Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CAPITAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Life History Correlates and Extinction Risk of Capital-Breeding Fishes

We consider a distinction for fishes, often made for birds and reptiles, between capital-breeding and income-breeding species. Species that follow a capital-breeding strategy tend to evolve longer intervals between reproductive events and tend to have characteristics that we associate with higher extinction risk. To examine whether these ideas are relevant for fishes, we assembled life-history data for fish species, including an index of extinction risk, the interval between spawning events, the degree of parental care, and whether or not the species migrates to spawn. These data were used to evaluate two hypotheses: 1) fish species with a major accessory activity to spawning (migration or parental care) spawn less often and 2) fish species that spawn less often are at greater risk of extinction. We tested these hypotheses by applying two alternative statistical methods that account for phylogenetic correlation in cross-taxon comparisons. The two methods predicted average intervals between spawning events 0.13 to 0.20 years longer for fishes with a major accessory activity. Both accessories, above-average parental care and spawning migration, were individually associated with longer average spawning intervals. We conclude that the capital-breeding paradigm is relevant for fishes. We also confirmed the second hypothesis, that species in higher IUCN extinction risk categories had longer average spawning intervals. Further research is needed to understand the relationship between extinction risk and spawning interval, within the broader context of life history traits and aquatic habitats.

60 APPLIED LIFE SCIENCES↗

Los Alamos National Laboratory Human and Intellectual Capital for Sustaining Nuclear Deterrence

This paper provides an overview of the current human and intellectual capital at Los Alamos National Laboratory, through specific research into the statistics and demographics as well as numerous personal interviews at all levels of personnel. Based on this information, a series of recommendations are provided to assist Los Alamos National Laboratory in ensuring the future of the human and intellectual capital for the nuclear deterrence mission. While the current human and intellectual capital is strong it stands on the precipice and action must be taken to ensure Los Alamos National Laboratory maintains leadership in developing and sustaining national nuclear capabilities. These recommendations may be applicable to other areas of the nuclear enterprise, including the Air Force, after further research and study.

99 GENERAL AND MISCELLANEOUS↗

Solar Access to Public Capital (SAPC) Mock Securitization Project

In late 2012, the National Renewable Energy Laboratory (NREL) initiated the Solar Access to Public Capital (SAPC) working group. Backed by a three-year funding facility from the U.S. Department of Energy (DOE), NREL set out to organize the solar, legal, banking, capital markets, engineering, and other relevant stakeholder communities in order to open lower-cost debt investment for solar asset deployment. SAPC engaged its members to standardize contracts, develop best practices, and comprehend how the rating agencies perceive solar project portfolios as an investment asset class. Rating agencies opine on the future creditworthiness of debt obligations. Issuers often seek investment-grade ratings from the rating agencies in order to satisfy the desires of their investors. Therefore, for the solar industry to access larger pools of capital at a favorable cost, it is critical to increase market participants' understanding of solar risk parameters. The process provided valuable information to address rating agency perceptions of risk that, without such information, could require costly credit enhancement or higher yields to attract institutional investors. Two different securities were developed--one for a hypothetical residential solar portfolio and one for a hypothetical commercial solar portfolio. Five rating agencies (Standard and Poor's, Moody's, KBRA, Fitch, and DBRS) participated and provided extensive feedback, some through conversations that extended several months. The findings represented in this report are a composite summary of that feedback and do not indicate any specific feedback from any single rating agency.

14 SOLAR ENERGY↗

Hydropower Capital and O&M Costs: An Exploration of the FERC Form 1 Data

This report explores the potential for using responses from the Federal Energy Regulatory Commission’s (FERC’s) “Electric Utility Annual Report,” also known as FERC Form 1, as a cost database for conventional and pumped storage hydropower (PSH). The report outlines the process used to compile an easy-to-access database from the original FERC Form 1 data and discusses the historical cost/performance data. The steps for developing the database include downloading the annual FoxPro files from the FERC website (FERC, 2020), reading them into an Excel format, and reconciling naming issues across years, repeated entries, and shared assets, among others. The cleaned and compiled Form 1 database is available on Oak Ridge National Laboratory’s (ORNL’s) HydroSource website. For this report, the compiled Form 1 database was linked to two other hydropower databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets, that provide additional information on the characteristics and other features of plants in the Form 1 data. Explorations of the plant characteristics, performance, capital costs, and operation and maintenance (O&M) cost data in the combined database were presented separately for conventional hydropower and PSH projects. Form 1 has several advantages as a hydropower cost database. First, the cost data is reported directly by plant owners. Second, Form 1 provides cost breakdowns of capital and operating costs for large conventional and PSH plants enabling more detailed tracking of hydropower costs compared with typical total cost estimates. Third, although the Form 1 data is not reported by all operational hydropower plants in the United States, the available data represents a wide range of plant characteristics and a sizable proportion of the hydropower fleet (61% of PSH plants and 22% of conventional hydropower plants by capacity). The lower proportion of the conventional hydropower fleet is because Form 1 reporting requirements apply only to private utilities that meet given size thresholds, leaving out federally owned facilities and many smaller hydropower plants. Overall, the Form 1 cost database represents a unique, publicly available database on hydropower asset capital and O&M costs. This report leads to a compiled database for the reporting years 1994 to 2020 that helps resolve issues with accessibility and use of the FERC Form 1 data by hydropower plant owners, project developers, technology developers, and regulators.

