Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2023”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Radiological Impact of 2023 Operations at the Savannah River Site

This report presents the environmental dose assessment methods and the estimated potential doses to the public from 2023 Savannah River Site (SRS) air and liquid radioactive releases. Also documented are potential doses from special-case exposure scenarios, such as the consumption of wildlife or goat milk. Dose to the Offsite Representative Person The 2023 dose to the offsite representative person from SRS liquid releases was 0.14 mrem and from SRS air releases it was 0.016 mrem. To show compliance with the U. S. Department of Energy (DOE) all pathway dose standard of 100 mrem/yr, SRS conservatively adds these two doses for a total representative person dose of 0.16 mrem which is 0.16% of the DOE standard. Sportsman Doses Onsite Hunter: SRS conducts annual hunts to control onsite deer and feral hog populations. The estimated dose from consuming harvested deer or hog meat is determined for every onsite hunter. During 2023, the maximum potential dose an onsite hunter received was 9.42 mrem, or 9.42% of DOE’s 100 mrem/yr all pathway dose standard. Creek Mouth Fisherman: SRS estimated the maximum potential dose from fish consumption at 0.17 mrem from bass collected at the mouth of Lower Three Runs. This dose is 0.17% of the DOE standard. SRS bases this hypothetical dose on the low probability scenario that, during 2023, a fisherman consumed 24 kg (53 lbs) of bass caught exclusively from the mouth of Lower Three Runs. Release of Material Containing Residual Radioactivity SRS did not release any real property (land or buildings) in 2023. SRS unconditionally released a total of 13,324 items of personal property (such as tools) from radiological areas in 2023. Most of these items did not leave the Site. However, all of these items required no additional radiological controls post-survey as they met DOE Order 458.1 release criteria. Radiation Dose to Aquatic and Terrestrial Biota SRS conducts screening evaluations of plant and animal doses for aquatic and terrestrial ecosystems. For 2023, all SRS aquatic system locations passed the initial (Level 1) screenings and no further assessments were required at those locations. For the land-based systems evaluation, SRS performed initial screenings using concentration data from the five onsite radiological soil sampling locations. Typically, SRS collects and analyzes only one soil sample per year from each location. For 2023, all land-based locations passed their initial (Level 1) pathway screenings.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environment Report for Calendar Year 2023 - Princeton Plasma Physics Laboratory

This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. In 2023, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2023, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 27, 2023.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Characterization of Infrequent Samples from The Concentration, Storage, And Transfer Facility: Leak Detection Box (LDB) Drain Cell Sample: February 26, 2023, Sample

Savannah River Mission Completion Engineering (SRMC-E) requested that the Savannah River National Laboratory (SRNL) analyze the Concentration, Storage, and Transfer Facility (CSTF) samples from the following Tank Farm areas: the sump encasement, catch tank, drain cell, and waste tank annulus. In general, these CSTF samples will be analyzed on an infrequent basis and analyses will include detection for total beta/gamma activities, total alpha activity, free hydroxide, and pH measurements. This report presents characterization results for the leak detection box (LDB) February 26, 2023, drain cell sample. The sample was clear and colorless with no visible particulates. The results are measurements for total gamma, total alpha, total beta, free hydroxide, pH, and density. These analyses were performed in triplicate. A summary of the average analytical results for the LDB sample includes the following. The directly measured pH for the LDB February 26, 2023 "as-received" drain cell sample range was 7.12-7.16, and the free hydroxide concentration was <0.02 M. The density of the "as-received" drain cell sample determined at 25 °C was 1.02±0.00 g/mL. The total alpha activity for the LDB February 26, 2023, sample is reported as a less than value (Upper Limit) because of possible spectral interferences. Thus, the total alpha activity averaged <3.52E+02 dpm/mL. This value is less than 4.83E+03 dpm/mL, which is the procedural limit for non-waste determination. The total beta activity in the LDB February 26, 2023, drain cell sample is above the instrument detection limits and average 9.76E+03±5.94E+02 dpm/mL. The total beta activity in the LDB February 26, 2023, drain cell sample is above he instrument detection limits and averaged 7.76E+03±5.94E+02 dpm/mL. The average measured cesium-137 activity (dominant beta emitter) in the LDB February 26, 2023, drain cell sample is 7.76E+03±2.35E+02 dpm/mL. The corresponding Ba-137m (dominant gamma emitter) activity, calculated as 94.6% of the Cs-137 values, is 7.34E+03±2.23E+02 dpm/mL. The total empirical activity of the beta and gamma emitting (represented by the sum of total beta and Ba-137m activities) averaged 1.71E+04±8.18E+02 dpm/mL. This value is less than 8.69E+05 dpm/mL, which is the procedural limit for non-waste determination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

