Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ASC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Asc-Seurat: analytical single-cell Seurat-based web application

Abstract Background Single-cell RNA sequencing (scRNA-seq) has revolutionized the study of transcriptomes, arising as a powerful tool for discovering and characterizing cell types and their developmental trajectories. However, scRNA-seq analysis is complex, requiring a continuous, iterative process to refine the data and uncover relevant biological information. A diversity of tools has been developed to address the multiple aspects of scRNA-seq data analysis. However, an easy-to-use web application capable of conducting all critical steps of scRNA-seq data analysis is still lacking. Summary We present Asc-Seurat, a feature-rich workbench, providing an user-friendly and easy-to-install web application encapsulating tools for an all-encompassing and fluid scRNA-seq data analysis. Asc-Seurat implements functions from the Seurat package for quality control, clustering, and genes differential expression. In addition, Asc-Seurat provides a pseudotime module containing dozens of models for the trajectory inference and a functional annotation module that allows recovering gene annotation and detecting gene ontology enriched terms. We showcase Asc-Seurat’s capabilities by analyzing a peripheral blood mononuclear cell dataset. Conclusions Asc-Seurat is a comprehensive workbench providing an accessible graphical interface for scRNA-seq analysis by biologists. Asc-Seurat significantly reduces the time and effort required to analyze and interpret the information in scRNA-seq datasets.

60 APPLIED LIFE SCIENCES↗

Advanced Stirling Convertor (ASC-E2) Performance Testing at NASA Glenn Research Center

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG Project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, four pairs of ASCs capable of operating to 850 C and designated with the model number ASC-E2, were delivered by Sunpower of Athens, OH, to GRC in 2010. The ASC-E2s underwent a series of tests that included workmanship vibration testing, performance mapping, and extended operation. Workmanship vibration testing was performed following fabrication of each convertor to verify proper hardware build. Performance mapping consisted of operating each convertor at various conditions representing the range expected during a mission. Included were conditions representing beginning-of-mission (BOM), end-of-mission (EOM), and fueling. This same series of tests was performed by Sunpower prior to ASC-E2 delivery. The data generated during the GRC test were compared to performance before delivery. Extended operation consisted of a 500-hour period of operation with conditions maintained at the BOM point. This was performed to demonstrate steady convertor performance following performance mapping. Following this initial 500-hour period, the ASC-E2s will continue extended operation, controller development and special durability testing, during which the goal is to accumulate tens of thousands of hours of operation. Data collected during extended operation will support reliability analysis. Performance data from these tests is summarized in this paper.

Oriti, Salvatore↗

Advanced Stirling Convertor (ASC-E2) Performance Testing at NASA Glenn Research Center

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG Project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, four pairs of ASCs capable of operating to 850 C and designated with the model number ASC-E2, were delivered by Sunpower of Athens, Ohio, to GRC in 2010. The ASC-E2s underwent a series of tests that included workmanship vibration testing, performance mapping, and extended operation. Workmanship vibration testing was performed following fabrication of each convertor to verify proper hardware build. Performance mapping consisted of operating each convertor at various conditions representing the range expected during a mission. Included were conditions representing beginning-of-mission (BOM), end-of-mission (EOM), and fueling. This same series of tests was performed by Sunpower prior to ASC-E2 delivery. The data generated during the GRC test were compared to performance before delivery. Extended operation consisted of a 500-hr period of operation with conditions maintained at the BOM point. This was performed to demonstrate steady convertor performance following performance mapping. Following this initial 500-hr period, the ASC-E2s will continue extended operation, controller development and special durability testing, during which the goal is to accumulate tens of thousands of hours of operation. Data collected during extended operation will support reliability analysis. Performance data from these tests is summarized in this paper.

Oriti, Salvatore↗

Report of experiments and evidence for ASC L2 milestone 4467: demonstration of a legacy application's path to exascale

