Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “British”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

AmeriFlux CA-RBM Richmond Brackish Marsh

This is the AmeriFlux version of the carbon flux data for the site CA-RBM Richmond Brackish Marsh. Site Description - This site is a tidal brackish marsh on the southern side of the Sturgeon Bank Wildlife Management Area (WMA) in Richmond, British Columbia, Canada. This area is situated within the estuary of the Fraser River. The total area of Sturgeon Bank WMA is 5,152 ha, of which the tidal marsh area is 205 ha. The southern of the WMA is characterized as a brackish marsh, which transitions to a salt marsh as you go north. Human development has influenced this area for almost 200 years. Human activities in this area began in the early 1800s, which included dredging, dyke and entrainment structures, agriculture, and other uses. The areas were designated as WMA in 1998. This area experiences a semidiurnal tidal cycle. The flux tower is located near the southern edge of the marsh, where the dominant species is cattail (Typha latifolia), with a canopy height of 160 cm. The tower is in a high marsh system and was installed to analyze energy, H2O, CO2, and CH4 fluxes on June 1, 2022.

Knox, Sara [The University of British Columbia]↗

AmeriFlux FLUXNET-1F CA-DSM Delta Salt Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site CA-DSM Delta Salt Marsh. This is the FLUXNET version of the carbon flux data for the site CA-DSM Delta Salt Marsh produced by applying the standard ONEFlux (1F) software. Site Description - This site is a tidal salt marsh on the eastern side of the Boundary Bay Wildlife Management Area (WMA) in Delta, British Columbia, Canada. This area is located on the southern front of the Fraser River. The total area of the Boundary Bay WMA is 11,470 ha, and the eastern part surrounding the flux tower accounts for 39 ha. This area is surrounded by farms and dikes. The Provincial Government purchased this area in 1974 limiting public access and designated it as WMA in 1995. This area has a mixed semidiurnal tidal cycle. The dominant species is Saltgrass (Distichlis spicata) with a canopy height of ~40 cm. The tower is in a high marsh system and was installed to analyze energy, H2O, CO2, and CH4 fluxes on September 3, 2021.

Knox, Sara [The University of British Columbia]↗

AmeriFlux FLUXNET-1F CA-RBM Richmond Brackish Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site CA-RBM Richmond Brackish Marsh. This is the FLUXNET version of the carbon flux data for the site CA-RBM Richmond Brackish Marsh produced by applying the standard ONEFlux (1F) software. Site Description - This site is a tidal brackish marsh on the southern side of the Sturgeon Bank Wildlife Management Area (WMA) in Richmond, British Columbia, Canada. This area is situated within the estuary of the Fraser River. The total area of Sturgeon Bank WMA is 5,152 ha, of which the tidal marsh area is 205 ha. The southern of the WMA is characterized as a brackish marsh, which transitions to a salt marsh as you go north. Human development has influenced this area for almost 200 years. Human activities in this area began in the early 1800s, which included dredging, dyke and entrainment structures, agriculture, and other uses. The areas were designated as WMA in 1998. This area experiences a semidiurnal tidal cycle. The flux tower is located near the southern edge of the marsh, where the dominant species is cattail (Typha latifolia), with a canopy height of 160 cm. The tower is in a high marsh system and was installed to analyze energy, H2O, CO2, and CH4 fluxes on June 1, 2022.

Knox, Sara [The University of British Columbia]↗

Metatranscriptomics reveals a shift in microbial community composition and function during summer months in a coastal marine environment

Abstract Temperate coastal marine waters are often thermally stratified from spring through fall but can be dynamic and disrupted by tidal currents and wind‐driven upwelling. These mixing events introduce deeper, cooler water with a higher partial pressure of CO 2 (pCO2) and its associated microbial communities to the surface. Anecdotally, these events impact shellfish hatcheries and farms, warranting improved understanding of changes in composition and activity of marine microbial communities in relation to environmental processes. To characterize both compositional and functional changes associated with abiotic factors, here, we generate a reference metatranscriptome from the Strait of Georgia over representative seasons and analyze metatranscriptomic profiles of the microorganisms present within intake water containing different pCO 2 levels at a shellfish hatchery in British Columbia from June through October. Abiotic factors studied include pH, temperature, alkalinity, aragonite, calcite, and pCO 2 . Community composition changes were observed to occur at broad taxonomic levels and most notably to vary with temperature and pCO 2 . Functional gene expression profiles indicated a strong difference between early (June–July) and late summer (August–October) associated with viral activity. The taxonomic data suggest this could be due to the termination of cyanobacteria and phytoplankton blooms by viral lysis in the late season. Functional analysis indicated fewer differentially expressed transcripts associated with abiotic variables (e.g., pCO 2 ) than with the temporal effect. Microbial composition and activity in these waters vary with both short‐term effects observed alongside abiotic variation and long‐term effects observed across seasons. The analysis of both taxonomy and functional gene expression simultaneously in the same samples by environmental RNA (eRNA metatranscriptomics) provided a more comprehensive view for monitoring water bodies than either would in isolation.

