Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Boiler plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

An Alternative Casting Technique to Improve the Creep Resistance of Cast INCONEL Alloy 740H

The increasing performance requirements of power plant designs, such as advanced-ultra supercritical (A-USC), require the use of Ni-based superalloys to replace high-strength, ferritic-martensitic steels for components subjected to temperatures above 898 K (625 °C) and for austenitic stainless steels components at temperatures above 973 K (700 °C). To date, commercial Ni-based superalloy INCONEL 740H has been shown to be appropriate for use in A-USC power plants as boiler components in a wrought product. However, large complex components in boilers as well as other casings in the turbine and valve chest require castings of a thick-wall nature. Using the alloy in its cast form would be significantly valuable in terms of range of component size, geometry and complexity. Previous investigations revealed short creep lives from cast INCONEL alloy 740H. Here in this investigation, an alternative casting route that utilized a melt procedure resulting in a fine-grain casting, and in conjunction with a computationally optimized homogenization heat treatment, not only controlled the grain size and grain boundary structure but minimized chemistry variability and segregation. A primarily equiaxed and homogenous grain size distribution was obtained from this approach with better repartition of M 23 C 6 carbides along the grain boundaries. Furthermore, better than 38 pct increase was obtained for this material in comparison to the creep life obtained from the best performing conventionally cast material. More importantly, the fine-grain homogenized (FGH) casting route resulted in the Larson–Miller plot for this material that coincided with that of wrought alloy 740. At low creep stresses (with a test still in progress), the FGH casting is resulting in higher values of the LMP than the wrought alloy.

36 MATERIALS SCIENCE↗

Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Coal and Biomass – Integration of Combustor Boiler and DCC

Critical to the future of power generation is the development of a power plant that will be capable of flexible operation to meet the needs of the modern grid, providing resilient, low-emissions power to a grid that is increasingly seeing a large penetration of intermittent wind and solar. The modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. The process offers: 1) a modular plant design for improved operational flexibility; 2) fuel-staging combined with pressurized oxy-combustion, which leads to smaller plant size, higher plant efficiency, and lower cost for pollutant and greenhouse gas removal compared with traditional carbon-capture equipped coal power plants; and 3) small modular boilers and pollutant removal units that can be fabricated in shop and assembled on site, further reducing plant capital costs. Under DOE's support (DE-FE0031925), WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustion system and the direct contact cooler (DCC) from Technology Readiness Level (TRL) 4 to TRL-5, which would allow these technologies to be subsequently incorporated into a pilot plant. This talk will present an overview of the SPOC technology, CFD modeling and validation for burner and boiler development, and recent results to evaluate critical components for system integration needed to advance its TRL.

Magalhaes, Duarte↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Coal and Biomass – Integration of Combustor Boiler and DCC

Utilities and grid operators worldwide are under significant pressure to incorporate intermittent renewable sources while strategizing on how to maintain the necessary stability and reliability of the grid. The development of a power plant which will be capable of flexible operation to meet the needs of the grid as more intermittent sources like wind and solar energy are incorporated is key to maintain the reliability of the grid. Through the use of innovative and cutting-edge technologies that improve efficiency and reduce carbon emissions, and being small compared to today's conventional utility-scale power plants, the modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. Specifically, the process offers: 1) a modular plant design that allows for better operational flexibility; 2) the utilization of fuel-staging and pressurized oxy-combustion, resulting in smaller plant size, improved plant efficiency, and reduced costs for pollutant and CO2 removal compared to traditional power plants with post-combustion capture technology; and 3) the use of small modular boilers and pollutant removal units that can be constructed off-site leading to reduced capital costs for the plant. WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustor-boiler system and the direct contact cooler. To demonstrate the boiler convective section and to obtain critical data for commercial-scale pressurized boiler design, a simulated convective heat transfer boiler test section was designed and integrated with the combustor (radiant section). A direct contact cooler (DCC) was integrated with the combustor-boiler to demonstrate the dynamic operation of the integrated system and the performance of the DCC, including the efficiency for simultaneous removal of NOx and SOx. This talk will present an update on the evaluation of the critical components for system integration, including heat transfer data from the simulated boiler, scrubbing efficiency for the DCC under different operating conditions, and CFD modeling and validation for burner and boiler development.

