Model fluxes, and show how different objects can be expected to deliver corroborating signals. We discuss different search strategies, their opportunities and limitations, and the interplay of regimes where different celestial objects are optimal dark matter detectors. Deconstructing the assumptions of these searches leads us to point out a new search using the Galactic center stellar population that can provide greater sensitivity to the dark matter-nucleon scattering cross section than the Sun, despite being significantly further away in our Galaxy.

79 ASTRONOMY AND ASTROPHYSICS↗

Secure Control Regions for Distributed Stochastic Systems with Application to Distributed Energy Resource Dispatch: Preprint

With the increasing connectedness and interdependence of systems that are stochastic in nature, the issue of how to manage and coordinate them for safe operation has evidently become more important. In many networked system architectures, the system-wide output has to be delicately managed; often within a prescribed set of bounds. In this paper, a novel control framework is proposed where the bounds on the outputs are translated into independent bounds on the controllable inputs of each subsystem. The main benefit of this framework is that respecting the individual control bounds suffices to guarantee that the system-wide outputs will remain within safe boundaries. Since the systems are assumed to be stochastic, the bounds on the output are introduced as probabilistic chance constraints. The benefits of this framework are demonstrated by applying it to the control of distributed energy resources in a distribution networks where main goal is to keep the voltage magnitudes with their prescribed bounds. The control bounds are evaluated using real data on an IEEE test system.

chance constrained optimization↗

Secure Control Regions for Distributed Stochastic Systems with Application to Distributed Energy Resource Dispatch

With the increasing connectedness and interdependence of systems that are stochastic in nature, the issue of how to manage and coordinate them for safe operation has evidently become more important. In many networked system architectures, the system-wide output must be delicately managed, often within a prescribed set of bounds. In this paper, a novel control framework is proposed where the bounds on the outputs are translated into independent bounds on the controllable inputs of each subsystem. The main benefit of this framework is that respecting the individual control bounds suffices to guarantee that the system-wide outputs will remain within safe boundaries. Because the systems are assumed to be stochastic, the bounds on the output are introduced as probabilistic chance constraints. The benefits of this framework are demonstrated by applying it to the control of distributed energy resources in a distribution network where the main goal is to keep the voltage magnitudes within their prescribed bounds. The control bounds are evaluated using real data on an IEEE test system.

chance constrained optimization↗

Renewable electricity capacity planning with uncertainty at multiple scales

Abstract We formulate and compare optimization models of investment in renewable generation using a suite of social planning models that compute optimal generation capacity investments for a hydro-dominated electricity system where inflow uncertainty results in a risk of energy shortage. The models optimize the expected cost of capacity expansion and operation allowing for investments in hydro, geothermal, solar, wind, and thermal plant, as well as battery storage for smoothing load profiles. A novel feature is the integration of uncertain seasonal hydroelectric energy supply and short-term variability in renewable supply in a two-stage stochastic programming framework. The models are applied to data from the New Zealand electricity system and used to estimate the costs of moving to a 100% renewable electricity system by 2035. We also explore the outcomes obtained when applying different forms of CO 2 constraint that limit respectively non-renewable capacity, non-renewable generation, and CO 2 emissions on average, almost surely, or in a chance-constrained setting, and show how our models can be used to investigate the merits of a proposed pumped-hydro scheme in New Zealand’s South Island.

Ferris, Michael C.↗

SAMPEX science pointing with velocity avoidance

The Solar, Anomalous, and Magnetospheric Particle Explorer (SAMPEX) science pointing mode is presented with the additional constraint of velocity avoidance. This constraint has been added in light of the orbital debris and micrometeoroid fluxes that have been revealed by the Long Duration Exposure Facility (LDEF) recovered in January 1990. These fluxes are 50-100 times higher than the flux tables that were used in the September 1988 proposal to NASA for the SAMPEX mission. The SAMPEX Heavey Ion Large Telescope (HILT) sensor includes a flow-through isobutane proportional counter that is susceptible to penetration by orbital debris and micrometeoroids. Thus, keeping the HILT sensor pointed away from the velocity vector, the direction of maximum flux, will compensate for the higher than expected fluxes. Using an orbital debris model and a micrometeoroid model developed at the Johnson Space Center (JSC), and a SAMPEX dynamic simulator developed by the Guidance and Control Branch at the Goddard Space Flight Center (GSFC), an 'optimal' minimum ram angle (the angle between the HILT boresight and the velocity vector) of 90 degrees has been determined. It is optimal in the sense of minimizing the science pointing performance degradation while providing approximately an 89 percent chance of survival for the HILT sensor over a three year period.

