Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Artemis 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

LunaNet Position, Navigation, and Timing Services and Signal, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. September 2022 introduced the National Aeronautics and Space Administration’s (NASA) Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever commercial mission, launched by a commercial launch service provider, aiming to land on the lunar surface. The NASA Artemis programme plans initial crewed landings and traverses in 2025, supported by the Lunar Gateway, followed by regular launches to build the lunar systems (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with Commercial Lunar Payload Services (CLPS, (NASA, n.d.)) to deliver science and technology to the Moon, with launches starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) programme plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target the Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, and surface crew and rovers). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This includes a description of the high-level LANS concept and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Exploration Mission ? 1( now referred to as Artemis 1), programmatically referred to as the Integrated vehicle modal test. The Integrated vehicle modal test of the Exploration Mission - 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the ML while inside the Vehicle Assembly Building, which is currently scheduled for the late spring or early summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Exploration Mission ? 1 test vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and SLS during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of being able to successfully complete the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis and the unique challenges faced due to the Mobile Launcher's size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

Exploring the Moon: Training Astronauts for Artemis Missions

For the first time in over 50 years, NASA scientists are training astronauts assigned to lunar missions. The successful Artemis 1 test flight in 2022 set the stage for future human missions to the Moon. The Artemis II mission will send astronauts to fly by the Moon, providing the first opportunity since Apollo for humans to directly observe and document the lunar surface from a few thousand kilometers, including the lunar far side. Artemis III will be the first human mission to land and explore the Moon’s surface near the lunar South Pole. To prepare for Artemis exploration, geology training for the Artemis II crew and detailed training plans for Artemis III and beyond are in full swing. NASA scientists have been working for several years with the Flight Operations Directorate (FOD) at the Johnson Space Center on a progressive geology training program that starts with incoming astronaut classes, offers opportunities to maintain the geology proficiency between flight assignments, and trains the broader engineering-operations-management community in geology and field operations. In the spring of 2023, our team developed an introductory week-long class called Lunar Fundamentals and delivered this content to the Artemis II crew, as well as key NASA Flight Control Team members. The Lunar Fundamentals curriculum combines basic geographic and geologic information about the Moon; includes detailed content on major geologic processes, the lunar environment, lunar volatiles, and sample science; provides historical context of our growing knowledge about the Moon; and introduces new lunar data sets and tools for exploring the lunar surface. With the Lunar Fundamentals foundation, we continue development of the advanced planetary science classroom content for the Artemis III crew, together with field training science objectives and plans. Partnering with our FOD colleagues, we are building an integrated training plan for lunar science, exploration field methods, and operational skills to ensure that the Artemis astronauts exploring the Moon will have the necessary foundation in geology and lunar science to achieve mission success.

Astronauts training↗

Returning to the Moon: NASA's Artemis Missions

With Artemis missions, NASA will establish the first long-term presence on the Moon. NASA’s goal is to land the first woman on the Moon and return them safely to Earth. The exploration and settlement on Moon will enable the next giant leap - sending the first astronauts to Mars. During the next era of human exploration, we will discover life-saving, Earth-changing science and technology along the way. Artemis missions will enable a growing lunar economy by fueling new industries, supporting job growth, and furthering the demand for a skilled workforce. In her seminar, Dr. Agrawal will provide an overview of the Artemis program, its different elements and a brief description of some of the technical advancements that have been made to enable the first Artemis 1 flight. She will then provide an overview of the Orion program whose charter is to multiple spacecraft for Artemis missions and discuss the ongoing activities at NASA Ames in support of Orion and Artemis programs.

Artemis↗

Returning to the Moon: NASA's Artemis Missions

With Artemis missions, NASA will establish the first long-term presence on the Moon. NASA’s goal is to land the first woman on the Moon and return them safely to Earth. The exploration and settlement on Moon will enable the next giant leap - sending the first astronauts to Mars. During the next era of human exploration, we will discover life-saving, Earth-changing science and technology along the way. Artemis missions will enable a growing lunar economy by fueling new industries, supporting job growth, and furthering the demand for a skilled workforce. In her seminar, Dr. Agrawal will provide an overview of the Artemis program, its different elements and a brief description of some of the technical advancements that have been made to enable the first Artemis 1 flight. She will then provide an overview of the Orion program whose charter is to multiple spacecraft for Artemis missions and discuss the ongoing activities at NASA Ames in support of Orion and Artemis programs.