This report documents thirteen of Sandia's contributions to the Computational Systems and Software Environment (CSSE) within the Advanced Simulation and Computing (ASC) program between fiscal years 2009 and 2012. It describes their impact on ASC applications. Most contributions are implemented in lower software levels allowing for application improvement without source code changes. Improvements are identified in such areas as reduced run time, characterizing power usage, and Input/Output (I/O). Other experiments are more forward looking, demonstrating potential bottlenecks using mini-application versions of the legacy codes and simulating their network activity on Exascale-class hardware. The purpose of this report is to prove that the team has completed milestone 4467-Demonstration of a Legacy Application's Path to Exascale. Cielo is expected to be the last capability system on which existing ASC codes can run without significant modifications. This assertion will be tested to determine where the breaking point is for an existing highly scalable application. The goal is to stretch the performance boundaries of the application by applying recent CSSE RD in areas such as resilience, power, I/O, visualization services, SMARTMAP, lightweight LWKs, virtualization, simulation, and feedback loops. Dedicated system time reservations and/or CCC allocations will be used to quantify the impact of system-level changes to extend the life and performance of the ASC code base. Finally, a simulation of anticipated exascale-class hardware will be performed using SST to supplement the calculations. Determine where the breaking point is for an existing highly scalable application: Chapter 15 presented the CSSE work that sought to identify the breaking point in two ASC legacy applications-Charon and CTH. Their mini-app versions were also employed to complete the task. There is no single breaking point as more than one issue was found with the two codes. The results were that applications can expect to encounter performance issues related to the computing environment, system software, and algorithms. Careful profiling of runtime performance will be needed to identify the source of an issue, in strong combination with knowledge of system software and application source code.

99 GENERAL AND MISCELLANEOUS↗

Photoelectron Spectroscopy and Theoretical Study on Monosolvated Cyanate Analogue Clusters ECX-· Sol (ECX- = NCSe-, AsCSe- and AsCS-; Sol = H2O, CH3CN)

Six monosolvated cyanate analogue clusters ECX-?Sol (ECX– = NCSe-, AsCSe-, and AsCS-; Sol = H2O and CH3CN) were investigated using negative ion photoelectron spectroscopy (NIPES). NIPES experiments show that these clusters possess overall similar spectra compared to their respective isolated ECX- anions but shift to higher electron binding energy with solvent CH3CN stabilizing the excess electrons slightly more than H2O. For the ECX-·H2O series, vertical detachment energies and their increments relative to the bare species are measured to be 3.700 / 0.370, 3.085 / 0.425, 3.085 / 0.430 eV for NCSe-, AsCSe- and AsCS-, respectively, while the corresponding values in ECX-·CH3CN series are 3.835 / 0.505, 3.145 / 0.475, and 3.135 / 0.480 eV. Ab initio electronic structure calculations indicate the excess charges located at the terminal N and Se atoms in NCSe- and migrated to the central C atom in AsCSe- and AsCS-. For NCSe-, the solvation is driven by the interactions with the two negatively charged terminal ends, while for AsCSe- and AsCS-, the solvation revolves around the interactions with the central C atom, where all the excess negative charge is concentrated. Two nearly degenerate isomers for NCSe-·H2O are identified, one forming a single strong N…H-O hydrogen bond (HB) and the other featuring a bidentate HB with two hydroxyl H atoms pointing to N and Se ends. In contrast, the negative central C atom in AsCSe-/AsCS- allows the formation of a bifurcated HB with H2O. Similar effects are observed for the acetonitrile case, in which the three H atoms of methyl group interact with the two negatively charged terminal ends in NCSe-, while prefer binding to the central negative carbon atom in AsCSe-/AsCS-. The different binding motifs derived in this work may suggest distinctly different solvation properties in NCSe- versus AsCSe-/AsCS-, with the former anion leading to asymmetric solvation at the N end of the solute, while the latter species creating more ‘isotropic’ solvation around the central C equatorial plane. This work was supported by U.S. Department of Energy (DOE), Office of Science, Office of Basic Energy Sciences, Division of Chemical Sciences, Geosciences, and Biosciences, and performed using EMSL, a national scientific user facility sponsored by DOE’s Office of Biological and Environmental Research and located at Pacific Northwest National Laboratory, which is operated by Battelle Memorial Institute for the DOE. The theoretical calculations were conducted on EMSL’s “Cascade” Supercomputer.

