Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACT MANAGEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

GSFC Supplier Surveillance

Topics covered include: Develop Program/Project Quality Assurance Surveillance Plans The work activities performed by the developer and/or his suppliers are subject to evaluation and audit by government-designated representatives. CSO supports project by selecting on-site supplier representative s by one of several methods: (1) a Defense Contract Management Agency (DCMA) person via a Letter Of Delegation (LOD), (2) an independent assurance contractor (IAC) via a contract Audits, Assessments, and Assurance (A3) Contract Code 300 Mission Assurance Support Contract (MASC)

Kelly, Michael P.↗

Technology Transfer Annual Report - Fiscal Year 2017

TECHNOLOGY TRANSFER Idaho National Laboratory (INL) is a U.S. Department of Energy (DOE) multiprogram national laboratory that conducts research and development in all DOE mission areas. Like all other national laboratories, INL has a statutory, technology transfer mission to make its capabilities and technologies available to federal agencies, state and local governments, universities and industry. To fulfill this mission, INL encourages its scientific, engineering and technical staff to disclose new inventions and creations to ensure the resulting intellectual property is captured, protected and made available to others who might benefit from it. As part of the mission, intellectual property is licensed to industrial partners for commercialization, job creation and delivering the benefits of federally funded technology to consumers. In some cases, unique capabilities are made available to other federal agencies, international organizations, domestic and foreign commercial entities or small businesses to solve specific technical challenges. INL employees work cooperatively with researchers and technical staff from the university and industrial sectors to further develop emerging technologies. In this global economy, INL is contributing to the development of the next generation of engineers and scientists by licensing software to educational institutions throughout the world. Abstract This report is a catalog of select INL technology transfer activities, including commercialization transactions and research agreements, executed during this past year. The size and diversity of INL technical resources, coupled with the large number of relationships with other organizations, virtually ensures that a report of this nature will fail to capture all interactions. Recognizing this limitation, this report focuses on transactions that are specifically authorized by technology transfer legislation (and corresponding contractual provisions) or involve the transfer of legal rights to technology to other parties. This report was compiled from primary records that were readily available to the INL’s Technology Deployment and Contracts Management offices. Accomplishments cataloged in the report reflect the achievements and creativity of the researchers, technicians, support staff and operators of the INL workforce. Prepared for the U.S. Department of Energy Under DOE Idaho Operations Office Contract DE-AC07-05ID14517

2017↗

Jet Propulsion Laboratory: Annual Report 2002

The year 2002 brought advances on many fronts in our space exploration ventures. A new orbiter settled in at Mars and delivered tantalizing science results suggesting a vast store of water ice under the planet's surface, a discovery that may have profound consequences for exploring Mars. A long-lived spacecraft made its final fly-bys of Jupiter's moons, while another started its final approach toward Saturn and yet another flew by an asteroid on its way to a comet. A new ocean satellite began science observations, joined in Earth orbit by a pair of spacecraft measuring our home planets gravity field, as well as JPL instruments on NASA and Japanese satellites. A major new infrared observatory and a pair of Mars rovers were readied for launch. All told, JPL is now communicating with 14 spacecraft cast like gems across the velvet expanses of the solar system. It is a far cry from the early 1960's, when JPL engineers made prodigious efforts to get the first planetary explorers off the ground and into space - an achievement of which we were especially mindful this year, as 2002 marked the 40th anniversary of the first successful planetary mission, Mariner 2, which barely reached our closest planetary neighbor, Venus. Added to this anniversary were celebrations surrounding the 25th anniversaries of the launches of Voyagers 1 and 2, two remarkable spacecraft that are still flying and are actively probing the outer realms of the solar system. These events of the past and present provide an occasion for reflection on the remarkable era of exploration that we at the Jet Propulsion Laboratory are privileged to be a part of. As 2002 neared its end, the Laboratory had yet another reason for celebration, as a new five-year management contract between NASA and the California Institute of Technology was signed that calls for a closer working relationship with NASA and other NASA centers as a member of the 'One NASA' team. There is a strong emphasis on cost control and management, areas in which we can improve, enabling us to become more competitive. This new agreement again confirms NASA's trust and faith in Caltech and JPL, in which we should all take great pride. If the history of JPL were a book, we are on the verge of turning the page to one that promises to be one of the most exciting and busiest chapters in JPL's history. In 2003 and 2004, we will launch 11 spacecraft or major payloads. We will land two rovers on Mars; put a spacecraft in orbit around Saturn, deliver a probe to the surface of its largest moon, Titan, and map Titan's surface withimaging radar; send a spacecraft past a comet collecting samples from its tail, while another one is launched toward a comet impact; bring a capsule back to Earth with the first samples ever collected beyond the orbit of the Moon; map the skies in the ultraviolet as well as the infrared spectrum to unprecedented accuracy; and continue the mapping of ocean topography and winds on our home planet, Earth.