Magalhaes, Duarte↗

A Lizard-inspired Tube Inspector (LTI) Robot

This final report summarizes the research findings of the current project. This project is a collaboration between New Mexico State University (NMSU) as a lead (Recipient) and Arizona State University (ASU) as a Co-Recipient. Tubular structures are common components of boilers and heat exchangers in power plants. Over time, these components may suffer corrosion, cracks, and stress-corrosion cracks in either the body or the welded connections. A single tube leakage can cause an outage of several weeks. Regular inspection is a key safety factor when ensuring that power plants are maintained in reliable, operational condition. This inspection, however, is challenging, time-consuming, and in many cases impossible due to accessibility issues and safety concerns. Recent developments in robotic-based inspection can offer a great solution. Hard-to-reach places can be inspected without overhauling the unit, saving time and cost. Although several robots have been designed and implemented successfully for inspecting power plant components, in particular tubular structures, their mobility and flexibility are limited. Most of these robots use wheels for mobility which reduces their maneuverability of these robots. Moreover, they usually use magnets to attach to tubes which will not work on tubes with non-ferromagnetic materials. These robots usually carry measurement tools for a particular non-destructive testing (NDT) method such as ultrasound testing (UT) that requires a couplant to perform a point-by-point (scanning) inspection of the tubular structure. In this project, we developed a versatile lizard-inspired tube inspector (LTI) robot with embedded inspection sensing components for tube inspection which removes the need for point-by-point scanning of tube surface for crack and corrosion detection. Inspired by a “lizard”, the novelty of the current project is the integration of couplant-free ultrasound sensing and transmission, advanced data-driven defect detection and imaging, and friction-based mechanical mobility components in a single robot to eliminate a need for smooth surfaces and simple geometry for mobility and scanning. The LTI robot could replace the wheel-based approach with friction-based mobility to significantly increase the flexibility and maneuverability of the robot. The LTI robot can get into a power plant unit, such as a boiler, from a small area allowing it to access a component of interest for inspection (e.g., move on OD, curved and flat surfaces, non-ferromagnetic or ferromagnetic materials, and tubes with rough surfaces and complex geometries). Additionally, an advanced data-driven method using ultrasound data was pioneered to allow the robot to detect defects in the entire area between the robot’s multi-functional mobility system (grippers). Integrating a couplant-free ultrasound sensing in the robot’s grippers as well as using advanced data-driven methods allowed the LTI to detect defects in the entire cross-section of a tube using its grippers when stationary and when mobile.

20 FOSSIL-FUELED POWER PLANTS↗

Advanced District Energy Controls for Improved Efficiency and Resilience

District energy (DE) systems have efficiently provided heat and cooling to buildings in the US for over a century by leveraging economies of scale through shared generation assets. However, optimizing DE boiler and chiller plants is complex due to the intricate mix of equipment and multiple operating flows. Sophisticated controls are necessary to achieve highest efficiencies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Report on High-Fidelity Dynamic Modeling of a Coal-Fired Steam Power Plant

As a result of the growth of renewables including solar and wind energy with fluctuating production, fossil fuel power plants are being required to cycle between high and low power production. This cycling is both at a greater frequency and over a wider range than in the past. In many cases, power plants are not designed for this type of cycling operation but can nonetheless endure these challenging operation requirements under the right conditions. In this project, optimal solution for enhanced flexible operations are being investigated using model based estimation and control techniques. To support the development of model-based estimator and model-based controls at GE Global Research, GE Steam Power configured a dynamic model using a reference steam plant design including the boiler, turbine, and water/steam conditioning systems as well as the controls needed for plant cycling with stability and reliability. The dynamic model was built using the APROS® software from VTT, and then calibrated to multiple load conditions from full load (100%TMCR) to partial loads (75%TMCR, 50%TMCR and 25%TMCR) based on internally developed steady state heat balance models at the unit level. These internal heat balance models are based on first principles and extensive engineering experiences from GE Steam Power as an OEM and a services provider. This topical report presents the structure of the unit level dynamic model, the tuning process, and representative simulation results from typical load cycling simulations using the dynamic model.

