Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CLOSURES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Hamiltonian fluid closures of the Vlasov-Ampère equations: From water-bags to N moment models

Moment closures of the Vlasov-Ampère system, whereby higher moments are represented as functions of lower moments with the constraint that the resulting fluid system remains Hamiltonian, are investigated by using water-bag theory. The link between the water-bag formalism and fluid models that involve density, fluid velocity, pressure and higher moments is established by introducing suitable thermodynamic variables. The cases of one, two, and three water-bags are treated and their Hamiltonian structures are provided. In each case, we give the associated fluid closures and we discuss their Casimir invariants. We show how the method can be extended to an arbitrary number of fields, i.e., an arbitrary number of water-bags and associated moments. The thermodynamic interpretation of the resulting models is discussed. Finally, a general procedure to derive Hamiltonian N-field fluid models is proposed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Communication: Fragment-based Hamiltonian model of electronic charge-excitation gaps and gap closure

Capturing key electronic properties such as charge excitation gaps within models at or above the atomic scale presents an ongoing challenge to understanding molecular, nanoscale, and condensed phase systems. One strategy is to describe the system in terms of properties of interacting material fragments, but it is unclear how to accomplish this for charge-excitation and charge-transfer phenomena. Hamiltonian models such as the Hubbard model provide formal frameworks for analyzing gap properties but are couched purely in terms of states of electrons, rather than the states of the fragments at the scale of interest. The recently introduced Fragment Hamiltonian (FH) model uses fragments in different charge states as its building blocks, enabling a uniform, quantum-mechanical treatment that captures the charge-excitation gap. These gaps are preserved in terms of inter-fragment charge-transfer hopping integrals T and on-fragment parameters U{sup (FH)}. The FH model generalizes the standard Hubbard model (a single intra-band hopping integral t and on-site repulsion U) from quantum states for electrons to quantum states for fragments. We demonstrate that even for simple two-fragment and multi-fragment systems, gap closure is enabled once T exceeds the threshold set by U{sup (FH)}, thus providing new insight into the nature of metal-insulator transitions. This result is in contrast to the standard Hubbard model for 1d rings, for which Lieb and Wu proved that gap closure was impossible, regardless of the choices for t and U.

74 ATOMIC AND MOLECULAR PHYSICS↗

Third-moment closure of turbulence for predictions of separating and reattaching shear flows: A study of Reynolds-stress closure model

A numerical study of computations in backward-facing steps with flow separation and reattachment, using the Reynolds stress closure is presented. The highlight of this study is the improvement of the Reynold-stress model (RSM) by modifying the diffusive transport of the Reynolds stresses through the formulation, solution and subsequent incorporation of the transport equations of the third moments, bar-u(i)u(j)u(k), into the turbulence model. The diffusive transport of the Reynolds stresses, represented by the gradients of the third moments, attains greater significance in recirculating flows. The third moments evaluated by the development and solution of the complete transport equations are superior to those obtained by existing algebraic correlations. A low-Reynolds number model for the transport equations of the third moments is developed and considerable improvement in the near-wall profiles of the third moments is observed. The values of the empirical constants utilized in the development of the model are recommended. The Reynolds-stress closure is consolidated by incorporating the equations of k and e, containing the modified diffusion coefficients, and the transport equations of the third moments into the Reynolds stress equations. Computational results obtained by the original k-e model, the original RSM and the consolidated and modified RSM are compared with experimental data. Overall improvement in the predictions is seen by consolidation of the RMS and a marked improvement in the profiles of bar-u(i)u(j)u(k) is obtained around the reattachment region.

