Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CCP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Rapid Coal-Ash Characterization using Geophysical Methods & Machine Learning

Coal combustion products (CCP) are challenging to delineate in heterogeneous field settings. Conventional methods (test pits, coring, and laboratory analyses) are labor-intensive, slow, invasive, and provide sparse spatial coverage. This study evaluates whether rapid non-invasive geophysical screening methods—induced polarization (IP), magnetic susceptibility, and nuclear magnetic resonance (NMR) —combined with surface colorimetry (RGB_24), can discriminate CCP-soil mixtures and provide reliable estimates of CCP content. Laboratory measurements were collected on five CCP-soil mixtures (series) and modeled using (i) a linear baseline, (ii) a calibrated non-linear (power-mean) model, and (iii) a machine-learning (ML) Random Forest approach, with validation via leave-one-series-out and site-specific tests. Across the five series, individual signals—particularly IP and magnetic susceptibility—were strongly predictive of ash content but were consistently outperformed by combined models. The pooled calibrated non-linear and ML models captured the observed non-linearity and achieved high accuracy and precision, improving on linear fits. Colorimetry showed the weakest direct relationship with ash content for the tested samples but improved performance when included in multi-signal models. At pre-selected 3.5% decision threshold, calibrated and ML approaches yielded near-perfect classification (Matthews correlation coefficient ˜ 1), suggesting strong practical operability for field screening. Additionally, field-analog tests highlighted the role of endmembers—accuracy declined without access to end-member measurements but was largely recovered by collecting a minimal labeled pair for local recalibration. With end members, accuracy remained high. Globally trained models performed well on three operational unknowns; however, series-specific refits provided the most accurate predictions. Overall, these results highlight the potential of combining rapid geophysics and minimal local calibration for improved coal-ash delineation.

Peshtani, Klaudio↗

NARC Rayon Replacement Program for the Space Shuttle Reusable Solid Rocket Motor Nozzle: Screening Summary

Thiokol Corporation and NASA MSFC are jointly developing a replacement for North American Rayon Corporation (NARC) Aerospace Grade Rayon (1650/720 continuous filament), the precursor for the Carbon Cloth Phenolic (CCP) ablatives used in the Space Shuttle Reusable Solid Rocket Motor (RSRM) Nozzles. NARC discontinued production of Aerospace Grade Rayon in September 1997. NASA maintains a stockpile of NARC Rayon to support RSRM production through the summer of 2005. The program plan for selection and qualification of a replacement for NARC rayon was approved in August 1998. Screening activities began in February 1999. The intent of this paper is to provide a summary of the data generated during the screening phase of the NARC Rayon Replacement Program. Twelve cellulose based fibers (rayon and lyocell) were evaluated. These fibers were supplied by three independent vendors. Many of these fibers were carbonized by two independent carbonizers. Each candidate was tested according to standard acceptance test methods at each step of the manufacturing process. Additional testing was performed with the candidate CCPS, including hot fire tests, Process studies and mechanical and thermal characterization. Six of the twelve fiber candidates tested were dropped at the conclusion of Phase 1. The reasons for the elimination of these candidates included; difficulties in processing the material in the whitegoods, carbon and CCP forms; poor composite mechanical performance; and future availability concerns. The remaining six fibers demonstrated enough promise to merit continued evaluation and optimization of the CCP fabrication process. Note: Certain CCP data falls under the restrictions of US export laws, (ITAR, etc.) and will not be included in this paper.

Cook, R. V.↗

Overview of NASA's Break the Ice Lunar Challenge

This paper provides the background, status and ongoing plans by NASA’s CentennialChallenges Program (CCP) in developing “Break the Ice Lunar Challenge”. This challenge will enable the development of excavation technologies that can operate in the extreme conditions on the Moon. As a direct result of NASA’s Space Policy Directive 1 (To the Moon, then Mars”), CCP organized a kickoff meeting in October 2019 where Subject Matter Experts (SME) from various NASA centers got together and identified the technology gaps in the areas of Lunar Excavation, Manufacturing, and Construction. Following the kickoff meeting, CCP in partnership with external challenge consultants conducted in-depth interviews with experts from academia, industry, and NASA over a period of two months to further identify any technology gaps and the status of the current state of the art technologies in these areas. Through these activities, we determined that there is sufficient need and opportunity to move forward and develop this into a robust challenge. As a nextstep, CCP organized a workshop in February 2020 where experts from academia, industry, NASA, and other government agencies met to validate the specific technology need and prioritize those needs in such a way that the potential challenge can address the high priority needs. Since the completion of this workshop, a core challenge development team has been working on the challenge scenarios, rules, and requirements with the goal to open the challenge in Nov 2020.

