Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “wind resource data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Wind Energy Accomplishments and Year-End Performance Report: Fiscal Year 2022

Four decades ago, construction was just beginning on experimental turbines at the National Wind Technology Center (NWTC). Today, the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) facility is the centerpiece of the laboratory's Flatirons Campus, a world-class hub for renewable energy research. The nation's shift to 100% clean electricity by 2035 will require a mix of renewable energy sources and strategies - and together, wind and solar energy could account for 60% to 80% of that clean energy resource. In Fiscal Year (FY) 2022, NREL scientists, engineers, and analysts contributed to these visionary goals through their wind energy research. As wind innovations push into new areas, NREL continues to play a vital role in advancing technology and addressing deployment barriers in pursuit of more efficient, reliable, and predictable wind energy systems. FY 2022 wind research and development explored the potential for dramatic growth in land-based systems, the launch of the nation's first commercial-scale offshore installations, and transmission infrastructure buildout. Land-based wind energy is one of the most cost-effective electricity supply options - but utility-scale deployment will require up to 10 times the current number of turbines. An NREL plan addressed this need to accelerate U.S. wind technology rollout at distributed and utility scales. Another project conducted by NREL and the Pacific Northwest National Laboratory (PNNL) helps position the nation's first major offshore wind corridor for success. The WETO-funded Atlantic Offshore Wind Transmission Study is evaluating options for balancing electricity supply and demand, while supporting resilience of the grid and marine industries. WETO, NREL, and other partners are working to enable the enormous supply chain and workforce changes the U.S. wind energy industry will need to meet net-zero-carbon-emissions targets. As part of a seminal series of DOE-funded supply chain studies, NREL analysts reported on the trade-offs involved in manufacturing large volumes of wind technologies, while addressing cost, workforce, and logistics issues. All of this research is supported by NREL's outstanding research teams, tools, data, and facilities. A WETO-funded international wind energy field campaign, the American WAKE experimeNt (AWAKEN), has brought together experts from NREL, PNNL, and Sandia National Laboratories to create the world's most comprehensive set of high-resolution data on wind energy atmospheric phenomenon. This study could lead to more accurate predictions of losses from turbine-to-turbine wake interactions, eventually helping wind plants capture more energy and operators save millions of dollars. In addition, NREL researchers developed testing, modeling, and analysis tools to improve the security of power grids by identifying wind power plant dynamic stability problems. A new Stochastic Soaring Raptor Simulator (SSRS) protects golden eagles from turbine encounters by predicting flight paths. This report provides more detail on these top achievements and other accomplishments made by NREL and its partners during FY 2022 (between October 1, 2021, and September 30, 2022).

accomplishments↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Porting the WAVEWATCH III (v6.07) wave action source terms to GPU

Abstract. Surface gravity waves play a critical role in several processes, including mixing, coastal inundation, and surface fluxes. Despite the growing literature on the importance of ocean surface waves, wind–wave processes have traditionally been excluded from Earth system models (ESMs) due to the high computational costs of running spectral wave models. The development of the Next Generation Ocean Model for the DOE’s (Department of Energy) E3SM (Energy Exascale Earth System Model) Project partly focuses on the inclusion of a wave model, WAVEWATCH III (WW3), into E3SM. WW3, which was originally developed for operational wave forecasting, needs to be computationally less expensive before it can be integrated into ESMs. To accomplish this, we take advantage of heterogeneous architectures at DOE leadership computing facilities and the increasing computing power of general-purpose graphics processing units (GPUs). This paper identifies the wave action source terms, W3SRCEMD, as the most computationally intensive module in WW3 and then accelerates them via GPU. Our experiments on two computing platforms, Kodiak (P100 GPU and Intel(R) Xeon(R) central processing unit, CPU, E5-2695 v4) and Summit (V100 GPU and IBM POWER9 CPU) show respective average speedups of 2× and 4× when mapping one Message Passing Interface (MPI) per GPU. An average speedup of 1.4× was achieved using all 42 CPU cores and 6 GPUs on a Summit node (with 7 MPI ranks per GPU). However, the GPU speedup over the 42 CPU cores remains relatively unchanged (∼ 1.3×) even when using 4 MPI ranks per GPU (24 ranks in total) and 3 MPI ranks per GPU (18 ranks in total). This corresponds to a 35 %–40 % decrease in both simulation time and usage of resources. Due to too many local scalars and arrays in the W3SRCEMD subroutine and the huge WW3 memory requirement, GPU performance is currently limited by the data transfer bandwidth between the CPU and the GPU. Ideally, OpenACC routine directives could be used to further improve performance. However, W3SRCEMD would require significant code refactoring to make this possible. We also discuss how the trade-off between the occupancy, register, and latency affects the GPU performance of WW3.