Frakes, Joseph P.↗

High throughput embryonic zebrafish test with automated dechorionation to evaluate nanomaterial toxicity

Engineered nanomaterials pose occupational health and environmental concerns as they possess unique physical and chemical properties that can contribute to toxicity. High throughput toxicity screening methods are needed to address the increasing number of nanomaterials in production. Here we used a zebrafish photomotor response (PMR) test to evaluate a set of fifteen nanomaterials with military relevance. Automated dechorionation of zebrafish embryos was used to enhance nanomaterials bioavailability. Optimal PMR activity in zebrafish embryos was found at 30–31 hours post-fertilization (hpf). Behavioral and toxicological responses were measured at 30 and 120 hpf; behavioral responses were found for thirteen of the fifteen nanomaterials and acute toxicity (LC50) levels for nine of the fifteen nanomaterials below the maximum test concentration of 500 μg/ml. Physico-chemical characterization of the nanomaterials detected endotoxin and bacterial contamination in two of the tested samples, which may have contributed to observed toxicity and reinforces the need for physical and chemical characterization of nanomaterials use in toxicity testing. The zebrafish PMR test, together with automated dechorionation, provides an initial rapid assessment of the behavioral effects and toxicity of engineered nanomaterials that can be followed up by physico-chemical characterization if toxicity is detected, reducing the amount of time and monetary constraints of physico-chemical testing.

59 BASIC BIOLOGICAL SCIENCES↗

Stochastic Microgrid Scheduling With Chance‐Constrained Resilience Consideration

Traditionally, it is assumed that microgrids transition seamlessly from grid‐connected operation to islanded mode in the event of sudden main grid outages. In reality, the islanding process, especially unintentional islanding, is rarely seamless. Instead, it is subject to voltage and frequency fluctuations caused by the instantaneous disconnection of the point of common coupling (PCC) switch, variations in loads and renewable generation output and even the protection tripping of distributed energy resources (DERs). To mitigate these fluctuations and facilitate a smooth islanding process, we propose a stochastic microgrid scheduling model that incorporates chance‐constrained resilience measures. Specifically, the resilience measure is defined as the probability of successful islanding (PSI), that is, the probability that a microgrid can mitigate the generation‐demand imbalance caused by the disconnection of the PCC switch, variations in load and renewable generation and DER tripping. This measure is modelled using chance constraints. Unlike existing reliability and resilience indices, which typically neglect the possibility of microgrid/DER failure under extreme events and assume their survival while primarily focussing on reducing impact duration or magnitude, the proposed PSI‐based framework explicitly addresses microgrid and DER survival during the islanding transition. The formulated nonlinear chance constraints are approximated using a multiinterval approach and equivalently represented as a mixed‐integer linear programming (MILP) formulation. Case study results validate the proposed method, showing that the PSI estimation error is reduced to less than 8%, compared to approximately 28% with existing methods. Various sensitivity analyses on the DER tripping rate and PSI settings were performed to validate the robustness of the proposed method. In particular, the necessity of accounting for DER tripping in the PSI calculation was demonstrated.

chance constrained optimization↗

A shared-mobility-based framework for evacuation planning and operations under forecast uncertainty

To meet evacuation needs from carless populations who need personalized assistance to evacuate safely, in this article we propose a ridesharing-based evacuation program that recruits volunteer drivers before a disaster strikes, and then matches volunteer drivers with evacuees once demand is realized. Here we optimize resource planning and evacuation operations under uncertain spatiotemporal demand, and construct a two-stage stochastic mixed-integer program to ensure high demand fulfillment rates. We consider three formulations to improve the number of evacuees served, by minimizing an expected penalty cost, imposing a probabilistic constraint, and enforcing a constraint on the conditional value at risk of the total number of unserved evacuees, respectively. We discuss the benefits and disadvantages of the different risk measures used in the three formulations, given certain carless population sizes and the variety of evacuation modes available. We also develop a heuristic approach to provide quick, dynamic and conservative solutions. We demonstrate the performance of our approaches using five different networks of varying sizes based on regions of Charleston County, South Carolina, an area that experienced a mandatory evacuation order during Hurricane Florence, and utilize real demographic data and hourly traffic count data to estimate the demand distribution.

