Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Bulk Electric System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

GMD Coupling to Power Systems and Disturbance Mitigation

Presentation includes slides on Geomagnetic Disturbance: Ground Fields; Geomagnetic Disturbance: Coupling to Bulk Electric System; Geomagnetic Disturbance: Transformers; GMD Assessment Workflow (TPL-007-1); FERC order 830; Goals; SuperMag (1 min data) Nov. 20-21, 2003 Storm (DST = -422); Spherical Harmonics; Spherical Harmonics Nov. 20-21, 2003 Storm (DST = -422); DST vs HN0,0; Fluctuations vs. DST; Fluctuations; Conclusions and Next Steps; GMD Assessment Workflow (TPL-007-1); EMP E3 Coupling to Texas 2000 Bus Model; E3 Coupling Comparison (total GIC) Varying Ground Zero; E3 Coupling Comparison (total MVAR) Varying Ground Zero; E3 Coupling Comparison (GIC) at Peak Ground Zero; E3 Coupling Comparison (GIC) at Peak Ground Zero; and Conclusion.

58 GEOSCIENCES↗

Data-driven cyber attack detection and mitigation for decentralized wide-area protection and control in smart grids

Modern power systems have already evolved into complicated cyber physical systems (CPS), often referred to as smart grids, due to the continuous expansion of the electrical infrastructure, the augmentation of the number of heterogeneous system components and players, and the consequential application of a diversity of information and telecommunication technologies to facilitate the Wide Area Monitoring, Protection and Control (WAMPAC) of the day-to-day power system operation. Because of the reliance on cyber technologies, WAMPAC, among other critical functions, is prone to various malicious cyber attacks. Successful cyber attacks, especially those sabotage the operation of Bulk Electric System (BES), can cause great financial losses and social panics. Application of conventional IT security solutions is indispensable, but it often turns out to be insufficient to mitigate sophisticated attacks that deploy zero-day vulnerabilities or social engineering tactics. To further improve the resilience of the operation of smart grids when facing cyber attacks, it is desirable to make the WAMPAC functions per se capable of detecting various anomalies automatically, carrying out adaptive activity adjustments in time and thus staying unimpaired even under attack. Most of the existing research efforts attempt to achieve this by adding novel functional modules, such as model-based anomaly detectors, to the legacy centralized WAMPAC functions. In contrast, this dissertation investigates the application of data-driven algorithms in cyber attack detection and mitigation within a decentralized architecture aiming at improving the situational awareness and self-adaptiveness of WAMPAC. First part of the research focuses on the decentralization of System Integrity Protection Scheme (SIPS) with Multi-Agent System (MAS), within which the data-driven anomaly detection and optimal adaptive load shedding are further explored. An algorithm named as Support Vector Machine embedded Layered Decision Tree (SVMLDT) is proposed for the anomaly detection, which provides satisfactory detection accuracy as well as decision-making interpretability. The adaptive load shedding is carried out by every agent individually with dynamic programming. The load shedding relies on the load profile propagation among peer agents and the attack adaptiveness is accomplished by maintaining the historical mean of load shedding proportion. Load shedding only takes place after the consensus pertaining to the anomaly detection is achieved among all interconnected agents and it serves the purpose of mitigating certain cyber attacks. The attack resilience of the decentralized SIPS is evaluated using IEEE 39 bus model. It is shown that, unlike the traditional centralized SIPS, the proposed solution is able to carry out the remedial actions under most Denial of Service (DoS) attacks. The second part investigates the clustering based anomalous behavior detection and peer-assisted mitigation for power system generation control. To reduce the dimensionality of the data, three metrics are designed to interpret the behavior conformity of generator within the same balancing area. Semi-supervised K-means clustering and a density sensitive clustering algorithm based on Hierarchical DBSCAN (HDBSCAN) are both applied in clustering in the 3D feature space. Aiming to mitigate the cyber attacks targeting the generation control commands, a peer-assisted strategy is proposed. When the control commands from control center is detected as anomalous, i.e. either missing or the payload of which have been manipulated, the generating unit utilizes the peer data to infer and estimate a new generation adjustment value as replacement. Linear regression is utilized to obtain the relation of control values received by different generating units, Moving Target Defense (MTD) is adopted during the peer selection and 1-dimensional clustering is performed with the inferred control values, which are followed by the final control value estimation. The mitigation strategy proposed requires that generating units can communicate with each other in a peer-to-peer manner. Evaluation results suggest the efficacy of the proposed solution in counteracting data availability and data integrity attacks targeting the generation controls. However, the strategy stays effective only if less than half of the generating units are compromised and it is not able to mitigate cyber attacks targeting the measurements involved in the generation control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power System Protection and Resilient Metrics

