Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Battery Energy Storage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Resilient and Cost-Effective Hybrid Li-Ion Battery Energy Storage System for Sites with Solar Generation and Electric Vehicle (EV) Charging (CRADA Final Report, CRD-19-00799)

The batteries of an energy storage system designed for multiple use-cases are traditionally selected to withstand the highest rate at which a battery is discharged relative to its maximum capacity (C-rate) and cycling requirements of the most intense use-case. However, this is not cost-effective given that the price of the batteries is strongly correlated to C-rate and cyclability. We propose to establish design guidelines for a hybrid energy storage system and test an edge controller that uses high-power and high-energy batteries for high- cyclability use cases such as frequency regulation and electric vehicle (EV) charging and low-cost batteries for low-power and low-cyclability use cases such as summer peak loads. The three main objectives of this proposal are (i) establishing sizing guidelines for such a hybrid storage system, (ii) installing a hybrid storage system in the Energy Systems Integration Facility (ESIF) sized based on those guidelines, and (iii) testing an edge controller specific for the system through hardware tests.

14 SOLAR ENERGY↗

Battery Energy Storage System (BESS) Licensing and Permitting [Slides]

This presentation provides an overview of the licensing, permitting, and regulatory frameworks governing Battery Energy Storage Systems (BESS) across multiple international contexts. It outlines foundational permitting considerations - including safety standards, siting requirements, regulatory and environmental obligations, and interconnection processes - alongside typical pathways for installation, approval, and inspection. The presentation summarizes key technical standards such as NFPA 855 and IEEE guidelines, and emphasizes best practices for safe and effective deployment. A series of detailed case studies from South Africa, Chile, Mexico, Brazil, Costa Rica, Honduras, and the Dominican Republic illustrates how different countries structure approval authority, evaluate environmental impacts, and integrate BESS into national grid systems. The deck concludes with insights on emerging challenges, including evolving regulatory frameworks, financial viability, and the need for pricing mechanisms that accurately value storage services.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Battery Energy Storage System (BESS) End-of-Performance and Decommissioning Considerations [Slides]

This presentation provides a comprehensive overview of end-of-performance and decommissioning considerations for large-scale Battery Energy Storage Systems (BESS). It outlines expected system lifespans, midterm assessment needs, and pathways for extending operational life through augmentation or repowering. The presentation details regulatory requirements that govern decommissioning plans, cost estimates, financial assurance mechanisms, and performance obligations across multiple jurisdictions. It further examines end-of-life equipment management, including recycling, waste handling, transportation, and environmental compliance. Designed to support Malawi's electricity-sector institutions, the presentation highlights how planning for decommissioning and environmental stewardship can be integrated early in project development to ensure safe, financially accountable, and environmentally responsible BESS system retirement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Report series: finding of effect and mitigation documentation for the mercury solar photovoltaic array and battery energy storage system, area 23, nevada national security site, nye county, nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) proposes to install solar photovoltaic (PV) power generation arrays and an associated battery energy storage system (BESS) for the town of Mercury at the Nevada National Security Site (NNSS) in Nye County, Nevada (Figure 1). The purposes of the development of this facility are to support long-term efforts to modernize Mercury and to provide energy-resilient infrastructure and address climate adaptation needs. Because it is within the boundary of the Mercury Historic District (MHD), it is subject to the terms of the Programmatic Agreement Between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (hereafter referred to as the Mercury PA). An identification and evaluation report prepared for this undertaking determined that a contributing element to the MHD, the Mercury airstrip (26NY15777), is within the APE (Haynes 2024). The Mercury airstrip was developed following the closure of Camp Desert Rock in 1957 and used until late 1963 or 1964 when the Camp Desert Rock Airport was renovated, and the Mercury Bypass road constructed. The town of Mercury and the immediate surrounding area have been determined eligible for listing in the National Register of Historic Places (NRHP) as the MHD (SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992 (Reed 2019). Originally recorded in 2016, 26NY15777 was determined individually not eligible for listing in the NRHP because it lacked sufficient integrity to convey its significance (Palmer 2016). It was subsequently determined in 2018 to be a contributing element of the MHD in an architectural survey of the district (Palmer 2018) and identified in Appendix C of the Mercury PA as a Category I contributing element. However, as per Stipulation IV.B.2, because the airstrip had already been formally evaluated and determined not to be individually eligible for the NRHP in consultation with the SHPO, this categorization was an error. NNSA/NFO reported this to the SHPO in Haynes 2024 and the SHPO concurred on June 11, 2024 (Reed). Accordingly, the airstrip is a Category II Property for the purposes of complying with the Mercury PA. The Mercury airstrip is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and subject to the stipulations of the Mercury PA.