Artemis↗

Artemis Innovative Assembly and Integration Operations of the Launch Abort Systemat KSC

This paper describes the Artemis program assembly and integration approach that enables affordable and low risk processing operations for the Launch Abort System at KSC. NASA is currently developing the Artemis 1 spacecraft to meet the test objectives of an uncrewed orbital mission to the moon and return to earth in 2021. The Artemis Orion spacecraft consists of a Crew Module (CM), a Service Module (SM), and a Launch Abort System (LAS) to safely transport a crew of 4 to the moon and return to earth. The LAS enables the CM to have an abort capability for the crew during the launch phase of the mission from the launch pad throughout the ascent phase. The LAS includes motor elements for abort, attitude control, and stage separation is assembled at the Launch Abort System Facility (LASF) adjacent to the CM/SM (CSM) assembly operations in the Neil Armstrong Operations and Checkout Building (O&C) at KSC. The LAS integration to the CSM is completed in the LASF and the completed Artemis spacecraft is integrated to the Space Launch System (SLS) in the Vehicle Assembly Building (VAB) at KSC. A significant LAS development flight test milestone was recently completed in 2019 for the Ascent Abort (AA-2) flight test at Cape Canaveral Air Force Station where a high-altitude abort test was successfully achieved using a Peacekeeper booster stage exercising all of the LAS systems including propulsion, avionics, and pyrotechnics demonstrating he LAS readiness for crewed flight. The first operational flight of the LAS will be for the Artemis 2 mission which is the first crewed mission for the Orion program planned in 2023.

William J Koenig↗

Comparisons of Artemis I and Wind Tunnel Buffet Environments and Induced Structural Responses

This paper presents comparisons of buffet forcing functions (BFFs) and associated structural responses for the Space Launch System from two data sources: 1) Artemis I (AR01) Developmental Flight Instrumentation (DFI) and 2) transonic wind-tunnel (WT) tests. Failures of DFI sensors prevented the development of a complete set of flight-based BFFs, where each BFF is based on azimuthal integration over 360-degrees of unsteady pressures acquired by sensor rings placed at many longitudinal stations along the vehicle. Instead, a set of equivalent flight- and WT-based BFFs was developed based on functional DFI and WT sensors that share the same locations. Root-mean-square (rms) levels of equivalent BFFs from flight and WT data are in-family for most of the cardinal Mach numbers. However, at stations downstream of the booster forward attachment (FA) protuberance, the rms of flight-based BFFs exceed their WT counterparts. Strikingly, vortex-shedding off the FA protuberance occurs at lower frequencies during flight than in WT experiments. This frequency shift propagates onto the spectrum of flight-measured vs. WT-based structural responses. Aside from vortex-shedding frequency mismatch, a generally good agreement between AR01 and WT-based responses is an indirect indication that WT buffet environments are fairly well representative of their AR01 counterpart.

transonic buffet↗

Comparisons of Artemis I and Wind Tunnel Buffet Environments and Induced Structural Responses

This paper presents comparisons of buffet forcing functions (BFFs) and associated structural responses for the Space Launch System from two data sources: 1) Artemis I (AR01) Developmental Flight Instrumentation (DFI) and 2) transonic wind-tunnel (WT) tests. Failures of DFI sensors prevented the development of a complete set of flight-based BFFs, where each BFF is based on azimuthal integration over 360-degrees of unsteady pressures acquired by sensor rings placed at many longitudinal stations along the vehicle. Instead, a set of equivalent flight- and WT-based BFFs was developed based on functional DFI and WT sensors that share the same locations. Root-mean-square (rms) levels of equivalent BFFs from flight and WT data are in-family for most of the cardinal Mach numbers. However, at stations downstream of the booster forward attachment (FA) protuberance, the rms of flight-based BFFs exceed their WT counterparts. Strikingly, vortex-shedding off the FA protuberance occurs at lower frequencies during flight than in WT experiments. This frequency shift propagates onto the spectrum of flight-measured vs. WT-based structural responses. Aside from vortex-shedding frequency mismatch, a generally good agreement between AR01 and WT-based responses is an indirect indication that WT buffet environments are fairly well representative of their AR01 counterpart.

transonic buffet↗

NASA Space Launch System Artemis I & II Post Flight Ascent Aerothermal Environments Overview

Since 2011 the Aerosciences Branch/EV33 at NASA Marshall Space Flight Center has been involved with the development of ascent external aerothermal environments for the NASA Space Launch System (SLS) Block 1 launch vehicle for the purposes of supporting thermal analysis and the design of thermal protection systems. The SLS Block 1 Artemis I and II launch vehicles successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2022 and April 1st, 2026, respectively. Over 70 aerothermal islands, consisting of over 265 operational instruments captured aerodynamic heating and plume induced environments throughout the launch vehicles. Gauges consisted of calorimeters, radiometers, gas temperature probes, pressure transducers, bi-directional pressure probes and thermocouples. Prior to launch, aerothermal design environment models were generated to predict ascent aerodynamic heating and plume induced environments over a design space that covered a range of vehicle trajectories that varied atmospheric, vehicle performance, and off-nominal, engine-out conditions. Post flight reconstruction models were developed for each flight island using the Day-of-Launch (DOL) Best Equivalent Trajectory (BET) that provided freestream conditions and propulsion system boundary conditions. This paper discusses a summary of the ascent aerothermal environments observed during the flights and the respective modelling approaches and the performance of them through comparisons of flight data and predictions.