During a real-time power system event, a system operator need to conservatively reduce the operating limits while changing system conditions are analyzed. The time it takes to develop new operating limits could affect millions of transmission system users especially if this event is classified by NERC as a Category D type event (extreme events resulting in the loss of two or more bulk electric system elements) . Controls for the future grid must be able to perform real-time analysis, identify new reliability risks, and set new SOLs (System Operating Limit) for real-time operations. In this paper we are inducing “Resilience Metrics” requirements that describe how systems operate at an acceptable level of normalcy despite disturbances or threats. We consider the interdependencies inherent in critical infrastructure systems and discuss some resilience metrics that can be distributed in current supervisory control and data acquisition (SCADA) to provide a level of state awareness. This level of awareness provides knowledge that can be used to characterize and reduce the risk of cascading events. A “resilience power system agent” is proposed that provides attributes to measure and perform this metrics.

42 ENGINEERING↗

Navigating United States Standards and Regulation for Digital Energy Systems

This report provides an analysis of the U.S. standards and regulatory landscape for digital energy systems, focusing on cybersecurity, safety, and reliability requirements. It examines the interplay between federal mandates, state regulations, voluntary industry standards, and utility-specific policies, highlighting critical gaps between compliance and real-world risk mitigation. While NERC CIP standards enforce cybersecurity for Bulk Electric System assets, distribution-level infrastructure and emerging technologies often fall outside mandatory oversight, creating vulnerabilities. The report identifies systemic challenges such as reliance on self-attestation, uneven state adoption of safety codes, and lagging standards for advanced technologies like battery energy storage and inverter-based resources. Through a detailed gap analysis, it underscores the urgency of proactive risk-based approaches, independent verification, and strategic engagement with state and federal entities. Recommendations include adopting tiered security frameworks, strengthening procurement practices, and addressing emerging technology risks to ensure resilient and secure digital energy infrastructure. This guidance is intended for utilities, regulators, and stakeholders navigating compliance obligations and seeking to enhance cybersecurity and safety beyond minimum standards.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

A Review of PJM Interconnection's April 13, 2018, Response to National Energy Technology Laboratory's Report on Reliability, Resilience and the Oncoming Wave of Retiring Baseload Units

In a March 2018 report entitled Reliability, Resilience and the Oncoming Wave of Retiring Baseload Units , the National Energy Technology Laboratory (NETL) analyzed the fleet performance of market areas impacted by a 13-day storm known colloquially as the “Bomb Cyclone.” Special attention was paid to northeastern areas, as these were most impacted. With respect to PJM Interconnection LLC (PJM), the report found that 1) without coal units, the system would have experienced shortfalls; 2) approximately 25 gigawatts (GW) of heretofore underutilized coal-fired plants provided crucial capacity, lending the system resilience; 3) nearly 28 GW of natural gas-fired capacity did not deploy, due to severe spikes in natural gas prices caused in turn by constrained gas deliverability, in the face of tremendous space heating demand and transmission deliverability constraints on the bulk electric system. In April 2018, PJM issued a response that argued the NETL analysis was misplaced, asserting that gas-fired capacity was available and that it could have been called into service but was not, due to “economics.” This brief represents NETL’s reaction to PJM’s assertions in its April 2018 response.