2023 Annual Explosives Inventory Completion

The 2023 Lawrence Livermore National Laboratory (LLNL) annual explosives inventory was executed from May 18, 2023 to September 27, 2023 and was verified for accuracy effective September 28, 2023 following the LLNL Explosive Materials Inventory Plan. This year’s annual inventory includes changes incorporated based on the Department of Energy (DOE) Office of Inspector General (OIG) Audit Report DOE-OIG-20-50, The Department of Energy’s Storage and Disposition of Explosives Material at Selected Sites, dated July of 2020. Based on the associated recommendations, explosives at DOE and National Nuclear Safety Administration (NNSA) sites are considered "sensitive personal property" and applicable inventories must comply with 41 CFR 109, Personal Property Management. This regulation adds additional stipulations which require the annual inventory to include accountability of the total site inventory. In addition, the inventory must be performed by personnel other than the property owner, or alternatively must include independent verification. The development of the inventory plan was agreed to by the LLNL Explosives Safety Committee in conjunction with the LLNL Property and Business Division Leader. The LLNL Explosive Materials Inventory Plan was reviewed and approved by the DOE Explosives Safety Committee Chair on May 17, 2023 and by the NNSA Property Management Office on May 25, 2023.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

2023 Billion-Ton Report

The U.S. Department of Energy Bioenergy Technology Office's (BETO's) 2023 Billion-Ton Report (BT23) is an assessment of renewable carbon resources potentially available in the United States. BT23 explores these resources in terms of quantity, price, geographical density and distribution, and market maturity. Resource quantities in this report are limited by specified economic and environmental sustainability constraints. Good practices are needed to ensure biomass production has positive environmental outcomes. BT23 supports BETO's mission, particularly the 2023 Multi-Year Program Plan. To access 2023 Billion-Ton Report PDFs, appendices, and high-level messages, navigate to the 2023 Billion-Ton Report landing page at https://energy.gov/eere/bioenergy/2023-billion-ton-report-assessment-us-renewable-carbon-resources on the U.S. Department of Energy Bioenergy Technologies Office website. To access information about the quality assumptions used in this report, please see the Biomass Feedstock Library at https://bioenergylibrary.inl.gov/Home/Home.aspx Please cite the 2023 Billion-Ton Report as: U.S. Department of Energy. 2024. 2023 Billion‐Ton Report: An Assessment of U.S. Renewable Carbon Resources. M. H. Langholtz (Lead). Oak Ridge, TN: Oak Ridge National Laboratory. ORNL/SPR-2024/3103. doi: 10.23720/BT2023/2316165. Contact Us

BT23↗

SPRUCE Redox-Active Subsurface Organic Matter, Marcell Experimental Forest, Minnesota, 2023

This dataset contains measurements that report on the effects of the SPRUCE experimental treatments on redox-active organic matter (RAOM) reduction (Valenzuela and Cervantes, 2021). Measurements occurred at the SPRUCE Experiment site in the Marcell Experimental Forest in northern Minnesota, USA. This work is also a follow-up to Rush et al. (2021a) which investigated effects of temperature on RAOM reduction after two years of experimental warming (Rush et al. 2021b). This follow-up dataset addresses two main questions; (i) How does warming and elevated carbon dioxide (CO2) directly affect in situ RAOM reduction, and subsequent methane (CH4) and CO2 production, across the peat depth profile? and (ii) How has long-term warming and elevated CO2 changed the total RAOM pool, and subsequent CH4 and CO2 production, across the peat depth profile? This dataset reports electron shuttling capacity (a proxy for RAOM reduction; Keller, and Takagi, 2013) and carbon dioxide (CO2) and methane (CH4) concentrations both in one-week in situ incubations (2023-05-31 to 2023-08-01) and 42-day laboratory incubations from peat collected in 2023 (2023-05-31 to 2023-06-26). Laboratory incubations also measured acetate concentrations. The 2023 laboratory incubations were also compared with laboratory incubations conducted on peat collected in 2016 (Rush et al. 2021b). This dataset contains three data files in comma-separate (.csv) format. Additional metadata are provided: three data dictionaries and a file-level metadata file in comma separate (.csv) format and a user guide in PDF (*.pdf) format.