aerothermodynamics↗

Artemis, Gateway, the Return to the Moon and Forward to Mars for Heliophysics

Over a 100 years ago we humans first landed on Antarctica. At the time we could not have imagined the heliophysics scientific gains that would be got from this continent. Sixty-five years ago we had the first international geophysical year aimed at deployment of instrumentation across this southern most continent and around the globe in recognition of the potential advancements from this integrated system of measurements. This potential has been realized and continues to grow as Antarctica returns science results across most disciplines, inspires artists and athletes, and has touched the lives of many through these gains. Today we are on the precipice of a future new Antarctica with the launch of Artemis 1 and plans for the return of humans to the lunar surface and human exploration to Mars. Heliophysics and space weather are necessary components for the success of these dreams and will benefit greatly from the fundamental science exploration that Artemis and mission to Mars will enable. Within this paper we will discuss the ways in which Artemis and the mission to Mars will benefit Heliophysics and space weather and end with recommendations for steps we see needed to actualize these dreams.

Alexa J Halford↗

Artemis, Gateway, the Return to the Moon and Forward to Mars for Heliophysics

Over a 100 years ago we humans first landed on Antarctica. At the time we could not have imagined the heliophysics scientific gains that would be got from this continent. Sixty-five years ago we had the first international geophysical year aimed at deployment of instrumentation across this southern most continent and around the globe in recognition of the potential advancements from this integrated system of measurements. This potential has been realized and continues to grow as Antarctica returns science results across most disciplines, inspires artists and athletes, and has touched the lives of many through these gains. Today we are on the precipice of a future new Antarctica with the launch of Artemis 1 and plans for the return of humans to the lunar surface and human exploration to Mars. Heliophysics and space weather are necessary components for the success of these dreams and will benefit greatly from the fundamental science exploration that Artemis and mission to Mars will enable. Within this paper we will discuss the ways in which Artemis and the mission to Mars will benefit Heliophysics and space weather and end with recommendations for steps we see needed to actualize these dreams.

Alexa Halford↗

Navigation Performance of the BioSentinel Deep Space CubeSat Mission

The BioSentinel mission was recently launched aboard the SLS launch vehicle (LV) as part of the Artemis- 1 campaign. The BioSentinel navigation team successfully tracked and guided the spacecraft through a lunar gravity assist to its destination Earth-trailing heliocentric orbit. This 6U CubeSat carries live yeast cells to analyze the effects of radiation at large distances from Earth, becoming the first biological payload in Deep Space. Prelaunch activities included mission design updates, orbit determination rehearsals and the development of a tracking schedule in coordination with the Artemis-1 payload office and the Deep Space Network (DSN). An important influence on the trajectories of Artemis I secondaries was the uncertainty associated with deployment from the Interim Cryogenic Propulsion System (ICPS), the upper stage of the SLS LV. The ICPS was rotating at a rate of 1 rpm; there was also an uncertainty in the spin axis attitude, which translated into an unknown clock angle of deployment. The variability in this angle and magnitude of deployment implied the existence of a non-negligible risk of a lunar impact, which was evaluated for various potential launch dates. We present the results of Monte Carlo analyses and compute the pertinent maneuvers to avoid it. In addition, we present a comparison with the actual deployment once the mission launched by reconstructing our trajectory with tracking data. On November 16th 2022 BioSentinel successfully deployed from ICPS and the navigation team started to receive 2-way Doppler and Sequential Ranging data from the DSN. We processed early data to try to obtain a first ephemeris using Initial Orbit Determination (IOD) methods such as the least squares. Soon after deployment, the spacecraft was tumbling and entered safe mode, creating a period where the tracking data were sparse. The mission team recovered the spacecraft and after four tracking passes, we solved for a first ephemeris that was sent to the DSN for better tracking of the spacecraft. After propagating this first ephemeris solution, we determined that we avoided impact with a margin of a few hundred km from the lunar surface. More tracking data over the next few days (from DSN as well as ESA antennas) allowed for a more refined orbit solution predicting a periselene altitude of 406 km and a lunar eclipse lasting 36.5 minutes. Therefore, BioSentinel operators aborted any correction maneuvers. This periselene altitude also gave us the necessary energy to achieve a heliocentric orbit. The next challenge was due to the necessary adjustments in our orbit determination method due to the large energy boost resulting from the lunar flyby. After a series of tracking passes we were able to get a nominal solution that resulted into a stable trajectory. This paper discusses in detail the navigation performance using the X-band IRIS transponder, as well as the challenges and lessons learned prior to and during this deep space, CubeSat mission.

