Solar PV on U.S. Houses of Worship: Overview of Market Activity and Trends [Slides]

Rooftop solar photovoltaic systems on houses of worship can provide unique community benefits and can raise local awareness and acceptance of solar energy. Recognizing that potential, a stakeholder team selected under DOE’s Solar Energy Innovation Network is working to develop a scalable model for recruiting and installing solar PV on houses of worship in underserved communities. Berkeley Lab is providing analytical support to this stakeholder team through several work products, including this report, which provides a data-oriented overview of market activity and trends related to solar PV installations on U.S. houses of worship (HoW). Drawing on Berkeley Lab’s project-level dataset of U.S. solar PV installations, the report describes: -market size and growth trends for PV on HoW -demographic characteristics of the communities in which HoW with PV are located, including income, race and ethnicity, and educational levels -key characteristics of the PV systems installed on HoW, including system size, installed costs, prevalence of third-party ownership, and pairing with storage -characteristics of the installer network servicing PV installations on HoW The purpose of the market overview is to inform business development and policy-making efforts aimed at supporting solar adoption by HoW.

14 SOLAR ENERGY↗

Solar-to-Grid Public Data File for Utility-scale (UPV) and Distributed Photovoltaics (DPV) Generation, Capacity Credit, and Value for 2012-2020

Lawrence Berkeley National Laboratory (Berkeley Lab) estimates hourly project-level generation data for utility-scale solar projects and hourly county-level generation data for residential and non-residential distributed photovoltaic (PV) systems in the seven organized wholesale markets and 10 additional Balancing Areas. To encourage its broader use, Berkeley Lab has made this data file public here at OEDI, covering the years 2012-2020. The public project-level dataset is updated annually with data from the previous calendar year. For more information about the research project, including a technical report, briefing material, visualizations, and additional data, please visit the project homepage linked in this submission.

annual solar value↗

Utility-Scale Solar, 2023 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2023 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Highlights of this year’s update include: -10.4 GWAC of new utility-scale PV capacity came online in 2022, bringing cumulative installed capacity to more than 61.7 GWAC across 46 states. -94% of all new utility-scale PV capacity added in 2022 uses single-axis tracking. -Median installed project costs declined to $\$1.32$/WAC (or $\$1.07$/WDC) in 2022. -Plant-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$39$/MWh in 2022 ($\$29$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20-30$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. -In 2022, solar’s average market value (defined in the report to include only energy and capacity value) rose by 40% to $\$71$/MWh and exceeded average wholesale prices in 4 of the 7 ISOs/RTOs and 11 of 18 other balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from ~100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -the end of 2022, there were at least 947 GW of utility-scale solar power capacity within the interconnection queues across the nation, 456 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2024 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2024 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Key findings from this year’s report include: -18.5 GWAC of new utility-scale PV capacity came online in 2023, bringing cumulative installed capacity to more than 80.2 GWAC across 47 states. Installed costs continued to fall in 2023. Relative to 2022, capacity-weighted averages decreased by 8% to -$\$1.43$/WAC (or $\$1.08$/WDC). Costs, based on a 7.1 GWAC sample of 76 plants completed in 2023, have fallen by 75% (averaging 10% annually) since 2010. Plant-level capacity factors vary widely, from 6% to 36% (on an AC basis), with a sample median of 24%. -Levelized cost of energy (LCOE) of new 2023 projects increased slightly to $\$46$/MWh prior to the application of tax credits but continued to fall to $\$31$/MWh when accounting for federal incentives. PPA prices have largely followed the decline in solar’s LCOE over time, but newly signed longer-term PPA prices have increased since 2021, to an average of $\$35$/MWh (levelized, in 2023 dollars). -Solar’s average energy and capacity value (i.e., ability to offset costs of other power generation sources) across the U.S. was $\$45$/MWh in 2023. Solar’s average market value was lowest in CAISO ($\$27$/MWh), the market with the greatest solar generation share, and highest in ERCOT ($\$67$/MWh). -Newer solar projects had greater market value in 2023 than their generation costs, yielding $\$1.1$ billion in benefits. Projects built in 2022 delivered on average $\$15$/MWh more market value than their costs in 2023. -Solar’s combined value from wholesale electricity markets, public health and climate damage reduction were greater than generation costs and incentives, yielding $\$13.7$ billion in net benefits in 2023. We estimate U.S. health benefits of $\$24$/MWh and reduced global climate damages of $\$101$/MWh. -Adding battery storage is one way to increase the value of solar. Deployment of 52 new PV+battery hybrid plants set a record with 5.3 GW installed in 2023. Our public data file tracks metadata and PPA prices from more than 100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -Looking ahead, a massive pipeline of at least 1,085 GW of solar capacity dominates the nation’s interconnection queues at the end of 2023. Nearly 571 GW, or 53%, of that total was paired with a battery – in CAISO it was a staggering 98%. Historically only 10% of the requested solar capacity is built. -For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Tracking the Sun: Pricing and Design Trends for Distributed Photovoltaic Systems in the United States (2023 Edition) [Slides]