54 ENVIRONMENTAL SCIENCES↗

Evaluating Short-warning Mitigation via Intentional Robust Disruption of a Hypothetical Impact of Asteroid 2023 NT1

We investigate various short-warning mitigation scenarios via fragmentation for a hypothetical impact of asteroid 2023 NT1, a near-Earth object (NEO) that was discovered on 2023 July 15, two days after its closest approach to Earth on July 13. The asteroid passed by Earth within ∼0.25 lunar distances, with a closest approach of ∼1 × 10 5 km and a velocity of 11.27 km s −1 . Its size remains largely uncertain, with an estimated diameter range of 26–58 m and a most probable estimate of 34 m (JPL Sentry, 2023 September 15; weighted by the NEO size frequency distribution). If 2023 NT1 had collided with Earth, it could have caused significant local damage. Assuming a spherical asteroid with a diameter of 34 m, uniform density of 2.6 g cm −3 , and impact velocity of 15.59 km s −1 , a collision would have yielded an estimated impact energy of ∼1.5 Mt, approximately 3 times the energy of the Chelyabinsk airburst in 2013. We analyze the effectiveness of mitigation via intentional robust disruption for objects similar to 2023 NT1. We utilize Pulverize It (PI), a NASA Innovative Advanced Concepts study of planetary defense via fragmentation, to model potential mitigation scenarios through simulations of hypervelocity asteroid disruption and atmospheric ground effects in the case of a terminal defense mode. Simulations suggest that PI is an effective multimodal approach for planetary defense that can operate in extremely short interdiction modes, in addition to long interdiction timescales with extended warning. Our simulations support the proposition that threats like 2023 NT1 can be effectively mitigated with intercepts of 1 day (or less) prior to impact, yielding minimal to no ground damage.

Asteroids↗

Numerically Testing Conceptual Models of the Utah FORGE Reservoir Using July 2023 Circulation Test Data

Over the past several years, many new data sets have become available regarding the characterization of the Utah FORGE reservoir. These include, but are not limited to, the stimulation of Well 16A, the drilling and completion of Well 16B, and interwell circulation confirmatory testing. As part of the characterization efforts, conceptual models of the reservoir are re-examined as new data become available. As part of the planning for FORGE activities, numerical models are often used to predict the reservoir response to the planned testing. Stochastic methods are often employed to bound uncertainty and allow for evaluation of comprehensive ranges of key reservoir parameters. For the most recent interwell circulation confirmatory testing (July 2023), a priori numerical model predictions did bound the observed behavior (Xinj et al., 2023), but key deviations from expected behavior prompted the FORGE team to reevaluate our conceptual model of the reservoir. In early October 2023, key members of the development, testing, and monitoring teams met for 2 days to review newly collected data and discuss ‘interesting’ or ‘key’ observations. From these discussions, 15 Key Observations were documented, with several significant ones being that the discrete fracture network developed from the 16A stimulation data may not be appropriate and that the early time pressure data obtained during the summer 2023 reservoir testing were best described using radial solutions. In July 2023, two campaigns of interwell confirmatory testing were conducted, the first set of tests occurred on July 4-5 and the second set on July 18-19. The second set of circulation tests conducted at the Utah FORGE site between the injection well 16A(78)-32 and production well 16B(78)-32 on July 18 and 19, 2023 are used to calibrate material properties in a thermal-hydraulic-mechanical (THM) simulation of the discrete fracture network connecting the wells. The spatially and temporally varying reservoir properties are calibrated to match the time dependent pressure and production profiles from the circulation tests. In future work, this calibrated model will be coupled to the native state THM model of the FORGE reservoir to predict surface deformation and strains resulting from pumping schedules.

