Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Baseline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Information content of a single pass of phase-delay data from a short baseline connected element interferometer

An analytic development of the information array obtained with a single tracking pass of phase-delay measurements made from a short baseline interferometer is presented. Phase-delay observations can be made with great precision from two antennas using a single, common distributed frequency standard, hence the name connected element. With the information array, closed-form expressions are developed for the error covariance in declination and right ascension. These equations serve as useful tools for analyzing the relative merits of candidate station locations for connected element interferometry (CEI). The navigation performance of a short baseline interferometer located at the Deep Space Network's (DSN's) Goldstone intracomplex is compared with that which is presently achievable using Very Long Baseline Interferometry (VLBI) over intercontinental baselines. The performance of an intracomplex pair of short baselines formed by three stations is also investigated, along with the use of a single baseline in conjunction with conventional two-way Doppler data. The phase-delay measurement accuracy and data rate used in the analysis are based on the expected performance of an experimental connected element system presently under construction at Goldstone. The results indicate that the VLBI system that will be used during the Galileo mission can determine the declination and right ascension of a distant spacecraft to an accuracy of 20 to 25 nrad, while the CEI triad system and the combination of CEI-Doppler system are both capable of 30 to 70 nrad performance.

Thurman, S. W.

An evaluation of water vapor radiometer data for calibration of the wet path delay in very long baseline interferometry experiments

The internal consistency of the baseline-length measurements derived from analysis of several independent VLBI experiments is an estimate of the measurement precision. The paper investigates whether the inclusion of water vapor radiometer (WVR) data as an absolute calibration of the propagation delay due to water vapor improves the precision of VLBI baseline-length measurements. The paper analyzes 28 International Radio Interferometric Surveying runs between June 1988 and January 1989; WVR measurements were made during each session. The addition of WVR data decreased the scatter of the length measurements of the baselines by 5-10 percent. The observed reduction in the scatter of the baseline lengths is less than what is expected from the behavior of the formal errors, which suggest that the baseline-length measurement precision should improve 10-20 percent if WVR data are included in the analysis. The discrepancy between the formal errors and the baseline-length results can be explained as the consequence of systematic errors in the dry-mapping function parameters, instrumental biases in the WVR and the barometer, or both.

Kuehn, C. E.

Baseline Medical System Translation for the Impact Medical Database

NASA has developed a new evidence-based data-driven probabilistic risk assessment and tradespace analysis tool as a successor to the Integrated Medical Model (IMM). This updated decision support tool is known as IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces). Whereas IMM focuses on the resources and risks associated with International Space Station (ISS) and Low Earth Orbit (LEO) missions, IMPACT estimates the frequency and consequences of medical conditions that might arise during exploration missions. One of the services offered by IMM is a series of generic or baseline medical systems associated with typical mission types or DRMs (Design Reference Missions), such that requestors may prioritize questions pertaining to the mission itself over the medical supplies indicated by the model outputs for that DRM. In a mission focused request, the appropriate baseline medical system is used in place of a prepared or optimized medical kit. In preparation, an effort was undertaken to create baseline systems of medical resources within IMPACT suitable for typical DRMs. Using an existing baseline medical system within IMM’s Integrated Medical Evidence Database (iMED) as a starting point, the resources found within the medical kit were compared to and substituted for equivalent resources available within the IMPACT MD (Medical Database). In consultation with clinicians with knowledge of IMPACT’s MD, each resource was matched as closely as possible to a similarly purposed resource in IMPACT, seeking to preserve the treatment capabilities and procedures offered by the IMM medical system while reconciling the differences in modeled resources and medical conditions between the models. To demonstrate the efficacy of this work, a prototype ISS medical system in IMPACT was translated from the baseline used in the IMM. The appropriate medical system was then run through its associated medical model to compare and validate the resultant risks and risk mitigation provided by each baseline ISS medical kit.

S Schwartz

A comparison between Lageos laser ranging and VLBI determined baselines

Two independent measurement techniques, Lageos satellite laser ranging (SLR), and very long baseline interferometry (VLBI) are compared in the measurement of distances (or baselines) between several locations in the continental U.S. The results of this analysis is summarized where both the SLR and VLBI baseline lengths and their differences (SLR minus VLBI) are presented. A comparison of the 22 baselines shows a mean difference of 1.0 + or - 1.1 cm with a scatter about zero of 5.2 cm. No apparent systematic scale difference between the networks is evident. A map of the baselines is included and indicates their differences, SLR minus VLBI, in centimeters.

Kolenkiewicz, R.