01 COAL, LIGNITE, AND PEAT↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Four-Stage Multi-Physics Simulations to Assist Temperature Sensor Design for Industrial-Scale Coal-Fired Boiler

The growth of renewable energy sources presents a pressing challenge to the operation and maintenance of existing fossil fuel power plants, given that fossil fuel remains the predominant fuel source, responsible for over 60% of electricity generation in the United States. One of the main concerns within these fossil fuel power plants is the unpredictable failure of boiler tubes, resulting in emergency maintenance with significant economic and societal consequences. A reliable high-temperature sensor is necessary for in situ monitoring of boiler tubes and the safety of fossil fuel power plants. In this study, a comprehensive four-stage multi-physics computational framework is developed to assist the design, optimization installation, and operation of the high-temperature stainless-steel and quartz coaxial cable sensor (SSQ-CCS) for coal-fired boiler applications. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. With the simulation-guided sensor installation plan, the newly designed SSQ-CCSs have been employed for field testing for more than 430 days. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

42 ENGINEERING↗

Development of the Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Coal and Biomass

Critical to the future of power generation is the development of a power plant that will be capable of flexible operation to meet the needs of the modern grid, providing resilient, low-emissions power to a grid that is increasingly seeing a large penetration of intermittent wind and solar. The modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. The process offers: 1) a modular plant design for improved operational flexibility; 2) fuel-staging combined with pressurized oxy-combustion, which leads to smaller plant size, higher plant efficiency, and lower cost for pollutant and greenhouse gases removal compared with traditional carbon-capture equipped coal power plants; and 3) small modular boilers and pollutant removal units that can be fabricated in shop and assembled on site, further reducing plant capital costs. Under DOE's support (DE-FE0031925), WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustion system and the direct contact cooler (DCC) from Technology Readiness Level (TRL) 4 to TRL-5, which would allow these technologies to be subsequently incorporated into a pilot plant. This talk will present an overview of the SPOC technology, CFD modeling and validation for burner and boiler development, and recent results to evaluate critical components needed to advance its TRL.

Magalhaes, Duarte↗

LH CO 2 MENT Colorado Project (Final Report)

The objective of Electricore’s pre-FEED project “LH CO 2 MENT COLORADO PROJECT” is to accelerate the implementation of a 1.5 million tonnes per year (TPY), and first-of-a-kind (FOAK) at world scale, Svante VeloxoTherm™ carbon capture plant. This project represents a quantum leap to a large-scale facility that will launch Svante’s carbon capture technology into the next era of accomplishments and market acceptance. By completing the Front-End Loading (FEL) Feasibility Study Report (FEL-2) for a fit-for-purpose design at the HOLCIM cement plant, located near Florence Colorado, USA, this technology can be proven as the future of large-scale deployment for carbon capture and storage. This carbon capture plant was designed with the goal of reaching a target of near Net Zero Emissions by capturing 90% of the carbon dioxide (CO 2 ) emissions from the HOLCIM cement plant and from the boiler which produces steam required to regenerate the adsorbent. Additionally, this project will be leveraging a renewable Power Purchase Agreement (PPA) using solar energy to acquire power at the target price of 0.04 $/kWh or less. In its current configuration CO 2 emissions from the HOLCIM cement plant is around 700 – 800 kg/ton of clinker produced. The proposed new carbon capture plant will allow a reduction of CO 2 emissions to about 100 kg/ton of clinker produced. The scope of work consists of the process design and capital & operating cost estimation (Class IV) for a total plant capacity of 4,750 TPD of pipeline grade CO 2 . The Svante VeloxoTherm™ technology is comprised of a Rotary Adsorption Machine (RAM) for intensified Thermal Swing Adsorption (TSA) using Structured Adsorbent Beds (SABs) and related Balance of Plant (BOP), including CO 2 compression. A business case (financial analysis) evaluation has been undertaken for the Owner’s management review. Recommendations on how best to proceed to the next stage of the project have been conveyed and are documented within this report. This analysis has relied on a detailed and comprehensive Project Financial Model, evaluating the Total Project IRR (after tax, unlevered, and including all forecast 45Q PTCs and 100% tax efficiency) – the project financial analysis (as opposed to standard TEA analysis) only considered a 12 year plant economic lifetime as a result of 45Q being the sole driver considered at this stage. The Total Project IRR was evaluated across a large number of potential scenarios. The evaluation demonstrated that if the 45Q PTD is increased to $85/MT for sequestration, there are a large number of feasible scenarios which demonstrate economic returns.