Amano, R. S.↗

A broadly-applicable unified closure relation for Taylor bubble rise velocity in pipes with stagnant liquid

Taylor bubble velocity in slug flow is a closure relation which significantly affects the prediction of liquid holdup (or void fraction) and pressure gradient in mechanistic models of slug flow for oil and gas pipe applications. In this work, we use a validated Computational Fluid Dynamics (CFD) approach to simulate the motion of Taylor bubbles in pipes; the interface is tracked with a Level-Set method implemented in a commercial code. A large numerical database is generated covering the most ample range of fluid properties and pipe inclination angles explored to date (Eo ∊ [10, 700],Mo ∊ [1 x 10 -6 , 5 x 10 3 , and θ ∊ [0°, 90°]). A unified Taylor bubble rise velocity correlation is extracted from that database. The new correlation predicts the numerical database with 8.6% absolute average relative error and a coefficient of determination R 2 = 0.97 and other available experimental data with 13.0% absolute average relative error and R 2 = 0.84 outperforming existing correlations and models.

Mechanics↗

High-rate strength response of tantalum from dynamic hole closure experiments

The science and engineering communities have significant interest in experimental platforms to evaluate and improve models for dynamic material deformation. While well-developed platforms exist, there are still gaps to fill for strain and strain rate conditions accessed during impact and other high-rate loading scenarios. To fill one such gap for strength measurements, a platform was recently developed that accesses high strain rate (≥ 10 5 /s) and large strain (≥ 50%) conditions by measuring the transient closure of a cylindrical hole using in situ x-ray imaging. In the work reported here, further refinement of the platform is performed to reduce the potential effects of porosity and anelasticity on the measurement. This helps us to isolate the strength effects that are the focus of the experiment. The updated experimental configuration employs a two-layer flyer design and elongated target to reduce the magnitude of the tensile excursions associated with rarefaction wave interactions. This allows for a more direct assessment of strength models commonly used for dynamic simulations of metals. Here we apply the new technique to well-characterized tantalum material, allowing for a robust connection to other experimental techniques. Deformation localization can be a concern in large strain experiments, and to help inform future use of the experimental platform, we use simulations with a sub-zone treatment of shear banding to explore potential localization behavior. Here we develop and utilize an experimental configuration with improved isolation of strength effects that can be applied to an expanded range of materials.

42 ENGINEERING↗

The impact of collisionality, FLR, and parallel closure effects on instabilities in the tokamak pedestal: Numerical studies with the NIMROD code

The extended-MHD NIMROD code [C. R. Sovinec and J. R. King, J. Comput. Phys. 229, 5803 (2010)] is verified against the ideal-MHD ELITE code [H. R. Wilson et al., Phys. Plasmas 9, 1277 (2002)] on a diverted tokamak discharge. When the NIMROD model complexity is increased incrementally, resistive and first-order finite-Larmour radius effects are destabilizing and stabilizing, respectively. Lastly, the full result is compared to local analytic calculations which are found to overpredict both the resistive destabilization and drift stabilization in comparison to the NIMROD computations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Single-neutron levels near the N=82 shell closure

The (d, p) reaction was measured with the radioactive ion beams of {sup 126}Sn and {sup 128}Sn in inverse kinematics at the Holifield Radioactive Ion Beam Facility at Oak Ridge National Laboratory, utilizing the Super ORRUBA silicon detector array. Angular distributions of reaction protons were measured for several states in {sup 127}Sn and {sup 129}Sn to determine angular momentum transfers and deduce spectroscopic factors. Such information is critical for calculating direct (n,{gamma}) cross sections for the r-process as well as for constraining shell model parameters in the A Almost-Equal-To 130 region. Combined with previous experiments on {sup 130}Sn and {sup 132}Sn, these results will provide a complete set of (d, p) reaction data on even tin isotopes between stable {sup 124}Sn and doubly-magic {sup 132}Sn.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Addendum 2 to the Closure Report for CAU 577 Area 5 Chromium Containing Waste Disposal Cells, NNSS, Nevada

Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” includes five low-level waste cells at the Nevada National Security Site Area 5 Radioactive Waste Management Site where buried waste received from Nuclear Fuel Services, Inc., was subsequently determined to contain chromium that exceeded the toxicity characteristic leaching procedure regulatory limit, which would require the waste to carry hazardous waste code D007. CAU 577 was created to satisfy the requirements of the Settlement Agreement (SA) executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) on April 25, 2019 (NDEP 2019). The SA required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO). The FFACO process ensures proper closure of the chromium-containing waste and documentation of that closure through FFACO-type documents. The following three Corrective Action Sites (CASs) were closed, and their closure was documented in the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030, dated September 2021 (U.S. Department of Energy [DOE] Environmental Management [EM] Nevada Program 2021a): • CAS 05-21-02, Waste Disposal Cell 12 • CAS 05-21-03, Waste Disposal Cell 15 • CAS 05-21-04, Waste Disposal Cell 17 Closure of the following CAS was previously documented in the Addendum to the Closure Report for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada, DOE/EMNV--0030-ADD, dated September 2022 (DOE EM Nevada Program 2022): • CAS 05-21-05, Waste Disposal Cell 20 This second addendum to the Closure Report documents the closure activities that have occurred for CAS 05-21-06, Waste Disposal Cell 21. This is the last CAS in CAU 577. The final waste shipment was placed in the waste disposal cell on November 21, 2022. Following this, closure activities began on November 28, 2022, and were conducted according to the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for CAU 577 (DOE EM Nevada Program 2021b). The following closure activities were performed: • Constructing an engineered evapotranspiration cover • Installing two subsidence monuments and vadose zone monitoring equipment • Seeding the cover with a mixture of native plant species • Installing four concrete monuments on the corners of the cover and placing two use restriction (UR) warning signs on each monument These activities fulfill applicable federal and state regulations for closure of CAS 05-21-06 and minimize potential future exposure pathways to buried waste. Completed closure activities are also consistent with closure of the nine historical Resource Conservation and Recovery Act (RCRA) units included in Section 10.2.2 of the RCRA Permit that governs hazardous waste management activities at the Nevada National Security Site (Permit NEV HW0101) (NDEP 2023). UR documentation for this CAS is included in Appendix B of this report. The post-closure plan is presented in detail in the CADD/CAP for CAU 577 (DOE EM Nevada Program 2021b), and the requirements are summarized in Section 5.2 of this document. In accordance with paragraph 5D of the SA, a request to incorporate the requirements for post-closure monitoring of CAU 577 was included with the permit application for RCRA Permit NEV HW0101 that was submitted in January 2022 (NNSA/NFO 2022). The request included the post-closure requirements for the three CASs that had been closed at the time of submittal of the application as well as requirements that would be implemented upon future approval of closure of the remaining two CASs. All CAU 577 post-closure monitoring requirements have been captured in the April 4, 2023, Revision 7 of the RCRA Permit (NDEP 2023). As the RCRA Permit NEV HW0101 has been revised since the submittal of the original CAU 577 Closure Report (DOE EM Nevada Program 2021a) and Addendum 1 (DOE EM Nevada Program 2022), the post-closure requirements in this Addendum 2 report do not align with the previous documents. Specific changes resulting from the issuance of Revision 7 of the RCRA Permit are discussed in Section 5.2 of this report. The requirements in this report are consistent with the current permit (NDEP 2023) and supersede all requirements listed in the CAU 577 Closure Report and Addendum 1. All CAU 577 post-closure requirements should be conducted in accordance with the version of the RCRA Permit that is current at the time of the activities being performed. The DOE EM Nevada Program is requesting a Notice of Completion from NDEP for closure of CAU 577. Although CAU 577 is not a legacy site, the FFACO process is being followed to ensure proper closure of the chromium-containing waste. Therefore, transfer of CAU 577 from Appendix III of the FFACO to Appendix IV, Closed Corrective Action Units, is requested, as all closure activities have been completed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-closure program streamlining at the Nevada national security site - 15290