20 FOSSIL-FUELED POWER PLANTS↗

AMI Communication Requirements to Implement Demand-Response: Applicability of Hybrid Spread Spectrum Wireless

While holistically defining the smart grid is a challenge, one area of interest is demand-response. In 2009, the Department of Energy announced over $\$$4 billion in grant and project funding for the Smart Grid. A significant amount of this funding was allotted to utilities for cost sharing projects to deploy Smart Grid technologies, many of whom have deployed and are deploying advanced metering infrastructure (AMI). AMI is an enabler to increase the efficiency of utilities and the bulk power grid. The bulk electrical system is unique in that it produces electricity as it is consumed. Most other industries have a delay between generation and consumption. This aspect of the power grid means that there must be enough generation capacity to meet the highest demand whereas other industries could over produce during off-peak times. This requires significant investment in generation capacity to cover the few days a year of peak consumption. Since bulk electrical storage doesn't yet exist at scale another way to curb the need for new peak period generation is through demand-response; that is to incentivize consumers (demand) to curtail (respond) electrical usage during peak periods. Of the various methods proposed for enabling demand-response, this paper will focus on the communication requirements for creating an energy market using transactional controls. More specifically, the paper will focus on the communication requirements needed to send the peak period notices and receive the response back from the consumers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Value of Nuclear Energy to the Reliability of the North American Power System: Results for Western and Eastern Interconnections

This report documents the fulfillment of a milestone for the United States (U.S.) Department of Energy Office of Nuclear Energy Light Water Reactor Sustainability Program: completing a baseline study of regional impact of nuclear power plants and hydrogen production in maintaining grid services and power quality. Models have been comprehensively demonstrated for the Western Interconnection, or Western Electric Coordinating Council area, and in the Eastern Interconnection for scenarios representative of past extreme events (e.g., drought and heat waves). Understanding the impact on the reliability of the bulk electric system of any reduction in generation capacity from nuclear power, for any reason, is the motivation of this work. Factors that might lead to the premature or unplanned closure of nuclear plants, extended outages, or repurposing of nuclear power include: • Aging infrastructure: Many nuclear power plants in the U.S. are nearing the end of their designed operating lives. Upgrading aging infrastructure can be expensive, and some utilities may choose to retire plants rather than invest in costly upgrades. • Low wholesale electricity prices: The deregulation of the electricity market in many states has led to increased competition and driven down wholesale electricity prices, causing nuclear power operators to seek other revenue sources for their heat and power such as clean hydrogen production. • Renewables growth: The rapid growth of renewable energy sources like solar and wind power is posing a challenge to traditional generation sources like nuclear. While many see renewables as a key part of the clean energy transition, their intermittent nature requires additional grid solutions for reliable power supply. • The potential for regulatory decisions to be in conflict: In its 2021 rulemaking, EPA rule (86 FR 880), the Environmental Protection Agency (EPA) set a compliance date for the ban on processing and distribution in commerce of Decabromodiphenyl Ether (DecaBDE). Since DecaBDE is in many components, particularly wiring, of nuclear power plants which are deemed safety-related or important to safety, three plants would not have been able to restart after their 2023 spring outages, and numerous others would have faced issues in the near future. Fortunately, in this case, the EPA provided relief to the nuclear energy industry. The report provides a summary of the significant role nuclear energy plays in the United States’ power generation mix, supplying around 20% of the nation’s electricity generation, spread across 28 U.S. states. Nuclear power is reliable, mostly unaffected by weather and seasonal changes, and provides a consistent source of baseload power. In terms of capacity, nuclear power plants account for as much as 26% of balancing area power generation capacity. Nuclear power also provides a substantial contribution (e.g., 10% of the inertia in the Eastern Interconnection) of the synchronous spinning mass/inertia that buffers the rate at which frequency changes when a load and generation imbalance occurs (e.g., a large plant trips or a load is suddenly shed due to a transmission outage). This contribution is critical for maintaining grid stability during sudden changes in load or generation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cybersecurity Awareness in the Power Grid

We report on a series of interviews and observations conducted with control room dispatchers in a bulk electrical system. These dispatchers must react quickly to incidents as they happen in order to ensure the reliability and safe operation of the power grid. They do not have the time to evaluate incidents for signs of cyber-attack as part of their initial response. Cyber-attack detection involves multiple personnel from a variety of roles at both local and regional levels. Smart grid technology will improve detection and defense capabilities of the future grid, however, the current infrastructure remains a mixture of old and new equipment which will continue to operate for some time. Thus, research still needs to focus on strategies for the detection of malicious activity on current infrastructure as well as protection and remediation.