58 GEOSCIENCES↗

A multi-scale time-series dataset with benchmark for machine learning in decarbonized energy grids

The electric grid is a key enabling infrastructure for the ambitious transition towards carbon neutrality as we grapple with climate change. With deepening penetration of renewable resources, the reliable operation of the electric grid becomes increasingly challenging. In this paper, we present PSML, a first-of-its-kind open-access multi-scale time-series dataset, to aid in the development of data-driven machine learning (ML)-based approaches towards reliable operation of future electric grids. The dataset is synthesized from a joint transmission and distribution electric grid to capture the increasingly important interactions and uncertainties of the grid dynamics, containing power, voltage and current measurements over multiple spatio-temporal scales. Using PSML, we provide state-of-the-art ML benchmarks on three challenging use cases of critical importance to achieve: (i) early detection, accurate classification and localization of dynamic disturbances; (ii) robust hierarchical forecasting of load and renewable energy; and (iii) realistic synthetic generation of physical-law-constrained measurements. We envision that this dataset will provide use-inspired ML research in safety-critical systems, while simultaneously enabling ML researchers to contribute towards decarbonization of energy sectors.

54 ENVIRONMENTAL SCIENCES↗

AmeriFlux FLUXNET-1F US-Me2 Metolius mature ponderosa pine

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Me2 Metolius mature ponderosa pine. This is the FLUXNET version of the carbon flux data for the site US-Me2 Metolius mature ponderosa pine produced by applying the standard ONEFlux (1F) software. Site Description - Site Description before Fire (January, 2002 - August, 2020): The mean stand age is 71 years old and the stand age of the oldest 10% of trees is about 108 years old. This site is one of the Metolius core cluster sites with different age and disturbance classes and part of the AmeriFlux network. The overstory is almost exclusively composed of ponderosa pine trees (Pinus ponderosa Doug. Ex P. Laws) with a few scattered incense cedars (Calocedrus decurrens (Torr.) Florin) and has a peak leaf area index (LAI) of 2.1 m2 m-2. Tree height is relatively homogeneous at about 18 m, and the mean tree density is approximately 339 trees ha-1 (Irvine et al., 2008). The understory is sparse with an LAI of 0.2 m2 m-2 and primarily composed of bitterbrush (Purshia tridentata (Push) DC.) and greenleaf manzanita (Arctostaphylos patula Greene). Soils at the site are sandy (69%/24%/7% sand/silt/clay at 0–0.2 m depth and 66%/27%/7% at 0.2–0.5 m depth, and 54%/ 35%/11% at 0.5–1.0 m depth), freely draining with a soil depth of approximately 1.5 m (Irvine et al., 2008; Law et al., 2001b; Schwarz et al., 2004). Green Ridge Fire: On August 20, 2020, the Green Ridge Fire burned through Us-Me2. The fire was ignited by lightning on August 16th, and grew rapidly to the east over the first few days driven by strong, downslope (westerly) afternoon winds. Fire behavior and observed fire effects were highly heterogeneous due to the localized wind pattern carrying the flaming head of the fire forward, and the efforts being made by suppression resources to contain the fire. The site experienced the full range of fire effects, from <1 m high surface fire that charred litter and duff and only consumed shrubs and herbaceous material to full tree (>15 m) crown fire that consumed 100% of needles, small limbs, and surface fuels at high intensity, leaving only ash and bare soil post-fire. Salvage Logging: From late March to late April 2021, salvage logging by the landowner occurred at the site. Almost all trees within the flux footprint were logged except a small area with lower burn severity, where sap flow and automatic soil respiration measurements are continued since the fire. In August 2022 the primary flux system was moved from the top of the damaged tall tower to a nearby shorter tower centering on the salvage/regenerating footprint.

