Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Nano-Engineered Catalyst Supported on Ceramic Hollow Fibers for the Utilization of CO 2 in Dry Reforming to Produce Syngas

The objective of this project was to develop a novel catalytic reactor containing nano-engineered catalysts for the utilization of CO 2 (captured from coal-fired power plants and other CO 2 emitting sources) in dry methane reforming (DMR) (CO 2 + CH 4 → 2 H 2 + 2 CO) to produce synthesis gas (syngas). The technology aims to reduce CO2 emissions by developing beneficial uses for CO 2 from coal-fired power plants. It also offers an alternative to mitigate CO 2 emissions in areas where geologic storage may not be an optimal solution and/or utilization could significantly offset the costs of carbon capture and sequestration. The nano-engineered Ni-based catalyst was prepared by atomic layer deposition (ALD). The Ni particles were as small as ~2-4 nm. The nano-engineered catalyst showed CH 4 conversion >95%, H 2 /CO ratio in the range of 0.7-1.0, and CH 4 reforming rate as high as 2,500 L/h/gNi at 850 ºC and pressure of 15-25 psia. The Ni-based ALD catalyst also showed good stability in DMR reaction during a 200-h continuous operation at 850 °C. This is due to strong bonding between the nanoparticles and substrates since the Ni nanoparticles were chemically bonded to the substrate during the ALD process. The high thermal stability maintains the high dispersion of Ni nanoparticles, which can inhibit coke formation because their step edges are small enough to limit carbon nucleation and growth. Technoeconomic analysis (TEA) indicates the levelized cost of syngas (LCOS) is $172/ton with our technology, which is lower than the equivalent (molar) cost of hydrogen produced by steam methane reforming (SMR) or autothermal reforming (ATR). The major operating cost is natural gas feed and fuel, and the levelized cost is highly sensitive to the price of natural gas and relatively insensitive to the CAPEX. Revenues from syngas could have a significant impact on the net cost of electricity (COE), depending on the cost of natural gas and the selling price of syngas, estimated at $36 per MWh if the syngas were sold at $195 per ton. Following DOE NETL’s guidance, a lifecycle analysis (LCA) was conducted to compare with SMR. The functional unit for the basis of comparison was defined as 1kg carbon monoxide in the product stream. The global warming potential (GWP) of our process was found to be 40% lower than the state-of-the-art SMR process. The sensitivity analysis confirms the emissions are most sensitive to the natural gas fuel requirements to deliver heat to the process.

01 COAL, LIGNITE, AND PEAT↗

Rapid Quality Assessment in Additive Manufacturing: New Procedure Accelerates Build Quality Assessment. White paper

Accelerated growth of the additive manufacturing (AM) industry in recent years is accompanied by a rising need for methods to quickly assess quality at-scale. Current practices for quality inspection include nondestructive test methods and destructive testing of witness coupons, which are artifacts built alongside the actual part. However, these methods can be costly and time-consuming. Recognizing this need, the Additive Manufacturing Center of Excellence (AM CoE) initiated a project led by its partner, Auburn University, to develop rapid testing procedure using asbuilt samples tested in torsion to quantitatively assess build quality. The presented work developed a rapid testing procedure using as-built samples tested in torsion to quantify small variances for assessing build quality.

42 ENGINEERING↗

Integrated Water-Gas-Shift Pre-combustion Carbon Capture Process

TDA Research, Inc (TDA) has developed a highly efficient integrated WGS pre-combustion carbon capture technology and demonstrated its techno-economic viability for use in the Integrated Gasification Combined Cycle (IGCC) power plants that process coal. The new system uses a warm gas CO 2 scrubber integrated with a Water-Gas-Shift (WGS) catalyst to capture greater than 90% of the carbon emissions, which does not increase the cost of electricity (COE) as much as conventional carbon capture technologies.