Centennnial Challenges↗

NASA Commercial Crew Program Crew Transportation System Certificate of Flight Readiness Plan

NASA Commercial Crew Program (CCP) Crew Transportation System (CTS) Certification of Flight Readiness (CoFR) is the authorization granted by the Agency that certifies the flight readiness of a Commercial Provider’s CTS to conduct a flight test or mission to transport NASA Crew to and from the ISS. The Commercial Provider is responsible for developing and executing its plan for certifying the flight readiness of its CTS. The CCP with the International Space Station (ISS) Program must substantiate the Commercial Provider’s CoFR assertion to ensure compliance with NASA requirements and NASA Crew safety. NASA CCP CTS CoFR is the approval of the Commercial Provider’s evidence that: • The physical as-built CTS was produced, assembled, integrated, and tested within the approved production and operational constraints. • The mission specific requirements are enveloped within the certified CTS capabilities. • The CTS personnel are trained and certified to support the mission. • All aspects of the CTS are ready for the mission.

Certification of Flight Readiness↗

NASA Support for Commercial Crew Launch Capabilities

Since the earliest days of U.S. human spaceflight, NASA’s Marshall Space Flight Center in Huntsville, Alabama, has played a key role in American crew launch capability, from engineering support for the first Mercury-Redstone launches, to the Saturn launches to the Moon, through Shuttle and now Artemis. Today, Marshall brings that expertise gained through decades of crewed space launches to NASA’s Commercial Crew Program (CCP), providing launch vehicle engineering and programmatic support. The team’s responsibilities have included human certification of commercial launch systems for the CCP missions, including Atlas V and Falcon 9, and verifying each launch vehicle complies with flight certification. MSFC provides expertise in nearly all aspects of launch vehicle design and performance including solid motors and liquid engines, stage propulsion, thrust vector control, structural and dynamics, safety and mission assurance. During each commercial crew launch, an engineering support team is on console at Marshall’s Huntsville Operations Support Center, which has provided launch operations support since Apollo, providing real-time oversight to safety standards for the vehicle and verifying data. Launch vehicle support for Commercial Crew has come as a paradigm shift for the MSFC team, inspiring new approaches that leverage expertise and best practices from past NASA-developed launch vehicle missions, while at the same time providing new synergies from work with commercial partners on CCP. This paper will explore the role that the Marshall launch vehicle services team plays in the Commercial Crew Program, as well as lessons learned from the program that will continue to benefit a new era of spaceflight partnerships.

Commercial Crew↗

Investigating instabilities in magnetized low-pressure capacitively coupled RF plasma using particle-in-cell (PIC) simulations

The effect of a uniform magnetic field on particle transport in low-pressure radio frequency (RF) capacitively coupled plasma (CCP) has been studied using a particle-in-cell model. Three distinct regimes of plasma behavior can be identified as a function of the magnetic field. In the first regime at low magnetic fields, asymmetric plasma profiles are observed within the CCP chamber due to the effect of $\overrightarrow{E}$ × $\overrightarrow{B}$ drift. As the magnetic field increases, instabilities develop and form self-organized spoke-shaped structures that are distinctly seen within the bulk plasma closer to the sheath. In this second regime, the spoke-shaped coherent structures rotate inside the plasma chamber in the -$\overrightarrow{E}$ × $\overrightarrow{B}$ direction, where $\overrightarrow{E}$ × $\overrightarrow{B}$ are the DC electric and magnetic field vectors, respectively, and the DC electric field exists in the sheath and pre-sheath regions. The spoke rotation frequency is in the megahertz range. As the magnetic field strength increases further, the rotating coherent spokes continue to exist near the sheath. The coherent structures are, however, accompanied by new small-scale incoherent structures originating and moving within the bulk plasma region away from the sheath. This is the third regime of plasma behavior. The threshold values of the magnetic field between these regimes were found not to vary with changing plasma reactor geometry (e.g., area ratio between ground and powered electrodes) or the use of an external capacitor between the RF-powered electrode and the RF source. The threshold values of the magnetic field between these regimes shift toward higher values with increasing gas pressure. Analysis of the results indicates that the rotating structures are due to the lower hybrid instability driven by density gradients and electron-neutral collisions. This paper provides guidance on the upper limit of the magnetic field for instability-free operation in low-pressure CCP-based semiconductor deposition and etch systems that use the external magnetic field for plasma uniformity control.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Slow Strain Rate Testing of A537 Tank Wall Material