13 HYDRO ENERGY↗

Innovative Pathways: Transforming Impact Investments to Working Capital For Early Stage Cleantech Companies: Los Angeles Cleantech Incubator (January 1, 2020 to March 31, 2020)

Project Objectives: The focus for the entirety of the last quarter was on the completion of the pilot loan funding within our portfolio, and the closing out of our DOE-CAP Grant: “Innovative Pathways: Transforming Impact Investments to Working Capital for Early Stage Cleantech Companies.” The fourteenth quarter (Q14) of the program performance was also dedicated toward two main activities: the continued fundraising efforts for a formalized LACI debt fund, as well as finalization of the lending processes for pilot underwriting amongst the LACI Team and with Mission Driven Finance. This quarter marked key successes around the workflows of the DOE-CAP grant, specifically around fund capitalization efforts. Activities during the thirteenth quarter included: 1. Finalization of the DOE-CAP grant activities and work-flows; 2. Due diligence, underwriting and issuance of one (1) loan in Q1 2021 and three (3) in Q4 2020 for technology providers in grant-funded zero emissions mobility & community pilots, in partnership with LACI and local organizations, totaling ten (10) total loans; 3. Development of fundraising and marketing materials, and distribution to 30+ possible funding sources over the course of Q13 & Q14; and 4. Reinvigoration of conversations with Mission Driven Finance, the prospective underwriting partner for key activities and governance documents, and finalization of all loan processing activities once the fund is capitalized

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

From Concept to Capital: How Developers Secure Private Investment

With an increased need for funding diversity in hydropower, private capital is becoming more important than ever. Investors are actively seeking opportunities, but what makes a project attractive for investment, and how can companies secure private equity or venture capital backing? This session brings together experts to discuss what capital providers look for in providing financing for hydropower projects. Panelists will explore key barriers - such as the lack of diversified portfolios and long-term revenue certainty - and strategies to overcome them through innovative financing mechanisms, partnerships, and market-driven solutions.

16 TIDAL AND WAVE POWER↗

Resource Adequacy and Capital Cost Considerations Pertaining to Large Electric Grids Powered by Wind, Solar, Storage, Gas, and Nuclear

The capacity and generation of wind, solar, storage, nuclear, and gas are estimated for large, idealized copper-plate electric grids. Wind and solar penetrations of 30% to 80% are considered together with different storage systems such as vanadium and lithium-ion batteries, pumped hydroelectric, compressed air, and hydrogen. In addition to a baseline dispatchable fleet without wind/solar, two bounding cases with wind/solar are analyzed: one without storage and one where the whole wind/solar fleet is connected to the storage system, hence providing a buffer between the wind/solar fleet and the grid. The reality will likely be somewhere between these bounding cases. The viability of a power grid with a large wind/solar penetration and no storage is not guaranteed but was nonetheless considered to provide a lower-bound capital cost estimate. Overall, the options that rely strongly on wind, solar, and storage could be significantly more capital-intensive than those that rely strongly on nuclear, depending on the amount of storage necessary to ensure grid stability. This is especially true in the long run because wind, solar, and storage assets have shorter lifetimes than nuclear plants and, consequently, need to be replaced more frequently. More analyses (e.g., grid stability and public acceptance) are necessary to determine which option is most likely to provide the path of least resistance to powering a clean, affordable, and reliable grid in a timely manner. Depending on the priorities, the path of least resistance may not necessarily be the one that is less capital intensive.