VLBI Solutions for the Time Variation of DSN Baselines: 1978 - 1983

Very Long Baseline Interferometry (VLBI) results are presented for the two baseline sectors between the Goldstone DSN antenna complex and the overseas sites at Canberra, Australia and Madrid, Spain. Results from solutions using data taken between 1978 September and 1983 May show an apparent California-Spain baseline length increase of 21 cm during this time span, while the California-Australia length has remained constant. Statistical investigations of the integrity of the data are discussed along with dominant systematic error sources and their effect on baseline length determination. Results and interpretation of the time behavior of the angle between DSN baselines are also described.

Treuhaft, R. N.

Baseline estimation from simultaneous satellite laser tracking

Simultaneous Range Differences (SRDs) to Lageos are obtained by dividing the observing stations into pairs with quasi-simultaneous observations. For each of those pairs the station with the least number of observations is identified, and at its observing epochs interpolated ranges for the alternate station are generated. The SRD observables are obtained by subtracting the actually observed laser range of the station having the least number of observations from the interpolated ranges of the alternate station. On the basis of these observables semidynamic single baseline solutions were performed. The aim of these solutions is to further develop and implement the SRD method in the real data environment, to assess its accuracy, its advantages and disadvantages as related to the range dynamic mode methods, when the baselines are the only parameters of interest. Baselines, using simultaneous laser range observations to Lageos, were also estimated through the purely geometric method. These baselines formed the standards the standards of comparison in the accuracy assessment of the SRD method when compared to that of the range dynamic mode methods. On the basis of this comparison it was concluded that for baselines of regional extent the SRD method is very effective, efficient, and at least as accurate as the range dynamic mode methods, and that on the basis of a simple orbital modeling and a limited orbit adjustment. The SRD method is insensitive to the inconsistencies affecting the terrestrial reference frame and simultaneous adjustment of the Earth Rotation Parameters (ERPs) is not necessary.

Dedes, George C.

Angular navigation on short baselines using phase delay interferometry

Results are presented for two recent short baseline experiments, with baseline lengths of 6 and 253 km, showing delay residuals of 10 ps or less for angularly close sources. On the 6-km baseline, a fiber-optic link was used to distribute a common frequency reference, enabling coherent operation of the two stations. The observed delay residuals correspond to a differential angular accuracy of about 10 nrad on the 253-km baseline. Future plans are discussed, including the development of a realtime correlation capability on a 22-km baseline at Goldstone, CA.

Edwards, Charles D.

First GPS baseline results from the North Andes

The CASA Uno GPS experiment (January-February 1988) has provided the first epoch baseline measurements for the study of plate motions and crustal deformation in and around the North Andes. Two dimensional horizontal baseline repeatabilities are as good as 5 parts in 10 to the 8th for short baselines (100-1000 km), and better than 3 parts in 10 to the 8th for long baselines (greater than 1000 km). Vertical repeatabilities are typically 4-6 cm, with a weak dependence on baseline length. The expected rate of plate convergence across the Colombia Trench is 6-8cm/yr, which should be detectable by the repeat experiment planned for 1991. Expected deformation rates within the North Andes are of the order of 1 cm/yr, which may be detectable with the 1991 experiment.

Kellogg, James N.

Precise regional baseline estimation using a priori orbital information

A solution using GPS measurements acquired during the CASA Uno campaign has resulted in 3-4 mm horizontal daily baseline repeatability and 13 mm vertical repeatability for a 729 km baseline, located in North America. The agreement with VLBI is at the level of 10-20 mm for all components. The results were obtained with the GIPSY orbit determination and baseline estimation software and are based on five single-day data arcs spanning the 20, 21, 25, 26, and 27 of January, 1988. The estimation strategy included resolving the carrier phase integer ambiguities, utilizing an optial set of fixed reference stations, and constraining GPS orbit parameters by applying a priori information. A multiday GPS orbit and baseline solution has yielded similar 2-4 mm horizontal daily repeatabilities for the same baseline, consistent with the constrained single-day arc solutions. The application of weak constraints to the orbital state for single-day data arcs produces solutions which approach the precise orbits obtained with unconstrained multiday arc solutions.

Lindqwister, Ulf J.

Potential of long-baseline infrared interferometry for narrow-angle astrometry

Narrow-angle astrometry has many astrophysical applications, from the measurement of parallaxes to the search for planets around nearby stars. Ground-based long-focus telescopes with photoelectric detectors have achieved accuracies of about 2-3 milliarcsec in 1 h. This accuracy is limited primarily by the atmosphere, and is consistent with models of atmospheric turbulence. However, applying these turbulence models to observations with long-baseline interferometers yields astrometric errors that are far smaller than can be achieved with long-focus telescopes. The predictions for the ultimate accuracy of ground-based narrow-angle astrometry using long-baseline IR (2.2 micron) stellar interferometers are very promising. With the excellent seeing at a high altitude site like Mauna Kea, the atmospheric limit for a 1 h astrometric measurement is expected to be of the order of 10 microarcsec for 1 h of integration. This two-order-of-magnitude improvement over conventional measurements is due to two effects. One is that a long-baseline IR interferometer can find useful reference stars very near an arbitrary target star, so that the atmospherically-induced motions of both stars are highly correlated. The second is that the baseline length can be much larger than the separation of the stellar beams in the turbulent atmosphere, resulting in a reduction in astrometric error with increasing baseline length.