01 COAL, LIGNITE, AND PEAT↗

A Development of Critical Components for the Modular Staged Pressurized Oxy-Combustion Power Plant

DOE's Coal FIRST (Flexible, Innovative, Resilient, Small, Transformative) Initiative was implemented to encourage the development of the coal plant of the future, which will be capable of flexible operation to meet the needs of the grid; using innovative and cutting-edge components that improve efficiency and reduce emissions; providing resilient power to Americans; being small compared to today's conventional utility-scale coal power plants; and transforming how coal power plant technologies are designed and manufactured. The modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. The process offers: 1) a modular plant design for improved operational flexibility; 2) fuel-staging combined with pressurized oxy-combustion, which leads to smaller plant size, higher plant efficiency, and lower cost for pollutant and greenhouse gases removal compared with traditional carbon-capture equipped coal power plants; and 3) small modular boilers and pollutant removal units that can be fabricated in shop and assembled on site, further reducing plant capital costs. Under DOE's support (DE-FE0031925), WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustion system and the direct contact cooler (DCC) from TRL 4 to TRL-5, which would allow them to be subsequently incorporated into a pilot plant. These units are the only two components that are not commercially available for a SPOC plant, and hence, their development is a key step toward the commercialization of SPOC. This work presents the objectives, task descriptions, and current progress of the project. So far, the fabrication of a new combustor design and the convective heat transfer boiler has been completed, and the integration of the combustor, boiler, and DCC is underway. Recent results obtained with the newly designed combustor show a stable coal/methane flame while dry-feeding PRB coal under oxy-combustion conditions.

Magalhaes, Duarte↗

Distributed Coaxial Cable Sensors for In-Situ Condition Based Monitoring of Coal-Fired Boiler Tubes

The increasing contributions of renewable energy sources present new challenges to the operation and maintenance of the existing coal-fired power plants. One of the major operational risks is the unexpected failure of superheater boiler tubes, leading to the most unplanned power plant outrages. The boiler tube failure is difficult to predict due to the harsh operating environments. Therefore, condition-based monitoring (CBM) with a reliable high temperature sensor becomes necessary to produce a meaningful assessment of the health condition of boiler tubes and their remaining lifetime. In this work, the stainless-steel and quartz coaxial cable sensor (SSQ-CCS) is proposed for in-situ distributed monitoring of the boiler tube temperatures in existing coal-fired power plants. Comprehensive tests have been conducted with an in-house testing facility at Clemson University to study and evaluate the sensors’ performance in the temperature range of 100℃ to 600℃. The results indicated that the measurement resolution of the SSQ-CCS sensor is better than 1℃, and the drift is less than 2% over long-period testing. Meanwhile, multi-physics finite element analysis has been conducted to optimize the design and evaluate the safety of the SSQ-CCS temperature sensor under various operational conditions. Based on the performance obtained in the laboratory-scale testing, a field test has been implemented at a power plant. Four SSQ-CCS temperature sensors were installed for in-situ monitoring of the temperatures of a power plant’s superheat tube assembles. The data acquisition system has been successfully set up and collected sensing signals for more than three months. The sensing signals have been post-processed, and the monitored temperature history through the SSQ-CCS temperature sensor has been validated and compared with the conventional high temperature thermal couple data.