58 GEOSCIENCES↗

New Record Ocean Temperatures and Related Climate Indicators in 2023

The global physical and biogeochemical environment has been substantially altered in response to increased atmospheric greenhouse gases from human activities. In 2023, the sea surface temperature (SST) and upper 2000 m ocean heat content (OHC) reached record highs. The 0–2000 m OHC in 2023 exceeded that of 2022 by 15 ± 10 ZJ (1 Zetta Joules = 10 21 Joules) (updated IAP/CAS data); 9 ± 5 ZJ (NCEI/NOAA data). The Tropical Atlantic Ocean, the Mediterranean Sea, and southern oceans recorded their highest OHC observed since the 1950s. Associated with the onset of a strong El Niño, the global SST reached its record high in 2023 with an annual mean of ~0.23°C higher than 2022 and an astounding > 0.3°C above 2022 values for the second half of 2023. The density stratification and spatial temperature inhomogeneity indexes reached their highest values in 2023.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (S300): S300 Roadway Improvements - 817 Complex Soil Sampling and Analysis Plan, Addendum 1 (June 2023)

The purpose of this addendum is to amend and update the S300 Roadway Improvements – 817 Complex [project] Soil Sampling and Analysis Plan (SAP) dated May 2023. Field activities to implement the SAP were completed in May 2023 except for SB-17. SB-17 is therefore included in this addendum. In addition, this addendum amends the SAP by covering an expanded scope of work and project limits. The project limits have been expanded to include areas around Building 818. Sampling at the expanded project area is addressed in this addendum by two additional borings for geotechnical and environmental analyses. The project area consists of the access gate and existing access roads for the Process Area complex. Excavation depths are anticipated to be no deeper than 5 feet from current grade. None of the proposed disturbance areas are within known areas of contamination or mapped controlled excavation area (LLNL 2008). Therefore, this addendum proposes a sampling spacing in the vicinity of Building 818 of about 172 feet (Tier 2) in accordance with the Soil Screening and Management Plan (LLNL 2022). The information contained in this addendum supersedes the May 2023 SAP. However, this addendum only addresses elements of the May 2023 SAP that were modified. Elements of the May 2023 SAP that have not been modified are relevant and will remain in effect.

54 ENVIRONMENTAL SCIENCES↗

Transmission Value in 2023: Market Data Shows the Value of Transmission Remained High in Certain Locations Despite Overall Low Wholesale Electricity Prices

In 2023 additional electricity transmission would have provided the most value for links that crossed between grid interconnection regions in the United States (the Western Interconnection, the Eastern Interconnection, the Texas Interconnection) or crossed between system operator regions within the same interconnection. Many multi-interconnection or multi-region links had values of greater than $\$20$/MWh, or up to $\$175$ million/yr per 1 GW expanded transmission (subject to limits to the depth of the market at each side of the link). In contrast, many links within regions, or between regions in the northeast, had relatively low values in 2023, following the overall decline in wholesale electricity prices in 2023 compared with 2021-2022. The most valuable link in 2023, at $\$61$ /MWh, was between Texas and the Southwest. Multiple events in 2023 (high natural gas prices in the western U.S., and high summer temperatures in Texas and the Southwest) were observed to have driven this high value. Of particular note, high prices in Texas occurred at a largely distinct set of hours from high prices in the Southwest, helping to drive up the value of transmission in total and demonstrating significant value to both regions. This example demonstrates the unique value of transmission (compared to other solutions, such as building local generation resources) in delivering benefits to multiple regions given its ability to connect areas of the country that inevitably face differing circumstances.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Notice of Submittal – 2023 Radionuclide Air Emissions Report for Los Alamos National Laboratory

This report describes the emissions of airborne radionuclides from operations at Los Alamos National Laboratory (LANL) for calendar year 2023 and the resulting off-site dose from these emissions. This document fulfills the requirements established by the National Emissions Standards for Hazardous Air Pollutants in 40 CFR 61, Subpart H – Emissions of Radionuclides other than Radon from Department of Energy Facilities, commonly referred to as the Radionuclide NESHAP or Rad-NESHAP. Compliance with this regulation and preparation of this document is the responsibility of LANL’s Rad NESHAP compliance program, which is part of the Environmental Protection and Compliance (EPC) Division. The information in this report is required under the Clean Air Act and is being submitted to the U.S. Environmental Protection Agency (EPA) Headquarters and EPA Region 6. The highest effective dose equivalent (EDE) to an off-site member of the public was calculated using procedures specified by the EPA and described in this report. LANL’s EDE was 0.43 for 2023. The annual limit is 10 millirem per year, established by the EPA in 40 CFR 61 Subpart H. All measured air emissions are modeled to a single location, known as the Maximally Exposed Individual (MEI). During calendar year 2023, LANL continuously monitored radionuclide emissions at 28 “major” release points, or stacks. The Laboratory estimates emissions from an additional 59 “minor” release points using radionuclide usage source terms in lieu of stack monitoring. Also, LANL uses an EPA approved network of air samplers around the Laboratory perimeter to monitor ambient airborne levels of radionuclides. To provide data for dispersion modeling and dose assessment, LANL maintains and operates several meteorological monitoring towers. From these various systems, a comprehensive evaluation is conducted to calculate the MEI dose for the Laboratory. The MEI can be any member of the public at any off-site location where there is a residence, school, business, or office. In 2023, this MEI location was a business at 129 New Mexico State Road 4 (NM-4), located in the northern end of White Rock. The primary contributors to the off-site dose at this location are the ambient air data at that location combined with the collected potential emissions from unmonitored (minor) sources. Overall, the MEI dose in 2023 is similar to that which has been observed in recent years, and it remains well below the EPA’s 10 millirem per year limit. Doses reported to the EPA for the past 10 years are shown in Table E1.