At Savannah River Site (SRS), High-Level Waste is stored in below-grade carbon steel tanks. This waste in part consists of sludge, salt cake, and/or supernate. Preparation of this waste for future processing involves dissolution of the salt cake layer. The salt dissolution process can create conditions that leave the carbon steel tanks susceptible to localized corrosion. The salt to be dissolved contains high concentrations of nitrate, that once released, create an environment that may be conducive to pitting corrosion and/or stress corrosion cracking (SCC) of carbon steel. The salt dissolution process also liberates interstitial liquid trapped between the salt crystals. This liquid is initially high in nitrite and hydroxide concentration. High pH and greater ratios of nitrite to nitrate act as inhibitors to minimize corrosion of carbon steel in high nitrate environments. However, as dissolution proceeds, the concentration of nitrate will increase, while the hydroxide and nitrite concentration of the interstitial liquid will deplete and become insufficient to prevent the onset of corrosion attack. Tank blending and the addition of inhibitors are used to ensure adequate concentrations of hydroxide and nitrite. However, this is not desirable during salt dissolution as it can reduce process efficiency and increase the amount of waste that needs processing. This testing program was designed to examine the risk of SCC associated with utilizing the pitting factor (PF) and nitrite/nitrate (NO 2 - /NO 3 - ) ratio limits for handling dissolved salt solutions at an elevated temperature in the carbon steel waste tanks. The previously identified limits are a PF of 1.2 and an NO 2 - /NO 3 - ratio of 0.15. The results indicate that as long as the NO 2 - /NO 3 - ratio exceeds 0.1 and the PF is above approximately 0.8, there is a discernible safety margin between the open circuit potential (OCP) and the critical cracking potential (CCP) observed during applied potential testing. However, this margin, defined by the difference between the OCP and CCP, is relatively narrow, ranging from 0.1 to 0.25 volts. This small margin raises concerns about potential shifts in OCP during waste retrieval operations, which could inadvertently increase the risk of SCC if the OCP approaches or exceeds the CCP. These results confirm that dissolved salt solutions provide a potent chemistry that, under certain conditions, makes carbon steel susceptible to SCC. The next question to consider is the influence these results have on decisions for storage and retrieval of waste from the tanks. For Type III/IIIA waste tanks, the risk of SCC remains very low. First, and most importantly, the post-weld stress relief of the tanks has reduced the residual stress near the welds. Thus, without the stress component, SCC risk is minimized. The material of construction (A537 Carbon steel) for the Type III/IIIA tanks is superior to the steel in its resistance to SCC than the steel that was utilized for the Type I, II, and IV tanks (A285 carbon steel). From a chemistry control standpoint for a Type III/IIIA tank directly involved with handling dissolved salt solutions, the PF and NO 2 - /NO 3 - ratio limits may be utilized wherein chemistry control provides an extra layer of defense against SCC. Chemistry control for a Type III/IIIA tank minimizes the risk for a tank that may receive the dissolved salt solution, particularly if that tank is a Type I, II, or IV waste tank. On the other hand, if the dissolved salt solution is handled by a Type I, II, or IV waste tank the risk of SCC is real. The potent chemistry, absence of stress relief, and inferior material result in a condition that is conducive to cracking. Efforts should be made to either avoid transferring waste that may not meet the PF and NO 2 - /NO 3 - ratio criteria to one of these tanks or if it is unavoidable, take measures to minimize the consequences of a leak. As shown by these tests, even if the PF and NO 2 - /NO 3 - ratio criteria are met, there is a risk that the tank potential may be disturbed in the positive direction and the risk of SCC increase.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The NASA ASTP Combined-Cycle Propulsion Database Project