Jiao, Xinyu↗

Mitchell FEED Study Summary Report (Unlimited Rights Version) (Rev. D)

Heidelberg Materials (HM), Sargent & Lundy (S&L), and Mitsubishi Heavy Industries (MHI) completed a Front End Engineering Design (FEED) study for deployment of an amine-based CO 2 capture system at the Mitchell Cement Plant in Indiana. The project includes compression of captured CO 2 to a supercritical state for geological sequestration. The flue gases from 7,000 mtpd clinker plant combined with auxiliary boiler flue gases into the capture system. Auxiliary boiler supplies steam for solvent regeneration. The study developed an AACE Class 3 capital cost estimate (+30%/-20%) at approximately 30% design completion to evaluate the technical and economic feasibility of capturing up to 2 million tonnes of CO 2 per year.

42 ENGINEERING↗

Test and Validate Distributed Coaxial Cable Sensors for in situ Condition Monitoring of Coal-Fired Boiler Tubes

This project aims to test, validate, and advance the technology readiness level (from TRL5 to TRL7) of a novel low-cost distributed stainless-steel/ceramic coaxial cable sensing (SSC-CCS) technology for in situ monitoring of the boiler tube temperature in existing coal-fired power plants. The novel SSC-CCS sensing technology and associated condition-based monitoring (CBM) software to be demonstrated in this project will lead to an improved understanding of the boiler tube failure mechanisms and a prognostic system to improve the overall performance, reliability, and flexibility of the nation’s coal-fired power plant fleet. A boiler tube monitoring system with distributed coaxial cable temperature sensors and a sensor acquisition system was constructed. The high-temperature coaxial cable sensor with a length of 1.3m was made by using a quartz tube (1mm inner diameter (ID) and 6mm outer diameter (OD)) to concentrically separate a 304 stainless-steel (SS) rod (1mm OD) and SS tube (7.94mm OD and 6.16mm ID). The sensor acquisition system includes a vector network analyzer (VNA), a radio frequency (RF) power amplifier, multiple switches and a USB hub. The distributed stainless-steel quartz coaxial cable sensor (SSQ-CCS) had a linear response to temperature with a resolution uncertainty of σ = 0.77℃. To withstand the harsh conditions of 3,300 steam pressures and 800℃ high temperatures, the sensor was shielded by a protective tube made of the same material as the boiler tube. The protection tube had an OD of 1.5 inches and a thickness of 0.25 inches. In the laboratory tests, the sensor showed good sensitivity and fast response. The drift was bounded between +0.33% and -0.67% during a test at 600℃ for 350 hours, indicating good stability of the sensor. A field test was conducted where four sensors were welded on four superheat tubes (SH-Ts) at a coal-fired power station over 400 days. Conventional thermocouples were welded to the superheater tubes alongside the coaxial cable sensors for the purpose of comparison. Two sensors were capable of distributed sensing, with three multiplexed sensing sections. The other two sensors were single section. During the 400-day test period, the power plant experienced startups and shutdowns. At the steady state operations, the temperature of the boiler tube is about 600℃ (1112°F). The sensors recorded the entire coal-firing processes (start-up, steady state, and shut-down) and the glitch event. A GSM modem and a Watchdog were added to the system to ensure reliable data recording. The GSM modem sent daily messages to plant managers and Clemson team to inform the status of the sensor system. If the system was not normally working, the Watchdog would reboot the system automatically. The new coaxial cable based distributed sensing technology has been proven to be successful in both laboratory and field tests. A comprehensive four-stage multi-physics computational framework has been developed to assist the design, optimization, installation, and operation of SSQ-CCS. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. A conditional-based monitoring system is implemented as well. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

01 COAL, LIGNITE, AND PEAT↗

Characterization of Long-Term Service Coal Combustion Power Plant Extreme Environment Materials

