Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Case Studies in Leveraging Performance Contracts for Resilience Projects

The resilience of federal facilities has become increasingly important among lawmakers, agency leadership, and the American public as high impact natural hazards occur more frequently over time. Resilience is broadly defined as the ability of a federal facility to withstand, respond to, and recover rapidly from disruptions to maintain critical functions. The Department of Energy (DOE) Federal Energy Management Program (FEMP) was codified to facilitate the strengthening of federal energy and water efficiency and resilience. Performance contracting is one of the mechanisms through which federal agencies can finance projects at their facilities, but resilience improvement measures do not always result in utility cost savings, which are the primary driver behind performance contracts. This report provides example cases where performance contracts, specifically energy savings performance contracts (ESPC) or utility energy service contracts (UESCs), were used to implement a resilience measure at a federal facility.

99 GENERAL AND MISCELLANEOUS↗

Best Practices for Smart Grid-Interactive Efficient Building Ready Performance Contracts

Grid-interactive efficient building (GEB) measures reduce costs and optimize energy use for additional grid services by coordinating building energy loads and providing continuous demand management. Incorporating GEB energy conservation measures (ECMs) in performance contracts is reliant upon multiple factors. These factors include site selection with utility tariffs and incentives favorable to GEB, the identification of GEB as a priority in the initial stages of the contracting process, integration of GEB within comprehensive performance contracts with multiple other ECMs, and careful consideration of GEB measurement and verification (M&V) for energy savings performance contracts (ESPCs) and performance assurance for utility energy service contracts (UESCs).

building energy loads↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

Integrating monitoring-based commissioning (MBCx) software tools into performance contracts is a timely topic given recent developments in MBCx software offerings and the growing number of MBCx deployments nationwide. Many commercial building owners have started to install MBCx software tools that tie in advanced metering infrastructure, building automation systems, and local weather data to enable ongoing commissioning and identify energy conservation measures. To support federal and commercial building owners in understanding, procuring, and implementing MBCx software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into - and benefit - each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ESPC ESA Training Series: Site-Specific/Stand-Alone Contract Vehicle

This webinar provides instructions and resources for financing distributed energy projects (e.g., on–site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the site–specific/stand–alone contract vehicle. The site–specific/stand–alone contract vehicle is a procurement process using a request for proposal (RFP). Topics covered during the webinar include forming a strong project team, validating the feasibility of the distributed energy project at a site, acquisition planning, RFP development, procurement, proposal evaluation and contract award, and the construction and performance period. This webinar also provides an overview of the resources available in the ESPC ESA Toolkit, such as checklists and templates.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Construction of 3D MHD pressure drop correlation and flow characterization in the contraction region of a fusion blanket manifold

Inlet and outlet manifolds are typical components of liquid metal (LM) blanket designs of a fusion power reactor to be used to distribute the LM flow into breeding channels and collect it at the exit of the blanket. High pressure loss in the magnetohydrodynamic (MHD) flows featuring abrupt geometrical changes is one of the main feasibility issues of such designs. Recently, optimization studies were conducted to construct 3D MHD pressure drop correlations for a LM flow in an electrically insulating manifold with gradual expansion. Here, the 3D computational approach developed in that study is applied to the outlet manifold featuring gradual contraction. A systematic analysis was performed with a total number of 135 flow cases computed with COMSOL Multiphysics for Hartmann numbers 1000 < Ha < 10,000, Reynolds numbers 100 < Re < 12,000, and contraction angles 45° < θ < 75° for a fixed contraction ratio of 4. The effects of Ha, Re and θ on the flow recirculation, development length and the total pressure drop were carefully examined. A linear regression analysis was used to determine the power rule of pressure drop coefficient k related to Ha and Re, demonstrating a good match with the Ludford layer theory. Eventually, a correlation for the 3D MHD pressure drop coefficient was constructed as a function of Ha, Re and θ. Further, the results were compared against the inlet manifold. It was found that the flow in the inlet manifold exhibits larger recirculation zones. In the investigated range of Ha, Re and θ, the pressure drop coefficient k of the LM MHD flow in the gradual contraction is only slightly lower (< 8 %) than that in the gradual expansion.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Two-Way Option Contracts That Facilitate Adaptive Water Reallocation in the Western United States

Many water markets in the western United States (U.S.) have the ability to reallocate water temporarily during drought, often as short-term water rights leases from lower value irrigated activities to higher value urban uses. Regulatory approval of water transfers, however, typically takes time and involves high transaction costs that arise from technical and legal analyses, discouraging short-term leasing. This leads municipalities to protect against drought-related shortfalls by purchasing large volumes of infrequently used permanent water rights. High transaction costs also result in municipal water rights rarely being leased back to irrigators in wet or normal years, reducing agricultural productivity. This research explores the development of a multi-year two-way option (TWO) contract that facilitates leasing from agricultural-to-urban users during drought and leasing from urban-to agricultural users during wet periods. The modeling framework developed to assess performance of the TWO contracts includes consideration of the hydrologic, engineered, and institutional systems governing the South Platte River Basin in Colorado where there is growing competition for water between municipalities (e.g., the city of Boulder) and irrigators. The modeling framework is built around StateMod, a network-based water allocation model used by state regulators to evaluate water rights allocations and potential rights transfers. Results suggest that the TWO contracts could allow municipalities to maintain supply reliability with significantly reduced rights holdings at lower cost, while increasing agricultural productivity in wet and normal years. Additionally, the TWO contracts provide irrigators with additional revenues via net payments of option fees from municipalities.