National Aeronautics and Space Administration (NAS↗

Office of the Chief Financial Officer Annual Report 2010

In March, a review team consisting of CFOs from other national laboratories, industry, and members of the University of California Office of the President (UCOP) convened for three days to conduct a comprehensive peer review of the OCFO. This was the first time in almost a decade that the financial operations of the Laboratory had been reviewed. The Committee relayed their observations on our strengths, and their very thoughtful recommendations for improvement, which we are actively pursuing. These improvements, when implemented, will benefit the entire Laboratory for many years to come. The complete report is available on the OCFO website (www.lbl.gov/Workplace/CFO). In August, the senior management team of the OCFO participated in a strategic planning retreat. The purpose of the two and a half day exercise was, of course, to update our strategic plan, but instead of spending days developing a written document, we enlisted the expertise of a seasoned journalist who also happens to be a very talented graphic artist. He listened carefully to our ideas and committed them to a visual roadmap. All members of the OCFO, Business Managers, and the Laboratory Leadership Team reviewed this draft roadmap. By having a completely visual strategic plan that is posted widely throughout the OCFO, all employees can easily see and identify with the goals that we are all working towards. FY2010 was an extraordinary year. The Laboratory welcomed its seventh Director, Dr. Paul Alivisatos, who wasted no time communicating his vision and priorities for Berkeley Lab. They include five very ambitious initiatives: Carbon Cycle 2.0, The Next Generation Light Source, a Safe and Efficient Lab, Building Community, and Space. In response, the Office of the Chief Financial Officer (OCFO) developed twelve specific initiatives that align completely with these five priorities. We will be very focused on these in the coming fiscal year, but for now, let's review what happened in FY2010. FY2010 was a pivotal year for the Procurement and Property Department. A provision of the management contract that was signed fives years ago required us to achieve cost savings of $30M. I am proud to announce that this last fiscal year we reached that goal, in large part due to the implementation of eBuy, and the negotiation of strategic sourcing contracts. Our last wall-to-wall inventory exceeded all the Department of Energy's (DOE) national targets and DOE approved the LBNL property system unconditionally. Of the total inventory, 92.3% or 25,601 assets were accounted for using barcode scanning that made the inventory process much more efficient. The effective management of the American Recovery and Reinvestment Act (ARRA) funds was strengthened by the continued successful partnership that LBNL shares with our DOE Site Office. They provided authority, support and clarity to this very complex task. The Laboratory's ARRA Stimulus Committee played a critical role in assuring internal controls, compliance with DOE regulations and quality financial management. The LBNL Budget Officer led a DOE complex-wide effort to identify and share how various DOE facilities track and report ARRA-funded projects, share best practices, evaluate issues and discuss solutions. LBNL has been recognized as a leader in this process and will continue to share knowledge and best practices with other DOE laboratories. Continuous education of our staff as well as the greater Laboratory population was still a major focus of the OCFO. With the help of many OCFO senior managers and staff that acted as subject-matter experts, the Core Financial Management Program was completely re-engineered and resulted in a revised classroom and web-based curriculum that will be formally rolled out Lab-wide in early FY2011. The Office of Sponsored Projects and Industry Partnerships (OSPIP) led the effort to select and purchase four Click Commerce software modules for the LBNL electronic Scientific Research Administration (eSRA) project. In early FY2010, the implementation of the Institutional Review Board (IRB) module, responsible for the human subjects review process, began and should be completed in early FY2011. OSPIP also began implementation of the grants and contracts module and we expect an early go-live of 'Grants Express' in mid-FY2011 with a full completion date in FY2012. The peer review's most substantial recommendation for improvement involved the Laboratory's central financial systems. To quote: 'financial reporting system is outdated and inadequate. There is an inability to easily extract data; the field has little confidence in data; people spend more time mining data than analyzing data; requires field users to create & rely upon shadow systems; causes proliferation of program administrators and resource analysts. These issues impact the quality & execution of research; and the data warehouse lacks understanding & ownership.'