Sutherland, Ben J. G.↗

Results and Limits of Time-Division Multiplexing for the BICEP Array High-Frequency Receivers

Time-division multiplexing is the readout architecture of choice for many ground and space experiments, as it is a very mature technology with proven outstanding low-frequency noise stability, which represents a central challenge in multiplexing. Once fully populated, each of the two BICEP Array high-frequency receivers, observing at 150 GHz and 220/270 GHz, will have 7776 TES detectors tiled on the focal plane. The constraints set by these two receivers required a redesign of the warm readout electronics. The new version of the standard multichannel electronics, developed and built at the University of British Columbia, is presented here for the first time. BICEP Array operates time-division multiplexing readout technology to the limits of its capabilities in terms of multiplexing rate, noise and cross talk, and applies them in rigorously demanding scientific application requiring extreme noise performance and systematic error control. Finally, future experiments like CMB-S4 plan to use TES bolometers with time-division/SQUID-based readout for an even larger number of detectors.

47 OTHER INSTRUMENTATION↗

3D Simulations of gas injection on callovo-oxfordian claystone assuming spatial heterogeneity and anisotropy

A series of gas injection tests on Callovo-Oxfordian (COx) claystone from the Bure underground research laboratory (URL) in France were carried out at the British Geological Survey (BGS). The tests were performed using a triaxial apparatus specifically designed to capture small volumetric strains induced by the injected gas flow and consequent material dilatancy. The long-duration experiments were monitored throughout. Measurements also included pressure, stresses (axial and radial stresses prescribed for each test stage), rate of gas inflow, gas outflow volume as well as pore-pressures observed at various points of the sample. A coupled hydro-gas-mechanical 3D numerical model has been developed to simulate the tests. Initial permeability is assumed heterogeneous throughout the specimen and embedded fractures are incorporated in the formulation. Gas pressure-induced deformations during the test lead to variations of permeability due to changes in matrix porosity and, especially, fracture aperture as well as fracture orientation due to material anisotropy. A programme of sensitivity analyses involving the variation of different aspects and parameters of the model contributes to a better understanding of the phenomena and highlights its complexity. The model is able to reproduce the observed behaviour of the tests.

58 GEOSCIENCES↗

Techno-economic and life cycle analysis of synthetic natural gas production from low-carbon H 2 and point-source or atmospheric CO 2 in the United States

Synthetic natural gas (SNG) is of great interest in reducing fossil energy consumption while maintaining compatibility with existing NG infrastructure and end-use applications equipment. SNG can be produced using clean H 2 generated from renewable or nuclear energy and CO 2 captured from stationary sources or the atmosphere. In this study, we develop an engineering process model of SNG production using Aspen Plus® and production scales reported by the industry. We examine the levelized cost and life cycle greenhouse gas (GHG) emissions of SNG production under various CO 2 supply scenarios. Considering the higher cost of H 2 transportation compared with CO 2 transportation, we assume that CO 2 feedstock is transported via pipeline to the H 2 production location, which is collocated with the SNG plant. We also evaluate the cost of CO 2 captured from the atmosphere, assuming the direct air capture process can occur near the SNG facility. Depending on the CO 2 supply chain, the levelized cost of SNG is estimated to be in the range of $\$45–76$ per million British thermal units (MMBtu) on a higher heating value (HHV) basis. The SNG production cost may be reduced to $\$27–57$/MMBtu-HHV by applying a tax credit available in the United States for low-carbon H 2 production (45V). With a lower electricity price of 3¢/kWh for water electrolysis and accounting for a 45V tax credit, the SNG cost reaches parity with the cost of fossil NG. Depending on the CO 2 supply chain, SNG can reduce life cycle GHG emissions by 52–88% compared with fossil NG.

