Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUDGET AND FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

FY 2023 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Investigation of the Relationship between Green Design and Project Delivery Methods

The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more important in projects that used DB. (3) Experience--Team experience is important on all green design projects independent of the PDM. Owners should use a 'best value' selection process, which is more prevalent in DB projects, and include team experience as a criterion. The owner's role is critical with DB. (4) Leadership--Leadership is an important feature for all contracting parties involved in green design projects and it is a dominant success factor in DB projects. (5) Scope of work--A well-defined scope of work is important on all projects, independent of the PDM. In DB, improving the scope of work definition by developing a set of documents, typically comparable to the design development phase, as the basis for awarding a contract is called DB bridging. Using contracting techniques such as DB bridging can result in better identification of expected quality and improves the owner's level of control. (6) Funding and Budget--Having adequate funding and budget for the given scope of work is particularly important in a green design project. Public funding restrictions may not allow use of certain PDMs, and the nature of public funding streams may make non-traditional PDMs more difficult. (7) Complexity and Flexibility--Complexity and flexibility is a project feature that is more specific to green design projects and is more frequently associated with DB. (8) Control and Accountability--Control and accountability is a problem associated with DB more than with DBB. It is not specific to green design projects. DB Bridging can be used to offset the lack of control with traditional DB. The use of green design and DB is increasing and understanding the linkage between the two is important. This research has found that while linkages do exist, the owner needs to carefully consider all aspects of a green design project before making the decision of the most appropriate PDM.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DOE FY 2010 Budget Request and Recovery Act Funding for Energy Research, Development, Demonstration, and Deployment: Analysis and Recommendations

The combination of the FY 2010 budget request for the Department of Energy (DOE) and the portion of the American Recovery and Reinvestment Act of 2009 (ARRA) funds likely to be available in 2010 would (assuming that they would be split evenly between FY 2010 and FY 2011) result in a doubling in funding available for energy research, development, and deployment (ERD and D) from $3.6 billion in FY 2009 to $7.2 billion in FY 2010. Without the stimulus funds, DOE ERD and D investments in FY 2010 would decrease very slightly when compared to FY 2009. Excluding the $7.5 billion for the Advanced Technology Vehicles Manufacturing Loans in FY 2009, the FY 2010 budget request for deployment represents a 33 percent decrease from the FY 2009 levels from $520 million to $350 million. This decrease is largely due to the large amounts of funds appropriated in ARRA for DOE deployment programs, or $23.6 billion, which are three times greater than those appropriated in the FY 2009 budget. These very substantial funding amounts, coupled with the broad range of institutional innovations the administration is putting in place and movement toward putting a price on carbon emissions, will help accelerate innovation for a broad range of energy technologies. DOE's Advanced Research Projects Agency-Energy (ARPA-E) and the Energy Innovation Hubs are important initiatives that could contribute to two weak points of the government's energy innovation effort, namely funding high-risk projects in transformational technologies and in companies that have not traditionally worked with the government and strengthening the integration of basic and applied research in priority areas. Increasing the funding for different types of energy storage research, providing some support for exploring opportunities in coal-to-liquids with carbon capture and storage (CCS) and coal-and-biomass-to-liquids with CCS, and reducing funding for fission RD and D are other actions that Congress could take in the short-term. Energy storage may play a crucial role in the future of the power and transportation systems, which together consume two thirds of primary energy in the United States. A recent National Academy of Science report recommended carrying out detailed scenario assessments of the penetration of unconventional fuels from coal and coal and biomass with CCS. And the research plan provided for nuclear fission does not justify spending as many funds as were requested. The proposed funding for FY 2010 and the resources from ARRA, however, do not guarantee that the United States will finally enjoy the predictable and consistent publicly-funded energy technology innovation effort that it needs. The Obama administration must put in place a comprehensive energy technology innovation strategy that will ensure that an expanded ERD3 effort is both sustainable and efficient. This commission would be charged with, inter alia, developing a strategy that optimizes the integration of the various stages of innovation (research, development, demonstration, early deployment), as well as integrates efforts across technology areas. The database upon which this analysis is based may be downloaded in Excel format at: http://belfercenter.ksg.harvard.edu/publication/19119/ .

