Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMAND SYSTEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

iTOUGH2 Universal Optimization Using the PEST Protocol

iTOUGH2 (http://www-esd.lbl.gov/iTOUGH2) is a computer program for parameter estimation, sensitivity analysis, and uncertainty propagation analysis [Finsterle, 2007a, b, c]. iTOUGH2 contains a number of local and global minimization algorithms for automatic calibration of a model against measured data, or for the solution of other, more general optimization problems (see, for example, Finsterle [2005]). A detailed residual and estimation uncertainty analysis is conducted to assess the inversion results. Moreover, iTOUGH2 can be used to perform a formal sensitivity analysis, or to conduct Monte Carlo simulations for the examination for prediction uncertainties. iTOUGH2's capabilities are continually enhanced. As the name implies, iTOUGH2 is developed for use in conjunction with the TOUGH2 forward simulator for nonisothermal multiphase flow in porous and fractured media [Pruess, 1991]. However, iTOUGH2 provides FORTRAN interfaces for the estimation of user-specified parameters (see subroutine USERPAR) based on user-specified observations (see subroutine USEROBS). These user interfaces can be invoked to add new parameter or observation types to the standard set provided in iTOUGH2. They can also be linked to non-TOUGH2 models, i.e., iTOUGH2 can be used as a universal optimization code, similar to other model-independent, nonlinear parameter estimation packages such as PEST [Doherty, 2008] or UCODE [Poeter and Hill, 1998]. However, to make iTOUGH2's optimization capabilities available for use with an external code, the user is required to write some FORTRAN code that provides the link between the iTOUGH2 parameter vector and the input parameters of the external code, and between the output variables of the external code and the iTOUGH2 observation vector. While allowing for maximum flexibility, the coding requirement of this approach limits its applicability to those users with FORTRAN coding knowledge. To make iTOUGH2 capabilities accessible to many application models, the PEST protocol [Doherty, 2007] has been implemented into iTOUGH2. This protocol enables communication between the application (which can be a single 'black-box' executable or a script or batch file that calls multiple codes) and iTOUGH2. The concept requires that for the application model: (1) Input is provided on one or more ASCII text input files; (2) Output is returned to one or more ASCII text output files; (3) The model is run using a system command (executable or script/batch file); and (4) The model runs to completion without any user intervention. For each forward run invoked by iTOUGH2, select parameters cited within the application model input files are then overwritten with values provided by iTOUGH2, and select variables cited within the output files are extracted and returned to iTOUGH2. It should be noted that the core of iTOUGH2, i.e., its optimization routines and related analysis tools, remains unchanged; it is only the communication format between input parameters, the application model, and output variables that are borrowed from PEST. The interface routines have been provided by Doherty [2007]. The iTOUGH2-PEST architecture is shown in Figure 1. This manual contains installation instructions for the iTOUGH2-PEST module, and describes the PEST protocol as well as the input formats needed in iTOUGH2. Examples are provided that demonstrate the use of model-independent optimization and analysis using iTOUGH2.

15 GEOTHERMAL ENERGY↗

Rotary fast tool servo system and methods

A high bandwidth rotary fast tool servo provides tool motion in a direction nominally parallel to the surface-normal of a workpiece at the point of contact between the cutting tool and workpiece. Three or more flexure blades having all ends fixed are used to form an axis of rotation for a swing arm that carries a cutting tool at a set radius from the axis of rotation. An actuator rotates a swing arm assembly such that a cutting tool is moved in and away from the lathe-mounted, rotating workpiece in a rapid and controlled manner in order to machine the workpiece. One or more position sensors provides rotation and position information for a swing arm to a control system. A control system commands and coordinates motion of the fast tool servo with the motion of a spindle, rotating table, cross-feed slide, and in-feed slide of a precision lathe.

47 OTHER INSTRUMENTATION↗

Systems and methods for control system security

A component security device may be disposed at an interface between a component and a cyber-physical system. The disclosed component security device may be physically and/or electrically coupled between the component and infrastructure of the cyber-physical system, such as a backplane, bus, and/or the like. The component security device may be configured to monitor the component, and selectively isolate the component from the cyber-physical system. Since the component security device is interposed at the interface of the component, the component security device may be capable of isolating the component regardless of whether the component has been compromised (e.g., regardless of whether the component is capable of complying with system commands).