01 COAL, LIGNITE, AND PEAT↗

Emissions mitigation technology for advanced water-lean solvent-based CO 2 capture processes

This technical final report submitted to DOE/NETL presents all the research activities performed during the entirety of DE-FE0031660 project-Emissions Mitigation Technology for Advanced Water-Lean Solvent-Based CO 2 Capture Processes which spans from October 2018 through March 2022. RTI International has been conducting studies from fundamental and operational aspects to reduce the overall amine emissions from the advanced Water-Lean Solvent (WLS) systems, specifically RTI’s Non-Aqueous Solvent (NAS). This technical final report will highlight the key findings from project which align closely to the project objectives which are: Identify the contribution of vapor loss, entrainment, and aerosols to the overall emissions of water-lean systems; Determine the significance of CO 2 capture system operating parameters to the amine emissions; Develop an emissions model based on critical operating parameters; Evaluate the effectiveness of emissions mitigation devices to reduce the amine emissions to <1 ppm under flue coal-fired flue gas; and, Determine the contribution of the ECTs to the overall CO 2 capture cost. The following are the key findings based on numerous tests using both lab-scale setups and parametric testing performed at RTI’s Bench-scale Gas Absorption System (BsGAS). During the BP1, the aerosol generation system and monitoring equipment were installed at BsGAS to produce and determine the aerosol characteristics during the NAS CO 2 capture process. The aerosol produced by this setup produced aerosols with the peak diameter and concentration of 50 micron and 1.2E10 7 cm -3 , respectively. These particle sizes and concentrations are matched to those observed in the actual coal-fired power plant flue gases and expected to be found at the absorber inlet of the CO 2 capture system. Over 1,300 hours of parametric testing have been conducted to evaluate the impact of the aerosols and operating conditions during the CO 2 capture with NAS on the overall amine emissions in the treated flue gas. At the worse condition tested, the presence of the aerosols in the flue gas could increase the overall emissions by 10X compared to the baseline emissions from NAS’s vapor pressure. CO 2 capture rate was found to be a main factor impacting the overall emissions as well as aerosol size and concentrations in the absorber off-gas. The higher CO 2 capture rate, the higher amine emissions in the treated gas. The temperature difference between the temperature bulge seen in the absorber and the water wash temperature also impacts the particle growth where the larger the temperature difference, the more amine emissions from aerosols in the treated gas. The majority of the aerosols did not grow substantially in the system, and the particle concentrations remained nearly constant between the absorber inlet and wash outlet. Only a small portion of the particles were found to grow significantly. The high efficiency demister with mesh size of 5-10 micron can be installed to remove a portion of the aerosols from the gas stream leaving the water wash. Overall, these results from parametric testing have established the emission baseline and validate our assumption on the need of emission control technologies (ECT) in order to minimize the emissions from the baseline NAS CO 2 capture process. Over 2,000 of BsGAS operating hours was used to investigate a handful of process improvements which led to a selection of the vital few changes that effectively control the amine emissions. These process improvements are lime-coated-filters for absorber gas inlet, advanced demister at the top of the absorber, a second water wash with amine recovery unit were designed, installed, and tested at BsGAS at the end of BP1. The result showed that the NAS CO 2 capture process with these additional emission control devices could lower the amine emission in the treated gas to about 1 ppm using a simulated coal-fire flue gas stream. The main contributor in lowering the amine emission came from the second water wash with amine recovery unit where the amine concentration in the scrubbing water was kept below 2 wt% through a continuous amine removal via an adsorbent bed, resulting in a low amine vapor pressure. The adsorbent bed was regenerated via a direct steam regeneration and the recover amine was returned to the absorber to minimize wastewater and makeup amine. A flue gas generation system was designed and installed during the first half of BP2 to support the emission testing using a real coal-derived flue gas. The system is capable of generating both coal- and natural gas- derived flue gases with the composition of the gaseous species highly resemble to that of the power plant flue gases. The particulates detected in the coal-derived flue gas showed the mean diameter of 1 micron. The CO 2 