Hanson, Chad↗

Utilities Perspective on Protection Challenges with High IBR Penetration

Utilities have seen rapid increase in Solar, Wind, and Battery Energy Storage Resources that interconnect to their electric system through Inverters. Inverter-Based Resources (IBRs) have fault current characteristics that are unlike the fault current response of traditional rotating-machine-based generators, which is well known and repeatable. IBR’s non-traditional fault current behavior is due to the IBR control scheme, which is configured to provide a clean AC output but also protect the inverter’s sensitive power electronics devices from damage, one source of which is overcurrent. This results in low fault current magnitude, low or no negative sequence current injection, the variability of sequence component currents, the variability of voltage with respect to current angles, and the lack of inertia. The control scheme also results in a fault current response that can vary between manufactures and between models of the same manufacturer. High penetration of IBRs can adversely affect the protection schemes applied in areas with high penetration of IBRs. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems. This is mainly because the existing protection elements and practices have been designed based on the fault current response of conventional rotating machines. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This presentation identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. Instead of facing on one issue, we are looking broadly on all the challenges that system protection has experienced with high penetration of IBRs. Based on the IBR response from various utilities during real fault events and gathering perspective from different utility SMEs via questionnaire, the presentation summarizes on gathered data and internal experiences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DOE 10658 Project Sensitivity-Driven Wide Area Protection (SWAP) Coordination Tools for IBRs

Utilities have seen a rapid increase in solar, wind, and battery energy storage systems that interconnect to their electric system through inverters. Inverter-Based Resources (IBRs) have fault current characteristics that are unlike the fault current response of traditional rotating-machine-based generators, which is well-known and repeatable. IBR’s non-traditional fault current behavior is due to the IBR control scheme, which is configured to provide a clean AC output but also protects the inverter’s sensitive power electronics devices from damage from conditions such as overcurrent. This results in a low fault current magnitude, low or no negative sequence current injection, the variability of sequence component currents, the variability of voltage with respect to current angles, and the lack of inertia. The control scheme also results in a fault current response that can vary between manufacturers and between models of the same manufacturer. High penetration of IBRs can adversely affect the protection schemes applied in areas with high penetration of IBRs. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems. This is mainly because the existing protection elements and practices have been designed based on the fault current response of conventional rotating machines. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This report identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. Instead of focusing on one issue, this report looks broadly at all the challenges that system protection has experienced with high penetration of IBRs. Based on the IBR response from various utilities during real fault events and gathering perspectives from different utility SMEs via questionnaire, the report summarizes the gathered data and internal experiences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Low-Flow Marine Hydrokinetic Turbine for Small Autonomous Unmanned Mobile Recharge Stations