97 MATHEMATICS AND COMPUTING↗

Optimizing green infrastructure placement under precipitation uncertainty

Increased urbanization, infrastructure degradation, and climate change threaten to overwhelm stormwater systems across the nation, rendering them ineffective. Green Infrastructure (GI) practices are low cost, low regret strategies that can contribute to urban runoff management. However, questions remain as to how to best distribute GI practices through urban watersheds given precipitation uncertainty and the variable hydrological responses to them. We develop stochastic programming models to determine the optimal placement of GI practices across a set of candidate locations in a watershed to minimize the total expected runoff under medium-term precipitation uncertainties. Specifically, we first develop a two-stage stochastic programming model. Next, we reformulate this model using perturbed parameters to reduce the requisite computational time and extend it to multi-stage. In addition, we introduce constraints that allow for incorporating sub-catchment-level runoff reduction considerations. Furthermore, we account for hydrological connectivity in the watershed using an underlying acyclic connectivity graph of sub-catchments and incorporate various practical considerations into the models. In addition, we develop a systemic approach to downscale the existing daily precipitation projections into hourly units and efficiently estimate the corresponding hydrological responses. These advancements are brought together in a case study for an urban watershed in a mid-sized city in the U.S., where we perform sensitivity analyses, evaluate the importance of the considered constraints, and provide insights.

54 ENVIRONMENTAL SCIENCES↗

Building Load Control Using Distributionally Robust Chance-Constrained Programs with Right-Hand Side Uncertainty and the Risk-Adjustable Variants

Aggregation of heating, ventilation, and air conditioning (HVAC) loads can provide reserves to absorb volatile renewable energy, especially solar photo-voltaic (PV) generation. In this paper, we decide HVAC control schedules under uncertain PV generation, using a distributionally robust chance-constrained (DRCC) building load control model under two typical ambiguity sets: the moment-based and Wasserstein ambiguity sets. We derive mixed integer linear programming (MILP) reformulations for DRCC problems under both sets. Especially, for the Wasserstein ambiguity set, we use the right-hand side (RHS) uncertainty to derive a more compact MILP reformulation than the commonly known MILP reformulations with big-M constants. All the results also apply to general individual chance constraints with RHS uncertainty. Furthermore, we propose an adjustable chance-constrained variant to achieve tradeoff between the operational risk and costs. We derive MILP reformulations under the Wasserstein ambiguity set and second-order conic programming (SOCP) reformulations under the moment-based set. Using real-world data, we conduct computational studies to demonstrate the efficiency of the solution approaches and the effectiveness of the solutions. Summary of Contribution: The problem studied in this paper is motivated by a building load control problem that uses the aggregation of heating, ventilation, and air conditioning (HVAC) loads as flexible reserves to absorb uncertain solar photovoltaic (PV) generation. The problem is formulated as distributionally robust chance-constrained (DRCC) programs with right-hand side (RHS) uncertainty. In addition, we propose a risk-adjustable variant of the DRCC programs, where the risk level, instead of being predetermined, is treated as a decision variable. The paper aims to provide tractable reformulations and solution algorithms for both the (general) DRCC and the (general) adjustable DRCC models with RHS uncertainty.

