Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2024”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

2024 OES-Environmental 2024 State of the Science Report, Chapter 8: Marine Renewable Energy Data and Information Systems

As the marine renewable energy (MRE) sector grows, large amounts of environmental and technical data and information are being collected. When these data and information are openly available, they can be used to guide research and development, inform responsible siting and consenting of projects, and increase stakeholder understanding through transparency. For example, quality environmental data collected during the siting, consenting, construction, operation, and decommissioning of MRE projects can all play key roles in better characterizing baseline conditions, developing effective monitoring and mitigation strategies, and retiring environmental risks through data transferability (see Chapter 6). Ensuring that these data and information are easily discoverable and accessible will help the MRE sector make informed decisions and coexist in an increasingly busy ocean environment.

16 TIDAL AND WAVE POWER↗

2024 OES-Environmental 2024 State of the Science Report, Chapter 9: Beyond Single Marine Renewable Energy Devices: A System-wide Effects Approach

Global expansion of renewable energy, including marine renewable energy (MRE) technology development is necessary to mitigate the effects of climate change, facilitate a sustainable transition from carbon-based energy sources, and satisfy national energy security needs using locally produced electricity (European Commission 2022; IPCC 2023; IRENA 2020). As MRE engineering and research continue to focus on designing devices for deployment in nearshore and offshore waters around the world, researchers are also examining potential environmental effects on marine animals, habitats, and ecosystem processes. To date, the focus has been on interactions between small numbers of MRE devices (1-6) and the environment, such as collisions between animals and turbine blades, the effects of underwater noise and electromagnetic field (EMF) emissions, changes in habitats and oceanographic processes, risk of entanglement of animals, and displacement of animals (Boehlert & Gill 2010; Copping & Hemery 2020) (see Chapter 3).

16 TIDAL AND WAVE POWER↗

2024 OES-Environmental 2024 State of the Science Report, Chapter 10: Potential Environmental Effects of Marine Renewable Energy in Tropical and Subtropical Ecosystems

Marine renewable energy (MRE), such as wave, tidal, ocean current, and thermal and salinity gradient, is under development in many parts of the world. However, studies examining the environmental effects of MRE have primarily focused on deployments in temperate regions and countries in the Northern Hemisphere. As MRE development expands into tropical and subtropical countries (between 35°N and 35°S), there is a need to examine the potential environmental effects specific to these regions and their unique habitats and species. Unlike temperate regions where wave and tidal energy resources dominate, tropical and subtropical regions can leverage five different types of MRE: wave energy, tidal energy, ocean current energy, ocean thermal energy conversion (OTEC), and salinity gradient energy.

16 TIDAL AND WAVE POWER↗

Argonne Leadership Computing Facility 2024 Operational Assessment Report

This Operational Assessment Report describes how the Argonne Leadership Computing Facility (ALCF) met or exceeded every goal set by DOE for the calendar year (CY) 2024. In CY 2024, the ALCF operated Polaris, an AMD and NVIDIA-based Hewlett Packard Enterprise (HPE) Apollo 6500 Gen10+ system that provides a powerful platform for breakthrough science and prepares applications and workloads for Aurora, Argonne National Laboratory’s Intel-HPE exascale computer. Since going into production in August 2022, Polaris has supported research teams from the DOE Exascale Computing Project (ECP), which concluded in 2024, and from ALCF’s Aurora Early Science Program (ESP). Polaris delivered a total of 2555.7K node-hours to 17 Innovative and Novel Computational Impact on Theory and Experiment (INCITE) 2024 projects and 601.6K node-hours to ASCR Leadership Computing Challenge (ALCC) projects (12 of which were awarded during the 2023–2024 ALCC year and 11 of which were awarded during the 2024–2025 ALCC year), as well as providing substantial time for Director’s Discretionary (DD) projects (966.2K node-hours). As Table ES.1 shows, Polaris performed exceptionally well in terms of overall availability (97.7 percent), scheduled availability (99.6 percent), and utilization (94.7 percent; Table 2.1). In CY 2024, ALCF supported more than 2,000 users. As of March 18, 2025, ALCF’s users have published 254 papers in peer-reviewed journals and technical proceedings.