54 ENVIRONMENTAL SCIENCES↗

SPRUCE Ground Observations of Phenology in Experimental Plots, 2023

This data set consists of one comma separated (*.csv) file containing phenological transition dates, as derived from direct observations of vegetative and reproductive phenology recorded by a human observer, from the SPRUCE experiment during 2023 (2023-03-30 to 2023-11-29), the eighth full year of whole-ecosystem warming (Hanson et al. 2017). Both spring and autumn phenological events are included. Since April 2016, human observers have been directly tracking the phenology of both woody and herbaceous species on a weekly schedule within the SPRUCE experimental chambers, these data are reported in annual ground observations data sets (see Related Data Sets). The observed date reported here is the first survey date in 2023 on which an event/phenophase was definitively observed. This data set also contains a companion file in HTML (*.html) containing figures showing the relationship between the day of year and temperature treatment for different phenological phases by species for 2023.

Marcell Experimental Forest↗

Evaluating China’s Passenger Vehicle Market under the Vehicle Policies of 2021–2023

China is well known for its determination on large-scale vehicle electrification, which currently is mainly driven by fuel economy and electric vehicle policies mixed with the extensive charging infrastructure support and monetary incentives from the government. This study adopted the New Energy and Oil Consumption Credits (NEOCC) model 2020 version, a vehicle policy analysis tool developed by the Oak Ridge National Laboratory, in order to systematically quantify the potential impacts of the “Passenger Cars Corporate Average Fuel Consumption and New Energy Vehicle Credit Regulation”, which is a revised version released in June 2020 for the timeframe 2021–2023, the so-called dual credit policy (2021–2023). It was found that, under the dual credit policy (2021–2023), the sales of hybrid electric vehicles could reach 0.91 million by the end of 2023, which would increase much faster than they did in 2018–2020. The annual sales share of plug-in electric vehicles (PEVs) could reach 11.7%, and the PEV stocks could achieve 11.70 million by the end of 2023 if it keeps the expansion to the level of how it was in 2017. In addition, the BEVs with long electric range (such as 400 km) and the plug-in hybrid electric SUVs could be the most popular PEV types.

33 ADVANCED PROPULSION SYSTEMS↗

Indicators of Global Climate Change 2023: annual update of key indicators of the state of the climate system and human influence

Intergovernmental Panel on Climate Change (IPCC) assessments are the trusted source of scientific evidence for climate negotiations taking place under the United Nations Framework Convention on Climate Change (UNFCCC). Evidence-based decision-making needs to be informed by up-to-date and timely information on key indicators of the state of the climate system and of the human influence on the global climate system. However, successive IPCC reports are published at intervals of 5–10 years, creating potential for an information gap between report cycles. We follow methods as close as possible to those used in the IPCC Sixth Assessment Report (AR6) Working Group One (WGI) report. We compile monitoring datasets to produce estimates for key climate indicators related to forcing of the climate system: emissions of greenhouse gases and short-lived climate forcers, greenhouse gas concentrations, radiative forcing, the Earth's energy imbalance, surface temperature changes, warming attributed to human activities, the remaining carbon budget, and estimates of global temperature extremes. The purpose of this effort, grounded in an open-data, open-science approach, is to make annually updated reliable global climate indicators available in the public domain. As they are traceable to IPCC report methods, they can be trusted by all parties involved in UNFCCC negotiations and help convey wider understanding of the latest knowledge of the climate system and its direction of travel. The indicators show that, for the 2014–2023 decade average, observed warming was 1.19 [1.06 to 1.30] °C, of which 1.19 [1.0 to 1.4] °C was human-induced. For the single-year average, human-induced warming reached 1.31 [1.1 to 1.7] °C in 2023 relative to 1850–1900. The best estimate is below the 2023-observed warming record of 1.43 [1.32 to 1.53] °C, indicating a substantial contribution of internal variability in the 2023 record. Human-induced warming has been increasing at a rate that is unprecedented in the instrumental record, reaching 0.26 [0.2–0.4] °C per decade over 2014–2023. This high rate of warming is caused by a combination of net greenhouse gas emissions being at a persistent high of 53±5.4 Gt CO 2 e yr -1 over the last decade, as well as reductions in the strength of aerosol cooling. Despite this, there is evidence that the rate of increase in CO 2 emissions over the last decade has slowed compared to the 2000s, and depending on societal choices, a continued series of these annual updates over the critical 2020s decade could track a change of direction for some of the indicators presented here.