25 ENERGY STORAGE↗

On the role of Battery Energy Storage Systems in the day-ahead Contingency-Constrained Unit Commitment problem under renewable penetration

The integration of variable Renewable Energy Sources (vRES) to alleviate greenhouse gas emissions has introduced significant challenges for power systems operations. These challenges include high levels of uncertainty due to the intermittence associated with vRES and therefore impose the need to devise a reliable and cost-effective day-ahead unit commitment and power and reserves scheduling for real-time operations. Also, this increasing penetration of vRES requires higher ramping capabilities from units originally designed for other purposes (e.g., base-load generation), which might be exacerbated during contingency states. Hence, in this work, we propose a methodology to address the day-ahead Contingency-Constrained Unit Commitment (CCUC) problem that leverages the participation of Battery Energy Storage Systems (BESSs) to address load-following and post-contingency management, therefore alleviating the ramping burden on conventional thermal generators. To do so, we formulate a three-level optimization problem that represents the decision-making process of obtaining the least-cost commitment, generation and reserves scheduling, while restricting the Conditional Value-at-Risk (CVaR) of the system imbalance at real-time operations to user-defined tolerance levels. In addition, we devise a computationally efficient solution approach for the proposed problem based on the Column-and Constraint Generation (CCG) algorithmic framework. Two numerical experiments are conducted to empirically illustrate the benefits of the proposed methodology. Key results indicate a reduction in real-time ramping needs and a better usage of the system resources, with a reduction in the overall system commitment levels and reserve scheduling costs when compared to a benchmark case in which storage is not available.

Moreira, Alexandre↗

High-Voltage, Intermediate-Temperature, Fe- and Al-Mixed Metal Halide Molten Salt for Molten Sodium Battery Energy Storage

An inorganic Fe and Al halide-based, low-temperature molten salt catholyte is described, which, when paired with a molten sodium anode, has high operating potentials rivaling those of Li ion batteries. The newly developed catholyte consists of metal halides FeCl 3 /FeCl 2 –AlCl 3 –NaCl and is intended to cycle between Fe 3+ /Fe 2+ redox couples in the molten salt. The multicomponent molten salt was initially evaluated for phase behavior and basic electrochemical behavior before full battery testing. The assembled battery, utilizing a 20:35:45 (FeCl 3 :AlCl 3 :NaCl) composition, with a 50.83 Ah/kg theoretical gravimetric capacity and a specific energy of 176.95 Wh/kg, was cycled at variable depths of discharge (DoD) and current densities to determine its cycling efficiencies and limitations. In conclusion, preliminary cycling tests showed two operational potential regimes, with higher potential, 3.91 V (vs Na/Na + ), at low DoD and lower potential, 3.39 V (vs Na/Na + ), at high DoD with excellent energy efficiencies and cycling behavior under both regimes.

Aluminum↗

Real-time Simulation Model of a Vanadium Redox Flow Battery Energy Storage System with Power Electronics Integration

This paper presents a real-time (RT) model of a 20 kW multi-stack vanadium redox flow battery (VRFB) system including power electronics converters in a single real-time framework. Implemented on a Typhoon HIL 604 device, this model is designed to simulate the operation of the flow battery with system-level controls. To provide a realistic overview of a VRFB system, the model incorporates a closed-loop control system for managing the speeds of two centrifugal pumps and an electro-thermal model of the battery stacks, enabling realtime temperature estimation. Furthermore, a two-stage power electronics topology and associated control solution are presented, operating with distinct strategies for interfacing the battery model with the main grid and a local load. Results from simulations demonstrate that the VRFB model is well suited for RT environment, and system can manage power during both charging and discharging cycles, while a SCADA monitor is used to display critical variables for safe, efficient, and reliable operation of the VRFB systems.

Rezende Da Costa Reis Kimpara, Renata [ORNL] (ORCI↗

Methods and recommendations for large-scale deflagration testing of battery energy storage system enclosures

UL Solutions produced this report as a summary of a test series executed at Sandia National Laboratories that they funded. This report was approved for release by UL Solutions in October 2025 and released in 2026 on their website at https://www.ul.com/insights/methods-and-recommendations-large-scale-deflagration-testing-battery-energy-storage-system.