Rieger, Craig G.↗

Electromagnetic variable degrees of freedom actuator systems and methods

The present invention provides a variable reluctance actuator system and method that can be adapted for simultaneous rotation and translation of a moving element by applying a normal-direction magnetic flux on the moving element. In a beneficial example arrangement, the moving element includes a swing arm that carries a cutting tool at a set radius from an axis of rotation so as to produce a rotary fast tool servo that provides a tool motion in a direction substantially parallel to the surface-normal of a workpiece at the point of contact between the cutting tool and workpiece. An actuator rotates a swing arm such that a cutting tool moves toward and away from a mounted rotating workpiece in a controlled manner in order to machine the workpiece. Position sensors provide rotation and displacement information for a swing arm to a control system. A control system commands and coordinates motion of the fast tool servo with the motion of a spindle, rotating table, cross-feed slide, and in feed slide of a precision lathe.

42 ENGINEERING↗

Integrated behavior-based infrastructure command validation

A cybersecurity infrastructure command validation system is provided herein for validating asset commands issued within an infrastructure network. The cybersecurity infrastructure command validation system can be integrated into an infrastructure network to monitor and validate infrastructure asset commands in real-time or while the infrastructure network is active. The cybersecurity infrastructure command validation system can receive or intercept commands issued by asset controllers. The cybersecurity infrastructure command validation system can validate the commands based on a command validation model. The command validation model can represent normal operating behavior of the infrastructure network. The cybersecurity infrastructure command validation system can provide valid commands to the intended infrastructure asset, or can reject invalid commands. The cybersecurity infrastructure command validation system can store validation results for use in updating the command validation model. The cybersecurity infrastructure command validation system can flag or otherwise warn the infrastructure network or administrators of invalid commands.

Akyol, Bora A.↗

Command and Control of Utilities Systems

The utilities systems that encompass the Y-12 National Security Complex are an integral part of the entire campus, and are essential to maintaining critical mission focus for the site. Although the utilities systems each differ in function, the central production and distribution model creates a common thread on which each system is run. Several incidents in FY 2018 and FY 2019 documented a lack of overall systems control and highlighted the need to create a better command system that could maintain system availability and decrease possible impacts to the surrounding environment. An initial system was started in September of 2019 to better control mechanical utility distribution systems. The measurement of the system can be modeled against a standard command and control related incident. The corresponding work hours from a typical control-related incident were used as key component to this system model. System effectiveness is modeled against utility’s incidents that demonstrate a loss of command and control. The increased simulations of the model also document control can only be effectively contained within the stated time (3-5 years) by yielding more engineers to complete alignments, or drastically reducing the amount of time for alignments. The total control points of the model document a clear correlation between alignments, control points, and the amount of man-hours per incident. Current data shows that actual incident man-hours (1.88 manhours/ incident since initial system implementation) are near expected incident man-hours (1.81 manhours/ incident) with command and control for October 2021, which documents a 33.3% reduction in man-hours/incident since initial system implementation. A conclusion can be drawn that focus on increasing the amount of controlled points in the system can reduce incidents and the decrease the amount of non-value added work to employee’s day-to-day lives, while also achieving a culture that enhances and sustains utilities reliability.

99 GENERAL AND MISCELLANEOUS↗

Spinning Reserve From Hotel Load Response: Initial Progress

This project was motivated by the fundamental match between hotel space conditioning load response capability and power system contingency response needs. As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. At ORNL s suggestion, Digital Solutions Inc. adapted its hotel air conditioning control technology to supply power system spinning reserve. This energy saving technology is primarily designed to provide the hotel operator with the ability to control individual room temperature set-points based upon occupancy (25% to 50% energy savings based on an earlier study [Kirby and Ally, 2002]). DSI added instantaneous local load shedding capability in response to power system frequency and centrally dispatched load shedding capability in response to power system operator command. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host the spinning reserve test. The Tennessee Valley Authority supplied real-time metering equipment in the form of an internet connected Dranetz-BMI power quality meter and monitoring expertise to record total hotel load during both normal operations and test results. The Sevier County Electric System installed the metering. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. These results are prior to implementing control over the common area air conditioning loads. Testing was also not at times of highest system or hotel loading. Full response occurred in 12 to 60 seconds from when the system operator s command to shed load was issued. The load drop was very rapid, essentially as fast as the 2 second metering could detect, with all units responding essentially simultaneously. Load restoration was ramped back in over several minutes. The restoration ramp can be adjusted to the power system needs. Frequency response testing was not completed. Initial testing showed that the units respond very quickly. Problems with local power quality generated false low frequency signals which required testing to be stopped. This should not be a problem in actual operation since the frequency trip points will be staggered to generate a droop curve which mimics generator governor response. The actual trip frequencies will also be low enough to avoid power quality problems. The actual trip frequencies are too low to generate test events with sufficient regularity to complete testing in a reasonable amount of time. Frequency response testing will resume once the local power quality problem is fully understood and reasonable test frequency settings can be determined. Overall the preliminary testing was extremely successful. The hotel response capability matches the power system reliability need, being faster than generation response and inherently available when the power system is under the most stress (times of high system and hotel load). Periodic testing is scheduled throughout the winter and spring to characterize hotel response capability under a full range of conditions. More extensive testing will resume when summer outdoor temperatures are again high enough to fully test hotel response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Case for Modular Redundancy in Large-Scale High Performance Computing Systems