03 NATURAL GAS↗

Public perceptions of wave energy development on the west coast of North America: Risks, benefits, and coastal attachment

While solar and wind energy continue to grow as significant sources of renewable energy, a global energy transition away from fossil fuels will require an expanding portfolio of generating resources. Marine renewable energy has the potential to contribute greatly in the coming decades, as the more predictable nature of wave energy can support the resiliency of the power grid and complement solar and inland wind generation. Yet, the broad deployment of marine energy technologies like wave energy will depend on public support, making it critical to identify the relevant factors associated with public attitudes and risk/benefit perceptions. This paper draws on social representations theory to specifically examine perceptions of wave energy on the west coast of North America, a site chosen because of the high suitability for wave energy generation and the fact that one of only three wave energy test sites in the world is under development off the coast of Oregon. Using an online survey in June 2020, we recruited a sample of 2000 respondents from California, Oregon, Washington, and British Columbia. We found a majority of respondents held positive attitudes to wave energy, but respondents also had low familiarity – with a quarter of respondents lacking sufficient information to form an opinion. We used logistic regression to identify factors correlated with wave energy attitudes, finding that respondents who were more supportive of wind and solar energy, more optimistic about new technology, and reported more familiarity with wave energy were significantly more likely to have a positive impression of wave energy. Respondents with higher levels of place attachment to coastal areas were more split, as they perceived higher benefits of wave energy – but also higher risks. Our results indicate broad appeal of wave energy on the west coast, but we caution policymakers and developers to not take initial siting processes for granted. As experience has shown for offshore wind, broad appeal does not guarantee a smooth siting process in a local context. Furthermore, the role of place attachment to coastal areas must be taken seriously or risk alienating local communities.

16 TIDAL AND WAVE POWER↗

Characteristics and Variability of Winter Northern Pacific Atmospheric River Flavors

Abstract Atmospheric rivers (ARs) are intensive poleward moisture transport events that are essential to the global hydrological cycle and are often linked to extreme weather events. We categorize the winter North Pacific ARs into two “flavors”: wind‐dominated (windy ARs) and moisture‐dominated (wet ARs) using 40 years of hourly data from fifth generation of the European Centre for Medium‐Range Weather Forecasts Interim Reanalysis. We compare the differences between windy ARs and wet ARs including the lifecycle characteristics (such as genesis locations and changes of meteorological elements through the lifecycle), overall AR frequency, landfall impacts, and variability. The windy ARs are more likely to occur in the midlatitudes, while wet ARs are more active in the subtropics. Windy ARs are associated with intensive surface pressure lows, where the strong pressure gradient can support the strong wind within ARs. Due to larger size and longer lifetime, wet ARs are more likely to produce more precipitation over a lifecycle. By scaling the landfalling ARs, we show that wet ARs dominate the high‐category ARs (Category 4 and 5) with higher spatial frequency and more precipitation, and windy ARs have higher contributions in the lower AR categories especially over British Columbia. Windy ARs are modulated by El Niño Southern Oscillation (ENSO) teleconnections via the anomalous geopotential height and extended subtropical jet. Wet ARs are affected by the anomalous sea surface temperature over the midlatitudes related to ENSO. Sensitivity analysis with an alternate AR detection algorithm shows consistent results on AR flavors but with disagreement on the amplitude.

54 ENVIRONMENTAL SCIENCES↗

Dissecting the dominant hot spring microbial populations based on community-wide sampling at single-cell genomic resolution

With advances in DNA sequencing and miniaturized molecular biology workflows, rapid and affordable sequencing of single-cell genomes has become a reality. Compared to 16S rRNA gene surveys and shotgun metagenomics, large-scale application of single-cell genomics to whole microbial communities provides an integrated snapshot of community composition and function, directly links mobile elements to their hosts, and enables analysis of population heterogeneity of the dominant community members. To that end, we sequenced nearly 500 single-cell genomes from a low diversity hot spring sediment sample from Dewar Creek, British Columbia, and compared this approach to 16S rRNA gene amplicon and shotgun metagenomics applied to the same sample. We found that the broad taxonomic profiles were similar across the three sequencing approaches, though several lineages were missing from the 16S rRNA gene amplicon dataset, likely the result of primer mismatches. At the functional level, we detected a large array of mobile genetic elements present in the single-cell genomes but absent from the corresponding same species metagenome-assembled genomes. Moreover, we performed a single-cell population genomic analysis of the three most abundant community members, revealing differences in population structure based on mutation and recombination profiles. While the average pairwise nucleotide identities were similar across the dominant species-level lineages, we observed differences in the extent of recombination between these dominant populations. Most intriguingly, the creek's Hydrogenobacter sp. population appeared to be so recombinogenic that it more closely resembled a sexual species than a clonally evolving microbe. Together, this work demonstrates that a randomized single-cell approach can be useful for the exploration of previously uncultivated microbes from community composition to population structure.