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

All Scientists Meeting

Pier Oddone and Young-Kee Kim of Fermi National Accelerator Laboratory lead an all-scientists meeting to discuss current and future work, scope of research, budget and funding information, and other information relating to the lab and its scientists.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Recommendations on Funding Mission Operations and Historical Datasets

The Heliophysics Low Cost Access to Space (H-LCAS) and Flight Opportunities in Research and Technology (H-FORT) grant budgets primarily fund the development and construction of instrumentation. A side effect of this approach is that mission operations, including data collection and data processing, tend to be severely under budget (or unfunded). In order to satisfy the requirements of modern missions, we recommend a new funding source for mission operations. This funding source is increasingly vital going forward as new missions collect exponentially more data compared to past missions. Similarly, to take full advantage of underutilized historical datasets, we recommend adding another funding source to analyze these valuable datasets. Without these funding sources, mission datasets will, in the best case, be significantly underdeveloped and underutilized, and more likely, will fall dramatically short of their required scope.

Mykhaylo Shumko↗

Bioelectronics Research Lab (Final Report)

The Doheny Eye Institute at the University of Southern California (DEI) served as the lead institution in the DOE Artificial Retina Project. In this role, DEI coordinated the efforts of six national labs, four universities, and one company. The coordination role included arranging regular telecons, scheduling investigator meeting, collating and finalizing quarterly and annual reports, and maintaining progress towards project milestones. Despite being on time and accomplishing the milestones and receiving the highest marks by outside reviewers, the Artificial Retina Program was cut short by 2 years and the amount of funding was drastically reduced for the last 2 years that were funded. These budget cuts led to the inability of the team to complete any of the two products. The 200+ electrode device with the goal of providing vision compatible with mobility and orientation was built but not completed as there were no funds or time to complete the final packaging step for the implantable electronics. The 1,000 electrode device with the goal of providing reading vision was never started beyond conceptual designs.

42 ENGINEERING↗

Wind Generation on Winnebago Tribal Lands

The Winnebago Wind Energy Study evaluated facility-scale, community-scale and commercial-scale wind development on Winnebago Tribal lands in northeastern Nebraska. The Winnebago Tribe of Nebraska has been pursuing wind development in various forms for nearly ten years. Wind monitoring utilizing loaned met towers from NREL took place during two different periods. From April 2001 to April 2002, a 20-meter met tower monitored wind data at the WinnaVegas Casino on the far eastern edge of the Winnebago reservation in Iowa. In late 2006, a 50-meter tower was installed, and subsequently monitored wind data at the WinnaVegas site from late 2006 through late 2008. Significant challenges with the NREL wind monitoring equipment limited the availability of valid data, but based on the available data, average wind speeds between 13.6 – 14.3 miles were indicated, reflecting a 2+/3- wind class. Based on the anticipated cost of energy produced by a WinnaVegas wind turbine, and the utility policies and rates in place at this time, a WinnaVegas wind project did not appear to make economic sense. However, if substantial grant funding were available for energy equipment at the casino site, and if either Woodbury REC backup rates were lower, or NIPCO was willing to pay more for wind power, a WinnaVegas wind project could be feasible. With funding remaining in the DOE-funded project budget,a number of other possible wind project locations on the Winnebago reservation were considered. in early 2009, a NPPD-owned met tower was installed at a site identified in the study pursuant to a verbal agreement with NPPD which provided for power from any ultimately developed project on the Western Winnebago site to be sold to NPPD. Results from the first seven months of wind monitoring at the Western Winnebago site were as expected at just over 7 meters per second at 50-meter tower height, reflecting Class 4 wind speeds, adequate for commercial development. If wind data collected in the remaining months of the twelve-month collection period is consistent with that collected in the first seven months, the Western Winnebago site may present an interesting opportunity for Winnebago. Given the distance to nearby substations, and high cost of interconnection at higher voltage transmission lines, Winnebago would likely need to be part of a larger project in order to reduce power costs to more attractive levels. Another alternative would be to pursue grant funding for a portion of development or equipment costs, which would also help reduce the cost of power produced. The NREL tower from the WinnaVegas site was taken down in late 2008, re-instrumented and installation attempted on the Thunderway site south of the Winnebago community. Based on projected wind speeds, current equipment costs, and the project’s proximity to substations for possible interconnection, a Thunderway community-scale wind project could also be feasible.