Recent investigations into resilience of large-scale high-performance computing (HPC) systems showed a continuous trend of decreasing reliability and availability. Newly installed systems have a lower mean-time to failure (MTTF) and a higher mean-time to recover (MTTR) than their predecessors. Modular redundancy is being used in many mission critical systems today to provide for resilience, such as for aerospace and command \& control systems. The primary argument against modular redundancy for resilience in HPC has always been that the capability of a HPC system, and respective return on investment, would be significantly reduced. We argue that modular redundancy can significantly increase compute node availability as it removes the impact of scale from single compute node MTTR. We further argue that single compute nodes can be much less reliable, and therefore less expensive, and still be highly available, if their MTTR/MTTF ratio is maintained.

99 GENERAL AND MISCELLANEOUS↗

Detonation command and control

The detonation of one or more explosive charges and propellant charges by a detonator in response to a fire control signal from a command and control system comprised of a command center and instrumentation center with a communications link therebetween. The fire control signal is selectively provided to the detonator from the instrumentation center if plural detonation control switches at the command center are in a fire authorization status, and instruments, and one or more interlocks, if included, are in a ready for firing status. The instrumentation and command centers are desirably mobile, such as being respective vehicles.

47 OTHER INSTRUMENTATION↗

Detonation command and control

The detonation of one or more explosive charges and propellant charges by a detonator in response to a fire control signal from a command and control system comprised of a command center and instrumentation center with a communications link there between. The fire control signal is selectively provided to the detonator from the instrumentation center if plural detonation control switches at the command center are in a fire authorization status, and instruments, and one or more interlocks, if included, are in a ready for firing status. The instrumentation and command centers are desirably mobile, such as being respective vehicles.

58 GEOSCIENCES↗

Detonation command and control

The detonation of one or more explosive charges and propellant charges by a detonator in response to a fire control signal from a command and control system comprised of a command center and instrumentation center with a communications link therebetween. The fire control signal is selectively provided to the detonator from the instrumentation center if plural detonation control switches at the command center are in a fire authorization status, and instruments, and one or more interlocks, if included, are in a ready for firing status. The instrumentation and command centers are desirably mobile, such as being respective vehicles.

47 OTHER INSTRUMENTATION↗

EVSE Characterization: V2G EVSE Comparison

As part of the U.S. Department of Energy EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization is conducted over a wide range of direct current (DC) current and DC voltage operation for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2024 study conducted on electric vehicle supply equipment (EVSE) characterization by the Idaho National Laboratory (INL) include two bi-directional vehicle-to-grid (V2G) capable EVSEs. These EVSE are referred to as V2G-EVSE9 and V2G-EVSE10. Laboratory testing is conducted at nominal test conditions to characterize the power transfer capabilities, efficiency, power factor, and other power quality metrics of the two DC EVSEs capable of V2G bi-directional power transfer. Results from testing show the performance is consistent for V2G-EVSE9 and V2G-EVSE10 when comparing charging to discharging performance, except for V2G-EVSE10 for power transfer when operating above 70% of the rated DC current. V2G-EVSE10 efficiency is >98% while charging and <91% while discharging at the same operating conditions, near maximum-rated current, at 300VDC. In contrast, V2G-EVSE9 results are consistent for charging and discharging. This EVSE is nearly 96% efficient while charging or discharging when operating over 50% of rated AC power. V2G EVSE performance is also characterized during off-nominal AC grid conditions involving AC voltage deviation (426 VAC to 518 VAC), AC frequency deviation of +2% (58.8 Hz to 61.2 Hz), and AC voltage harmonics injection. Many test conditions have little-to-no impact on performance characteristics of the two EVSEs; however, there are a few notable findings with significant power transfer capability impacts. AC voltage harmonics injection resulted in negative impacts on power quality attributes for both EVSEs, but with no impact on power transfer capability. Off-nominal AC voltage and frequency conditions resulted in unstable or lack of power transfer capability for both EVSEs. V2G-EVSE9 is unable to transfer power when AC voltage is >300V L-N. V2G-EVSE10 is unable to transfer power when AC frequency deviation exceeds +0.8%. V2G energy management system transient response and latency are quantified during laboratory testing. V2G-EVSE9 and V2G-EVSE10 utilize cloud-based V2G energy management systems that command the power transfer level between the EVSE and EV. The latency and response characteristics of the entire systems (web-based user interface, V2G energy management system, cellular communications, and EVSE response) are quantified through laboratory testing for V2G-EVSE9 and V2G-EVSE10. V2G-EVSE9 latency ranges from 0.8 to 1.8 seconds, whereas V2G-EVSE10 latency ranges from 3.4 to 8.8 seconds. The ramp rate to a change in power transfer request also differs between the two EVSEs. V2G-EVSE10 ramp rate ranges from 50% to -250% of rated AC power per second, whereas V2G-EVSE9 rate ranges from 95% to -95% of rated AC power per second. At the highest rate of change in power transfer, V2G-EVSE10 can change from full charge power to full discharge power in less than one second. The V2G EVSE characterization presented in this report provides valuable insights and results for use by numerous entities. This includes modeling and simulation organizations, decision makers, fleet planning, industry stakeholders, and many others involved with the development and deployment of electrified transportation technologies. Additional high-power DC chargers, bidirectional chargers, and inductive power transfer EVSE characterization results are anticipated from additional EVSE brands and models, which will be detailed in future publications in support of the U.S. Department of Energy EVs@Scale consortium Next-Gen Profiles project.