Yuan, Qinqin↗

Trilinos Developers SQE Guide: ASC Software Quality Engineering Practices Version 3.0

The Trilinos Project is an effort to develop algorithms and enabling technologies within an object-oriented software framework for the solution of large-scale, complex multi-physics engineering and scientific problems. A new software capability is introduced into Trilinos as a package. A Trilinos package is an integral unit and, although there are exceptions such as utility packages, each package is typically developed by a small team of experts in a particular algorithms area such as algebraic preconditioners, nonlinear solvers, etc. The Trilinos Developers SQE Guide is a resource for Trilinos package developers who are working under Advanced Simulation and Computing (ASC) and are therefore subject to the ASC Software Quality Engineering Practices as described in the Sandia National Laboratories Advanced Simulation and Computing (ASC) Software Quality Plan: ASC Software Quality Engineering Practices Version 3.0 document. The Trilinos Developer Policies webpage contains a lot of detailed information that is essential for all Trilinos developers. The Trilinos Software Lifecycle Model defines the default lifecycle model for Trilinos packages and provides a context for many of the practices listed in this document.

Willenbring, James Michael↗

ASC-ATDM Performance Portability Requirements for 2015-2019

This report outlines the research, development, and support requirements for the Advanced Simulation and Computing (ASC ) Advanced Technology, Development, and Mitigation (ATDM) Performance Portability (a.k.a., Kokkos) project for 2015 - 2019 . The research and development (R&D) goal for Kokkos (v2) has been to create and demonstrate a thread - parallel programming model a nd standard C++ library - based implementation that enables performance portability across diverse manycore architectures such as multicore CPU, Intel Xeon Phi, and NVIDIA Kepler GPU. This R&D goal has been achieved for algorithms that use data parallel pat terns including parallel - for, parallel - reduce, and parallel - scan. Current R&D is focusing on hierarchical parallel patterns such as a directed acyclic graph (DAG) of asynchronous tasks where each task contain s nested data parallel algorithms. This five y ear plan includes R&D required to f ully and performance portably exploit thread parallelism across current and anticipated next generation platforms (NGP). The Kokkos library is being evaluated by many projects exploring algorithm s and code design for NGP. Some production libraries and applications such as Trilinos and LAMMPS have already committed to Kokkos as their foundation for manycore parallelism an d performance portability. These five year requirements includes support required for current and antic ipated ASC projects to be effective and productive in their use of Kokkos on NGP. The greatest risk to the success of Kokkos and ASC projects relying upon Kokkos is a lack of staffing resources to support Kokkos to the degree needed by these ASC projects. This support includes up - to - date tutorials, documentation, multi - platform (hardware and software stack) testing, minor feature enhancements, thread - scalable algorithm consulting, and managing collaborative R&D.

97 MATHEMATICS AND COMPUTING↗

Continued Development of the Advanced Stirling Convertor (ASC)

The Advanced Stirling Convertor (ASC) is being developed under contract with the NASA Glenn Research Center (GRC) and is supported by NASA s Science Mission Directorate for potential use in future radioisotope power systems having significantly increased efficiency and higher specific power compared to the current thermoelectric systems. An ASC with a lower temperature (approx.650 C) Inconel heater head is currently being substituted into the DOE/Lockheed Martin Advanced Stirling Radioisotope Generator (ASRG) program with a predicted convertor efficiency of 34 percent (AC electrical out to heat input ) at a temperature ratio of 2.7 and is expected to deliver approximately 75 W(sub ac). Continued development of the higher temperature (approx.850 C) version using existing materials and fabrication techniques in the hot portions is reported on here. The higher temperature ASC is expected to have 38 percent efficiency (AC electrical out to heat input) at a temperature ratio of 3.1 and is expected to deliver approximately 88 W(sub ac). The high temperature ASC also has approximately 30 C higher rejection temperature, which allows for further reduced system mass because of the reduced radiator size. Six higher temperature and hermetically sealed convertors are being built under this effort for extended life testing at GRC.

Wong, Wayne A.↗

Performance Measurement of Advanced Stirling Convertors (ASC-E3)

NASA Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance testing data of the Advanced Stirling Convertor (ASC). The latest version of the ASC (ASC-E3, to represent the third cycle of engineering model test hardware) is of a design identical to the forthcoming flight convertors. For this generation of hardware, a joint Sunpower and GRC effort was initiated to improve and standardize the test support hardware. After this effort was completed, the first pair of ASC-E3 units was produced by Sunpower and then delivered to GRC in December 2012. GRC has begun operation of these units. This process included performance verification, which examined the data from various tests to validate the convertor performance to the product specification. Other tests included detailed performance mapping that encompassed the wide range of operating conditions that will exist during a mission. These convertors were then transferred to Lockheed Martin for controller checkout testing. The results of this latest convertor performance verification activity are summarized here.