adequacy↗

STOCHASTIC OPTIMIZATION FOR LONG TERM CAPITAL STRUCTURES, SYSTEMS, AND COMPONENTS REFURBISHMENT AND REPLACEMENT

As commercial nuclear power plants (NPPs) pursue extended plant operations in the form of Second License Renewals (SLRs), opportunities exist for these plants to provide capital investments to ensure long-term, safe, and economic performance. Several utilities have already announced their intention to pursue extended operations for one or more of their NPPs via SLR2. The goal of this research is to develop a riskinformed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions in NPP operations. In order to prioritize project selection via a riskinformed approach we developed a single decision-making tool that integrates safety/reliability, cost, and stochastic optimization models to provide users with data analysis capabilities to more cost effectively manage plant assets. Both stochastic analysis methods—such as Monte Carlo-based sampling strategies—and multi-stage stochastic optimization strategies are employed to provide priority lists to decisionmakers in support of risk-informed decisions. We applied the proposed method to a trial application of projected replacement/refurbishment expenditures for plant capital assets (i.e., Structures, Systems, and Components [SSCs]). The objective is to optimize the SSC replacement/refurbishment schedule in terms of economic constraints, data uncertainties, and SSC reliability data, as well to generate a priority list for maximizing returns on investment.

42 ENGINEERING↗

LIFE Cost of Electricity, Capital and Operating Costs

Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

42 ENGINEERING↗

Single-column cryogenic air separation: Enabling efficient oxygen production with rapid startup and low capital costs—application to low-carbon fossil-fuel plants

The rapid integration of intermittent renewable sources into the electricity grid is driving the need for more flexible, low-carbon fossil-fuel plants with lower capital costs. This then drives the need to improve the cryogenic air separation unit (ASU). To address this changing landscape, we explore a Praxair single-column ASU (PSC-ASU) design with the goal of reducing costs and improving flexibility, compared to a conventional double-column ASU. The PSC-ASU incorporates partial air condensation and air pre-separation in the bottom reboiler with a phase separator as well as N 2 -enriched vapor condensation in the upper reboiler to decrease energy consumption, as compared to Linde’s single-column ASU. All three of the above-mentioned ASU designs are simulated in Aspen Plus and analyzed. An economic analysis is applied to evaluate the relative cost savings of the PSC-ASU compared to the double-column ASU. Results suggest that the specific energy consumption of the PSC-ASU is significantly lower than that of Linde’s single-column ASU due to a drastically improved oxygen recovery rate. Although this improved oxygen recovery rate is still lower than that of the double-column ASU, the required pressure ratio of the main air compressor is 21% lower than that of the double-column ASU. As a result, the specific energy consumption of the PSC-ASU is only 1.9% greater than that of the double-column ASU for producing 95.1 mol% O 2 . However, the PSC-ASU reduces the hourly capital cost by 19% due to the elimination of a high-pressure column. This would effectively decrease the total hourly cost of the ASU, and thus the total hourly cost of low-carbon, fossil-fuel power plants that require oxygen.

20 FOSSIL-FUELED POWER PLANTS↗

Quantifying capital goods for waste incineration

Highlights: • Materials and energy used for the construction of waste incinerators were quantified. • The data was collected from five incineration plants in Scandinavia. • Included were six main materials, electronic systems, cables and all transportation. • The capital goods contributed 2–3% compared to the direct emissions impact on GW. - Abstract: Materials and energy used for the construction of modern waste incineration plants were quantified. The data was collected from five incineration plants (72,000–240,000 tonnes per year) built in Scandinavia (Norway, Finland and Denmark) between 2006 and 2012. Concrete for the buildings was the main material used amounting to 19,000–26,000 tonnes per plant. The quantification further included six main materials, electronic systems, cables and all transportation. The energy used for the actual on-site construction of the incinerators was in the range 4000–5000 MW h. In terms of the environmental burden of producing the materials used in the construction, steel for the building and the machinery contributed the most. The material and energy used for the construction corresponded to the emission of 7–14 kg CO{sub 2} per tonne of waste combusted throughout the lifetime of the incineration plant. The assessment showed that, compared to data reported in the literature on direct emissions from the operation of incinerators, the environmental impacts caused by the construction of buildings and machinery (capital goods) could amount to 2–3% with respect to kg CO{sub 2} per tonne of waste combusted.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Next Generation Safeguards Initiative Efforts at Los Alamos National Laboratory: Developing Our Human Capital FY2015

This report documents the accomplishments of the Safeguards HCD Fiscal Year 2015 (FY15) Project Work Plan, highlighting LANL’s work as well as the accomplishments of our NGSI-sponsored students, graduate and postdoctoral fellows, and mid-career professionals during this past year. While fiscal year 2015 has been a year of transition in the Human Capital Development area for LANL, we are working to revitalize our efforts to promote and develop Human Capital in Safeguards and Non-proliferation and are looking forward to implementing new initiatives in the coming fiscal year and continuing to transition the knowledge of staff who have been on assignment at IAEA and Headquarters to improve our support to HCD.