The National Aeronautics and Space Administration (NASA) communicated its long-term R&D goals for aeronautics and space transportation technologies in its 1997-98 annual progress report (Reference 1). Under "Pillar 3, Goal 9" a 25-year-horizon set of objectives has been stated for the Generation 3 Reusable Launch Vehicle ("Gen 3 RLV") class of space transportation systems. An initiative referred to as "Spaceliner 100" is being conducted to identify technology roadmaps in support of these objectives. Responsibility for running "Spaceliner 100" technology development and demonstration activities have been assigned to NASA's agency-wide Advanced Space Transportation Program (ASTP) office located at the Marshall Space Flight Center. A key technology area in which advances will be required in order to meet these objectives is propulsion. In 1996, in order to expand their focus beyond "allrocket" propulsion systems and technologies (see Appendix A for further discussion), ASTP initiated technology development and demonstration work on combined-cycle airbreathing/rocket propulsion systems (ARTT Contracts NAS8-40890 through 40894). Combined-cycle propulsion (CCP) activities (see Appendix B for definitions) have been pursued in the U.S. for over four decades, resulting in a large documented knowledge base on this subject (see Reference 2). In the fall of 1999 the Combined-Cycle Propulsion Database (CCPD) project was established with the primary purpose of collecting and consolidating CCP related technical information in support of the ASTP's ongoing technology development and demonstration program. Science Applications International Corporation (SAIC) was selected to perform the initial development of the Database under its existing support contract with MSFC (Contract NAS8-99060) because of the company's unique combination of capabilities in database development, information technology (IT) and CCP knowledge. The CCPD is summarized in the descriptive 2-page flyer appended to this paper as Appendix C. The purpose of this paper is to provide the reader with an understanding of the objectives of the CCPD and relate the progress that has been made toward meeting those objectives.

Hyde, Eric H.↗

Simulation of Mission Phases

This position with the Simulation and Graphics Branch (ER7) at Johnson Space Center (JSC) provided an introduction to vehicle hardware, mission planning, and simulation design. ER7 supports engineering analysis and flight crew training by providing high-fidelity, real-time graphical simulations in the Systems Engineering Simulator (SES) lab. The primary project assigned by NASA mentor and SES lab manager, Meghan Daley, was to develop a graphical simulation of the rendezvous, proximity operations, and docking (RPOD) phases of flight. The simulation is to include a generic crew/cargo transportation vehicle and a target object in low-Earth orbit (LEO). Various capsule, winged, and lifting body vehicles as well as historical RPOD methods were evaluated during the project analysis phase. JSC core mission to support the International Space Station (ISS), Commercial Crew Program (CCP), and Human Space Flight (HSF) influenced the project specifications. The simulation is characterized as a 30 meter +V Bar and/or -R Bar approach to the target object's docking station. The ISS was selected as the target object and the international Low Impact Docking System (iLIDS) was selected as the docking mechanism. The location of the target object's docking station corresponds with the RPOD methods identified. The simulation design focuses on Guidance, Navigation, and Control (GNC) system architecture models with station keeping and telemetry data processing capabilities. The optical and inertial sensors, reaction control system thrusters, and the docking mechanism selected were based on CCP vehicle manufacturer's current and proposed technologies. A significant amount of independent study and tutorial completion was required for this project. Multiple primary source materials were accessed using the NASA Technical Report Server (NTRS) and reference textbooks were borrowed from the JSC Main Library and International Space Station Library. The Trick Simulation Environment and User Training Materials version 2013.0 release was used to complete the Trick tutorial. Multiple network privilege and repository permission requests were required in order to access previous simulation models. The project was also an introduction to computer programming and the Linux operating system. Basic C++ and Python syntax was used during the completion of the Trick tutorial. Trick's engineering analysis and Monte Carlo simulation capabilities were observed and basic space mission planning procedures were applied in the conceptual design phase. Multiple professional development opportunities were completed in addition to project duties during this internship through the System for Administration, Training, and Education Resources for NASA (SATERN). Topics include: JSC Risk Management Workshop, CCP Risk Management, Basic Radiation Safety Training, X-Ray Radiation Safety, Basic Laser Safety, JSC Export Control, ISS RISE Ambassador, Basic SharePoint 2013, Space Nutrition and Biochemistry, and JSC Personal Protective Equipment. Additionally, this internship afforded the opportunity for formal project presentation and public speaking practice. This was my first experience at a NASA center. After completing this internship I have a much clearer understanding of certain aspects of the agency's processes and procedures, as well as a deeper appreciation from spaceflight simulation design and testing. I will continue to improve my technical skills so that I may have another opportunity to return to NASA and Johnson Space Center.