Scholtz, Jean↗

Geomagnetic Disturbance Uncertainty Quantification Modeling: An Electromagnetic Transient and Steady-State Simulation Based Approach

Geomagnetic disturbances have been shown to disrupt the operation of the bulk electrical system through low-frequency effects in the earth's magnetic field that in turn induce changing electrical fields on the earth's surface. As a result, geomagnetically induced currents flow in transmission lines, introducing the risk for widespread damage to high-voltage transformers and voltage collapse due to induced reactive power loss. In a previous paper, the authors showed how certain modeling assumptions can lead to results that are unacceptable in certain edge case scenarios. In this paper, the authors build on their previous results using modeling uncertainty quantification in order to compare the results from electromagnetic transient program modeling software, ATP, to the positive-sequence calculation software, PowerWorld.

Bretas, Arturo Suman↗

Secure Information Exchange Gateway for Electric Grid Operations

The major objectives of the SIEGate project were to improve the security posture and minimize the cyber-attack surface of electric utility control centers and to reduce the cost of maintaining control-room-to-control-room information exchange. Major project goals included the design, development, testing, and commercialization of a single security-hardened appliance that could meet industry needs for resisting cyber-attacks while protecting the confidentiality and integrity of a growing volume of real-time information needed to ensure the reliability of the bulk electric system and interoperating with existing data formats and networking technologies. The SIEGate project has achieved its goals and objectives. The SIEGate Design Document, issued in March 2012, presented SIEGate use cases, provided SIEGate requirements, established SIEGate design principles, and prescribed design functionality of SIEGate as well as the components that make up SIEGate. SIEGate Release Version 1.0 was posted in January 2014. Release Version 1.0.83, which was posted on March 28, 2014, fixed many issues discovered by early adopters and added several new features. Release Candidate 1.1, which added additional improvements and bug fixes, was posted in June 2014. SIEGate executables have been downloaded more than 300 times. SIEGate has been tested at PJM, Entergy, TVA, and Southern. Security testing and analysis of SIEGate has been conducted at PNNL and PJM. Alstom has provided a summary of recommended steps for commercialization of the SIEGate Appliance and identified two deployment models with immediate commercial application.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Coal Fleet Transition: Retirement Impacts in the Eastern Interconnection

This report examines the impact of announced retirements on the mix of available generating capacity, prices, resource availability, and air emissions in the Eastern Interconnection. The report uses a security constrained economic dispatch (SCED) model - Ventyx's PROMOD IV 11.1 - of the bulk electric system (BES) to model the interconnection.

01 COAL, LIGNITE, AND PEAT↗

Near-Term Reliability and Resilience (NTRR) (Final Report)

The Near-Term Reliability and Resiliency (NTRR) was awarded in December 2020 as an inter-lab project to examine the reliability and resilience of the electricity grid and natural gas transportation availability. The project builds on studies conducted by The North American Electric Reliability Corporation (NERC), the U.S. Department of Energy (DOE), and other non-governmental research and operational focused on reliability and resilience analyses challenges. The research was conceived to address near-term scenarios (within 10 years), when many local and regional policy transitions could begin to impact grid reliability, resilience, and supporting infrastructure availability. To integrate the natural gas interdependency, the team began with the generating capacity and demand projections from the 2020 NERC Long-Term Reliability Assessment and the Bulk Electric System (BES) transmission topologies defined in the Western Electricity Coordinating Council (WECC) Anchor Data Set, Eastern Interconnection Reliability Assessment Group Multi-Regional Modeling Working Group (ERAG/MMWG) Data Set, the team calculated baseline regional power sector gas demands from present electricity delivery year through the end of delivery year 2030/31 by applying security constrained economic dispatch. This demand was compiled along with demand projections for regional residential, commercial, and industrial natural gas demands from the most recent Energy Information Administration (EIA) Annual Energy Outlook Reference Case into Deloitte’s MarketBuilder® North American Gas Model. Through the application of these demands, MarketBuilder® was projected the topology of natural gas flows in the natural gas pipeline network across the interconnected North American system along with regional natural gas prices that may be seen by market participants in future years Additionally, contingencies and sensitivities focused on the built models of the Eastern Interconnection (EI) and Western Interconnection (WI). They address challenges from the following with the outcomes being an identification of performance under the extreme conditions and an identification of potential grid weaknesses that should be addressed to mitigate the reduced performance and improve the resilience and reliability of the specific regions as well as the National Grid: • Weather events including extreme heat, extreme cold, high wind, no wind, wind and solar forecasting errors, and wildfires. • Gas availability, factoring in supply disruption (contractual and physical), seasonal availability constraints, and infrastructure limitations; and • Transmission availability and congestion.