54 ENVIRONMENTAL SCIENCES↗

Light-activated interlayer contraction in two-dimensional perovskites for high-efficiency solar cells

Understanding and tailoring the physical behaviour of halide perovskites under practical environments is critical for designing efficient and durable optoelectronic devices. Here, we report that continuous light illumination leads to >1% contraction in the out-of-plane direction in two-dimensional hybrid perovskites, which is reversible and strongly dependent on the specific superlattice packing. X-ray photoelectron spectroscopy measurements show that constant light illumination results in the accumulation of positive charges in the terminal iodine atoms, thereby enhancing the bonding character of inter-slab I–I interactions across the organic barrier and activating out-of-plane contraction. Correlated charge transport, structural and photovoltaic measurements confirm that the onset of the light-induced contraction is synchronized to a threefold increase in carrier mobility and conductivity, which is consistent with an increase in the electronic band dispersion predicted by first-principles calculations. Flux-dependent space-charge-limited current measurement reveals that light-induced interlayer contraction activates interlayer charge transport. Lastly, the enhanced charge transport boosts the photovoltaic efficiency of two-dimensional perovskite solar cells up to 18.3% by increasing the device’s fill factor and open-circuit voltage.

36 MATERIALS SCIENCE↗

Many-fermion simulation from the contracted quantum eigensolver without fermionic encoding of the wave function

Quantum computers potentially have an exponential advantage over classical computers for the quantum simulation of many-fermion quantum systems. Nonetheless, fermions are more expensive to simulate than bosons due to the fermionic encoding—a mapping by which the qubits are encoded with fermion statistics. Here we generalize the contracted quantum eigensolver (CQE) to avoid fermionic encoding of the wave function. In contrast to the variational quantum eigensolver, the CQE solves for a many-fermion stationary state by minimizing the contraction (projection) of the Schrödinger equation onto two fermions. We avoid fermionic encoding of the wave function by contracting the Schrödinger equation onto an unencoded pair of particles. Solution of the resulting contracted equation by a series of unencoded two-body exponential transformations generates an unencoded wave function from which the energy and two-fermion reduced density matrix (2-RDM) can be computed. We apply the unencoded and the encoded CQE algorithms to the hydrogen fluoride molecule, the dissociation of oxygen O 2 , and a series of hydrogen chains. Both algorithms show comparable convergence towards the exact ground-state energies and 2-RDMs, but the unencoded algorithm has computational advantages in terms of state preparation and tomography.

74 ATOMIC AND MOLECULAR PHYSICS↗

Analysis of Ground Source Heat Pump ECMs: Implemented Under DOE ESPC IDIQ Contract

Several federal performance and decarbonization objectives are driving the U.S. government to transition to net-zero emissions across the federal building portfolio. The overarching purpose of this Federal Energy Management Program (FEMP)-Geothermal Technologies Office (GTO) work is to support federal facilities in accomplishing the administration’s federal building decarbonization goals. Creating awareness of existing geothermal (or ground-source) heat pump (GHP) systems deployed on federal property, implemented using performance contracts and evaluating the energy and environmental impacts of these systems, this work will assist federal facilities in considering inclusion of GHP technology energy conservation measures (ECMs) in future performance contracting project awards. This report summarizes analyses of data from GHP ECMs installed under the DOE ESPC IDIQ contract across various climate areas and geographic locations, agencies, and building use types. Through the analysis of proposed GHP ECMs and understanding key metrics on implemented GHP systems in a variety of applications, FEMP and GTO can further support federal agencies in meeting decarbonization and net-zero building goals by evaluating and incorporating GHP systems into performance contracts and communicate the benefits of this technology.