Carlstrom, Nicholas Mercury↗

NASA KSC Intern Final Report - Virtual Reality in STEM Engagement

For this internship, I was a part of the multi-center NextGen STEM (Science, Technology, Engineering, and Mathematics) pilot. Specifically, I worked with the Developing Commercial Crew Program (CCP) Capabilities team that focuses on human spaceflight to the space station with NASA’s commercial partners. Composed of NASA employees and contractors (who are connected to KSC, JSC, and LaRC), they work to ensure that students will experience traditional classroom content and be immersed in emerging technologies in order to explore Commercial Crew missions and launch facilities. This group is in the process of creating educational products and resources to inspire the next generation to pursue STEM and to allow educators to have access to unique and enticing STEM activities. These products include: age-appropriate classroom lessons (including activity sheets and challenges) for kindergarten through twelfth grade; a CCP app and corresponding guide; learning experiences for students as well as educators; and virtual field trips and tours using NASA-created Virtual Reality (VR) videos and a custom VR app. My particular assignment was managing the VR equipment, developing an understanding of how to maximize the use of the equipment, creating documents that explain and convey the operations and procedures concerning the equipment (including lessons learned from equipment use), and training others to utilize the equipment effectively and correctly for conference events and group demonstrations. Over the course of this internship, I helped my team outline and learn essential procedures of operation for the VR equipment, solved technology problems that arose (due to the nature of creating unique products), and encouraged audiences at KSC and various conferences to consider using the CCP VR videos in their classrooms as an opportunity to engage and challenge the next generation to pursue STEM careers.

STEM↗

Overview of NASA's Break the Ice Lunar Challenge

The goal of NASA’s Artemis program is to return to the Moon and put in place a sustainable infrastructure that will enable permanent presence on the Moon. In-Situ Resource Utilization (ISRU) is critical in making the permanent presence on the Moon possible. One of the most important of these resources is water. On the Moon, water is trapped in icy regolith at the lunar poles, including inside permanently dark and cold craters. Excavating icy regolith and extracting water from it needs development of technologies that can operate reliably in the extreme lunar environmental conditions. Prize competitions are a well-known way of accelerating the development of new technologies and have been successfully used throughout the history. NASA’s Centennial Challenges Program(CCP) has been developing and executing prize competitions for past 15 years. Several of these competitions resulted in breakthrough technologies for in-space and terrestrial applications. In 2019, NASA Space Technology Mission Directorate (STMD) tasked CCP to develop a challenge to address the technology gaps in the areas of Lunar Excavation, Manufacturing, and Construction. This paper provides the background, status and ongoing plans by CCP in developing “Break the Ice Lunar Challenge”. The challenge is scheduled to open for registration in late 2020. This challenge will enable the development of excavation technologies that can operate in the extreme conditions on the Moon.

centennial challenges↗

Lidar-Polarimeter Retrieval OSSEs using a Nature Run in Support of NASA's Aerosols, Clouds, Convection and Precipitation (ACCP) Study