59 BASIC BIOLOGICAL SCIENCES↗

Monthly hydropower generation data for Western Canada to support Western-US interconnect power system studies

Hydroelectric power generation in Western Canada significantly contributes to power grid operations of the North American Western Interconnection through substantial generation, some of which is exported to the United States (U.S.). However, the lack of publicly available hydropower generation datasets poses challenges for future market projections and resource adequacy evaluations. We present a simulation-based monthly power system model-ready hydropower generation dataset for 110 facilities in British Columbia and Alberta from 1981 to 2019. These monthly hydropower generation estimates are developed from integrated hydrologic model simulations of runoff and reservoir-operated streamflow, followed by scaling that considers diversion inflow constraints based on hydropower water license information. To address the lack of comparable hydropower generation records, we conduct step-by-step evaluations for simulated runoff, regulated streamflow, and hydropower generation using available observations or estimates. The presented hydropower dataset aims to enhance the representation of hydropower resources in Western Canada, supporting power grid system studies for the Western Interconnection of the U.S. and Canada.

13 HYDRO ENERGY↗

Advancing Asset Management in Water Infrastructure Systems

Aging water system infrastructure, including drinking water, wastewater, and stormwater, poses a growing challenge for utilities and municipalities. These water systems have well documented challenges with respect to their age, condition, and level of service. ASCE annual report cards consistently rate these infrastructure systems in the United States as underfunded, overcapacity, or past service life (ASCE 2025 Report Card). For example, Chini and Stillwell (2017) estimated that the mean water loss in drinking water systems, i.e., non-revenue water, is approximately 16% across the United States. These concerns are not just relegated to the United States, with Courtenay, British Columbia, identifying 17% of their water main pipes as in a ‘poor’ condition state, defined as a category condition 5 out of 5 (City of Courtenay, 2024). These cases illustrate the challenges utilities are facing to manage extensive networks of infrastructure to deliver a consistent and high level of service. For buried infrastructure such as water systems, studies suggest that preventative interventions can lead to lower maintenance costs and fewer service disruptions (Mazumder et al, 2018; Li et al, 2014). The demonstrated need and benefit of appropriately applied asset management is juxtaposed against the relatively sparse literature that evaluates water systems within an asset management construct. Since 2020, just 37 papers specifically reference asset management in the Journal of Water Resources Planning and Management. Of those, only a few specifically look to develop strategies for improved asset management. Therefore, we highlight four key research areas that represent opportunities for advancement of asset management research for water systems. First, advances in condition assessment and forecasting are needed to better estimate asset deterioration using diverse datasets. Second, machine learning (ML) and artificial intelligence (AI) hold promise for predictive maintenance and investment prioritization, though questions of generalizability and model transparency remain. Third, applying a value of information framework can guide utilities in making cost-effective sensor deployment and data collection decisions, to direct monitoring strategies towards data-informed asset management decisions. Finally, integrated infrastructure management is critical, requiring coordinated planning with other infrastructure systems and stakeholder engagement to reduce costs and enhance service delivery.

Chini, Christopher M.↗

Otolith 87 Sr / 86 Sr identifies natal origin, movement and life history of Burbot Lota lota in the Kootenai River following 45 years of impoundment

Abstract Hydropower has long been an effective form of renewable energy, but the development of the resource has negatively impacted fishes throughout the world. Formulating recovery plans to mitigate these effects requires a firm understanding of species‐specific provenance, life history and life stage habitat requirements. However, the importance of this information is often only recognised after a substantial population decline, when obtaining it becomes demographically challenging. We provide a case study for this scenario and present a post hoc approach to gain insight into these critical data gaps for Burbot Lota lota in the upper Kootenai River in Montana and British Columbia. The population once supported a robust tribal and recreational harvest but declined following impoundment and these fisheries have remained closed or curtailed for nearly 20 years. The reasons for the decline are unknown and actions to assist recovery have been constrained by limited information regarding natal origin, life history and habitat use. We addressed this issue using strontium isotope ratios ( 87 Sr/ 86 Sr) in otoliths collected over four decades in Lake Koocanusa, the reservoir on the Kootenai River above Libby Dam. Due to the geologic heterogeneity of the basin and resulting variation in water 87 Sr/ 86 Sr, the assignment probability for Burbot to their region of natal origin approached unity. Otolith 87 Sr/ 86 Sr also indicated the population was comprised of mainstem‐ and tributary‐origin forms and their relative abundance changed over time. Mainstem Burbot was most abundant during the 1970s and 2000s, whereas tributary forms dominated between these periods. We suggest ecosystem changes following impoundment contributed to this shift in life history forms and the overall decline of the population. Our findings underscore the need for additional investigations of these impacts to guide restoration efforts.