capture operating was then proceed using the real coal-derived flue gas where the amine emission was controlled to be about 0-3 ppm for the total run time of about 200 hours. Similar testing was conducted with natural gas-derived flue gas and the result showed a highly amine emission of 30 ppm under the total run time of 200 hours. The Principal Component Analysis (PCA) and the Partial Least Squares Projection to Latent Structures (PLS) techniques were applied to the parametric testing data to derive a multivariate statistical model. The model was validated and trained with half of the data collected, and the predictive ability of the model was evaluated using the remaining half of the data. The resulting empirical model was capable of predicting the overall emissions from the NAS process without the ECTs with ±15% accuracy (average absolute deviation, AAD) in BP1. As more emission data were obtained under the real coal-flue gas in the BP2, the model incorporated these new set of data to reflect the final process configuration, operating parameters, and amine emission. This results in the updated empirical model predicting the amine emission from the NAS CO 2 capture process with 84% goodness-of-fit (R 2 ), 85% predictability (Q 2 ), and 15% AAD. The study evaluates the use of RTI’s Non-Aqueous Solvent technology for 90% CO 2 capture from a net 650 MWe pulverized coal power plant, downstream of the flue-gas desulfurization unit. The captured CO 2 has a purity of > 95% CO 2 , and is dried, compressed to 15.3 MPa (2,215 psia), ready for sequestration. The analysis uses Case B12B from the DOE Baseline study on Bituminous Coal, Revision 4 where the Cansolv CO 2 capture plant is replaced by the RTI CO 2 Capture plant. The CO 2 capture plant has been sized to capture >90% CO 2 from flue gas derived from a net 650 MWe supercritical pulverized coal power plant. The CO 2 capture plant is equipped with emission control technologies that limits the amine emissions to < 1 ppm. Two different cases were evaluated for the technoeconomic study. The key difference between the two cases is the regenerator pressure. In Case 1, the regenerator operates at 0.195 MPa (28.3 psia), whereas in Case 2, the regenerator pressure is 0.44 MPa (64 psia) thus removing the need for the first stage of compression of the eight-stage compression train. Results from the TEA are compared against the DOE reference cases for SCPC plant with and without CO 2 Capture (Case B12A and Case B12B of the DOE Baseline study, respectively). Case 2 with CO 2 regeneration at higher pressure results in the lower cost of CO 2 capture. The total capital cost of the capture process has been estimated using 2018 dollars in Aspen Process Economic Analyzer and was estimated to be $579 MM. The capture plant operation leads to a total parasitic power loss rate of 96 MWe, resulting in a decrease in pulverized coal power plant efficiency of 7.8% points. The resulting cost of electric power increases from 64.4 mills/kWh, for no capture, to 97.5 mills/kWh, with 90% capture, an increase of 51% in the COE. The cost of capturing 90% CO 2 was estimated to be $38.2/tonne-CO 2 , and meets the DOE target of $40/t-CO 2 . Emission control technologies (ECT) investigated in this project includes a second water wash with use of activated carbon beds for removal of amine from the wash water prior to recirculation in the water wash. These ECT allow operation of the CO 2 capture plant with < 1 ppm amine emissions with the treated flue gas and contributes to $2.4/t-CO 2 captured. Amine emissions derived from thermal and oxidative degradations were investigated under this project along with the emissions derived from aerosols for the NAS system. The thermally degraded of the lean NAS showed less than 4% decreased of the original total amine content in the NAS at 150 °C while the result obtained at 120 °C showed no drop in total amine content, suggesting that thermal degradation of the NAS is minimal. These results also suggested that the thermally degraded species are not likely formed and contributed to the emissions due to the low regeneration temperature of the NAS at 90-105 °C. The oxidative degradation, on the other hand, could become problematic as some of these oxidative degraded species were observed during the NAS-5 testing at National Carbon Capture Center (NCCC) and SINTEF in our previous project. The rapid screening of selected inhibitors suggested that oxidative degradation of NAS can be suppressed using thiol containing compounds in amounts of at least 1 mol%. The detailed mechanistic degradation pathway was conceived for a specific amine used in NAS formulation during BP2. he reduction of the nitrosamines caused by the NO x present in the flue gas was also examined. The study suggested that the thermo-chemical treatment of the NAS solvent would be a more effective and economically viable compared to removing NO x at the DCC.