Stirling Cycle↗

LANL CSSE L2: Case Study of In Situ Data Analysis in ASC Integrated Codes [Slides]

The massive, complex datasets generated by scientific simulations on next-generation computer architectures at extreme scale pose new challenges for data management and scientific understanding. A critical element in meeting these new challenges is in situ data analysis where information is reduced and analyzed as close to the point of generation as possible, for example, at run time or as the data stream to longer term storage. This milestone will demonstrate in situ data analysis in xRAGE, an ASC Eulerian Radiation Hydrodynamics code. We will work with the Eulerian Applications Project to identify target problems that will exercise physics of interest to the program, and we will work closely with users to maximize the achieved usability and productivity improvements. We will investigate enhancements to the in situ process that enable and improve techniques of data reduction and data triage in addition to improving in situ performance by using portable acceleration technology. We will report on their viability and performance in xRAGE or another ASC code. These products will provide ASC IC developers with reference codes and tools that will benefit DSW by advancing the technology for predictive science at extreme scales.

97 MATHEMATICS AND COMPUTING↗

ASC ATDM Level 2 Milestone #5325: Asynchronous Many-Task Runtime System Analysis and Assessment for Next Generation Platforms

This report provides in-depth information and analysis to help create a technical road map for developing next-generation programming models and runtime systems that support Advanced Simulation and Computing (ASC) work- load requirements. The focus herein is on asynchronous many-task (AMT) model and runtime systems, which are of great interest in the context of "Oriascale7 computing, as they hold the promise to address key issues associated with future extreme-scale computer architectures. This report includes a thorough qualitative and quantitative examination of three best-of-class AIM] runtime systems – Charm-++, Legion, and Uintah, all of which are in use as part of the Centers. The studies focus on each of the runtimes' programmability , performance , and mutability . Through the experiments and analysis presented, several overarching Predictive Science Academic Alliance Program II (PSAAP-II) Asc findings emerge. From a performance perspective, AIV runtimes show tremendous potential for addressing extreme- scale challenges. Empirical studies show an AM runtime can mitigate performance heterogeneity inherent to the machine itself and that Message Passing Interface (MP1) and AM11runtimes perform comparably under balanced conditions. From a programmability and mutability perspective however, none of the runtimes in this study are currently ready for use in developing production-ready Sandia ASC applications. The report concludes by recommending a co- design path forward, wherein application, programming model, and runtime system developers work together to define requirements and solutions. Such a requirements-driven co-design approach benefits the community as a whole, with widespread community engagement mitigating risk for both application developers developers. and high-performance computing runtime systein

97 MATHEMATICS AND COMPUTING↗

FY20 ASC IC L2 Milestone 7180: Performance Portability of SIERRA Mechanics Applications to ATS-1 and ATS-2. Executive Summary

The overall goal of this work was to accelerate simulations supporting the nuclear deterrence (ND) mission through improved performance of key algorithms in the ASC IC Sierra multi-physics application suite. This work focused on porting and optimizing algorithms for the graphics processing units (GPU) on the second ASC advanced technology system (ATS-2), while maintaining or improving performance on commodity technology systems (CTS) and ATS-1. Furthermore, these algorithmic developments used the ASC developed Kokkos performance portability abstraction library to maintain high performance across platforms using identical code, and enable sustainable reduced-cost migration and performance optimization to emerging hardware.

97 MATHEMATICS AND COMPUTING↗

Visualization on supercomputing platform level II ASC milestone (3537-1B) results from Sandia.

This report provides documentation for the completion of the Sandia portion of the ASC Level II Visualization on the platform milestone. This ASC Level II milestone is a joint milestone between Sandia National Laboratories and Los Alamos National Laboratories. This milestone contains functionality required for performing visualization directly on a supercomputing platform, which is necessary for peta-scale visualization. Sandia's contribution concerns in-situ visualization, running a visualization in tandem with a solver. Visualization and analysis of petascale data is limited by several factors which must be addressed as ACES delivers the Cielo platform. Two primary difficulties are: (1) Performance of interactive rendering, which is most computationally intensive portion of the visualization process. For terascale platforms, commodity clusters with graphics processors(GPUs) have been used for interactive rendering. For petascale platforms, visualization and rendering may be able to run efficiently on the supercomputer platform itself. (2) I/O bandwidth, which limits how much information can be written to disk. If we simply analyze the sparse information that is saved to disk we miss the opportunity to analyze the rich information produced every timestep by the simulation. For the first issue, we are pursuing in-situ analysis, in which simulations are coupled directly with analysis libraries at runtime. This milestone will evaluate the visualization and rendering performance of current and next generation supercomputers in contrast to GPU-based visualization clusters, and evaluate the performance of common analysis libraries coupled with the simulation that analyze and write data to disk during a running simulation. This milestone will explore, evaluate and advance the maturity level of these technologies and their applicability to problems of interest to the ASC program. Scientific simulation on parallel supercomputers is traditionally performed in four sequential steps: meshing, partitioning, solver, and visualization. Not all of these components are necessarily run on the supercomputer. In particular, the meshing and visualization typically happen on smaller but more interactive computing resources. However, the previous decade has seen a growth in both the need and ability to perform scalable parallel analysis, and this gives motivation for coupling the solver and visualization.