97 MATHEMATICS AND COMPUTING↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 2024

This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2024 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2024. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the US and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2024. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2024, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for nonradiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2024, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 25, 2024.

54 ENVIRONMENTAL SCIENCES↗

Shear Assisted Processing and Extrusion (ShAPE) of Aluminum Alloy 7075, 2024, and Al-12.4TM

The most common aluminum alloys utilized in the aerospace industry are 7075 and 2024 due to their high strength-to-weight ratio compared to advanced high strength steels and other aluminum alloys. Despite excellent performance, these aluminum alloys have seen limited use outside of the aerospace industry due in part to high cost. If high-performance aluminum extrusions could be made more cost effectively by eliminating energy intensive process steps typical of conventional extrusion, then numerous opportunities exist for more widespread adoption. A key reason for the high cost of 7075 and 2024 extrusions (25-75% higher than 6061) is their slow extrusion speed. 7075 and 2024 are limited to 2 m/min and 3.5 m/min respectively, in contrast to 6061 which can be extruded at 20–80 m/min. In addition to slow speed, aluminum alloys require numerous thermal treatments throughout the extrusion process including homogenization and pre-heating prior to extrusion, and solution heat treating and artificial aging after extrusion. Each of these steps contribute to the total energy consumed during manufacturing of extruded components. This project investigates the use of ShAPE to improve extrusion speed and reduce, or even eliminate, the typical thermal treatments for high strength aluminum alloys, all while improving material performance. The overarching goal of this project was to demonstrate that Shear Assisted Processing and Extrusion (ShAPE) can manufacture high-performance aluminum alloy tubing with lower manufacturing energy and improved mechanical properties compared to conventional extrusion. Unlike conventional extrusion where the billet is rammed against a stationary die using a strictly linear motion, the ShAPE process superimposes a rotational shear force by spinning the die while the billet is plunged. Compared to conventional linear extrusion, the ShAPE process imparts significantly more strain into the feedstock material, which enables the formation of novel microstructures. These microstructures manifest an array of property and process improvements for extrusion of high-performance aluminum alloys. The following accomplishments were achieved for this project: Extrusion of 7075 at 12.2 meters/min compared to 2 meters/min for conventional extrusion; Elimination of 7075 billet homogenization (430 °C for 20 hours) which is required prior to conventional extrusion; Elimination of 7075 billet pre-heating (400 °C for 1 hour) in a separate furnace which is required prior to conventional extrusion; Achieved 7075-T6with yield strength = 595 MPa, ultimate tensile strength = 531MPa, and elongation = 17.4% for extrusions made from unhomogenized billets. Exceeds the ASTM and ASM standard, and typical industry values; Achieved 7075-T5 (i.e., no solution heat treatment) with yield strength = 588 MPa, ultimate tensile strength = 535 MPa, and elongation = 14.8% for extrusions made from homogenized billets; Extrusion of 2024 at 7.4 meters/min compared to 3.5 meters/min for conventional extrusion; Achieved 2024-T8510 yield strength = 522 MPa, ultimate strength = 510MPa, and elongation = 7.1% for extrusions made from wrought billets. Exceeds the ASTM and ASM standard, and typical industry values; Extrusion of Al-12.4TM high-performance aluminum powder directly into tubing, in a single step, which eliminates process steps typical of powder metallurgy extrusion.

36 MATERIALS SCIENCE↗

Results for the April 2024 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2024 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained.1 The April 2024 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2024 (1QFY2024) and the Second Quarter Fiscal Year 2024 (2QFY2024). The following facts pertaining to the WAC are drawn from the analytical results provided in this report. WAC TARGETS and LIMITS were met for all analyzed chemical and radioactive contaminants for which the detection limits are below the WAC TARGETS and LIMITS. Nitrosamines were not detected in the SWPF DSS salt solution sample above the instrument detection limits of <1 mg/L. The minimum detection limit (<3.33E-01 pCi/mL) is reported for 94 Nb as determined from the minimum detectable activity associated with the radiochemical method used for this radionuclide. The reported detection limit is above the requested SRMC target minimum detection limit concentration. However, the minimum detection limit reported for the April 2024 semiannual SWPF DSS sample for 94 Nb is lower than the estimated detection limit of 4.38E-01 pCi/mL initially established by SRNL in 2009. Thus, per guidance from SRMC, 2 SRNL continues to achieve as low as practical detection limits for this radionuclide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2024 Results for Avian Monitoring at the Technical Area 36 Minie Site, Technical Area 39 Point 6, Technical Area 16 Burn Ground, and DARHT at Los Alamos National Laboratory