A prototype low-flow marine current turbine for deployment from a small unmanned mobile floating platform has been developed for autonomously seeking and harnessing tidal/coastal currents. The support platform is an unmanned surface vehicle (USV), in the form of a catamaran with two electric outboard motors and with capabilities for autonomous navigation. The USV utilized is a WAM-V 16 vehicle that has been developed separately with support from the Office of Naval Research (ONR) [1]. The marine current turbine is based on a freestream waterwheel (FSWW), also known as an undershot waterwheel (FSWW), mounted on the stern of the USV. The concept of operation involves the USV autonomously navigating to a designated marine current resource. Upon arrival, the USV anchors itself, aligns with the current, and deploys the FSWW turbine using a custom cable-lift mechanism. The turbine harnesses the local current, and an onboard power-take-off (PTO) device converts the mechanical energy into electricity, which is stored in an onboard battery bank. When energy harvesting is completed, the turbine and the anchor are retrieved and the USV navigates to a selected location. These unmanned at-sea platforms can provide power to other unmanned maritime systems. Specifically, in this project, the power generated onboard can be used to charge aerial drones via a custom flight deck that has been developed for the USV. The recharging capabilities offered by a fleet of such strategically placed recharging stations can significantly benefit aerial drones operating in the maritime domain by eliminating the need to travel back and forth to land or ship based charging stations. The project has resulted in the development of subcomponents, including the FSWW turbine, a novel PTO, an automated anchoring system for the USV, an automated turbine deployment system, and a flight deck with capabilities onboard the USV for landing, direct-contact charging and takeoff of aerial drones. The design and development of these subsystems have culminated in the overall prototype marine hydrokinetic platform (MHK Platform, Fig. 1). Comprehensive lab and field testing have been conducted to validate the functionality and performance of the platform and its components. The project demonstrates the potential for autonomous, unmanned systems to harness renewable energy from marine currents, and provide sustainable power solutions for maritime applications such as coastal surveillance and environmental monitoring; shoreline mapping; search and rescue; oceanographic research; inspection and maintenance of offshore energy installations like wind turbines and oil rigs; oil spill response; maritime disaster response; and aerial surveys, as well as facilitation of data transfer drones and shore stations.

16 TIDAL AND WAVE POWER↗

Multiparameter Constraints on Empirical Infrasound Period-Yield Relations for Bolides and Implications for Planetary Defense

How effective are methods for estimating bolide energies from infrasound signal period-yield relationships? A single global period–energy relation can obscure significant variability introduced by parameters such as the atmospheric Doppler wind profile and the bolide’s energy deposition profile as a function of altitude. Bolide speed, entry angle, burst altitude, and multiepisode fragmentation may all play a role in defining the detected period of the shockwave. By leveraging bolide light-curve data from the Center for Near Earth Object Studies, we re-examined the period–energy relation as a function of these parameters. Through a bootstrap approach, we show that various event subsets can deviate from widely cited period–energy models and we identify which specific conditions most strongly reshape the period–energy scaling. The results define both the fidelity and reliability of period–energy relations when no additional data beyond the infrasound record is available and improve the outcome when supporting data from bolide trajectories and light curves are included. Ultimately, these findings expand the scope of earlier models, providing a nuanced and robust framework for infrasound-only yield estimation under a range of bolide scenarios.

Planetary science↗

Evaluating the Grid Impact of Oregon Offshore Wind [Slides]

This analysis used high-resolution offshore wind data and a detailed production cost model (PCM) of the Western Interconnection to explore the value and operational impact of integrating offshore wind along Oregon's coastline. Leveraging local technical stakeholder expertise and input, we determined a set of scenarios to explore. These scenarios vary both offshore wind capacities and the Western Interconnection generation and transmission infrastructure. From the scenario modeling and analysis, we identified the following key findings. In addition, we simulated a subset of the scenarios for a range of historical weather years (2007-2013), to understand the robustness of our findings to different weather conditions. Trans-coastal transmission constraints and congestion are the key drivers to the curtailment of Oregon offshore wind. Once power can be delivered into the Willamette Valley, there are few system constraints that lead to a significant curtailment of offshore wind off the coast of Oregon. Approximately 2.6 GW of installed offshore wind capacity can be integrated into Oregon's power system without major upgrades to trans-coastal transmission while avoiding significant curtailment. The system value provided by offshore wind ranges between $\$65$ /MWh and $\$85$ /MWh across the various scenarios considered. Offshore wind heavily influences the flow of the cross Cascade transmission. Across all scenarios, we found a robust relationship of approximately 500-550 MW decrease in the hourly flow of the cross Cascade transmission for every 1,000 MW of hourly offshore wind generation. However, we also found there was not a strong relationship between the highest cross-Cascade transmission flow hours and high offshore wind generation, limiting the extent to which offshore wind can be considered a non-wires alternative to cross cascade transmission. Depending on the meteorological year, 880-1,580 MW and 1,650-3,100 MW can be counted on to serve coastal loads with 2.6 GW and 5 GW of offshore wind capacity, respectively. Offshore wind allows for more optimal daily and hourly scheduling of hydropower, while still complying with various technical and regulatory constraints on the water resource. Oregon offshore wind has the potential to contribute to the evening net load peak in California (i.e., mitigate duck curve challenges), however transmission congestion between California and Oregon limits this contribution. Co-located storage at the point of interconnection for offshore wind reduces curtailment when trans-coastal transmission is not upgraded, providing a non-wires alternative to increase offshore wind capacity beyond 2.6 GW.