03 NATURAL GAS↗

Southwestern Power Administration Annual Report 2008

Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

Financial statement, operating data, Southwestern ↗

Demand response providing ancillary services: A comparison of opportunities and challenges in US wholesale markets

Interest in using demand response (DR) resources to supply low cost reliability products to the bulk electricity system is on the rise due to the uncertain impacts of increasing penetrations of intermittent generation and recent rulings supporting demand side participation in wholesale markets from the Federal Energy Regulatory Commission. However, organized electricity and ancillary services markets are just beginning to support DR resources for ancillary services, and the set of rules and requirements for participation are unique to each market. This paper discusses the opportunities that exist in the ancillary service markets in each US Independent System Operator territory and identifies challenges to market participation for demand response resources. It compares resource requirements, limits to aggregation, measurement and verification, bidding requirements, market timelines, and the types of organizations that can play in the markets. Additionally, it uses market clearing prices and market size to compare what value may be extracted from these markets, and identifies how these prices are currently determined. Using these criteria, PJM and ERCOT have the most favorable conditions for demand response participation in ancillary service markets, and changes to rules that effect aggregation and minimum resource size could promote more participation in other AS markets across the US.

MacDonald, Jason↗

Electrification Futures Study: Impact of Electric Vehicles on Bulk Power Systems

This presentation builds on work presented at IEW2019 on "Transportation Scenarios of Electric Technology Adoption and Power Consumption" by providing insights on the impact of demand-side electrification, and electric vehicles in particular, on electricity supply and bulk power systems. This talk summarizes some results from the multi-year and multi-stakeholder Electrification Futures Study (EFS) series of reports. In particular, this work leverages integrated demand and supply modelling of future energy systems to provide insights on system design and operations focusing on demand flexibility and integration of variable renewables.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Advanced Research on Integrated Energy Systems Cyber Range

As digital technologies expand to meet the needs of a more autonomous, interconnected, and advanced power system, new cybersecurity complexities and vulnerabilities arise. The ARIES Cyber Range enables the energy sector to evaluate these evolutions and validate cybersecurity solutions without impacting live systems. Combining power grid-scale hardware with emulation and simulation approaches, the ARIES Cyber Range can faithfully replicate modern energy systems - from grid physics to communication networks, and everything in between - with real-world fidelity. At NLR, researchers and partners are answering complex power system cybersecurity questions, examining emerging threats to the electric sector, and de risking new security technologies, all at a mission-relevant speed that keeps pace with rapidly evolving systems and hazards.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Hybrid Dynamic/Steady-State Tool With Protection Simulation for Cascading-Outage Analysis of Extreme Events in Power Systems

The bulk electric power grid is subject to vulnerabilities from component outages, which in certain combinations (extreme events) might lead to cascading outages. Some of these outages can be severe enough to trigger brownouts and blackouts. Much is known about mitigating the first few failures near the beginning of a cascade, but there are few established methods and tools for directly analyzing the risks of cascading component outages over a longer time scale. Current power system tools have limited ability to perform detailed and accurate cascading-outage analysis, which could be computationally intensive. The Dynamic Contingency Analysis Tool (DCAT) enables power system planning engineers to more realistically assess the consequences of extreme contingencies and potential cascading events across their systems and interconnections. DCAT has several unique features: (i) detailed hybrid dynamic and steady-state analysis of power systems to mimic real-world cascading outages, (ii) detailed modeling of protection systems embedded in the dynamic simulation, (iii) simulation of corrective action after transients, (iv) simulation of islanding , and (v) high-performance computing capability to simulate a large number of contingencies in a reasonable time. DCAT outputs will help find technically sound solutions to reduce the risk of cascading outages. This paper provides details of DCAT methodology and shows its capabilities with extreme events on real-world cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