Shao, M.

Evaluation of very long baseline interferometry atmospheric modeling improvements

We determine the improvement in baseline length precision and accuracy using new atmospheric delay mapping functions and MTT by analyzing the NASA Crustal Dynamics Project research and development (R&D) experiments and the International Radio Interferometric Surveying (IRIS) A experiments. These mapping functions reduce baseline length scatter by about 20% below that using the CfA2.2 dry and Chao wet mapping functions. With the newer mapping functions, average station vertical scatter inferred from observed length precision (given by length repeatabilites) is 11.4 mm for the 1987-1990 monthly R&D series of experiments and 5.6 mm for the 3-week-long extended research and development experiment (ERDE) series. The inferred monthly R&D station vertical scatter is reduced by 2 mm or by 7 mm is a root-sum-square (rss) sense. Length repeatabilities are optimum when observations below a 7-8 deg elevation cutoff are removed from the geodetic solution. Analyses of IRIS-A data from 1984 through 1991 and the monthly R&D experiments both yielded a nonatmospheric unmodeled station vertical error or about 8 mm. In addition, analysis of the IRIS-A exeriments revealed systematic effects in the evolution of some baseline length measurements. The length rate of change has an apparent acceleration, and the length evolution has a quasi-annual signature. We show that the origin of these effects is unlikely to be related to atmospheric modeling errors. Rates of change of the transatlantic Westford-Wettzell and Richmond-Wettzell baseline lengths calculated from 1988 through 1991 agree with the NUVEL-1 plate motion model (Argus and Gordon, 1991) to within 1 mm/yr. Short-term (less than 90 days) variations of IRIS-A baseline length measurements contribute more than 90% of the observed scatter about a best fit line, and this short-term scatter has large variations on an annual time scale.

Macmillan, D. S.

Atmospheric pressure loading parameters from very long baseline interferometry observations

Atmospheric mass loading produces a primarily vertical displacement of the Earth's crust. This displacement is correlated with surface pressure and is large enough to be detected by very long baseline interferometry (VLBI) measurements. Using the measured surface pressure at VLBI stations, we have estimated the atmospheric loading term for each station location directly from VLBI data acquired from 1979 to 1992. Our estimates of the vertical sensitivity to change in pressure range from 0 to -0.6 mm/mbar depending on the station. These estimates agree with inverted barometer model calculations (Manabe et al., 1991; vanDam and Herring, 1994) of the vertical displacement sensitivity computed by convolving actual pressure distributions with loading Green's functions. The pressure sensitivity tends to be smaller for stations near the coast, which is consistent with the inverted barometer hypothesis. Applying this estimated pressure loading correction in standard VLBI geodetic analysis improves the repeatability of estimated lengths of 25 out of 37 baselines that were measured at least 50 times. In a root-sum-square (rss) sense, the improvement generally increases with baseline length at a rate of about 0.3 to 0.6 ppb depending on whether the baseline stations are close to the coast. For the 5998-km baseline from Westford, Massachusetts, to Wettzell, Germany, the rss improvement is about 3.6 mm out of 11.0 mm. The average rss reduction of the vertical scatter for inland stations ranges from 2.7 to 5.4 mm.

Macmillan, D. S.

Effect of Baseline Period on Quantification of Climate Extremes Over the United States

Extreme climate events are societally harmful and have increased in frequency and intensity in recent decades. Indices based on temperature and precipitation are a valuable way to quantify climate extremes. Certain indices are defined relative to percentiles, which are dependent on a climatological baseline period. In this study, indices computed using temperature and precipitation from the Modern Era Retrospective Analysis for Research and Applications, Version 2 are calculated using percentiles from three baseline periods: 1981–2010, 1991–2020 and 1981–2020. Updating the baseline period from 1981 to 2010 to 1991–2020 leads to significant changes in the quantification of temperature and precipitation extremes over the United States over 1980–2021. Using the later baseline period indicates more cold extremes, fewer warm extremes, and fewer but more intense precipitation extremes throughout the US, with regional variation. Changing the baseline period can mislead the public and decision makers, potentially undermining the appropriate response to climate-related health risks.