99 GENERAL AND MISCELLANEOUS↗

INL - NNL an International Technology Collaboration Case Study - Advanced Fogging Technologies for Decommissioning - 13463

International collaboration and partnerships have become a reality as markets continue to globalize. This is the case in nuclear sector where over recent years partnerships commonly form to bid for capital projects internationally in the increasingly contractorized world and international consortia regularly bid and lead Management and Operations (M and O) / Parent Body Organization (PBO) site management contracts. International collaboration can also benefit research and technology development. The Idaho National Laboratory (INL) and the UK National Nuclear Laboratory (NNL) are internationally recognized organizations delivering leading science and technology development programmes both nationally and internationally. The Laboratories are actively collaborating in several areas with benefits to both the laboratories and their customers. Recent collaborations have focused on fuel cycle separations, systems engineering supporting waste management and decommissioning, the use of misting for decontamination and in-situ waste characterisation. This paper focuses on a case study illustrating how integration of two technologies developed on different sides of the Atlantic are being integrated through international collaboration to address real decommissioning challenges using fogging technology. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt Waste Processing Facility Project (SWPF) project management improvements: Working under a cost cap contract - 15523

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar LRW processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. In June 2013, DOE and Parsons agreed to Contract Modification 0116 that definitized the remaining work to achieve Construction Complete with a target schedule and a cost cap contract structure. The SWPF project is currently 85 percent complete with construction, and approximately 10 percent complete with commissioning. To date there have been numerous lessons learned with regard to contract and project management, procurement, construction, safety and quality assurance approaches (both good practices and mistakes). These lessons learned are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE complex. An overview of the current SWPF project status is provided, along with challenges associated with operating under a cost cap environment within a cost-plus contract structure. Key lessons learned will be discussed including contract management, baseline development and acceptance under DOE O 413.3, Program and Project Management for the Acquisition of Capital Assets requirements, cost and schedule control, change management and risk strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SEISMIC DESIGN REQUIREMENTS SELECTION METHODOLOGY FOR THE SLUDGE TREATMENT & M-91 SOLID WASTE PROCESSING FACILITIES PROJECTS

In complying with direction from the U.S. Department of Energy (DOE), Richland Operations Office (RL) (07-KBC-0055, 'Direction Associated with Implementation of DOE-STD-1189 for the Sludge Treatment Project,' and 08-SED-0063, 'RL Action on the Safety Design Strategy (SDS) for Obtaining Additional Solid Waste Processing Capabilities (M-91 Project) and Use of Draft DOE-STD-I 189-YR'), it has been determined that the seismic design requirements currently in the Project Hanford Management Contract (PHMC) will be modified by DOE-STD-1189, Integration of Safety into the Design Process (March 2007 draft), for these two key PHMC projects. Seismic design requirements for other PHMC facilities and projects will remain unchanged. Considering the current early Critical Decision (CD) phases of both the Sludge Treatment Project (STP) and the Solid Waste Processing Facilities (M-91) Project and a strong intent to avoid potentially costly re-work of both engineering and nuclear safety analyses, this document describes how Fluor Hanford, Inc. (FH) will maintain compliance with the PHMC by considering both the current seismic standards referenced by DOE 0 420.1 B, Facility Safety, and draft DOE-STD-1189 (i.e., ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, and ANSI!ANS 2.26-2004, Categorization of Nuclear Facility Structures, Systems and Components for Seismic Design, as modified by draft DOE-STD-1189) to choose the criteria that will result in the most conservative seismic design categorization and engineering design. Following the process described in this document will result in a conservative seismic design categorization and design products. This approach is expected to resolve discrepancies between the existing and new requirements and reduce the risk that project designs and analyses will require revision when the draft DOE-STD-1189 is finalized.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Underground Test Area Fiscal Year 2014 Annual Quality Assurance Report: Nevada National Security Site, Nevada, Revision 0

