Calculating the Effects of Solids Input and Removal as a Temperature Control in the Advanced Scale Up Reactor Experiment (ASURE) Facility at NETL Using Aspen
The Advanced Scale Up Reactor Experiment (ASURE) facility at NETL is being designed to be a fuel-flexible multi-purpose reactor that can be used for pyrolysis/gasification or evaluation of other high pressure “circulating fluidized bed” (CFB) chemical processes. The initial system design calculations for pyrolysis/gasification are presented in this work showing the expected performance of the ASURE facility when used as a biomass conversion reactor. Several other areas of application include gasification of any carbonaceous fuel including biomass, coal, plastics, and other waste materials. The reactor can therefore be used to produce SYNGAS of various compositions and hydrogen as well as other high value chemicals resulting from a typical tuned gasification process. This paper discusses an ASPEN model of the facility, focusing on the riser of the CFB reactor and the solids recirculation loop. The ASPEN model divides the riser into two sections. A bottom section which receives ash, char and sand which have been recirculated from a return loop. In this section an inert fluidization gas, (N2 or CO2), is introduced which acts as the primary mover of the solids through the system. The bottom section is equipped with a restricted air feed so that the recirculated char can be partially oxidized. This oxidation process along with the inventory of recirculating sand are used to effectively control the temperature in the following two chemical conversion sections of the reactor which are the pyrolysis zone followed by a tar cracking zone. Fresh fuel is added to the pyrolysis zone and undergoes drying and devolatilization. The products ash, char, volatile matter, and water vapor exit the pyrolysis zone and enter the reaction block for tar cracking. Steam and CO2 gasification reactions will be incorporated into the tar cracking zone, however at the design operating temperature, conversion from these reactions is expected to be essentially zero. The unit when completed in 2026 will test mixtures of biomass, plastics, and waste coal. This paper presents the basic ASPEN engineering design model for this project and provides preliminary sensitivity studies to determine how the various parts of the reactor will perform.