01 COAL, LIGNITE, AND PEAT↗

Short video provides broad overview of the Lab’s 80-year history

In celebration of the Lab’s 80th anniversary this month, join National Security Research Center Senior Historian, Alan Carr (NSRCMS), as he provides a six-and-a-half-minute overview of the Lab’s history. The video, co-produced by Brian Clayton (CEA-MP) and Howard Coe (CEA-MP), covers three phases of the Lab’s evolution, from a nuclear weapons laboratory, then a nuclear science laboratory, to its manifestation today as a multidisciplinary laboratory.

99 GENERAL AND MISCELLANEOUS↗

Development of a Pre-Combustion CO 2 Capture Process Using High-Temperature PBI Hollow-Fiber Membranes

The overall objective of this project was to evaluate the advantages of transformational polybenzimidazole (PBI) polymer hollow-fiber membrane (HFM)-based, carbon dioxide (CO 2 ) capture and purification technology at bench-scale using an actual coal-derived syngas stream from a coal gasification facility. The project was carried out over two budget periods. The technical objectives in Budget Period 1 (BP1) included preparing HFs and modules and upgrading the available skid for field testing. The technical objectives for BP2 were to field-test the skid unit with actual coal-derived syngas from an oxygen-blown gasifier to obtain performance data, update the Techno-Economic Analysis (TEA) that would assist with future process scale-up, and provide information on the design of a small pilot-scale test unit. The goal was to advance the PBI-HFM CO 2 capture and gas separation system for pre-combustion applications beyond second-generation economic performance predictions and make progress toward meeting overall fossil energy performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) 30% less than baseline capture approaches. The research program was designed with progressive technical tasks leading to both dynamic and steady-state testing of the PBI-HFM skid with actual coal-derived syngas. The work plan was to: (1) fabricate sufficient Generation-2 (GEN-2) fibers for module fabrication; (2) upgrade the fiber skid to accommodate large fiber modules for bench-scale field testing; (3) conduct dynamic and steady-state testing with coal-derived syngas from an oxygen-blown gasifier and obtain system performance data; (4) perform a TEA and environmental, health, and safety (EH&S) assessment; (5) update the State-Point Data Table, Technology Gap Analysis (TGA), and Technology Maturation Plan (TMP); (6) uninstall and return the test skid to the Recipient’s facilities; and (7) submit a Final Report that describes the results and analysis of the project research effort.

03 NATURAL GAS↗

Bench-Scale Testing of a High Efficiency, Ultra-Compact Process for Pre-Combustion CO 2 Capture (Final Report)