The objective of this DOE-sponsored project was to develop a comprehensive database of mechanical properties, alloy microstructures, and to a lesser extent, the oxidation/corrosion behaviors of coal-fired power plant components, such as boiler tubing, steam headers, and steam piping, which had been in service for at least 100,000 operating hours (preferably more than 200,000 operating hours) under the operating conditions of high temperatures and high mechanical stresses where creep, fatigue, steam-side oxidation, and fireside corrosion were life-limiting factors. The components included in this database consisted of ferritic steels, creep strength enhanced ferritic (CSEF) steels, and 300-series H-grade stainless steels, as well as dissimilar metal welds (DMWs) among these types of materials. As a result of extensive metallurgical characterization and mechanical testing performed in this project, a comprehensive database on mechanical properties and detailed quantitative microstructural information was successfully developed for several long-term serviced EEM components. Such a database can be used by material research communities to develop, calibrate, refine, and validate mechanical behaviors, models, and other assessment tools for accurate prediction of remaining life of major components under similar EEM operating conditions.

20 FOSSIL-FUELED POWER PLANTS↗

Characterization of Long-term Service Coal Combustion Power Plant Extreme Environment Materials

The technical goal of this project is to develop a comprehensive database of mechanical properties, alloy microstructures, and to a lesser extent, the oxidation/corrosion behavior of coal-fired power plant components, such as boiler tubing, steam headers and steam piping, which have been in long-term service (at least 100,000 operating hours, and preferably more than 200,000 operating hours) under the operating conditions of high temperatures and high mechanical stresses where creep, fatigue, steam-side oxidation, and fireside corrosion are life-limiting factors. The components included in the database will include the following types of high temperature alloys: creep strength enhanced ferritic (CSEF) steels, 300-series H-grade stainless steels, and dissimilar metal welds (DMWs).

Characterization↗

COGIHTO: Comprehensive Geothermal Integrated HVAC Retrofits in Disadvantaged Communities

Geothermal heating and cooling (GHC) systems offer one of the most efficient approaches to provide space conditioning and water heating in buildings. Due to the relatively stable temperature of the ground year-round, these systems can provide an efficient solution to decarbonize heating systems. Yet this technology has faced limited market adoption due to its high first cost. This project seeks to address this barrier by designing a community GHC system at a public housing development in New York, taking advantage of load diversity (in terms of the timing and amount of heating / cooling used per person) that a larger community offers to reduce the size and thus first cost of a GHC system. Project success would result in societal benefit from reduced energy and fossil fuel use, reduced local emissions, and improved comfort, which would positively impact the health and well-being this community. This report presents the findings from Phase 1 project supported by the Department of Energy’s Geothermal Technologies Office and includes the technical design of a GHC at a public housing development in New York. To support the success of a potential deployment of a GHC system, the team conducted community engagement and prepared an assessment of the local workforce needs. The project team, led by EPRI, considered a subset of NYCHA housing developments that were previously identified by NYCHA as suitable for GHC retrofits. This report presents the site selection criteria the team developed and the overall score assigned to each of the eight developments considered. One site was selected for focus of the technical design: Stapleton Houses in Staten Island, a mid-size development with roughly 700 apartments across 6 buildings. The site has an existing hot water hydronic loop served by natural gas boilers for space heating and water heating. The technical design partner assessed baseline energy consumption at the site and established thermal models of the apartment buildings to assist in the design. The team considered several GHC system configurations and selected a hybrid geothermal design fed from water-source heat pumps with auxiliary gas boilers in a central plant. This design best leveraged the existing site configuration and minimized costs due to additional electrical infrastructure upgrades. The report also details the feedback received from community engagement efforts and the findings from the workforce needs assessment and workforce transition plan. Members of the site maintenance staff and the resident advisory council were interviewed for their input and feedback about both the site’s existing heating/cooling infrastructure and how a construction project would impact resident life. This feedback was taken into consideration when completing the geothermal system design. Research was conducted into existing workforce development opportunities available to NYCHA residents. A workforce development plan was established using information from NYCHA’s resident economic empowerment and sustainability group, along with training material and curriculum from the International Ground Source Heat Pump Association (IGSHPA).

15 GEOTHERMAL ENERGY↗