Andres Dono Perez↗

Methodology and Development of SLS Ascent Loads

The methodology and development of the Space Launch System (SLS) Block 1 Boost and Core phase Ascent loads will be presented in this paper. As is common practice, a series of fixed time/mass Finite Element Models of the vehicle were developed for the purpose of evaluating the structural loads and accelerations for particular Mach or time ranges associated with the Boost and Core phases of flight. Load contributors, which vary between bins, include the flight mechanic induced portion of the loads (e.g., Static-Elastic (STEL) or Vehicle Load Indicator (VLI) tool results), gust loads, buffet loads, Solid Rocket Booster thrust oscillations, Core Stage Engine thrust oscillations, maneuvering loads, thrust vector-related dispersions, and Programmed Test Input induced loads. Each of these load contributors will be examined in this paper, as well as the Loads Combination Equations used to generate the final loads. In addition to the typical coupled loads analysis, an Ascent loads evaluation is included in the SLS Artemis 1 Day of Launch process; a summary of this evaluation will also be presented in this paper.

SLS↗

Improving Data Analyses for a Biological Mission to Deep Interplanetary Space

Onboard the Artemis 1 rocket, NASA plans to launch the first deep space bioscience mission past low Earth orbit (LEO) since 1972, BioSentinel, a 6-Unit (6U) biological CubeSat. BioSentinel’s goals are to assess the effect of deep space ionizing radiation (IR) on DNA and cell damage response, using Saccharomyces cerevisiae, or budding yeast, as a model organism. BioSentinel accomplishes this by measuring Optical Density (OD) in addition to metabolic activity using the redox dye alamarBlue, both of which will be read through light emitting diode (LED) lights of differing wavelengths. With the largest and most sophisticated energy-providing solar panels utilized on a biological CubeSat to date, BioSentinel will be equipped with an IR dosimeter to identify what doses of radiation the yeast is exposed to at any point in time, in addition to a transponder to send such data back to NASA Ames’ Multi Mission Operations Center (MMOC). Biology computational programs and data processing scripts are necessary to analyze this complex data once it is received, including automated subroutines to analyze duplication rate, alamarBlue reduction, and time periods when paired against numerous other variables. Overall, we have implemented several VisualBasic biocomputational programs to analyze such data in an organized and efficient manner so that conclusions can be made rapidly. Furthermore, we showcase why efficient analysis of particular parameters is important to better understand the risks that deep space IR poses to astronauts, especially when considering the upcoming Artemis missions.

Bijan Harandi↗

Low-Thrust Trajectory Design for a Cislunar CubeSat Leveraging Structures from the Bicircular Restricted Four-Body Problem

The upcoming Lunar IceCube (LIC) mission will deliver a 6U CubeSat to a low lunar orbit via a ride-share opportunity during NASAs Artemis 1 mission. This presents a challenging trajectory design scenario, as the vast change in energy required to transfer from the initial deployment state to the destination orbit is compounded by the limitations of the LICs low-thrust engine. This investigation addresses these challenges by developing a trajectory design framework that utilizes dynamical structures available in the Bicircular Restricted Four-Body Problem (BCR4BP) along with a robust direct collocation algorithm. Maps are created that expedite the selection of invariant manifold paths from a periodic staging orbit in the BCR4BP that offer favorable connections between the LIC transfer phases. Initial guesses assembled from these maps are passed to a direct collocation algorithm that corrects them in the BCR4BP while including the variable low-thrust acceleration of the spacecraft engine. Results indicate that the ordered motion provided by the BCR4BP and the robustness of direct collocation combine to offer an efficient and adaptable framework for designing a baseline trajectory for the LIC mission.

Pritchett, Robert↗

Low-Thrust Trajectory Design for A Cislunar CubeSat Leveraging Structures from the Bicircular Restricted Four-Body Problem

The upcoming Lunar IceCube (LIC) mission will deliver a 6U CubeSat to a low lunar orbit via a ride-share opportunity during NASAs Artemis 1 mission. This presents a challenging trajectory design scenario, as the vast change in energy required to transfer from the initial deployment state to the destination orbit is compounded by the limitations of the LICs low-thrust engine. This investigation addresses these challenges by developing a trajectory design framework that utilizes dynamical structures available in the Bicircular Restricted Four-Body Problem (BCR4BP) along with a robust direct collocation algorithm. Maps are created that expedite the selection of invariant manifold paths from a periodic staging orbit in the BCR4BP that offer favorable connections between the LIC transfer phases. Initial guesses assembled from these maps are passed to a direct collocation algorithm that corrects them in the BCR4BP while including the variable low-thrust acceleration of the spacecraft engine. Results indicate that the ordered motion provided by the BCR4BP and the robustness of direct collocation combine to offer an efficient and adaptable framework for designing a baseline trajectory for the LIC mission.

Pritchett, Robert↗