17 WIND ENERGY↗

Holocene paleoclimate change in the western US: The importance of chronology in discerning patterns and drivers

We report sediment in lakes and meadows forms a powerful archive that can be used to reconstruct environmental change through time. Reconstructions of lake level, of chemical, biological, and hydrological conditions, and of surrounding vegetation provide detailed information about past climate conditions, both locally and regionally. Indeed, most of our current knowledge of centennial- to millennial-scale climate variability in the arid western United States, where information about past hydroclimate is particularly important, comes from such sediment-based reconstructions. The pressing need for robust, precise predictions of future conditions is a significant motivation for paleoclimate science, and current research questions frequently require Holocene reconstructions to be resolved at sub-centennial timescales. Increasingly, regional syntheses seek to identify synoptic-scale patterns similar to those defined from modern observations (seasonal, interannual, multi-decadal, etc.) or to compare with the output of climate model simulations. However, the age control on existing records, especially those more than about 20 years old, is often sufficient only for millennial-scale interpretation. Here we assess the age control for 84 published and unpublished records from lakes and meadows in the Great Basin, California, and desert southwest, and use Bayesian modeling to evaluate the 95% uncertainty ranges for the 42 best-dated records. In the Late Holocene, about half of the 42 records have <400-year mean uncertainty ranges; however, high-precision age control is especially critical for young records, used to develop an accurate understanding of a proxy’s response to known climate variations. In the Middle Holocene, records vary from 400 to >800-year mean uncertainty and records of the Early Holocene have 600- to >1400-year mean uncertainty ranges. We find that the largest control on modeled uncertainties is dating density, with at least 2 dates/kyr being optimal and suggest obtaining “range-finder” dates at the onset of a study to better predict the total number of dates needed for an adequate age model. Such a density avoids a commonly observed phenomenon of significant peaks in uncertainty arising in gaps between age control points. Analysis of the uncertainties associated with proxy shifts reveal that more than half are >400 years. Although such large uncertainties currently prevent sub-centennial interpretations in most cases, increased dating density, strategic use of limited funds (including budgeting for a 2 date/kyr minimum at the proposal stage), construction of age-depth models with Bayesian methods, and critical evaluation of chronological uncertainty will shed light on past climate variability at finer timescales, enhancing our understanding of global and regional drivers of western U.S. climate.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Site Sustainability Plan

The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP), while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. The mission of the Y-12 Energy Management program is to incorporate energy-efficient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

99 GENERAL AND MISCELLANEOUS↗

Laboratory Directed Research and Development Annual Report FY 2016

A national laboratory must establish and maintain an environment in which creativity and innovation are encouraged and supported in order to fulfill its missions and remain viable in the long term. As such, multiprogram laboratories are given discretion to allocate a percentage of their operating budgets to support research and development projects that align to PNNL’s and DOE’s missions and support the missions of other federal agencies, including DHS, DOD, and others. DOE Order 413.2C sets forth DOE’s Laboratory Directed Research and Development (LDRD) policy and guidelines for DOE multiprogram laboratories, and it authorizes the national laboratories to allocate up to 6 percent of their operating budgets to fund the program. LDRD is innovative research and development, selected by the Laboratory Director or his/her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory. The projects supported by LDRD funding all have demonstrable ties to DOE/DHS missions and may also be relevant to the missions of other federal agencies that sponsor work at the Laboratory. The program plays a key role in attracting the best and brightest scientific staff, which is needed to serve the highest priority DOE mission objectives. Individual project reports comprise the bulk of this LDRD report. The Laboratory focuses its LDRD research on scientific assets that often address more than one scientific discipline.

99 GENERAL AND MISCELLANEOUS↗

Laboratory Directed Research and Development Annual Report FY 2017

A national laboratory must establish and maintain an environment in which creativity and innovation are encouraged and supported in order to fulfill its missions and remain viable in the long term. As such, multiprogram laboratories are given discretion to allocate a percentage of their operating budgets to support research and development projects that align to PNNL’s and DOE’s missions and support the missions of other federal agencies, including DHS, DOD, and others. DOE Order 413.2C sets forth DOE’s Laboratory Directed Research and Development (LDRD) policy and guidelines for DOE multiprogram laboratories, and it authorizes the national laboratories to allocate up to 6 percent of their operating budgets to fund the program. LDRD is innovative research and development, selected by the Laboratory Director or his/her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory. The projects supported by LDRD funding all have demonstrable ties to DOE/DHS missions and may also be relevant to the missions of other federal agencies that sponsor work at the Laboratory. The program plays a key role in attracting the best and brightest scientific staff, which is needed to serve the highest priority DOE mission objectives. Individual project reports comprise the bulk of this LDRD report. The Laboratory focuses its LDRD research on scientific assets that often address more than one scientific discipline.