Los Alamos National Laboratory (LANL) biological subject matter experts in the Environmental Protection and Compliance Division initiated a multi-year program in 2013 to monitor avifauna (birds) at two open detonation sites and one open burn site on LANL property. Additional monitoring began in 2017 at a third firing site, the Dual-Axis Radiographic Hydrodynamic Test (DARHT) Facility. In this annual report, we compare monitoring results from these efforts among years to identify and evaluate firing and open burn site impacts on the local bird community. The objectives of this study are • to determine whether LANL operations impact bird abundance, species richness, or diversity; • to examine occupancy and nest success of secondary-cavity nesting birds that use nest boxes; and • to examine chemical concentrations (such as radionuclides, inorganic elements, and/or organic compounds) in nonviable eggs and deceased nestlings that are collected opportunistically with the upper-level bounds of background concentrations, when available. During May through July 2024, LANL biologists completed multiple avian point count surveys at each of the following treatment sites: • Technical Area (TA) 36 Minie Site, • TA-39 Point 6, • TA-16 Burn Ground, and • DARHT. We recorded a total of 1,088 birds that represented 65 species at the four treatment sites and compared these results with data from their associated control sites. In 2024, abundance and species richness at treatment and control sites continued to trend similarly from year to year, with minor random deviations expected from bird communities. Species richness at firing sites differed little from the previous year’s values. Two new bird species were observed at the firing sites—cedar waxwing (Bombycilla cedrorum) and pinyon jay (Gymnorhinus cyanocephalus). Shannon diversity values at TA-36 Minie Site, TA-39, and DARHT were statistically higher than one or more of their associated controls. Annual species diversity at treatment sites was high in 2024 across all firing sites relative to similar habitat control sites. We also monitored avian nest boxes to compare occupancy and nest success data from nest boxes at treatment sites with the overall avian nest box monitoring network and against a subset of relevant control sites. Nest box success has decreased at both treatment and control sites since monitoring began, suggesting that overlapping climatic factors are responsible for patterns of declining nest success. In 2024, nonviable avian eggs and one nestling were opportunistically collected at Bandelier National Monument, TA-16 Burn Ground, TA-36 Minie, TA-39 Point 6, and DARHT. All egg samples and the one nestling sample were evaluated for per- and polyfluoroalkyl substances, which were detected from all locations, including the control site at Bandelier National Monument. Overall results from 2024 continue to suggest that operations at the four treatment sites are not negatively impacting bird populations. This long-term project will continue to monitor for any changes over time.

54 ENVIRONMENTAL SCIENCES↗

Space Mission Options for Reconnaissance and Mitigation of Asteroid 2024 YR4

Near-Earth asteroid 2024 YR 4 was discovered on 2024-12-27 and its probability of Earth impact in December 2032 peaked at ~3% on 2025-02-18. Additional observations ruled out Earth impact by 2025-02-23. However, the probability of lunar impact in December 2032 then rose, reaching ~4% by the end of the apparition in May 2025. James Webb Space Telescope (JWST) observations on 2025-03-26 estimated the asteroid’s diameter at 60 ± 7 m. Studies of 2024 YR 4 ’s potential lunar impact effects suggest lunar ejecta could increase micrometeoroid debris flux in low Earth orbit up to 1000 times above background levels over just a few days, possibly threatening astronauts and spacecraft. In this work, we present options for space missions to 2024 YR 4 that could be utilized if lunar impact is confirmed. Here, we cover flyby & rendezvous reconnaissance, deflection, and robust disruption of the asteroid. We examine both rapid-response and delayed launch options through 2032. We evaluate chemical and solar electric propulsion, various launch vehicles, optimized deep space maneuvers, and gravity assists. Re-tasking extant spacecraft and using built spacecraft not yet launched are also considered. The best reconnaissance mission options launch in late 2028, leaving only approximately three years for development at the time of this writing in August 2025. Deflection missions were assessed and appear impractical. However, kinetic robust disruption missions are available with launches between April 2030 and April 2032. Nuclear robust disruption missions are also available with launches between late 2029 and late 2031. Finally, even if lunar impact is ruled out there is significant potential utility in deploying a reconnaissance mission to characterize the asteroid.