97 MATHEMATICS AND COMPUTING↗

Proposed Mars Surveyor Landing Sites in Northern Meridiani Sinus, Southern Elysium Planitia, and Argyre Planitia

Our objective is to propose two landing sites that the Mars Surveyor 2001 Lander and Athena Rover could go to on Mars that should meet the safety requirements of the spacecraft landing system and optimize surface operations (chiefly driven by power and communications requirements). An additional site within Argyre Planitia, initially proposed by Parker to the Mars Surveyor Landing Site program, is also proposed for potential consideration for post-2001 missions to Mars, as it is well outside the current latitude limits for the Athena Rover. All three sites are designed to be situated as close to a diversity of geologic units within a few kilometers of the landing site so that diversity can be placed in a geologic context. This objective is very different from the Mars Pathfinder requirement to land at a site with a maximum chance for containing a diversity of rocks within a few tens of meters of the lander. That requirement was driven by the Sojourner mobility limit of a few tens of meters. It can be argued that the Athena project, with its much larger mobility capability, might actually want to avoid such a site, because placing collected samples in geologic context would be difficult. While it has been argued, both before and after the Mars Pathfinder landing, that the provenance for local blocks may be determined by orbiter spectra, primarily from the MGS TES instrument, our ability to do so has yet to be demonstrated. Indeed, several months after conclusion of the Pathfinder mission, we have yet to reach a consensus on the composition of local materials. Our primary data set for selecting a landing site within the latitude and elevation constraints of the 2001 mission is the Viking Orbiter image archive. The site must be selected to place the landing ellipse so as to avoid obvious hazards, such as steep slopes, large or numerous craters, or abundant large knobs. For this purpose, we chose a resolution limit of better than 50 m/pixel. This necessarily excludes from the present study images from current and future orbiter spacecraft, until such data does become readily available. Within each proposed region, it may be possible to identify additional sites once these data become available. Second, the fine-component thermal inertia data, should be greater than about 5 or 6 cgs Units (10(exp -3) cal/sq cm s(exp -0.5)/K). Low thermal inertias imply dusty environments, which could pose a mobility hazard. Similarly, the albedo of the site should not be particularly high, which would also suggest dusty surfaces. Low albedos are preferred, as they often coincide with low Viking red:violet ratios and indicate less dusty surfaces. Next, the Modeled Block Abundance should also not be too high or too low. Based on the Viking Lander and Mars Pathfinder experiences, percentages of blocks should be on the order of 5-25%. Too many blocks could pose a hazard to the landing and mobility. Too few blocks could also indicate a dusty surface. Primary Landing Site: Northern Meridiani Sinus (Proposed by T. J. Parker and K., S. Edgett) Vital Statistics: (1) Latitude, Longitude: 0-3 N, 350-2 W. *Elevation (Viking): about0.5-1.5 Ian. (2) Viking Orbiter Image coverage: Excellent coverage by 15 - 25 m/pixel images (orbits 709A and 410B). Possible stereo coverage in region where two orbits overlap (probably small parallax angle, as these orbits are not listed in NASA Contractor Report 3501) (3) Albedo: about .18 -.26 (4) Block Abundance: 5-26% (5)Fine-Component Thermal Inertia: 5-9 cgs units This region consists of bright deposits similar to those described by Edgett et al, that also lie within a prominent dark albedo region. These deposits are flat-lying, to such a degree that they ramp against topography rather than draping over it. This led Edgett and Parker to suggest that they may be subaqueous sediments, possibly lacustrine or marine evaporites, laid down sometime from the late Noachian to middle Hesperian (age determination pending crater counts). A contact between this material and elevated, dissected highlands to the south was identified , and is described by Edgett et al. Our desire in proposing this landing site is to sample the edge of this deposit where it has been exposed through etching, presumably eolian deflation (the deposit, though in the highlands, is itself only lightly to moderately cratered). This should enable access to in situ stratigraphy. The actual landing site will be selected where slopes are not expected to be steep, such that the rover itself should be able to traverse them and sample layered materials on the way, either up or down the slope. Perhaps due to uncertainties at this time as to the friability or meter-scale roughness of the deposit, it might make sense to place the landing ellipse on the exhumed highland surface adjacent to the deflated margin of the deposit and plan on driving to the deposit rather than landing on it and driving