More than 200 sites on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) have been closed in place. At these sites, contamination has been left in place, and protection of human health, safety, and the environment is ensured through the establishment of use restrictions (URs). Post-closure requirements were initially established in the Closure Report (CR) for each site and include a variety of inspection, monitoring, maintenance, and reporting commitments. Post-closure requirements and site controls (fences, monuments, soil covers, and postings) may vary depending on site location, accessibility, land use scenario, and the nature of contaminants left in place. Corrective Action Sites (CASs) on the NNSS, NTTR, and TTR have been identified for closure under the Federal Facility Agreement and Consent Order (FFACO), which was signed in 1996. Over 1,900 CASs have been closed under the framework of the FFACO, and more than 200 of those have URs. Many post-closure requirements have been modified over time. In addition, because the scope of the program has spanned almost 20 years, the post-closure requirements have varied due to changing strategies and expectations. Because of the number of sites closed over the course of the program, post-closure requirements are found in hundreds of closure documents, addendums, errata sheets, Records of Technical Change, inspection reports, permit modifications, and correspondence. Furthermore, resources such as personnel and funding necessary to conduct the post-closure program have diminished, while computer capabilities and configuration control principles have improved since closure activities under the FFACO began. Because of these factors, to effectively manage the post-closure program, ensure that all commitments are being met, and improve the ease of identifying the most current post-closure requirements for each UR, the current requirements for every use-restricted site under the purview of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office will be consolidated into a single Post-Closure Plan. The Consolidated Post-Closure Plan will also outline a strategy and present possible criteria that may be used for future evaluation of post-closure requirements. Continual assessment of the post-closure program will ensure that the post-closure requirements for URs across the NNSS, NTTR, and TTR are consistently justifiable and sufficient to protect site workers, the public, and the environment while increasing efficiency. Future changes to post-closure requirements and justification for those changes will be recorded in revisions to the Consolidated Post-Closure Plan. This process will provide a comprehensive, consistent, and streamlined method for evaluation of post-closure requirements and implementation of changes. (authors)

54 ENVIRONMENTAL SCIENCES↗

In-Situ Testing and Performance Assessment of a Redesigned WIPP Panel Closure - 13192

There are two primary regulatory requirements for Panel Closures at the Waste Isolation Pilot Plant (WIPP), the nation's only deep geologic repository for defense related Transuranic (TRU) and Mixed TRU waste. The Federal requirement is through 40 CFR 191 and 194, promulgated by the U.S. Environmental Protection Agency (EPA). The state requirement is regulated through the authority of the Secretary of the New Mexico Environment Department (NMED) under the New Mexico Hazardous Waste Act (HWA), New Mexico Statutes Annotated (NMSA) 1978, chap. 74-4-1 through 74-4-14, in accordance with the New Mexico Hazardous Waste Management Regulations (HWMR), 20.4.1 New Mexico Annotated Code (NMAC). The state regulations are implemented for the operational period of waste emplacement plus 30 years whereas the federal requirements are implemented from the operational period through 10,000 years. The 10,000 year federal requirement is related to the adequate representation of the panel closures in determining long-term performance of the repository. In Condition 1 of the Final Certification Rulemaking for 40 CFR Part 194, the EPA required a specific design for the panel closure system. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has requested, through the Planned Change Request (PCR) process, that the EPA modify Condition 1 via its rulemaking process. The DOE has also requested, through the Permit Modification Request (PMR) process, that the NMED modify the approved panel closure system specified in Permit Attachment G1. The WIPP facility is carved out of a bedded salt formation 655 meters below the surface of southeast New Mexico. Condition 1 of the Final Certification Rulemaking specifies that the waste panels be closed using Option D which is a combination of a Salado mass concrete (SMC) monolith and an isolation/explosion block wall. The Option D design was also accepted as the panel closure of choice by the NMED. After twelve years of waste handling operations and a greater understanding of the waste and the behavior of the underground salt formation, the DOE has established a revised panel closure design. This revised design meets both the short-term NMED Permit requirements for the operational period, and also the Federal requirements for long-term repository performance. This new design is simpler, easier to construct and has less of an adverse impact on waste disposal operations than the originally approved Option D design. The Panel Closure Redesign is based on: (1) the results of in-situ constructability testing performed to determine run-of-mine salt reconsolidation parameters and how the characteristics of the bedded salt formation affect these parameters and, (2) the results of air flow analysis of the new design to determine that the limit for the migration of Volatile Organic Compounds (VOCs) will be met at the compliance point. Waste panel closures comprise a repository feature that has been represented in WIPP performance assessment (PA) since the original Compliance Certification Application of 1996. Panel closures are included in WIPP PA models principally because they are a part of the disposal system, not because they play a substantive role in inhibiting the release of radionuclides to the outside environment. The 1998 rulemaking that certified WIPP to receive transuranic waste placed conditions on the panel closure design to be implemented in the repository. The revised panel closure design, termed the Run-of-Mine (ROM) Panel Closure System (ROMPCS), is comprised of 30.48 meters of ROM salt with barriers at each end. The ROM salt is generated from ongoing mining operations at the WIPP and may be compacted and/or moistened as it is emplaced in a panel entry. The barriers consist of bulkheads, similar to those currently used in the panels as room closures. A WIPP performance assessment has been completed that incorporates the ROMPCS design into the representation of the repository, and compares repository performance to that achieved with the approved Option D design. Several key physical processes and rock mechanics principles are incorporated into the performance assessment. First, creep closure of the salt rock surrounding a panel entry results in consolidation of the ROM salt emplaced in the entry. Eventually, the ROM salt comprising the ROMPCS will approach a condition similar to intact salt. As the ROM salt reaches higher fractional densities during consolidation, back stress will be imposed on the surrounding rock mass leading to eventual healing of the disturbed rock zone above and below the panel closure. Healing of the disturbed rock zone above and below the ROMPCS reduces the porosity and permeability in those areas. Analysis of the new design demonstrates that: (1) the WIPP continues to meet regulatory compliance requirements when the ROMPCS design is implemented instead of Option D, and (2) there is no impact on the short-term effectiveness of the panel closure to limit the concentration of VOCs at the WIPP site boundary to a fraction of the health-based exposure limits (HBLs) during the operational period. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reconstruction of the Room D, B, G, and Q Closure Histories at the Waste Isolation Pilot Plant