99 GENERAL AND MISCELLANEOUS↗

Reliability Quantification of Advanced Stirling Convertor (ASC) Components

The Advanced Stirling Convertor, is intended to provide power for an unmanned planetary spacecraft and has an operational life requirement of 17 years. Over this 17 year mission, the ASC must provide power with desired performance and efficiency and require no corrective maintenance. Reliability demonstration testing for the ASC was found to be very limited due to schedule and resource constraints. Reliability demonstration must involve the application of analysis, system and component level testing, and simulation models, taken collectively. Therefore, computer simulation with limited test data verification is a viable approach to assess the reliability of ASC components. This approach is based on physics-of-failure mechanisms and involves the relationship among the design variables based on physics, mechanics, material behavior models, interaction of different components and their respective disciplines such as structures, materials, fluid, thermal, mechanical, electrical, etc. In addition, these models are based on the available test data, which can be updated, and analysis refined as more data and information becomes available. The failure mechanisms and causes of failure are included in the analysis, especially in light of the new information, in order to develop guidelines to improve design reliability and better operating controls to reduce the probability of failure. Quantified reliability assessment based on fundamental physical behavior of components and their relationship with other components has demonstrated itself to be a superior technique to conventional reliability approaches based on utilizing failure rates derived from similar equipment or simply expert judgment.

Shah, Ashwin R.↗

Lateral Load Testing of the Advanced Stirling Convertor (ASC-E2) Heater Head

Free-piston Stirling convertors are fundamental to the development of NASA s next generation of radioisotope power system, the Advanced Stirling Radioisotope Generator (ASRG). The ASRG will use General Purpose Heat Source (GPHS) modules as the energy source and Advanced Stirling Convertors (ASCs) to convert heat into electrical energy, and is being developed by Lockheed Martin under contract to the Department of Energy. Achieving flight status mandates that the ASCs satisfy design as well as flight requirements to ensure reliable operation during launch. To meet these launch requirements, GRC performed a series of quasi-static mechanical tests simulating the pressure, thermal, and external loading conditions that will be experienced by an ASC E2 heater head assembly. These mechanical tests were collectively referred to as lateral load tests since a primary external load lateral to the heater head longitudinal axis was applied in combination with the other loading conditions. The heater head was subjected to the operational pressure, axial mounting force, thermal conditions, and axial and lateral launch vehicle acceleration loadings. To permit reliable prediction of the heater head s structural performance, GRC completed Finite Element Analysis (FEA) computer modeling for the stress, strain, and deformation that will result during launch. The heater head lateral load test directly supported evaluation of the analysis and validation of the design to meet launch requirements. This paper provides an overview of each element within the test and presents assessment of the modeling as well as experimental results of this task.

Cornell, Peggy A.↗

Lateral Load Testing of the Advanced Stirling Convertor (ASC-E2) Heater Head

Free-piston Stirling convertors are fundamental to the development of NASA s next generation of radioisotope power system, the Advanced Stirling Radioisotope Generator (ASRG). The ASRG will use General Purpose Heat Source (GPHS) modules as the energy source and Advanced Stirling Convertors (ASCs) to convert heat into electrical energy, and is being developed by Lockheed Martin under contract to the Department of Energy. Achieving flight status mandates that the ASCs satisfy design as well as flight requirements to ensure reliable operation during launch. To meet these launch requirements, GRC performed a series of quasi-static mechanical tests simulating the pressure, thermal, and external loading conditions that will be experienced by an ASC-E2 heater head assembly. These mechanical tests were collectively referred to as "lateral load tests" since a primary external load lateral to the heater head longitudinal axis was applied in combination with the other loading conditions. The heater head was subjected to the operational pressure, axial mounting force, thermal conditions, and axial and lateral launch vehicle acceleration loadings. To permit reliable prediction of the heater head s structural performance, GRC completed Finite Element Analysis (FEA) computer modeling for the stress, strain, and deformation that will result during launch. The heater head lateral load test directly supported evaluation of the analysis and validation of the design to meet launch requirements. This paper provides an overview of each element within the test and presents assessment of the modeling as well as experimental results of this task.