Asteroid deflection↗

The Remarkable 2024 North Atlantic Mid‐Season Hurricane Lull

Abstract The 2024 North Atlantic (hereafter Atlantic) hurricane season started quickly, with the earliest Category 5 on record (Beryl) and three hurricanes forming through 14 August. Following Ernesto's dissipation on 20 August, the Atlantic hurricane season became extremely quiet during the climatological peak of hurricane season, with only one Category 2 hurricane (Francine) and one tropical storm through 23 September. Several environmental factors likely contributed to this unexpected, prolonged lull. During mid‐to‐late August, subseasonal conditions were broadly favorable for Atlantic hurricanes, but a northward shift in African easterly wave emergence latitude yielded fewer tropical cyclone seed disturbances that also traversed unfavorably cool ocean water. During early‐to‐mid September, subseasonal variability driven by the Madden‐Julian oscillation was less conducive to hurricane activity, with several bouts of increased vertical wind shear across the central Atlantic. Throughout most of the lull, the tropical Atlantic was anomalously dry and subsident, suppressing hurricane formation chances. Plain Language Summary The 2024 North Atlantic (hereafter Atlantic) hurricane season was anticipated to be extremely active, with seasonal forecasts calling for a potentially historic season. Following a busy start including the earliest Category 5 Atlantic hurricane on record (Beryl), the season became very quiet between 20 August–23 September, with only one Category 2 hurricane (Francine) and one tropical storm forming. Following the lull, the Atlantic became extremely busy again, with seven hurricanes forming from 25 September through the end of the season–the most on record for this period. This paper focuses on the surprising lull and attributes it to several different factors, including a late‐August northward shift in African easterly wave tracks (organized thunderstorm complexes spanning thousands of kilometers that often serve as Atlantic hurricane seeds). This northward shift brought these systems out over colder water and into a drier airmass, suppressing their hurricane formation chances. During the first 3 weeks of September, a large‐scale tropical phenomenon known as the Madden‐Julian oscillation, resulted in increased sinking motion, drier mid‐levels and increased vertical wind shear–all of which typically reduce Atlantic hurricane activity. Overall, the lull demonstrates how seed disturbances and other environmental factors can strongly modulate aggregate seasonal tropical cyclone activity. Key Points Following an active start, the 2024 Atlantic hurricane was quiet during the climatological peak with only 1 tropical storm and 1 hurricane The lull was not anticipated by seasonal forecasting agencies, which called for an extremely active 2024 Atlantic hurricane season Factors reducing storm count included a northward shift in African easterly waves, broad‐scale subsidence, and reduced mid‐level moisture

Klotzbach, P J↗

Utah FORGE: 2024 Discrete Fracture Network Model Data

The Utah FORGE 2024 Discrete Fracture Network (DFN) Model dataset provides a set of files representing discrete fracture network modeling for the FORGE site near Milford, Utah. The dataset includes four distinct DFN model file sets, each corresponding to different time frames and modeling approaches in 2024. These models characterize both natural and induced fractures in the geothermal reservoir, which consists of crystalline granitic and metamorphic rock approximately 8,000 feet below the ground surface. The dataset includes a reference DFN model from February 2024 that incorporates planar fractures and well trajectories, as well as upscaled permeability, porosity, compressibility, and storage values on specified grids. Additionally, there are models based on new microseismic (MEQ) data from May and July 2024, including fracture planes fitted to the latest MEQ catalog datasets, tensile fractures from hydraulic stimulation, and an alternative connected DFN for modeling purposes. Coordinate data is provided in both global and local frames, with detailed instructions on the transformations used to align with principal stress orientations. The dataset also includes notes and calculation files for estimating fracture sizes and differences between various fracture sets. There are subfolders for Global Coordinates and Local Coordinates. To move from the global to the local coordinate frame, fractures and wells were a) rotated 20 degrees counterclockwise looking down about the global point (335376.400482041, 4263189.99998761, 250.093546450195) to better align with the principal stresses; and b) translated by (-335408.68, -4263010.9, 1150). Upscaled permeability values using the _XYZ suffix show directions with respect to the global XYZ coordinate frame, while those using the _IJK suffix are aligned with local coordinate frame.