The overarching objective of this bench-scale study is to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift (WGS) reaction process that employs a carbon molecular sieve (CMS) membrane reactor (MR) followed by an adsorption reactor (AR) for pre-combustion CO 2 capture while demonstrating progress towards achievement of the overall performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) of 30% less than the baseline capture approaches. The main goal of this bench-scale project is to advance the proposed MR-AR transformative CO 2 capture technology to a sufficient maturity level so that our present industrial partners (M&PT and Worley) can potentially adapt the technology for further small pilot-scale testing. The project began at TRL 4, as the system prototype had already been validated in the laboratory on simulated syngas (as part of project DE-FE0026423). The project ended at TRL 5, via scaling-up of the prototype system and testing it on actual syngas at a host site (CAER at the University of Kentucky (UKy)). The project was carried-out in two different phases: In Phase I (during BP1 of the project), the team designed, constructed, and assembled the bench-scale experimental MR-AR system, prepared the membranes, adsorbents, and catalysts, tested the bench-scale unit with simulated syngas to validate functionality, and prepared a preliminary TEA of the technology. In Phase II (during BP2 of the project), the team installed the unit at the test site at the UKy site and completed all utility connections and hookups, field-tested the novel MR-AR process in the bench-scale system using real syngas, collected and analyzed experimental data, and completed a detailed TEA of the technology. A key aim of the project was to identify and address the technical and process risks and to generate information to advance the technology to the next stage of development. All project milestones and success criteria were met. Specifically, the team: (i) designed, constructed and assembled a bench scale system that handled 1 – 5 scfm syngas and tested its functionality with simulated syngas; (ii) prepared high performance CMS membrane tubes (ID: 3.5 mm, OD: 5.7 mm, 30” long) that meet the target H 2 permeance ( > 1 m 3 /(m 2 .hr.bar) or (> 370.3 GPU)) and a target H 2 /CO selectivity >80 at the relevant temperature (up to 300oC) and pressure conditions (up to 25 bar) with a <10% decline in performance over each 250 hr. testing period (iii) procured commercial sour-shift catalyst in sufficient quantity and prepared up to 10 kg of pelletized adsorbent for use at relevant conditions (250oC 2.5wt.% and target sorbent attrition rate < 0.2; (iv) installed the bench-scale unit at the test site (UKy) and tested the MR-AR technology using real syngas for over 250 hr. for both static and flow experiments; (v) updated the TEA analysis based on bench-scale data and met CO 2 capture goals of 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. The CMS membranes, HTC adsorbents and catalysts employed all exhibited very robust and stable performance during the long-term run (over a >250 hr live syngas run). Furthermore, the proposed MR-AR IGCC system achieved a LCOE with a N 2 sale price of $\$$ 30/ton, with N 2 compression (no N 2 compression) of 101.2 $\$$/MWh (95.3 $\$$/MWh), which represents a 29.8% (33.9%) LCOE reduction in the baseline IGCC with carbon capture of 144.2 $\$$/MWh. The proposed MR-AR IGCC delivers a CO 2 capture cost of 44.8 $\$$/tonne (39.9 $\$$/tonne) vs 98.1 $\$$/tonne of the baseline capture case and a net power production of 586 MWe (623 MWe) vs 556 MWe of the baseline capture case.

01 COAL, LIGNITE, AND PEAT↗

Quality Guidelines for Energy System Studies: Cost Estimation Methodology for NETL Techno-economic Assessments

This Quality Guidelines for Energy System Studies (QGESS) summarizes the methodology employed by the National Energy Technology Laboratory (NETL) in calculating plant costs in its techno-economic studies, such as the Cost and Performance Baseline for Fossil Energy Systems series of reports. It also outlines the approach used to calculate the cost of electricity (COE) or cost of product (COP) metrics by which NETL estimates the impact of technology options. These metrics and a clear understanding of the methodology used are essential in allowing different plant technologies to be compared on a similar basis. These guidelines were initially developed for power producing plants, although they can be applied to a variety of different revenue generating plants (e.g., coal to liquids, syngas generation, hydrogen) by substituting the industrial product quantity for the electrical quantity in the equations. The tables contained in this QGESS have been expanded upon relative to previous versions to include values to assume for several industries.

20 FOSSIL-FUELED POWER PLANTS↗

Transformational Sorbent System for Post-Combustion Carbon Capture (Final Report)

As part of this DOE Contract (Transformational Sorbent System for Post-Combustion Carbon Capture, DE-FE0031734),TDA Research Inc. developed a transformational sorbent system for post combustion CO 2 capture process that captures more than 95% of CO 2 emissions from a coal fired power plant, recovering CO 2 at 95% purity with a cost of CO 2 capture significantly lower than with amine-based system (~$30 per tonne (MT) of CO 2 captured). TDA’s transformational sorbent system uses a novel, highly stable, high-capacity metal organic framework (MOF) based CO 2 sorbent in a new vacuum/concentration swing adsorption (VCSA) process that allows us to use high efficiency vacuum pumps with a low auxiliary load. A pulverized coal fired power plant equipped with TDA’s transformational sorbent system for post combustion CO 2 capture is expected to efficiently produce electricity with a low Cost of Electricity (COE) and capture greater than 95% of the CO 2 from the power plant exhaust.