Cornell, Peggy A.↗

Lateral Load Testing of the Advanced Stirling Convertor (ASC-E2) Heater Head

Free-piston Stirling convertors are fundamental to the development of NASA s next generation of radioisotope power system, the Advanced Stirling Radioisotope Generator (ASRG). The ASRG will use General Purpose Heat Source (GPHS) modules as the energy source and Advanced Stirling Convertors (ASCs) to convert heat into electrical energy, and is being developed by Lockheed Martin under contract to the Department of Energy. Achieving flight status mandates that the ASCs satisfy design as well as flight requirements to ensure reliable operation during launch. To meet these launch requirements, GRC performed a series of quasi-static mechanical tests simulating the pressure, thermal, and external loading conditions that will be experienced by an ASC-E2 heater head assembly. These mechanical tests were collectively referred to as "lateral load tests" since a primary external load lateral to the heater head longitudinal axis was applied in combination with the other loading conditions. The heater head was subjected to the operational pressure, axial mounting force, thermal conditions, and axial and lateral launch vehicle acceleration loadings. To permit reliable prediction of the heater head s structural performance, GRC completed Finite Element Analysis (FEA) computer modeling for the stress, strain, and deformation that will result during launch. The heater head lateral load test directly supported evaluation of the analysis and validation of the design to meet launch requirements. This paper provides an overview of each element within the test and presents assessment of the modeling as well as experimental results of this task.

Cornell, Peggy A.↗

A report documenting the completion of the Los Alamos National Laboratory portion of the ASC level II milestone ""Visualization on the supercomputing platform

This report provides documentation for the completion of the Los Alamos portion of the ASC Level II 'Visualization on the Supercomputing Platform' milestone. This ASC Level II milestone is a joint milestone between Sandia National Laboratory and Los Alamos National Laboratory. The milestone text is shown in Figure 1 with the Los Alamos portions highlighted in boldfaced text. Visualization and analysis of petascale data is limited by several factors which must be addressed as ACES delivers the Cielo platform. Two primary difficulties are: (1) Performance of interactive rendering, which is the most computationally intensive portion of the visualization process. For terascale platforms, commodity clusters with graphics processors (GPUs) have been used for interactive rendering. For petascale platforms, visualization and rendering may be able to run efficiently on the supercomputer platform itself. (2) I/O bandwidth, which limits how much information can be written to disk. If we simply analyze the sparse information that is saved to disk we miss the opportunity to analyze the rich information produced every timestep by the simulation. For the first issue, we are pursuing in-situ analysis, in which simulations are coupled directly with analysis libraries at runtime. This milestone will evaluate the visualization and rendering performance of current and next generation supercomputers in contrast to GPU-based visualization clusters, and evaluate the perfromance of common analysis libraries coupled with the simulation that analyze and write data to disk during a running simulation. This milestone will explore, evaluate and advance the maturity level of these technologies and their applicability to problems of interest to the ASC program. In conclusion, we improved CPU-based rendering performance by a a factor of 2-10 times on our tests. In addition, we evaluated CPU and CPU-based rendering performance. We encourage production visualization experts to consider using CPU-based rendering solutions when it is appropriate. For example, on remote supercomputers CPU-based rendering can offer a means of viewing data without having to offload the data or geometry onto a CPU-based visualization system. In terms of comparative performance of the CPU and CPU we believe that further optimizations of the performance of both CPU or CPU-based rendering are possible. The simulation community is currently confronting this reality as they work to port their simulations to different hardware architectures. What is interesting about CPU rendering of massive datasets is that for part two decades CPU performance has significantly outperformed CPU-based systems. Based on our advancements, evaluations and explorations we believe that CPU-based rendering has returned as one viable option for the visualization of massive datasets.

97 MATHEMATICS AND COMPUTING↗