The 2017 Decadal Survey (DS) highlighted Earth System Science themes, science and application questions, and several high priority objectives that have led to the inclusion of Aerosols (A) and Clouds-Convection-Precipitation (CCP) as Designated Observables (DOs). On June 1, 2018, several NASA centers (GSFC, LaRC, JPL, MSFC, GRC and ARC) submitted a joint Study Plan to the NASA Earth Science Division for the Aerosol (A) and Cloud, Convection, and Precipitation (CCP) Pre-formulation Study (ACCP). The DS and the ACCP team recognized the science merit in combining the A and CCP DOs for both enhancing the ability to address a number of science objectives and also to provide an expanded capability to address additional objectives beyond those addressed by individual DOs. A critical element of the ACCP observing strategy is to make extensive use of new passive and active sensors as well as of the so-called Program-of-Record (PoR), complemented by a fully integrated sub-orbital component. Central to this observing system design is the adoption of a Value Framework in which quantitative assessment of the science benefits of space- and air-borne assets is a key element. Given pre-defined ACCP science objectives and geophysical variables with desired accuracies, ACCP relies on a spectrum of Observing System Simulation Experiments (OSSEs) aimed at addressing pixel level retrieval uncertainties and sampling trade-offs. In this talk we will discuss a subset of Retrieval OSSEs being considered for ACCP, namely, synergistic lidar-polarimeter retrievals based on observation simulations from the GEOS-5 Nature Run (G5NR). Starting with aerosol states from the GEOS-5 Nature Run (G5NR) sampled along specific satellite orbits, we simulate polarized radiances at the desired polarimeter wavelengths with the Vector Linearized Direct Ordinate Radiative Transfer (VLIDORT) model, alongside the lidar signal for the relevant lidars with realistic error characterization. Next, inversions are performed with the Generalized Retrieval of Aerosol and Surface Properties (GRASP) system and the accuracy of the retrieved geophysical variables are assessed. In this presentation we will highlight results for key architectures being considered for ACCP with emphasis on geophysical variables of particular relevance to ACCP’s aerosol science objectives.

A Da Silva↗

The Atmosphere Observing System (AOS): Synergistic Aerosol, Cloud, Convection and Precipitation Measurement and Modeling Systems

The 2017 Decadal Survey (DS) highlighted Earth System Science themes, science and application questions, and several high priority objectives that have led to the inclusion of Aerosols (A) and Clouds-Convection-Precipitation (CCP) as Designated Observables (DOs). On June 1, 2018, several NASA centers (GSFC, LaRC, JPL, MSFC, GRC and ARC) submitted a joint Study Plan to the NASA Earth Science Division for the Aerosol (A) and Cloud, Convection, and Precipitation (CCP) Pre-formulation Study (ACCP), with the ACCP Study concluding in early 2021. The new mission now in pre-phase A is being referred to as the Atmosphere Observing System (AOS), an integral part of NASA’s Earth System Observatory (ESO) strategy. The DS and the ACCP team recognized the science merit in combining the A and CCP DOs for both enhancing the ability to address a number of science objectives and also to provide an expanded capability to address additional objectives beyond those of the individual DOs. A critical element of the ACCP observing strategy is to make extensive use of new passive and active sensors as well as of the so-called Program-of-Record (PoR), complemented by a fully integrated sub-orbital component. In order to achieve maximum benefit, all these observations need to be integrated into comprehensive observing and modeling/data assimilation systems. Such an approach requires comprehensive model-data synthesis capabilities that needs to be conceived in conjunction with the space-based and suborbital components of AOS. In this presentation we will summarize the major science goals of AOS including cloud feedbacks, atmospheric convection, emphasizing aerosol processes and aerosol radiative effects, and the synergistic aspects of clouds-precipitation-aerosol interactions. We will describe examples of how AOS data will be used across space and time to better initialize forecasts and train modeling systems, and to infuse models and data assimilation systems with AOS data for advancing operational predictions and to generate expanded hindcasts and reconstruction of the climate record.

Arlindo da Silva↗

Convective precipitation retrievals from space-borne dual frequency (Ka- and W-band) radar observations

The 2017 Decadal Survey highlighted Earth System Science themes, science and application questions that led to the inclusion aerosols (A), clouds, convection, and precipitation (CCP) in the list of designated observables (DOs) to be pursued within the decade following the survey. Multiple observing system architectures were considered during the NASA A-CCP study, and dual frequency Ka-W band radars have been identified as components of the most likely architectures due to their ability to significantly contribute to the achievement of the science objectives and their synergy with other essential instruments. We present an algorithm to estimate convective precipitation from dual frequency, Ka- and W-band, observations applicable to the observing system architectures considered in the A-CCP study. The algorithm is based on the radar profiling algorithm used within the operational NASA GPM combined algorithm but features an additional module that makes the retrieval problem well-posed in cases of severe attenuation and potential loss of signal below the freezing level. The additional module is developed from GPM combined retrievals and consists of a procedure that generates an ensemble of potential retrievals consistent with the portions of the Ka-band and W-band observation profiles above the noise level. The ensemble solution is refined based on estimates of Path Integrated Attenuation (PIA) from the Surface Reference Technique (SRT) and radiometric observations.