01 COAL, LIGNITE, AND PEAT↗

Development of an Advanced Multiphysics Simulation Capability for Radiant's Microreactor Design

Argonne National Laboratory and Idaho National Laboratory, through a Department of Energy Gateway for Accelerated Innovation in Nuclear Voucher, supported key analysis needs of Radiant related to (i) air jacket thermal fluid performance, (ii) evaluation of decay heat source terms defining air jacket technical requirements, and (iii) assessment of modeling methodologies employed for core analysis. All of these activities center on numerical simulation of various aspects of Kaleidos using the Multiphysics Object-Oriented Simulation Environment (MOOSE) framework, the Cardinal multiphysics application, the OpenMC Monte Carlo code, and the Nek5000 computational fluid dynamics (CFD) code. This project builds upon an earlier Nuclear Energy Advanced Modeling and Simulation (NEAMS) Thermal-Hydraulic (T/H) Center of Excellence (CoE) project focused on initial demonstration of Cardinal multiphysics simulation of High Temperature Gas Reactors (HTGRs) and now focuses on Radiant’s Kaleidos concept.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Frequency Control and Dynamics (Part 1) [Slides]

This presentation provides an introductory overview of system dynamics and frequency control in electric power systems, with a focus on concepts relevant to small and interconnected grids such as those in Malawi. It explains foundational principles of AC system frequency, the relationship between generation-demand balance and frequency deviations, and the operational limits of generators and end-use equipment. The deck discusses frequency stability within broader system stability classifications and illustrates how inertia and turbine-governor dynamics shape system response to disturbances. It then outlines the tiered approach to frequency control - primary, secondary, and tertiary - detailing the roles, characteristics, timescales, and response mechanisms of each. Special emphasis is placed on hydro and thermal unit behavior, area control error (ACE), automatic generation control (AGC), and the operational implications of interconnecting small systems with larger grids. The material was developed to support Malawi's electricity sector and the establishment of the Southern Africa Battery Energy Storage Center of Excellence (SABESS CoE).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency Control and Dynamics (Part 2) [Slides]

This presentation provides an introductory overview of system dynamics and frequency control in electric power systems, with a focus on concepts relevant to small and interconnected grids such as those in Malawi. It explains foundational principles of AC system frequency, the relationship between generation-demand balance and frequency deviations, and the operational limits of generators and end-use equipment. The deck discusses frequency stability within broader system stability classifications and illustrates how inertia and turbine-governor dynamics shape system response to disturbances. It then outlines the tiered approach to frequency control - primary, secondary, and tertiary - detailing the roles, characteristics, timescales, and response mechanisms of each. Special emphasis is placed on hydro and thermal unit behavior, area control error (ACE), automatic generation control (AGC), and the operational implications of interconnecting small systems with larger grids. The material was developed to support Malawi's electricity sector and the establishment of the Southern Africa Battery Energy Storage Center of Excellence (SABESS CoE).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Techno-Economic Analysis of Solid Oxide Fuel Cell-Gas Turbine Hybrid Systems for Stationary Power Applications Using Renewable Hydrogen

Solid oxide fuel cell (SOFC)–gas turbine (GT) hybrid systems can produce power at high electrical efficiencies while emitting virtually zero criteria pollutants (e.g., ozone, carbon monoxide, oxides of nitrogen and sulfur, and particulate matters). This study presents new insights into renewable hydrogen (RH 2 )-powered SOFC–GT hybrid systems with respect to their system configuration and techno-economic analysis motivated by the need for clean on-demand power. First, three system configurations are thermodynamically assessed: (I) a reference case with no SOFC off-gas recirculation, (II) a case with cathode off-gas recirculation, and (III) a case with anode off-gas recirculation. While these configurations have been studied in isolation, here we provide a detailed performance comparison. Moreover, a techno-economic analysis is conducted to study the economic competitiveness of RH 2 -fueled hybrid systems and the economies of scale by offering a comparison to natural gas (NG)-fueled systems. Results show that the case with anode off-gas recirculation, with 68.50%-lower heating value (LHV) at a 10 MW scale, has the highest efficiency among the studied scenarios. When moving from 10 MW to 50 MW, the efficiency increases to 70.22%-LHV. These high efficiency values make SOFC–GT hybrid systems highly attractive in the context of a circular economy as they outcompete most other power generation technologies. The cost-of-electricity (COE) is reduced by about 10% when moving from 10 MW to 50 MW, from USD 1976/kW to USD 1668/kW, respectively. Renewable H 2 is expected to be economically competitive with NG by 2030, when the U.S. Department of Energy’s target of USD 1/kg RH 2 is reached.