Natalie P. Thomas

Geosynchronous platform definition study. Volume 4, Part 1: Traffic analysis and system requirements for the baseline traffic model

The traffic analyses and system requirements data generated in the study resulted in the development of two traffic models; the baseline traffic model and the new traffic model. The baseline traffic model provides traceability between the numbers and types of geosynchronous missions considered in the study and the entire spectrum of missions foreseen in the total national space program. The information presented pertaining to the baseline traffic model includes: (1) definition of the baseline traffic model, including identification of specific geosynchronous missions and their payload delivery schedules through 1990; (2) Satellite location criteria, including the resulting distribution of the satellite population; (3) Geosynchronous orbit saturation analyses, including the effects of satellite physical proximity and potential electromagnetic interference; and (4) Platform system requirements analyses, including satellite and mission equipment descriptions, the options and limitations in grouping satellites, and on-orbit servicing criteria (both remotely controlled and man-attended).

Source record

Earth Observatory Satellite system definition study. Report 5: System design and specifications. Volume 1: Baseline system description

A system baseline design oriented to the requirements of the next generation of Earth Observatory Satellite missions is presented. The first mission (EOS-A) is envisioned as a two-fold mission which (1) provides a continuum of data of the type being supplied by ERTS for the emerging operational applications and also (2) expands the research and development activities for future instrumentation and analysis techniques. The baseline system specifically satisfies the requirements of this first mission. However, EOS-A is expected to be the first of a series of earth observation missions. Thus the baseline design has been developed so as to accommodate these latter missions effectively as the transition is made from conventional, expendable launch vehicles and spacecraft to the Shuttle Space Transportation System era. Further, a subset of alternative missions requirements including Seasat, SEOS, SMM and MSS-5 have been analyzed to verify that the spacecraft design to serve a multi-mission role is economically sound. A key feature of the baseline system design is the concept of a modular observatory system whose elements are compatible with varying levels of launch vehicle capability. The design configuration can be used with either the Delta or Titan launch vehicles and will adapt readily to the space shuttle when that system becomes available in the early 1980's.

Source record

Space tug avionics definition study. Volume 3: Avionics baseline configuration definition

The baseline avionics systems for the space tug is comprised of a central digital computer that integrates the functions of all of the tug's subsystems by means of a redundant digital data bus. The major subsystems of the avionics system are: data management; communications; guidance, navigation, and control; rendezvous and docking; electrical power; and instrumentation. The baseline avionics system for the space tug resulting from system and subsystem trade studies is defined. Tug interfaces with the spacecraft, orbiter and the ground, and the baseline philosophy and configuration for onboard checkout of the tug are included. Baseline configurations, functional and operational features, component details and characteristics, and the supporting software are included in the subsystem descriptions.

Source record

Preliminary design study of a baseline MIUS

Results of a conceptual design study to establish a baseline design for a modular integrated utility system (MIUS) are presented. The system concept developed a basis for evaluating possible projects to demonstrate an MIUS. For the baseline study, climate conditions for the Washington, D.C., area were used. The baseline design is for a high density apartment complex of 496 dwelling units with a planned full occupancy of approximately 1200 residents. Environmental considerations and regulations for the MIUS installation are discussed. Detailed cost data for the baseline MIUS are given together with those for design and operating variations under climate conditions typified by Las Vegas, Nevada, Houston, Texas, and Minneapolis, Minnesota. In addition, results of an investigation of size variation effects, for 300 and 1000 unit apartment complexes, are presented. Only conceptual aspects of the design are discussed. Results regarding energy savings and costs are intended only as trend information and for use in relative comparisons. Alternate heating, ventilation, and air conditioning concepts are considered in the appendix.

Wolfer, B. M.

Characterization of secondary ignition sources in unattended compartments and full-scale baseline test

The characteristics of five fuel loads burned within a metal lavatory were identified. In 15 of the tests the lavatory door remained closed for the 30-minute test period while in 15 additional tests the door was opened after the fire had developed. Upon completion of these tests the most severe source was selected for use in the baseline test. In the baseline test, the lavatory and adjacent panels, all of which were constructed of contemporary materials, were tested for a period of 1 hour. Thermal, environmental, and biological data were obtained for all fuel loads, door conditions, and the baseline test. All tests were conducted in a cabin fire simulator with separate ventilation of the cabin and lavatory representative of an inflight condition. The baseline test established that by using the most severe fuel source: (1) the exposed animal subject survived without complications; (2) no toxic levels of gas within the cabin were detected; (3) a propagating fire did not develop in adjacent structures; (4) the lavatory containing the fire remained structurally intact; (5) decomposition of portions of the lavatory did occur; and (6) cabin visibility would have presented a problem after 5 minutes.

Klink, D. M.