Dunnigan, James L.↗

AmeriFlux CA-DSM Delta Salt Marsh

This is the AmeriFlux version of the carbon flux data for the site CA-DSM Delta Salt Marsh. Site Description - This site is a tidal salt marsh on the eastern side of the Boundary Bay Wildlife Management Area (WMA) in Delta, British Columbia, Canada. This area is located on the southern front of the Fraser River. The total area of the Boundary Bay WMA is 11,470 ha, and the eastern part surrounding the flux tower accounts for 39 ha. This area is surrounded by farms and dikes. The Provincial Government purchased this area in 1974 limiting public access and designated it as WMA in 1995. This area has a mixed semidiurnal tidal cycle. The dominant species is Saltgrass (Distichlis spicata) with a canopy height of ~40 cm. The tower is in a high marsh system and was installed to analyze energy, H2O, CO2, and CH4 fluxes on September 3, 2021.

Knox, Sara↗

Renewable Thermal Energy Systems Designed for Industrial Process Solutions in Multiple Industries

The need for renewable heat in industry is vital for the next decade and beyond. Industrial decarbonization is a key area that must be accelerated, to foster the removal of fossil fuels from the provision of heat, especially at low temperatures. This paper looks at the development and results of case studies for understanding the economics and potential for renewable thermal energy systems (RTES), particularly in hybrid configurations to provide industrial process heat (IPH). For the case studies, these include non-concentrating e.g., heat pumps, and concentrating collectors e.g., parabolic trough collectors and direct steam generation (DSG)-linear Fresnel collectors (LFCs). The results show that a levelized cost of heat (LCOH) of $6-$8 per million British Thermal Units (MMBTU) is possible, depending on the direct normal irradiance (DNI) and the system sizing e.g., to increase the solar fractions. In Arizona for example, with a DNI of 7.36 kWh/m2/day, the base case for the DSG-LFC system with 6hrs of thermal energy storage could potentially meet a 1 MWth load 80% of the year.

concentrated solar thermal↗

How did the world’s first atomic bomb get its name? Looking back on the Trinity test on its 76th anniversary

The world’s first-ever atomic bomb is called The Gadget. It was detonated in the New Mexico desert on July 16,1945 during the Trinity test, verifying that an implosion-type plutonium bomb would be successful when released above Nagasaki just weeks later. That atomic bomb was called Fat Man and it was a weaponized version of the Trinity device of The Gadget. According to the longtime lore, the bulbous-looking Fat Man bomb’s name was inspired by British Prime Minister Winston Churchill. After the Thin Man bomb, whose moniker was inspired by the U.S. President Franklin Roosevelt, didn’t come to fruition, the gun-type uranium atomic bomb named Little Boy was developed. It was likely dubbed as such because it was smaller in size.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Smart, Connected Manufactured Housing Solutions through High-Performance Design. Final CRADA report

This report focuses on HVAC, domestic hot water, and miscellaneous electric loads via voluntary opportunities that may arise from partnerships with utilities, as well as future US Environmental Protection Agency ENERGY STAR and DOE Zero Energy Ready Manufactured Home programs. Phase I of this project has begun the technical dialogue toward developing an implementation plan among DOE’s Oak Ridge National Laboratory, Clayton Manufactured Homes, and US Department of Housing and Urban Development Code manufactured housing stakeholders. These activities have focused on delivering high-performance design through integration of technology. Project tasks include the following: Identifying baseline energy analysis resources opportunities from a variety of DOE and utility stakeholders; Developing a smart home and business solution by leveraging existing utility programs working with Smart Homes Partners resources such as ACE IoT Solutions, Google Nest, and Ecobee; Developing improved smarter ventilation systems with industry ventilation partners such as the Madison Group; Developing improved building science QA/QC testing equipment with manufacturers such as The Energy Conservatory, and supporting other feasible concepts vetted under DOE’s Advanced Buildings Collaborative with Slipstream, reinventing HVAC in manufactured housing; and, Developing smart home short- and long-term viable technical solutions in coordination with Clayton Manufactured Homes in new and/or revitalized community scales for future Phase II prototype demonstrations, which may include design (and perhaps construction) of single-section homes targeting rental property developers and multi-section homes targeting low- to middle-income affordable housing community developers Given the ongoing US Department of Energy (DOE) rulemaking activities, baseline energy analysis assessments of envelope prescriptive and Uo (i.e., the overall thermal energy efficiency of the home in British thermal units per square foot of exterior heat loss/gain surfaces) measures were removed from the scope of Phase I of this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