25 ENERGY STORAGE↗

A Hierarchical VLSM-Based Demand Response Strategy for Coordinative Voltage Control between Transmission and Distribution Systems

This paper presents a two-stage hierarchical voltage-load sensitivity matrix (VLSM)-based demand response (DR) algorithm for regulating the voltage at distribution feeders while fulfilling the transmission system DR requests. This allows distributed energy resources be aggregated to provide transmission-level services without causing operational issues in the distribution grids. At the beginning of each operation interval, a transmission system controller will issue DR commands to distribution system controllers. In the first stage, the distribution system controller uses a VLSM-based dispatch algorithm to dispatch the available DR resources on the distribution feeder with an objective to minimize the total voltage deviations at the lowest cost. Then, power flow studies are conducted assuming that the DR commands have been executed. If voltage violations are detected, a second-stage VLSM-based DR dispatch will be performed to remove those violations. After that, the upper and lower DR limits calculated for the next operation interval are sent back to the transmission system controller so the transmission optimization algorithm can use them as operational constraints to make subsequent decisions. The DR resources include smart photovoltaic (PV) inverters that can curtail real power and provide reactive power support, controllable loads and capacitor banks. In conclusion, the IEEE 123-bus test system with 5-minute PV and load data is used to evaluate the performance of the algorithm. In conclusion, simulation results show that the proposed algorithm can fulfill the transmission-level DR requests while maintaining the voltage in the distribution system within limits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Cooperative Game Theory-based Secondary Frequency Regulation in Distribution Systems

Participation of distribution systems in frequency regulation has become an important factor for grid operation after the integration of distributed energy resources (DERs). While available reserves from a single distribution system may not be sufficient for frequency regulation, aggregated reserves from several distribution systems can provide frequency regulation at grid-scale. This paper proposes a cooperative game theory-based approach for secondary frequency regulation in distribution systems consisting of distributed energy resources (DERs). A two-stage strategy is proposed to effectively and precisely determine a change in active power set points of DERs following a command from system operators. In the first stage, the value or worth of each DER and their coalitions are determined using initial rates of change of frequency (ROCOF) for each DER/coalition. In the second stage, the Shapley value, one of the solution concepts of cooperative game theory, is used to determine changes in active power set points of DERs. The proposed method is implemented on several distribution systems including a modified IEEE 13-node system and modified 33-node distribution system.

Gautam, Mukesh↗

The problem analysis of data processing performance in nuclear power plant computerized information and control system - 288

This paper is based on the data processing performance problems of operating command delay and system display not updating real-time for nuclear power plant computerized information and control system. The plant computerized information and control system is responsible for monitoring and controlling the plant operation, and it is a key part in the plant DCS system. Its data processing performance will affect the operation stability of nuclear power plant. The architecture, hardware configuration and data communication for plant computerized information and control system among the different levels in DCS are described. The main reasons affecting data processing performance in different signal channels are analyzed according to the plant load test results. The CPU load curves for real time server and central processing server are displayed, although the detailed cause for operating command delay and system display not updating realtime are not found, central processing server load is heavier than real time server which remind us to analyze the data processing of software resource scheduling deeply. So the resource distribution problem of software execution task is also analyzed according to CPU load test results. This paper provides the optimization analysis for data processing performance, and it is available and effective according to the latest test results. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