Mircea Grecu↗

Commercial Crew Program and the Safety Technical Review Board

The Commercial Crew Program (CCP) is unique to any other program office at NASA. After the agency suffered devastating budget cuts and the Shuttle Program retired, the U.S. gave up its human spaceflight capabilities. Since 2011 the U.S. has been dependent on Russia to transport American astronauts and cargo to the International Space Station (ISS) and back. NASA adapted and formed CCP, which gives private, domestic, aerospace companies unprecedented reign over America's next ride to space. The program began back in 2010 with 5 companies and is now in the final phase of certification with 2 commercial partners. The Commercial Crew Program is made up of 7 divisions, each working rigorously with the commercial providers to complete the certification phase. One of these 7 divisions is Systems Engineering and Integration (SE&I) which is partly comprised of the Safety Technical Review Board (STRB). The STRB is primarily concerned with mitigating improbable, but catastrophic hazards. It does this by identifying, managing, and tracking these hazards in reports. With the STRB being in SE&I, it significantly contributes to the overall certification of the partners' vehicles. After the partners receive agency certification approval, they will have the capability to provide the U.S. with a reliable, safe, and cost-effective means of human spaceflight and cargo transport to the ISS and back.

crew transportation system↗

NASA Crew Transportation System Certification Plan

NASA Crew Transportation System (CTS) Certification is the authorization granted by the Agency that allows the use of a Commercial Provider’s CTS to transport NASA Crew to and from the ISS. The CTS Certification decision is made by the NASA Associate Administrator based on the comprehensive assessment of the Certification Review Board and recommendations from the CCP and ISS Program Managers and the NASA Associate Administrator of Space Operations Mission Directorate. The Commercial Provider is responsible for developing and executing its plan for certifying the CTS. The Commercial Crew Program (CCP) with the International Space Station (ISS) Program must substantiate the Commercial Provider’s certification assertion of compliance with NASA requirements and NASA Crew safety.

CCP↗

Flight motor set 360L002 (STS-27R). Volume 5: Nozzle component

A review of the performance and post-flight condition of the STS-27 Redesigned Solid Rocket Motor (RSRM) nozzles is presented. Thermal/Structural instrumentation data is reviewed, and applicable Discrepancy Reports (DRs) and Process Departures (PDs) are presented. The Nozzle Component Program Team (NCPT) performance evaluation and the Redesign Program Review Board (RPRB) assessment is included. The STS-27 nozzle assemblies were flown on the RSRM Second Flight (Space Shuttle Atlantis) on 2 December 1988. The nozzles were a partially submerged convergent and/or divergent movable design with an aft pivot point flexible bearing. The nozzle assemblies incorporated the following features: RSRM forward exit cone with snubber assembly, RSRM fixed housing, Structural backup Outer Boot Ring (OBR), RSRM cowl ring, RSRM nose inlet assembly, RSRM throat assembly, RSRM aft exit cone assembly with Linear-Shaped Charge (LSC), RTV backfill in Joints 1, 3, and 4, Use of EA913 NA adhesive in place of EA913 adhesive, Redesigned nozzle plug, and Carbon Cloth Phenolic (CCP) with 750 ppm sodium content. The CCP material usage for the STS-27 forward nozzle and aft exit cone assemblies is shown.

Meyer, S. A.↗

Communications Contingency Plan: Planning for Crises and Controversy

Interviews were conducted with a variety of Marshall Space Flight Center personnel and local media representatives in Huntsville, Alabama, in order to identify the current perceptions of these individuals regarding communication effectiveness between MSFC and the media. The purposes of the Phase One report are to (1) assess the need for a contingency plan for communicating in situations of crisis and controversy; (2) identify goals and objectives for the planning process; and (3) provide recommendations for future planning activities to achieve the goals and objectives outlined in Phase One. It is strongly recommended that MSFC personnel who are involved in communications with the media participate in a facilitated, strategic communications planning process in order to develop Phase Two of the Communications Contingency Plan (CCP). Phase Two will address (1) the categorizing, ranking and prioritizing of crises and controversies; (2) the development of action steps and implementation strategies for the CCP; and (3) the development of a monitoring and evaluation process for ongoing plan effectiveness.

Treise, Deborah↗