54 ENVIRONMENTAL SCIENCES↗

2023 Cleanroom Monitoring for OSIRIS-REx

OSIRIS-REx is an asteroid sample return mission that delivered asteroid regolith from Bennu to Earth on 9/24/2023 [1]. Cleanroom monitoring of OSIRIS-REx Curation facilities has been ongoing since 2021 when construction of the OSIRIS-REx lab at Johnson Space Center (JSC) was completed [2]. The monitoring continues inside of the OSIRIS-REx lab in Houston. Monitoring was also conducted on a temporary cleanroom constructed inside a hangar at the Utah Test and Training Range (UTTR) to initially receive the Sample Return Capsule (SRC) upon its landing there. The following reports on cleanroom monitoring that has taken place in the months leading up to as well as after OSIRIS-REx return. Monitoring techniques used include particle counts, deployment of Si wafer witness plates (Balazs, Inc.) and Al foil witness plates, gas sampling (Balazs, Inc.) and microbiological monitoring. We collected particle counts at both the lab at JSC as well as the temporary cleanroom at UTTR. Particle counts were taken monthly from six locations in the lab at JSC. Particle counts were taken from seven locations at UTTR in July, August, and September. The UTTR cleanroom particle counts were taken daily in the five days leading to OSIRIS-REx return as well as consistently the day of return (every 2 minutes and 15 seconds 7:21 am- 6:27 pm) from one location inside the cleanroom. The particle counts at UTTR consistently stayed well within the ranges of its required ISO 7 equivalent classification (352,000 maximum particles/ m3 ≥ 0.5 μm). Most analysis showed that the particle counts were far below ISO 7 requirements (highest measured count was 61,484 particles/ m3 ≥ 0.5 um). but the elevated instances correlated to exterior hangar doors being open. Particle counts were reduced when keeping exterior hangar doors closed. The particle counts at JSC have stayed consistently within their ISO 5 equivalent classification (3,520 maximum particles/ m3 ≥ 0.5 um). In most instances, the counts are much better except in one instance where the count measured 13,381 particles/ m3 ≥ 0.5 um. The high spike in particle counts in the JSC lab correlated with the air handlers being shut down temporarily the previous day. The particle counts taken in the same location quickly reduced and measured 0 when taken a month later with the air handlers on. We deployed 8-inch semiconductor polished Si wafer witness plates for 24-hour periods inside of the OSIRIS-REx Curation lab at JSC (in July, August, September, and November 2023) and the cleanroom at UTTR (July and September 2023) to test for possible organic and inorganic contaminants. We also deployed these wafers inside of the OSIRIS-REx Touch-and-Go sample Acquisition Mechanism (TAGSAM) glovebox (where Bennu sample processing occurs) and desiccator (Bennu sample storage) at JSC in August 2023. These samples were all sent to Balazs for analysis via Thermal Desorption Gas Chromatography Mass Spectroscopy (TD-GC-MS) to quantify organic compounds and vapor phase decomposition inductively coupled plasma mass spectrometry (VPD-ICP-MS) to quantify inorganic contaminants. We collected air samples using an adsorbent tube connected to a pump for six hours (100 mL/minute) inside of both the JSC lab and the UTTR cleanroom. These samples were taken at JSC in July, August, September, November, and December and at UTTR in July and September. Additionally, a sample was taken just outside of the TAGSAM glovebox airlock door in July. These samples were sent to Balazs for analysis of volatile organics in air. Overall, the OSIRIS-REx lab at JSC and cleanroom at UTTR yielded very low organic and inorganic contaminants (similar results to Genesis lab at JSC which is ISO 4 equivalent) except for boron, which is attributed to the borosilicate glass in the fan filter units. We collected monthly surface and air samples inside the JSC lab to monitor potential microbial contamination. We report the recovery rate for each sampling event, which is defined as the number of samples exhibiting bacterial or fungal growth divided by the total number of samples collected. Since the lab was commissioned in 2021 the median recovery rate is 29%. This recovery rate is consistent with other ISO 5 equivalent labs used to curate astromaterials collections. Increases in recovery rate correspond to construction and/or extra activity in the lab. However, increases in recovery rate do not reliably correlate to increases in particle counts, which highlights the need for a dedicated microbial monitoring program for biologically sensitive collections. We sampled the temporary clean room at UTTR in July, August, and September of 2023 to monitor potential microbial contamination. The recovery rate decreased from 80% in August to 29% in September. However, in all instances, the diversity of bacteria and fungi was higher in the UTTR cleanroom than in the JSC lab. We routinely collected more than twenty different organisms from the UTTR cleanroom. In the JSC lab the median diversity is 2 organisms. Based on these results we hypothesize that microbes from UTTR could be transported back to JSC with the Bennu samples. To mitigate this risk, in September of 2023, we implemented additional cleaning procedures in the JSC lab to reduce the bioburden on surfaces that could come into direct contact with hardware used to process Bennu samples. Since adopting these additional cleaning measures, the median recovery rate has decreased to 14%. We did not observe an increase in fungal or bacterial diversity in the lab in the October sampling. We will continue to monitor this trend closely for the next several months. Supported by NASA under Award NNH09ZDA007O and Contract NNM10AA11C.