17 WIND ENERGY↗

Models and Strategies for Optimal Demand Side Management in the Chemical Industries

Deregulation and the increase of renewable electricity generation from wind and solar photovoltaics have transformed the U.S. electricity market. Economic and environmental benefits notwithstanding, the presence of renewables has increased variability and uncertainty on the supply side of the grid. Managing demand, rather than generation – a strategy referred to as “demand response (DR)” – is an attractive approach for mitigating this imbalance. DR efforts aim to reduce electricity usage during peak demand times, lessening stress on the grid. Industrial users are particularly attractive entities for DR participation since they present large, localized loads that can provide significant relief on grid demand and –unlike other large loads, such as buildings – are minimally dependent on human needs and preferences. In this project, we accomplished three main objectives. (1) We developed data-driven low-order DR scheduling-relevant dynamic models of chemical processes. Concurrently, we studied the formulation and solution of the associated optimal DR production scheduling problems. (a) A prototype air separation unit (ASU) model was used to generate simulated operating data for initial modeling efforts, which enabled the later use of industrial data for data-driven modeling. (b) We utilized Hammerstein-Wiener (HW) and Finite Step Response (FSR) models to represent nonlinear plant dynamics. (c) The HW models were linearized using exact linearization so they could potentially be embedded in power system models, which are formulated as mixed integer linear programs (MILPs). (d) We solved DR optimization problems under uncertainty and found that even naïve predictions of electricity price and product demand led to significant cost savings benefits. (2) Our DR scheduling optimization problem formulations are amenable to real-time solution. (a) We utilized Lagrangian Relaxation (LR) to efficiently solve the optimization problem by decoupling subproblems linked by complicating constraints. (b) We have achieved computation times for the 3-day DR scheduling problem of an ASU as low as 1.88 minutes. (3) Our representations of the DR behavior of chemical process as grid-level batteries were embedded in power system models. (a) For a small-scale grid, we found that incorporating the dynamics of the chemical plant in the optimal power flow calculations resulted in better resource management leading to up to 15% and 46% cost reduction for the grid and chemical plant operations, respectively, during periods of power line congestion. We have published several works dedicated to modeling and solving DR optimization problems from the user side. These were published in top peer-reviewed journals and are summarized in this report. The most recent work (and papers in preparation) considers DR scheduling from the grid side. Future efforts will consider networked plants (e.g., air separation units operating on a common pipeline) for DR participation, which is expected to amplify the capabilities of industrial DR participants to perform load-shifting. Our consideration of uncertainty in DR has inspired future directions in this area as well: we plan to develop multistage methods to fully account for the effects of uncertainty in DR scheduling.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Variability in Wind Energy Generation across the Contiguous United States

ERA5 provides high-resolution, high-quality hourly wind speeds at 100 m and is a unique resource for quantifying temporal variability in likely wind-derived power production across the United States. Gross capacity factors (CF) in seven independent system operators (ISOs) are estimated using the location and rated power of each wind turbine, a simplified power curve, and ERA5 output from 1979 to 2018. Excluding the California ISO, the marginal probability of a calm (zero power production) is less than 0.1 in any ERA5 grid cell. When a calm occurs, the mean co-occurrence across wind-turbine-containing grid cells ranges from 0.38 to 0.39 for ISOs in the Midwest and central plains [Midcontinent (or Midwest) ISO (MISO), Southwest Power Pool (SPP), and the Electric Reliability Council of Texas (ERCOT) region], increasing to 0.54–0.58 for ISOs in the eastern United States [Pennsylvania–New Jersey–Maryland interconnection (PJM), New York ISO (NYISO), and New England ISO (NEISO)]. Periods with low gross CF have a median duration of ≤6 h, except in California, and are most likely during summer. Additionally, gross CF exhibit highest variance at periods of 1 day in ERCOT and SPP; on synoptic scales in MISO, NEISO, and NYISO; and on interannual time scales in PJM. This implies differences in optimal strategies for ensuring resilience of supply. Theoretical scenarios show adding wind energy capacity near existing wind farms is advantageous even in areas with high existing installed capacity (IC), while expanding into areas with lower IC is more beneficial to reducing ramps and the probability of gross CF falling below 20%. These results emphasize the benefits of large balancing areas and aggregation in reducing wind power variability and the likelihood of wind droughts.