15 GEOTHERMAL ENERGY↗

Dataset for "Evaluating Deep Learning Approaches for Predictions in Unmonitored Basins with Continental-scale Stream Temperature Models" Willard et al. (2024)

This data release provides all data and code used in the paper " "Evaluating Deep Learning Approaches for Predictions in Unmonitored Basins with Continental-scale Stream Temperature Models" Willard et al. (2024)" to model stream temperature, evaluate, and assess results. The associated manuscript explores current open questions in prediction in ungauged and unmonitored basins concerning top-down versus bottom-up approaches, tradeoffs between data available and input requirements, and the appropriate representation of catchment attributes as inputs to deep learning models. Modeling was done primarily with long short-term memory (LSTM) models, and stream site coverage spans 1362 locations across the conterminous United States. The data is organized into these items items:Code repository and data for the paper " "Evaluating Deep Learning Approaches for Predictions in Unmonitored Basins with Continental-scale Stream Temperature Models" Willard et al. (2024)".Code: stream_temp_ml_regionalization.zip contains the code repositoryData to run the code: - data_dir.zip -- contains all files that should be moved to the "DATA_DIR" variable defined in the "set_env_vars.sh" script in the code repository- metadata_dir.zip -- contains all files that should be moved to the "METADATA_DIR" variable defined in the "set_env_vars.sh" script in the code repository- error_analysis_attribute_and_groundwater_dir.zip - workflows for the extended error analysis by stream attribute and groundwater influenceData produced by the code and used in the paper:- outputs_dir.zip - contains model output and results (outputs_dir/results), model weights (outputs_dir/models), and all other outputs used for the paper including feature importances.To cite this code, please use the following BibTeX or MLA entries:bibtex:@misc{willard2024streamdata, author = {Jared Willard and Fabio Ciulla and Helen Weierbach and Vipin Kumar and Charuleka Varadharajan}, title = {Dataset for "Evaluating Deep Learning Approaches for Predictions in Unmonitored Basins with Continental-scale Stream Temperature Models"}, year = {2024}, doi = {10.15485/2448016}, publisher = {ESS-DIVE Repository}, url = {https://doi.org/10.15485/2448016}}MLA: Willard, Jared, et al. Dataset for "Evaluating Deep Learning Approaches for Predictions in Unmonitored Basins with Continental-scale Stream Temperature Models". 2024. ESS-DIVE Repository, doi:10.15485/2448016.

54 ENVIRONMENTAL SCIENCES↗

Energy and economic impacts of U.S. federal energy and water conservation standards adopted from 1987 through 2024

This paper presents estimates of the key impacts of U.S. national energy and water conservation standards adopted from 1987 through 2024. The standards for consumer products, commercial and industrial equipment, lighting products, and plumbing products include those set by legislation as well as standards adopted by the Department of Energy (DOE) through rulemaking. In 2024 alone, these standards are estimated to have saved an estimated 6.0 quads of primary energy, which is equivalent to 6.5% of total U.S. energy consumption, and 1.7 trillion gallons of water, which is equivalent to approximately 12% of the annual water withdrawals for public supply in the U.S in 2015. The estimated reduction in CO 2 emissions associated with the standards in 2024 was 270 million metric tons, which is equivalent to 5.6% of total annual U.S. CO 2 emissions from energy consumption. The annual savings in operating costs for households and businesses totaled $\$$105 billion, and the average household saved $\$$576 in operating costs as a result of standards on residential appliances and plumbing products. The estimated cumulative past and future energy and water savings from these standards amount to 307 quads of energy and almost 53 trillion gallons of water. The estimated cumulative CO 2 emissions reduction from the standards come to 10.3 billion metric tons. Accounting for the increased upfront costs of more-efficient products and the energy and water cost savings over the products’ lifetime, the standards have a cumulative net present value of benefit of $\$$3.2 trillion using 3 percent discount rate and $\$$3.5 trillion using 7 percent discount rate when discounting past and future benefits to 2024.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