Rachel Comstock Funk↗

Wind Energy Accomplishments and Year-End Performance Report: Fiscal Year 2023

As the United States' largest source of renewable energy, wind is already playing a vital role in the nation's shift to electricity generated from sustainable resources. Scientists, engineers, and analysts at the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) are propelling our country closer to this clean energy future with new efficient, reliable, and cost-competitive wind technologies and deployment strategies. In Fiscal Year 2023 (FY 2023), NREL received national acclaim for recent wind technology breakthroughs, applauded sustained decades of progress in wind energy research, and heralded new initiatives to support the next generation of wind development. This report and NREL's achievements of the last year set the stage for innovative research to come. Two NREL software innovations used to assess wind technology options were recognized with R&D 100 Awards. The Renewable Energy Potential (reV) model helps planners, developers, and researchers calculate wind energy capacity, generation, and cost for specific facilities, fleets and scenarios. NREL's Simulation and Emulation for Advanced Systems validates transmission and distribution solutions to minimize implementation risks. Both of these tools can be applied to a range of renewable solutions to cut costs and improve the reliability of systems in even the most remote locations. The laboratory commemorated landmark anniversaries for wind energy research facilities and programs managed by NREL. The National Wind Technology Center (NWTC) celebrated 30 years as a world-class hub for renewable energy research. An important component of the NWTC on NREL's Flatirons Campus, the one-of-a-kind 7-megawatt (MW) Controllable Grid Interface wind energy research apparatus, turned 10 this year. The Collegiate Wind Competition completed its tenth annual competition in May 2023. Six years after the grand challenges in wind energy science were first compiled, NREL brought together more than 100 wind energy experts from 15 countries to revisit the field's most pressing research needs. Other key new research initiatives examined ways to simultaneously address the needs for skilled wind energy workers and equitable job opportunities. NREL released the first national-level report evaluating offshore wind industry workforce gaps and ways to build a large, diverse pool of job candidates. The lab also co-hosted the International Partnering Forum's Offshore Wind Workforce Summit as part of its ongoing efforts to address the special challenges of that industry sector. NREL research and development (R&D) for the DOE Wind Energy Technologies Office (WETO) continues to build momentum in its efforts to combat climate change, create clean energy jobs, and promote energy justice. This report provides more detail on these top achievements and other accomplishments made by NREL and its partners during FY 2023 (between Oct. 1, 2022, and Sept. 30, 2023).

accomplishments↗