Gaudet, Benjamin [UL Solutions] (ORCID:00090006419↗

Battery Storage Unlocked: Lessons Learned From Emerging Economies

The Clean Energy Ministerial (CEM) is a global forum that promotes policies and programs that advance clean energy technology. The CEM's mission is to bring together a community of global leaders to scale clean energy, amplifying the impact to all the sectors of the economy and applying a whole-of-society approach to meet collective climate and clean energy goals. At COP28 in Dubai, United Arab Emirates, the CEM announced the Supercharging Battery Storage Initiative as a vehicle to accelerate battery storage deployment around the world. The initiative supports countries around the world in co-creating strategies that enhance policy, regulation, supply chain, manufacturing, and financing solutions for battery energy storage deployment. Additionally, the initiative seeks to reduce the cost of the technology and promote diversified, sustainable, and secure supply chains (CEM n.d.). Through international collaboration, the initiative supports the integration of renewable energy globally, while securing the stability and reliability of the electricity grid.

batteries↗

Small Hydro Power Plants with Integrated BESS for Enhance Resiliency

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a black start- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFM controlled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗

Techno-Economic Analysis for the Addition of Thermal Energy Storage to a Campus With Existing Battery Storage

Rising global temperatures and increasing energy demands pose significant challenges for energy management, particularly in institutional and commercial settings. As cooling needs grow, campuses must balance operational efficiency, cost control, and grid stability. Energy storage solutions, such as thermal energy storage (TES) systems, offer a promising approach to shifting energy consumption from peak to off-peak periods, alleviating peak demand, reducing utility costs, and enhancing grid resilience. When integrated with existing battery energy storage systems (BESS), TES can further optimize load management and improve energy savings, especially in buildings with diverse energy needs. This article presents a techno-economic analysis of integrating a chilled water TES system into the central plant at California State University, Dominguez Hills, which already operates a BESS. We assess three TES sizing strategies—full storage, load leveling, and peak demand limiting—by modeling and simulations based on historical energy loads. Our findings show that we can control TES systems to complement BESS operation, with campus-level load leveling providing the greatest cost savings by reducing peak demands. Furthermore, the study also evaluates the long-term economic viability of TES, considering installation costs, energy savings, and payback periods under varying tariffs. This research offers practical guidance for institutions seeking to enhance energy resilience and reduce operational costs through energy storage solutions.

25 ENERGY STORAGE↗

Enhancing Building Energy Efficiency through Advanced Sizing and Dispatch Methods for Energy Storage

Energy storage and electrification of buildings hold great potential for future decarbonization. However, there are several technical and economic barriers that prevent large-scale adoption and integration of energy storage in buildings. These barriers include integration with building control systems, high capital costs, and the necessity to identify and quantify value streams for different stakeholders. To overcome these obstacles, it is crucial to develop advanced sizing and dispatch methods to assist planning and operational decision-making for integrating energy storage in buildings. This work develops simple and flexible optimal sizing and dispatch framework for thermal energy storage (TES) and battery energy storage (BES) systems in large-scale office building. The optimal sizes of TES, BES, as well as other building assets are determined in a joint manner instead of sequentially to avoid sub-optimal solutions. The interaction between the sizing at the planning stage and hourly or sub-hourly dispatch at the operating stage is explicitly modeled. The solution is determined considering both capital costs in optimal sizing and operational benefits in optimal dispatch. Comprehensive assessments are performed using simulation studies to quantify potential energy, economic, and emission benefits by different utility tariffs and climate locations, to improve our understanding of the techno-economic performance of different TES and BES systems, and to identify barriers for adopting energy storage for buildings. Finally, the proposed framework will provide guidance to a broad range of stakeholders to properly design energy storage in buildings and maximizes potential benefits, thereby advancing affordable building energy storage deployment and helping us accelerating the transition towards a cleaner and more equitable energy economy.

Yu, Mingyung↗

Component Criticality in BESS for Cybersecurity

Battery energy storage systems (BESS), inverters, and associated digital equipment are integral pieces of interdependent energy delivery systems. When considering the supply chain security of such systems, there is often a misplaced focus on the origin of energy generation and storage materials like battery cells, overlooking the more significant cyber risks that stem from digital power electronics control systems. Part of this misplaced focus is due to the relative costs of these components, with more attention given to expensive raw materials rather than the impactful digital elements themselves. The Idaho National Laboratory (INL) is addressing this gap in supply chain security through a systems-of-systems approach that considers the impact various components in digital energy systems can have should misoperation occur. Therefore, INL assigns a cyber criticality score based on quantitative analysis, which enables informed prioritization of mitigations and allows operators to reduce risk in light of the prevalence of a BESS and associated systems foreign supply chain.

25 ENERGY STORAGE↗