Experimental measurements of room closure in salt repositories are valuable for understanding the evolution of the underground and for validating geomechanical models. Room closure was measured during a number of experiments at the Waste Isolation Pilot Plant (WIPP) during the 1980's and 1990's. Most rooms were excavated using a multi-pass mining sequence, where each pass necessarily destroyed some of the mining sequence closure measurement points. These destroyed points were promptly reinstalled to capture the closure after the mining pass. After the room was complete, the mining sequence closure measurement stations were supplemented with remotely read closure measurement stations. Although many aspects of these experiments were thoroughly documented, the digital copies of the closure data were inadvertently destroyed, the non-trivial process of zeroing and shifting the raw closure measurements after each mining pass was not precisely described, the various closure measurements within a given room were not directly compared on the same plot, and the measurements were collected for several years longer than previously reported. Consequently, the hand-written mining sequence closure measurements for Rooms D, B, G, and Q were located in the WIPP archives, digitized, and reanalyzed for this report. The process of reconstructing the mining sequence closure histories was documented in detail and the raw data can be found in the appendices. Within the mid-section of a given room, the reconstructed closure histories were largely consistent with other mining sequence and remotely read closure histories, which builds confidence in the experiments and suggests that plane strain is an appropriate modeling assumption. The reconstructed closure histories were also reasonably consistent with previously published results, except in one notable case: the reconstructed Room Q closure histories 30 days after excavation were about 45 % less than the corresponding closures reported in Munson's 1997 capstone paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modified Closures in Monte Carlo Algorithms for Diffusive Binary Stochastic Media Transport Problems