25 ENERGY STORAGE↗

Field-Scale Testing of a High-Efficiency Membrane Reactor (MR)—Adsorptive Reactor (AR) Process for H2 Generation and Pre-Combustion CO2 Capture

The study objective was to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift reaction process employing a carbon molecular sieve membrane (CMSM)-based membrane reactor (MR) followed by an adsorptive reactor (AR) for pre-combustion CO2 capture. The project was carried out in two different phases. In Phase I, the field-scale experimental MR-AR system was designed and constructed, the membranes, and adsorbents were prepared, and the unit was tested with simulated syngas to validate functionality. In Phase II, the unit was installed at the test site, field-tested using real syngas, and a technoeconomic analysis (TEA) of the technology was completed. All project milestones were met. Specifically, (i) high-performance CMSMs were prepared meeting the target H2 permeance (>1 m3/(m2.hbar) and H2/CO selectivity of >80 at temperatures of up to 300 °C and pressures of up to 25 bar with a <10% performance decline over the testing period; (ii) pelletized adsorbents were prepared for use in relevant conditions (250 °C < T < 450 °C, pressures up to 25 bar) with a working capacity of >2.5 wt.% and an attrition rate of <0.2; (iii) TEA showed that the MR-AR technology met the CO2 capture goals of 95% CO2 purity at a cost of electricity (COE) 30% less than baseline approaches.

42 ENGINEERING↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

Optical functions of crystalline and amorphous TeO2

The optical functions of crystalline paratellurite (α-TeO2) and amorphous TeO2 were determined using several optical techniques: (1) standard spectroscopic two-modulator generalized ellipsometry (2-MGE) of paratellurite (200–850 nm, 6.2–1.46 eV), (2) near-normal-incidence two-modulator generalized ellipsometry microscopy (2-MGEM) of paratellurite (577 nm, 2.15 eV), (3) Mueller matrix transmission of paratellurite (320–798 nm, 3.87–1.55 eV), and (4) polarized transmission of paratellurite (323.6–334.3 nm, 3.83–3.71 eV). The 2-MGE measurements yielded highly accurate values of the dielectric functions and error estimates from 1.46 to 6.2 eV for both paratellurite and amorphous TeO2, whereas the polarization-dependent transmission yielded more accurate values of the absorption coefficient below the band edge of paratellurite. The 2-MGEM measured the diattenuation of paratellurite, which is related to the birefringence. Mueller matrix transmission measurements of paratellurite of a (001) cut crystal as a function of angle of incidence were used to determine both the birefringence and the rotary power as a function of photon energy.

Jellison Jr, Gerald [ORNL]↗

Pioneer WEC concept design report

The "Pioneer WEC" project is targeted at developing a wave energy generator for the Coastal Surface Mooring (CSM) system within the Ocean Observatories Initiative (OOI) Pioneer Array. The CSM utilizes solar photovoltaic and wind generation systems, along with rechargeable batteries, to power multiple sensors on the buoy and along the mooring line. This approach provides continuous power for essential controller functions and a subset of instruments, and meets the full power demand roughly 70% of the time. Sandia has been tasked with designing a wave energy system to provide additional electrical power and bring the CSM up-time for satisfying the full-power demand to 100%. This project is a collaboration between Sandia and Woods Hole Oceanographic Institution (WHOI), along with Evergreen Innovations, Monterey Bay Aquarium Research Institute (MBARI), Eastern Carolina University (ECU), Johns Hopkins University (JHU), and the National Renewable Energy Laboratory (NREL). This report captures Phase I of an expected two phase project and presents project scoping and concept design results.

16 TIDAL AND WAVE POWER↗