Berkeley Lab’s annual Tracking the Sun report describes trends among grid-connected, distributed solar photovoltaic (PV) and paired PV+storage systems in the United States. For the purpose of this report, distributed solar includes residential systems, roof-mounted non-residential systems, and ground-mounted systems up to 5 MW-AC. Ground-mounted systems larger than 5 MW-AC are covered in Berkeley Lab’s companion annual report, Utility-Scale Solar. The latest edition of the report is based on 3.2 million systems installed through year-end 2022, representing more than 80% of systems installed to date. The report describes and discusses key trends related to: -Project characteristics, including system size, module efficiencies, prevalence of paired PV with storage, use of module-level power electronics, third-party ownership, mounting configurations, panel orientation, and non-residential customer segmentation ownership -Median installed-price trends, both nationally and by state -Variability in pricing according to system size, state, installer, equipment type, and other factors, relying on both descriptive and econometric analysis The report also includes a multi-variate regression analysis to estimate the effects of key pricing drivers for residential systems installed in 2022.

14 SOLAR ENERGY↗

Tracking the Sun: Pricing and Design Trends for Distributed Photovoltaic Systems in the United States, 2024 Edition [Slides]

Berkeley Lab’s annual Tracking the Sun report describes trends among grid-connected, distributed solar photovoltaic (PV) and paired PV+storage systems in the United States. For the purpose of this report, distributed solar includes residential systems, roof-mounted non-residential systems, and ground-mounted systems up to 5 MW-AC. Ground-mounted systems larger than 5 MW-AC are covered in Berkeley Lab’s companion annual report, Utility-Scale Solar. The latest edition of the report is based on 3.7 million systems installed through year-end 2023, representing close to 80% of systems installed to date. The report describes and discusses key trends related to: -Project characteristics, including system size, module efficiencies, roof-coverage ratios, prevalence of paired PV with storage, use of module-level power electronics, third-party ownership, mounting configurations, panel orientation, and customer segmentation -Median installed-price trends, both nationally and by state -Variability in pricing according to system size, state, installer, equipment type, and other factors, relying on both descriptive analysis and a multi-variate regression to estimate the effects of key pricing drivers for residential systems installed in 2023.

14 SOLAR ENERGY↗

Impact Report: Quantum Systems Accelerator

The Quantum Systems Accelerator (QSA) is a U.S. National Quantum Information Science Research Center established in August 2020 and funded by the Department of Energy (DOE) Office of Science. QSA is composed of 15 partner institutions— universities and national laboratories—bringing together pioneers of many of today’s unique quantum information science (QIS) and engineering capabilities. Led by Lawrence Berkeley National Laboratory (Berkeley Lab), with Sandia National Laboratories (Sandia Labs) as the lead partner, 250+ QSA researchers are catalyzing U.S. leadership in a fast-growing field that seeks solutions to the Nation’s and the world’s most pressing problems by harnessing the laws of quantum mechanics.

97 MATHEMATICS AND COMPUTING↗

Disaggregating Future Retail Electricity Rate Growth [Slides]