In a stochastic medium, the material properties at a given spatial location are known only statistically. The most common approach to solving particle transport problems involving binary stochastic media (BSM) is to use the atomic mix approximation in which the transport problem is solved using homogenized (volume-averaged) material properties. A common deterministic model developed for solving BSM particle transport problems is the Levermore-Pomraning (LP) model. Zimmerman and Adams proposed a Monte Carlo algorithm (Algorithm A) that solves the LP equations and another Monte Carlo algorithm (Algorithm B) that locally preserves the sampled material realization; we refer to these Monte Carlo algorithms as the LP and LPLRP (LP local realization preserving) algorithms, respectively. One-dimensional (1D) planar geometry benchmark studies have shown that the LPLRP algorithm is often significantly more accurate than the LP algorithm for problems with an incident angular flux as well as for problems with an interior source. The LPLRP algorithm implementation in these benchmark comparisons made explicit use of the one-dimensional nature of the problem. The LP model is derived by assuming an 'upwind' closure in the coupling term relating the two materials in a binary stochastic medium. Su and Pomraning developed a modified form of this closure by considering the small correlation length limit and requiring the modified closure to produce the correct exponential decay for a source-free half-line albedo problem in rod geometry. They concluded that the modified closure is generally not inferior to the LP closure and in some cases is significantly better. Brantley investigated the use of the Su-Pomraning (SP) closure in the Monte Carlo LP algorithm (LP-SP) for the suite of benchmark problems and concluded that 1) the LP-SP algorithm was somewhat more accurate overall than the LP algorithm and somewhat less accurate overall than the LPLRP algorithm for an incident angular flux benchmark suite, and 2) the LP-SP algorithm was generally the least accurate of the algorithms for an interior source benchmark suite. Larsen et al. performed an asymptotic analysis of the transport equation in 1D planar geometry for the situation in which the physical system is 1) a random binary stochastic medium with material macroscopic total cross sections and mean slab width values of O(1) or smaller and 2) optically thick with weak absorption and sources at each spatial point and therefore globally diffusive. The asymptotic analysis demonstrates that, under these assumptions, the transport equation limits to the conventional diffusion equation with atomically-mixed (volume-averaged) material properties. Larsen et al. also demonstrate that, under these same assumptions, the LP equations asymptotically limit to an atomically-mixed diffusion equation with a diffusion coefficient that is too large, leading to an unphysical flattening of the ensemble-averaged scalar flux distribution. Vasques and Yadav recently performed an asymptotic analysis of an adjusted Levermore-Pomraning closure in which the Markovian transition functions are rescaled such that the equations asymptotically limit to the correct atomically-mixed diffusion equation; we refer to this model as LP-VY. In this paper, we demonstrate that the adjusted LP closure proposed by Vasques and Yadav is a special case of the SP closure obtained by assuming that the absorption cross sections in the two materials are equal. We further demonstrate that the Su-Pomraning closure has the correct asymptotic limit for the diffusive physical system and is therefore an appropriate closure for these problems. We also describe how to incorporate these various closures into the Monte Carlo LP and LPLRP particle transport algorithms, and we present numerical results comparing the accuracy of the Monte Carlo LP, LP-VY, LP-SP, LPLRP, and LPLRP-SP algorithms for the set of diffusive benchmark problems. We demonstrated that the SP closure has the correct asymptotic limit for the diffusive physical system under investigation in this paper and that the VY closure is a special case of the SP closure obtained by assuming equal absorption in the two materials. Both of these closures are readily implemented in the Monte Carlo LP and LPLRP algorithms for particle transport in BSM. Through numerical comparisons to a diffusive benchmark suite, we confirmed that 1) the LP and LPLRP algorithms do not limit to the appropriate diffusion solution and 2) the LP-VY, LP-SP, and LPLRP-SP algorithms limit to the appropriate diffusion solution and are of comparable accuracy. The LPLRP algorithm has been shown to be generally more accurate than the LP algorithm for non-diffusive problems. However, the numerical results in this paper indicate that the LPLRP algorithm does not limit to the correct diffusion equation for the asymptotic limit under consideration. The work in this paper demonstrates that the SP algorithm does limit to the correct diffusion equation for the asymptotic limit considered. Future work will investigate the possibility of whether the LPLRP-SP algorithm is accurate for both diffusive and non-diffusive problems.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Designing a Site Closure Strategy for Uranium in Groundwater and Surface Water - 19534