This report is required by the Underground Test Area (UGTA) Quality Assurance Plan (QAP) and identifies the UGTA quality assurance (QA) activities from October 1, 2013, through September 30, 2014 (fiscal year [FY] 2014). All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); National Security Technologies, LLC (NSTec); Navarro-Intera, LLC (N-I); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2014. The activities included conducting oversight assessments for QAP compliance, identifying findings and completing corrective actions, evaluating laboratory performance, and publishing documents. UGTA Activity participants conducted 25 assessments on topics including safe operations, QAP compliance, activity planning, and sampling. These assessments are summarized in Section 2.0. Corrective actions tracked in FY 2014 are presented in Appendix A. Laboratory performance was evaluated based on three approaches: (1) established performance evaluation programs (PEPs), (2) interlaboratory comparisons, or (3) data review. The results of the laboratory performance evaluations, and interlaboratory comparison results are summarized in Section 4.0. The UGTA Activity published three public documents and a variety of other publications in FY 2014. The titles, dates, and main authors are identified in Section 5.0. The Contract Managers, Corrective Action Unit (CAU) Leads, Preemptive Review (PER) Committee members, and Topical Committee members are listed by name and organization in Section 6.0. Other activities that affected UGTA quality are discussed in Section 7.0. Section 8.0 provides the FY 2014 UGTA QA program conclusions, and Section 9.0 lists the references not identified in Section 5.0.

54 ENVIRONMENTAL SCIENCES↗

Technology Transfer Annual Report Fiscal Year 2015

Idaho National Laboratory (INL) is a Department of Energy (DOE) multi-program national laboratory that conducts research and development in all DOE mission areas. Like all other federal laboratories, INL has a statutory, technology transfer mission to make its capabilities and technologies available to federal agencies, state and local governments, universities, and industry. To fulfill this mission, INL encourages its scientific, engineering, and technical staff to disclose new inventions and creations to ensure the resulting intellectual property is captured, protected, and available to others who might benefit from it. As part of the mission, intellectual property is licensed to industrial partners for commercialization, job creation, and delivering the benefits of federally funded technology to consumers. In some cases, unique capabilities are made available to other federal agencies, international organizations, domestic and foreign commercial entities, or small businesses to solve specific technical challenges. INL employees work cooperatively with researchers and technical staff from the university and industrial sectors to further development of emerging technologies. In this multinational global economy, INL is contributing to the development of the next generation of engineers and scientists by licensing software to educational institutions throughout the world. This report is a catalog of select INL technology transfer and commercialization transactions and research agreements that were executed during this past year. The size and diversity of INL technical resources, coupled with the large number of relationships with other organizations, virtually ensures that a report of this nature will fail to capture all interactions. Recognizing this limitation, this report focuses on transactions that are specifically authorized by technology transfer legislation (and corresponding contractual provisions) or involve the transfer of legal rights to technology to other parties. This report was compiled from primary records, which were readily available to the INL’s Technology Deployment and Contracts Management Offices. Accomplishments cataloged in the report reflect the achievements and creativity of the researchers, technicians, support staff, and operators of the INL workforce.

99 GENERAL AND MISCELLANEOUS↗

The Costs and Feasibility of Floating Offshore Wind Energy in the O'ahu Region

The State of Hawai'i has set a target to achieve a 100% Renewable Portfolio Standard (RPS) by 2045, and is well suited to become the first state to achieve this goal due to its relatively small load, high electricity prices, heavy reliance on imported fossil fuels, and favorable conditions for wind and solar. The Bureau of Ocean Energy Management contracted NREL to conduct a cost and feasibility study to provide information to decision makers on Hawai'i about the viability of floating offshore wind to be a part of the 100% RPS. We used NREL's Offshore Regional Cost Analyzer (ORCA) spatial cost model to evaluate the Levelized Cost of Energy (LCOE) in the region surrounding O'ahu as this is the island with the highest energy demand. The ORCA results showed that LCOE could range from around $\$$83 MWh to $\$$194 MWh for commercial operation dates in 2019 but has the potential to decrease to $\$$48 MWh - $\$$109 MWh by 2032 due to maturing global supply chains, increasing turbine rating, and new technological innovations. These costs are expected to be competitive with global floating wind costs in the early 2030s. The strong wind resource, proximity to infrastructure on land, and benign metocean conditions can potentially compensate for the logistical complexities of installing projects in Hawai'i far from mainland supply chains if sufficient investments are made to develop ports, grid infrastructure, and workforce on O'ahu to support the construction and operation of offshore wind projects. In addition to the cost results, this report also discusses the likely technologies that would comprise floating wind projects near O'ahu, the existing infrastructure available to projects, unique conditions facing offshore wind in the region such as exposure to hurricanes and limits on allowable export cable capacity, newly developed wind resource data sets for the region, and local stakeholder perspectives on offshore wind.