Recent Berkeley Lab research found that modest retail rate increases over the past 10 years were mostly driven by large increases in capital expenditures (CapEx) that were offset in part by substantial wholesale price reductions. Decision-makers are increasingly concerned about the potential future rate impacts of a number of policies and industry trends that support rapid decarbonization, electrification, and grid modernization. Using historical FERC Form 1 data and the existing literature on policies and industry trends that are likely to affect utility-incurred costs and retail sales, Berkeley Lab researchers developed ranges of forecasted growth rates for cost-related rate drivers (i.e., fuel and purchased power; transmission, distribution, generation, and other categories of both non-fuel operations & maintenance and CapEx) and non-cost related rate drivers (i.e., retail sales, peak demand, and customers). These were then used as inputs to a pro-forma utility financial model (FINDER) that estimated the growth in retail electric rates between 2020 and 2030 for a prototypical vertically-integrated investor-owned utility in the United States. The analysis produced the following results: 1. Assuming average growth rates in all rate drivers, future retail rate growth is driven by sizable increases in all CapEx costs, where fuel and purchased power costs are replaced by generation CapEx as the largest rate component between 2020 and 2030. 2. Growth in sales/peak demand/customers, generation CapEx costs, and fuel and purchased power (FPP) costs, in isolation, produce the most uncertainty in rate growth. Specifically, a 1% increase in the compound annual growth rate (CAGR) of retail sales, coincident peak demand (CP), and customers (Sales-CP-Cust) results in a 0.88-0.93% decrease in the CAGR of rates, in isolation. However, a 1% increase in the CAGR of generation CapEx budgets results in a 0.07-0.14% increase in the CAGR of rates, while a 1% increase in the CAGR of FPP costs causes a 0.10-0.14% increase in the CAGR of rates, all else being equal. 3. Taking into account the correlation and variability of the growth in all rate drivers jointly, generation CapEx is expected to be both the largest and most uncertain rate component by 2030 (20-25% share of the retail rate). Transmission and distribution CapEx, along with fuel and purchased power costs are each expected to comprise between 12% and 17% of retail rates.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Are You Philanthropy-Ready? How to Work with Foundations on Mission-Aligned Community Solar

Community solar is emerging as a popular way to deliver a range of economic and social benefits that go beyond clean energy. The US Department of Energy (DOE) has set a goal for America to deploy enough community solar projects to power the equivalent of five million households by 2025 and create $1 billion in energy bill savings. To reach the goal, DOE has created the Community Power Accelerator, as part of the National Community Solar Partnership (NCSP). The Accelerator is an online ecosystem bringing together developers, lenders, foundations, community organizations, and other stakeholders to support the deployment of mission-aligned community solar. The Accelerator is especially focused on projects that deliver "meaningful benefits" to customers and communities, including: access by low- to moderate-income households; greater bill savings; resilience and grid benefits; community ownership; and local workforce development. Many philanthropic organizations are looking at community solar as a way to capture these benefits in their grant-making and investment programs, while also reducing pollution and promoting environmental justice. To help community-based organizations (CBOs), non-profit organizations, and mission-aligned developers seeking philanthropic support, Berkeley Lab and the National Renewable Energy Lab prepared Are You Philanthropy-Ready? How to Work with Foundations on Mission-Aligned Community Solar. The guide provides an overview of how foundations work, gives tips on what they seek in a fundable project, and provides guidance on crafting effective proposals. In short, this guide aims to help the fund-seeker become philanthropy-ready.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)

Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

2022↗

Utility-Scale Solar, 2021 Edition

Berkeley Labs "Utility-Scale Solar", 2021 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2020, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

2021↗

Utility-Scale Solar, 2023 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)

Berkeley Labs "Utility-Scale Solar", 2023 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2022, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

analysis↗

Utility-Scale Solar, 2024 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)

Berkeley Labs "Utility-Scale Solar", 2024 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2023, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, net value, and interconnection queue data.

analysis↗

Cyclotron Road Partnership (CRADA Final Report)

The Cyclotron Road program was launched in 2015 by LBNL, with support from the DOE Advanced Manufacturing Office (AMO), to accelerate technical innovation in the energy sector. The program brought scientist-entrepreneurs to LBNL to access unique research assets and expertise. In 2016, LBNL partnered with Activate Global, Inc., a 501(c)(3) non-profit, to expand the program and provide enhanced access to capital and business support services. Under this Cooperative Research and Development Agreement (CRADA), LBNL provided technical support and expertise, while Activate engaged with private sector, philanthropic, and government partners to support innovators and research-phase small businesses, aiming to translate high-impact materials and manufacturing technologies from lab to market. The program received funding from various sponsors, including the DOE, DARPA, and the California Energy Commission, and was managed through a collaborative framework that maintained accountability by the participant organization and Berkeley Lab regarding roles and tasks relevant to this collaboration.

99 GENERAL AND MISCELLANEOUS↗

LBNL-BELLA Center Monoenergetic Photon Source Experiments

This document outlines measurements made by Idaho National Laboratory (INL) staff at the Berkeley Lab Laser Accelerator (BELLA) Center. Measurements of a mono-energetic Thomson photon beam were made with various INL instruments. The photon beam was generated by a laser-plasma accelerator system. This project is referred to by the name Laser Wake. Key Lawrence Berkeley National Laboratory (LBNL) personnel involved include Liona Fan-Chiang, Cameron Geddes, Anthony Gonsalves, Robert Jacob, Tobias Ostermayr, and Hai-En Tsai.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