99 GENERAL AND MISCELLANEOUS↗

Annual Report 2008 -- Office of the Chief Financial Officer (OCFO)

It is with great pleasure that I present to you the 2008 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office. Also included are some financial comparisons with other DOE Laboratories and a glossary of commonly used acronyms.

99 GENERAL AND MISCELLANEOUS↗

Office of the Chief Financial Officer Annual Report 2009

Presented is the 2009 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office.

99 GENERAL AND MISCELLANEOUS↗

Ares V: Progress Toward Unprecedented Heavy Lift

Every major examination of America s spaceflight capability since the Apollo program has highlighted and reinforced the need for a heavy lift vehicle for human exploration, science, national security, and commercial development. The Ares V is NASA s most recent effort to address this gap and provide the needed heavy lift capability for NASA and the nation. An Ares V-class heavy lift capability is important to supporting beyond earth orbit (BEO) human exploration. Initially, that consists of exploration of the Moon vastly expanded from the narrow equatorial Apollo missions to a global capability that includes the interesting polar regions. It also enables a permanent human outpost. Under the current program of record, both the Ares V and the lunar exploration it enables serve as a significant part of the technology and experience base for exploration beyond the Moon, including Mars, asteroids, and other destinations. The Ares V is part of NASA s Constellation Program architecture. The Ares V remains in an early stage of concept development, while NASA focused on development of the Ares I crew launch vehicle to replace the Space Shuttle fleet. However, Ares V development has benefitted from its commonality with Ares I, the Shuttle, and contemporary programs on which its design is based. The Constellation program is currently slated for cancellation under the proposed 2011 federal budget, pending review by the legislative branch. However, White House guidance on its 2011 budget retains funding for heavy lift research. This paper will discuss progress to date on the Ares V and its potential utility to payload users.

Sumrall, Phil↗

The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

Schedule↗

Engineering New Catalysts for In-Process Elimination of Tars

The key objective of this project was to develop a new and more efficient methodology for engineering and economically producing optimized robust catalysts for the reduction or elimination of tars in biomass gasification. Whereas current catalyst technology typically disposes thin layers of catalytically-active material onto rigid supports via wet chemistry-based methods, this project investigated novel thermal methods for directly incorporating catalytically active materials onto robust supports as well as novel approaches for incorporating catalytically active materials on and/or within an otherwise inert refractory support material which is then subsequently formed and processed to create a catalytically-active material on all exposed surfaces. Specifically, the focus of this engineered catalyst development was on materials which were derived from, or otherwise related to, olivine-like minerals, due to the inherent attrition resistance and moderate catalytic properties exhibited by natural olivine when used in a fluidized bed biomass gasifier. Task 1 of this project successfully demonstrated the direct thermal impregnation of catalytically-active materials onto an olivine substrate, with the production of a Ni-olivine catalyst. Nickel and nickel oxide were thermally impregnated onto an olivine substrate and when reduced were shown to demonstrate improved catalytic activity over the baseline olivine material and equal the tar-decomposing performance of Ni-olivine catalysts prepared by conventional wet impregnation. Task 2 involved coordination with our subcontracted project partners to further develop and characterize catalyst formulations and to optimize activity and production methods. Within this task, several significant new materials were developed. NexTech Materials developed a sintered ceramic nickel-magnesium-silicate catalyst that demonstrated superb catalytic activity and high resistance to deactivation by H2S. Alfred University developed both supported and integrated (bulk) catalysts via a glass-ceramic processing route which were shown to exhibit excellent catalytic activity and superior resistance to attrition deactivation. With the discovery of these active, robust, glass-based catalysts, and with the permission of the project officer, the investigation of waste-based materials as originally proposed for Task 3 and pilot-scale testing proposed in Task 5 were deferred indefinitely in favor of further investigation of the glass-ceramic based catalyst materials. This choice was justified in part because during FY 2006 and through FY 2007, funding restrictions imposed by congressional budget choices significantly reduced funding for DOE biomass-related projects. Funding for this project was limited to what had been authorized which slowed the pace of project work at GTI so that our project partners could continue in their work. Thereafter, project work was allowed to resume and with restored funding, the project continued and concentrated on the development and testing of glass-ceramic catalysts in bulk or supported formats. Work concluded with a final development devoted to increasing the surface area of glass-ceramic catalysts in the form of microspheres. Following that development, project reporting was completed and the project was concluded.

03 NATURAL GAS↗