Human Capital Development University Engagement↗

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design standardization of unit operations for reducing the capital intensity and cost of small‐scale chemical processes

Abstract A methodology is proposed to reduce the cost and capital intensity of small‐scale chemical processes by creating new opportunities for economies of numbers through standardizing the equipment designs across multiple processes. We depart from asynchronous design of single‐processes and adopt a common‐functionality based simultaneous design of multiple processes that use similar unit operations. A generalized cost function is used to appropriately balance the trade‐offs between economies of scale and economies of numbers. An optimization‐based framework for design standardization is developed and illustrated using two case studies. The first involves the simultaneous synthesis of methanol and ammonia processes, and the second addresses the optimal synthesis of multi‐column natural gas liquid (NGL) fractionation processes for different natural gas sources. We observe that considerable reduction in capital intensity of small‐scale processes is possible through equipment standardization.

Arora, Akhil↗

Improving estimates of transmission capital costs for utility-scale wind and solar projects to inform renewable energy policy

Estimating the overall costs of transmission needed to integrate variable renewable energy (VRE) onto the grid is challenging. An improved understanding of these transmission costs would support electricity system planning as VRE penetrations increase. This paper brackets VRE transmission capital costs using multiple approaches based on interconnection studies, actual transmission projects, capacity-expansion simulation models, and aggregated U.S. VRE-related transmission expenditures. Each approach possesses advantages and drawbacks, and combining the approaches lends confidence to the results. The resulting range of average levelized VRE transmission costs is 1– 10 dollars/MWh, which is generally lower than earlier estimates in the literature. These transmission capital costs can increase the direct plant-level levelized cost of VRE by 3%–33%, based on levelized costs of energy of 29– 56 dollars/MWh for utility-scale wind and 36–46 dollars/MWh for utility-scale solar. As VRE deployment continues to expand, policy makers can use this information to (1) assess the benefits of transmission avoidance and deferral when comparing distributed energy resources versus utility-scale projects, (2) evaluate the potential costs of large-scale public transmission investments, and (3) better analyze system-level costs of utility-scale VRE technologies. Future research can expand on the framework presented here by providing a review of operation and maintenance costs for transmission systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Financial-technical co-design for capital-intensive, resource-responsive energy systems

Because of their capital-intensive operation, wind energy systems that are competitive in terms of the cost of the energy that they produce lead to risk-reward trade-offs that make their business cases less favorable than those of conventional energy generation technologies. However, wind energy systems tend to be designed to maximize energy production or minimize cost of energy rather than to maximize their business cases. In this work, we attempt to exploit designs specifically tailored to business cases. We develop a novel framework for analyzing energy systems that ties their design variables to monthly operating incomes using simple models and historical hourly market and resource data. Using this approach, we demonstrate that for a wind site with abundant wind resource in the California Independent System Operator market, we can control the trade-off between mean and 5th percentile monthly returns by choosing the specific power of the turbine at a fixed modeled initial capital cost. Our framework gives a measure of the risk-reward spectrum of energy generation assets that could be built at a given site with respect to the sub-annual resource/market variation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimal Financing Decision in a Contract Food Supply Chain with Capital Constraint

To solve the financing problem of the food producers, we consider a two‐echelon contract food supply chain composed of a family farm with capital constraints and a food processing enterprise. With no capital constraints as the benchmark model, we analyze optimal decisions of the family farm and the food processing enterprise in the case of bank financing with bank participation only and bank financing with “government, bank, and insurance” coparticipation. Then, we discuss how the risk of yield uncertainty influences the optimal decisions and profits of the family farm and the food processing enterprise under different financing situation. Meanwhile, the reason why the government subsidizes agriculture is explored, and the policy of minimum purchase price of the food is initiated when the market price is too low. Finally, the numerical examples and sensitivity analysis are presented. The results show that the bank financing with “government, bank, and insurance” coparticipation improves the welfare of supply chain members more obviously than the bank financing with bank participation only; when the rice price is too low, the policy of minimum purchase price of food is initiated, which increases the revenue and the growing enthusiasm of the family farm; the profits of the family farm and the food processing enterprise will decrease as the risk of yield uncertainty increases in the case of bank financing, and the risk of yield uncertainty will be reduced for the family farm when bank financing with “government, bank, and insurance” coparticipation.

Luo, Ying (ORCID:0000000158101443)↗