15 GEOTHERMAL ENERGY↗

Performance contracting centers of expertise: a framework for federal implementation

This report examines the establishment and operation of Energy Performance Contracting (EPC) Centers of Expertise (COEs) within the federal government. EPCs, including Energy Savings Performance Contracts (ESPCs) and Utility Energy Service Contracts (UESCs), are critical mechanisms for advancing energy efficiency, resilience, and infrastructure modernization without the need for significant upfront appropriations. However, EPCs require specialized knowledge in project development, contracting, financing, legal parameters and technical project oversight. Currently federal agencies have varying levels of expertise and institutionalized policy to effectively and consistently use congressionally authorized EPCs which have decades of proven and impactful use. To address these challenges, several federal agencies have created COEs to centralize expertise, standardize practices, and streamline implementation. This report reviews statutory and policy drivers, highlights the benefits and challenges and presents case studies from the General Services Administration (GSA), the Department of Veterans Affairs (VA) and the U.S. Army Engineering and Support Center Huntsville (HNC). Recommendations are also provided for agencies considering the establishment of EPC COEs, which will bring much needed structure, consistency and lead to implementation of these energy and infrastructure building projects to save costs for U.S. taxpayers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

To support federal and commercial building owners in understanding, procuring, and implementing monitoring-based commissioning (MBCx) software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into—and benefit—each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Understanding Emerging Building Technologies in Federal Performance Contracting Markets

Every year, federal technology evaluation programs test and assess the performance of building technologies that are being considered for wider deployment in federal facilities. Despite these investments in technology validation, many of the technologies evaluated by federal programs struggle to achieve broad penetration into the federal performance contracting market. This report contains the results of a market-research survey conducted by the National Renewable Energy Laboratory to understand barriers to the wider adoption of validated building technologies in the federal performance contracting market and how this information can be used to increase their deployment. The initial phase of this research focuses on the energy service company community and the barriers they perceive to wider adoption of these evaluated technologies. The report ends with an examination of recommendations for how the U.S. Department of Energy's Federal Energy Management Program can assist agencies in deploying emerging building technologies through energy savings performance contracts.

25 ENERGY STORAGE↗

Voltage Service Limits Smart Contract Using Distributed Ledger Technology for Electrical Utility Grid with Customer-Owned Generator

Modern electrical grids face growing stability risks from customer-owned generators, especially at points of common couplings (PCCs). Disruptive behavior from power-electronic sources can cause protective relays to isolate problematic generators, making measurement integrity critical. This article presents a distributed ledger technology (DLT) approach that uses smart contracts to evaluate PCC voltage measurements and trigger backup breaker operations. The approach is framed as a verifiable, multi-organization attestation and audit layer, not as a real-time control security mechanism. In the proposed architecture, voltage measurements from a hardware protective relay are anchored on a DLT through the Cyber Grid Guard (CGG) system for attestation by both the grid utility and customer-owned generator. A Voltage Service Limits (VSLs) smart contract evaluates the on-chain measurements against allowable phase-voltage limits derived from the ANSI C84.1 standard. The framework is validated in a hardware-relay-in-the-loop test bed under sustained-undervoltage, sustained-overvoltage, and transient line-to-line fault scenarios. The results show that the VSL smart contract can process these measurements and issue backup breaker actions consistent with the defined service-limit criteria, demonstrating the DLT potential as a verifiable audit layer at the PCC that complements primary protection.

cyber security↗

Smart Contract-Defined Secondary Control and Co-Simulation for Smart Solar Inverters using Blockchain Technology

This paper proposes a cooperative control approach using blockchain technology for solar inverters in a photovoltaic system. Moreover, a co-simulation method for smart inverters and a blockchain network is studied. The blockchain assisted-smart inverter (BASI) consists of a solar inverter and an internet of things device as a client node of a blockchain network, which can fully utilize emerging blockchain technologies such as distributed ledger, security functions, and smart contract. The control includes a primary-level droop control in a BASI and smart contract-defined secondary-level supervisory control in a secured blockchain network. The concept of the proposed smart contract-defined control approach is validated by simulation studies using the cyber-physical co-simulation testbed built-in MATLAB/Simulink in a PC interfacing with a Hyperledger-Fabric blockchain software implemented in a PC.

14 SOLAR ENERGY↗

Reduced Contracting Time To Accelerate Construction: A Streamlined Approach for Speed and Scale

In the fast-paced construction world, efficiency isn't just an advantage - it's a necessity. By implementing the Cooperative Construction Contracting Agreement (CCCA), we are transforming how we approach major projects, replacing traditional multistep contracting with a streamlined, one-step process. This innovative contracting approach saves valuable time and resources, enabling us to accelerate delivery across our portfolio of projects. Under the old model, each construction phase required separate competitive solicitations for design, build, and other services. With the CCCA, we've consolidated these steps, working with a trusted partner from start to finish. This results in significant time savings that translate into faster project execution without compromising quality or safety.

collaborative partnerships↗

On the completeness of contraction map proof method for holographic entropy inequalities

The contraction map proof method is the commonly used method to prove holographic entropy inequalities. Existence of a contraction map corresponding to a holographic entropy inequality is a sufficient condition for its validity. But is it also necessary? In this note, we answer that question in affirmative for all linear holographic entropy inequalities with rational coefficients. We show that the pre-image of a non-contraction map is not a hypercube, but a proper cubical subgraph, and show that this manifests as alterations to the geodesic structure in the bulk, which leads to the violation of inequalities by holographic geometries obeying the RT formula.

97 MATHEMATICS AND COMPUTING↗