Dual feed progressive cavity pump extrusion system for functionally graded direct ink write 3D printing
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
HIV-1 therapy with single or dual broadly neutralizing antibodies (bNAbs) has shown viral escape, indicating that at least a triple bNAb therapy may be needed for robust suppression of viremia. We performed a two-part study consisting of a single-center, randomized, double-blind, dose-escalation, placebo-controlled first-in-human trial of the HIV-1 V2-glycan-specific antibody PGDM1400 alone or in combination with the V3-glycan-specific antibody PGT121 in 24 adults without HIV in part 1, as well as a multi-center, open-label trial of the combination of PGDM1400, PGT121 and the CD4-binding-site antibody VRC07-523LS in five viremic adults living with HIV not on antiretroviral therapy (ART) in part 2. The primary endpoints were safety, tolerability and pharmacokinetics for both parts and antiviral activity among viremic adults living with HIV and not on ART for part 2 of the study. The secondary endpoints were changes in CD4 + T cell counts and development of HIV-1 sequence variations associated with PGDM1400, PGT121 and VRC07-523LS resistance in part 2. Intravenously administered PGDM1400 was safe and well-tolerated at doses up to 30 mg kg -1 and when given in combination with PGT121 and VRC07-523LS. A single intravenous infusion of 20 mg kg -1 of each of the three antibodies reduced plasma HIV RNA levels in viremic individuals by a maximum mean of 2.04 log10 copies per ml; however, viral rebound occurred in all participants within a median of 20 days after nadir. Rebound viruses demonstrated partial to complete resistance to PGDM1400 and PGT121 in vitro, whereas susceptibility to VRC07-523LS was preserved. Viral rebound occurred despite mean VRC07-523LS serum concentrations of 93 µg ml -1 . The trial met the pre-specified endpoints. Our data suggest that future bNAb combinations likely need to achieve broad antiviral activity, while also maintaining high serum concentrations, to mediate viral control.
Not provided.
To test small technologies at lower cost for space science applications, LANL has developed a small high altitude balloon payload that could, in the future, be regularly and inexpensively launched from LANL. A neutron detector, NEMO, was integrated to evaluate its performance in a space-like mixed-radiation environment and collect neutron data in the atmosphere. In collaboration with EES-14, a high-altitude balloon payload was launched from LANL Technical Area 51 on February 27, 2023 and April 17, 2023. For real-time geolocation, a SAM-M8Q M8 GNSS module was used to get position and time, and an Iridium RockBLOCK 9603 was used to communicate with the ground using the Iridium satellite fleet. These modules were all controlled using an Iteaduino Mega microcontroller board. Finally, a High Altitude Science Eagle Flight Computer with a temperature pressure sensor ran independently, writing data to an SD card. All of these modules were powered by a 5 mAh lithium polymer battery. The battery was attached to the bottom of the payload while the remaining electronics were embedded in the underside of the top of the payload. These modules were wired as seen in Figure 1-2. The Iteaduino Mega microcontroller board was programmed to use the RockBLOCK to send a message once every 10 minutes containing neutron and GPS data read off the NEMO and SAM M8Q, respectively. Once the message send attempt finished, the RockBLOCK would be slept for the rest of the 10 minute interval. The Eagle Flight Computer ran continuously throughout the flight, taking data every 6 seconds. The RockBLOCK message data was set up to be delivered from the Iridium satellite fleet to a website, where it was stored and parsed to create live maps and plots for analysis and balloon retrieval. The RockBLOCK message data was additionally configured to be sent to an email as a fail-safe. The payload was ground-tested successfully for over 50 hours, with multiple revisions occurring to best prepare for conditions at altitude and improve the software and firmware to fix any issues that cropped up with the data pipeline. Additional to the balloon payload, the flight had an attached iMet-4 radiosonde and Garmin T5 GPS Dog Collar. The radiosonde provided GPS and meteorological data. The T5 dog collar is used along with a Garmin Astro 430 to track the balloon at a range of up to 9 miles for retrieval. The balloon itself was initially a 1600 g meteorological balloon with an attached High Altitude Science parachute, both of which can be seen in Figure 1-3. After the first flight, the EES team swapped to a Rocketman parachute.
Explore the source record for details and available documents.
Explore the source record for details and available documents.