downslope. This should also enable imaging the margin for evidence of layering should it prove too difficult to climb. A target ellipse on the highland surface should also allow Athena access to ancient Noachian highland materials, particularly if placed near crater ejecta or an inlier of knobby material. Secondary Landing Site: Southern Elysium Planitia (Proposed by T. J. Parker) Vital Statistics: (1) Latitude, Longitude: 1.5-3.5 S, 195-198 W. (2) Elevation (Viking): -1.0 km. (3) Viking Orbiter Image coverage: Excellent coverage by 15 - 25 m/pixel images (orbit 725). Possible stereo coverage between images from beginning and end of orbit that overlap (probably small parallax angle) (4) Albedo: about .27-.28 (5) Block Abundance: 4-7% (6) Fine-Component Thermal Inertia: about 3 cgs units This region consists of eroded knobby material, probably of Noachian age, though much of the crater population has been destroyed, that is onlapped at a sharp contact by an extensive plains unit in southern Elysium Planitia that is Amazonian in age. The plains materials have been attributed to unusually low-viscosity flood lavas from fissures south of the Elysium volcanic rise, or to lacustrine materials associated with a large, Amazonian lake at the source of Marte Vallis. Parker and Schenk presented evidence in support of the latter interpretation, though they attributed the putative shore morphology to an embayment of a northern plains ocean into the southern Elysium region. Detailed examination of the margin of the deposit, showing erosion, not simply burial, of small crater rims and fluidized ejecta blankets, also points to lacustrine or marine sedimentation rather than volcanic plains burial. The plains surface exhibits a "crusty" appearance that many researchers have attributed to pressure ridges in lava flows. In a lacustrine context, they also resemble pressure ridges in desiccated evaporite deposits and salt-rimmed pools (now dry) similar in scale and morphology to spectacular, hundred meter-scale pool rims in alkaline Lake Natron, East African Rift. The eroded highland margin surface adjacent to these plains appears to be fairly smooth, even at 15 m/pixel. Isolated knob inliers are scattered from a few kilometers to several tens of "kilometers apart. Heights of the knobs have not been measured yet but, based on experience with similar features in the Pathfinder landing ellipse, are probably typically on the order of several tens of meters high and smaller, though some of the largest knobs in the region are probably up to a few hundred meters high. Two craters larger than a kilometer in diameter, with fluidized deposits, lie nearby the proposed landing site. Very high-resolution images from MOC should help to determine whether a landing site navigable by the Athena rover could be placed in this region. The space between knobs and craters is large enough to enable placement of a target landing ellipse between them but still provide access to one or more of them and to the margin of the Elysium plains material. Post-2001 Mars Surveyor Landing Site: Argyre Planitia (Proposed by T. J. Parker) Vital Statistics: (1) Latitude, Longitude: 55-56 S, 41-43 W. (2) Elevation (Viking): 1.0 km. (3) Viking Orbiter Image coverage: Excellent coverage by 40 m/pixel images (orbits 567B, 568B, and 569B). Excellent stereo coverage with large parallax angles over the entire landing site region, and much of central and southern Argyre. (4) Albedo: about .23-.24 (5) Block Abundance: No data (6) Fine-Component Thermal Inertia: No data The floors of both the Argyre and Hellas basins contain etched layered materials that are probably thick accumulations of channel or lacustrine sediments. The deposits in Hellas are much more eroded than those in Argyre, and Hellas lacks a channel outlet. Argyre is unique in that Uzboi Vallis flowed out of the basin, requiring overflow of a standing body of water within Argyre. This makes it the largest impact basin on Mars with channels both draining into it and flowing out from it. Hellas' channels may be catastrophic flood channels, whereas Argyre was fed by modest-scale valley networks, though the outlet at Uzboi Vallis was a catastrophic flood Highland craters and basins of this kind should be high-priority landing targets for missions intended to focus on the search for either prebiotic organic materials or even simple fossil microorganisms. Basins with internally-draining valley networks should be preferred over flood channels, as they could have provided the long-term influx of water favorable to the origin of life. (Catastrophic floods are not conducive to fossil preservation, due to their very short durations and high transportation energies). They also afford an opportunity to study the evolution of the planet's climate and volatiles during the period of time between the late Noachian and early Hesperian, when a drastic change from a proposed early warm, wet climate to one more closely resembling the modern environment is thought to have occurred. Large basin

Parker, T. J.↗