A site closure strategy was designed and mapped for residual uranium present in groundwater and surface water at the US DOE Office of Legacy Management (LM) Monticello Mill Tailings Site (MMTS) Operable Unit (OU) III, which is regulated under CERCLA. The MMTS is a former mill site that was used to process uranium and vanadium ore in southeastern Utah until 1960. OU III includes surface water in Montezuma Creek and groundwater present in a shallow alluvial aquifer along the creek valley for several kilometers downgradient of the former mill site. The current remedy consists of an operating pump-and-treat system, monitored natural attenuation (MNA), and institutional controls (ICs). Performance evaluations indicate that a prolonged restoration period is likely, as well as an asymptotic trend in uranium concentrations that still exceed the remediation goal. Multiple strategies and scenarios were evaluated before selecting a preferred site closure strategy. Recommendations were developed to support advancing the site towards closure over the next few years and guide the process of regulatory interactions and decision making at the MMTS OU III. Site closure is an important milestone that reflects successful remedial progress at LM sites. Post-closure site management would be maintained to ensure conditions are protective of human health and the environment. The site closure strategy was considered in the context of site remedial progress. The primary sources of groundwater contamination have been removed, including mill tailings and contaminated soils, sediment, and debris. Five-year reviews have regularly concluded that the remedy is protective of human health and environment and that ICs are effective in preventing exposure to contaminated groundwater. The affected aquifer is low-yielding and has no history of domestic use. In 2004, the final remedy selected in the Record of Decision (ROD) was MNA with ICs. However, a pump-and-treat system was installed and continues to operate as a contingency remedy in the area with the highest residual uranium concentrations. The need for a contingency pump-and-treat system was triggered by a departure of the long-term monitoring data from model projections that were used as the basis for remedy performance metrics specified in the ROD. In 2015, the pump-and-treat system was expanded. Average uranium concentrations have declined locally over time. However, monitoring data and column studies indicate that the system effectiveness will eventually become ineffective in reducing uranium concentrations, likely due to the reequilibration of uranium present in the solid matrix in various states (i.e., sorbed, precipitated). Currently, there are no agreed-upon metrics for discontinuing the contingency pump-and-treat system. Three closure strategies effectively applied at other CERCLA sites were considered at MMTS OU III: (1) restoring natural attenuation conditions and conducting MNA; (2) applying alternate concentration limits (ACLs); and (3) waiving a remedial goal based on technical impracticability (TI). Each closure strategy was evaluated in the following manner: (1) identifying the criteria and requirements associated with current regulations, policy, and guidance, (2) assessing the ability to meet those criteria based on the current site knowledge and the conceptual site model, and (3) identifying data gaps that need to be filled to further assess the closure strategy. Following this evaluation, a preferred closure strategy was selected: to transition to a remedy based on MNA and maintenance of ICs, without active remediation. Several scenarios for transitioning to the preferred closure strategy were identified. Each scenario consisted of 'if/then logic' associated with a larger decision diagram. The decision diagram considered the current conceptual site model (CSM) and potential outcomes of studies that will be conducted to fill data gaps, as well as the performance of the existing treatment system and long-term monitoring data. Two scenarios for transitioning to the preferred closure strategy were highlighted for future planning and were described in detail. For both scenarios, the preferred closure strategy includes demonstrating criteria for MNA acceptance, pump-and-treat termination, long-term monitoring, and eventual site delisting. Recommended actions over the next few years were also developed, including updating the CSM, conducting numerical modeling to predict remedial performance and time frames, conducting geochemical analyses to assess uranium fate and transport, and summarizing the lines of evidence and basis for MNA. This detailed example of the development of a site-specific closure strategy provides the thought process and decision logic used to assess uncertainty using an if/then framework; identify common elements and recommended actions to advance the site towards closure; and navigate the inherent uncertainty in the timing of future events, outcome of regulatory discussions, and remedial progress over time that is common to many complex US DOE facilities. In addition, the national regulations, policy, guidance, and state of practice regarding commonly used site closure strategies was summarized for consideration, including MNA, ACLs, and TI. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