17 WIND ENERGY↗

Evaluation of human engineering design standard (MSFC-STD-267A) in the design of manned space vehicles

The major conclusion of the detailed examination of the human factors engineering design standard is that it is unsuitable for future spacecraft design. The standard, published in 1966, was not intended to be a zero or reduced gravity standard and was directed primarily toward ground support equipment and technology. Futhermore, ambiguities, conflicts, and unenforceable requirements contribute to the difficulty. The role of man in future space missions and its impact on human engineering standards are also discussed, and it is concluded that greater standardization is vital to the success of future missions. A survey of NASA/MSFC contractors was made, and it was found that MSFC-STD-267A is largely ignored and the most significant problems are inaccessibility and nonspecificity of the data. The resistance of contract management and designer and of program managers is a primary reason for poor human engineering design. Specific recommendations for improvement of format and organization, including an interim solution, are given.

Rogers, J. G.↗

An evaluation of contractor projected and actual costs

GSFC contractors with cost-plus contracts provide cost estimates for each of the next four quarters on a quarterly basis. Actual expenditures over a two-year period were compared to the estimates, and the data were sorted in different ways to answer several questions and give quantification to observations, such as how much does the accuracy of estimates degrade as they are made further into the future? Are estimates made for small dollar amounts more accurate than for large dollar estimates? Other government agencies and private companies with cost-plus contracts may be interested in this analysis as potential methods of contract management for their organizations. It provides them with the different methods one organization is beginning to use to control costs.

Kwiatkowski, K. A.↗

Standardization and program effect analysis (Study 2.4). Volume 3: Design-to-cost analysis

The program procedures that were incorporated into an on-going "design-to-cost" spacecraft program are examined. Program procedures are the activities that support the development and operations of the flight unit: contract management, documents, integration meetings, engineering, and testing. This report is limited to the program procedures that were implemented, with emphasis on areas that may depart from normal satellite development practices.

Shiokari, T.↗

Bibliography of Lewis Research Center technical contributions announced in 1976

Abstracts of Lewis authored publications and publications resulting from Lewis managed contracts which were announced in the 1976 issues of STAR (Scientific and Technical Aerospace Reports) and IAA (International Aerospace Abstracts) are presented. Research reports, journal articles, conference presentations, patents and patent applications, and these are included. The arrangement is by NASA subject category. Citations indicate report literature (identified by their N-numbers) and the journal and conference presentations (identified by their A-numbers). A grouping of indexes helps locate specific publications by author (including contractor authors), contractor organization, contract number, and report number.

Source record↗

Prototype thin-film thermocouple/heat-flux sensor for a ceramic-insulated diesel engine

A platinum versus platinum-13 percent rhodium thin-film thermocouple/heat-flux sensor was devised and tested in the harsh, high-temperature environment of a ceramic-insulated, low-heat-rejection diesel engine. The sensor probe assembly was developed to provide experimental validation of heat transfer and thermal analysis methodologies applicable to the insulated diesel engine concept. The thin-film thermocouple configuration was chosen to approximate an uninterrupted chamber surface and provide a 1-D heat-flux path through the probe body. The engine test was conducted by Purdue University for Integral Technologies, Inc., under a DOE-funded contract managed by NASA Lewis Research Center. The thin-film sensor performed reliably during 6 to 10 hr of repeated engine runs at indicated mean surface temperatures up to 950 K. However, the sensor suffered partial loss of adhesion in the thin-film thermocouple junction area following maximum cyclic temperature excursions to greater than 1150 K.

Kim, Walter S.↗

Process assessments in NASA

A software process assessment procedure, refined by the Software Engineering Institute (SEI), has been introduced into NASA. The techniques were extended to cover contract management and especially software quality assurance organizations. A preliminary assessment questionnaire consisting of 98 items was introduced and found to be a useful tool at a series of on-site surveys.

Bush, Marilyn W.↗

CSTAR support for the commercial Launch Voucher Demonstration Program

Congress mandated a Launch Voucher Demonstration Program (LVDP) in the NASA FY 1993 Authorization Bill. This program was to have been put into place by October 1, 1993 and would end on September 30, 1995, with a report to Congress on January 31, 1996. CSTAR was asked to provide a participatory relationship to NASA concerning the Launch Voucher Demonstration Program, specifically due to CSTAR's COMET experience and knowledge of the CCDS payload and transportation planning, budgeting, and contract management process. This paper describes CSTAR's involvement in the development of the Launch Voucher Demonstration Program.

Myers, Carter H.↗