17 WIND ENERGY↗

CORE-CM in The Greater Green River and Wind River Basins: Transforming and Advancing a National Coal Asset (Final Report)

The following document summarizes project results from “CORE-CM in the Greater Green River and Wind River Basins: Transforming and Advancing a National Coal Asset”. This project is part of the U.S. Department of Energy’s (“DOE”) National Energy Technology Laboratory’s (“NETL”) Carbon Ore, Rare Earth Elements, and Critical Minerals (CORE-CM) Initiative. This report concludes that the Greater Green River and Wind River Basins (GGRB-WRB) Area-of-Interest (AOI 9) is the ideal region for continued research and development in progressing the broader CORE-CM goals outlined by the DOE. Based upon the extensive analyses of technical, social, and community criteria, this report illustrates that the GGRB-WRB hosts numerous potential CORE-CM feedstocks (both coal- and non-coal based), diverse opportunities for utilizing existing industrial waste streams, ample infrastructure and industry to support new CORE-CM-focused technologies, and a highly motivated, well educated, and adaptable workforce to further develop the regional and national CORE-CM supply chain. Additionally, some potential solutions for technological gaps suggest that the GGRB-WRB's diverse resources can play a significant role in achieving the national goal of critical materials independence. With full community participation, meaningful involvement of regional Tribal Nations, and building upon the stakeholder engagement demonstrated here, the GGRB-WRB region presents a unique opportunity for advancing the CORE-CM Initiative. This project was designed to bring together coal-based communities and stakeholders from across the GGRB-WRB to advance new industries for CORE-CM resources. The University of Wyoming (UWyo) School of Energy Resources (SER) led a project team of experts from the Colorado Geological Survey (CGS), Colorado School of Mines (CSM), Los Alamos National Lab (LANL), and local community colleges. Input from basinal, regional, and national experts bolstered the coalition in order to advance the mission of DOE’s CORE-CM initiative and develop the domestic CORE-CM supply chain. Phase I of this project was designed to address the goal of developing and catalyzing economic growth, job creation, and technology innovation in the GGRB-WRB of Wyoming and Colorado, by increasing the supply of CORE-CM to manufacturers of non-fuel Carbon Based Products (CBP) and products reliant upon CM. The GGRB-WRB CORE-CM project worked toward providing benefit through several avenues of performance and research. • Develop a coalition team to achieve project objectives • Complete detailed assessments, including State-of-the-Art (SOTA) Data acquisition of potential CORE-CM materials across the AOI, and meaningfully contributes to DOE’s CORE-CM goals nationally. • Strategic planning for regional economic growth, job creation, and associated technology innovation around coal materials, including plans to maximize the development of potential CORE-CM resources and technology by creating regional public-private partnerships. • Define regional economic growth potential around existing strengths, energy infrastructure, business and industry, including planning for the leveraging of highly trained workforces, existing and novel coal technologies, and energy infrastructure in development of CORE-CM supply chains. • Develop a preliminary strategic plan for increasing the supply of CORE-CM materials to manufacturers of non-fuel Carbon Based Products (CBP) and products reliant upon CM, focusing on regional strengths that result in an emerging diversified CORE-CM economy. • Assemble a committed network of stakeholders and communities that learn about, accept, and grow new energy technologies within coal regions. Additionally, the project team significantly contributed to the CORE-CM Initiative’s national goals, through cross-regional scoping, collaborating with CORE-CM projects in other AOIs, and including parallel regional project experts. In addition to active inclusion and meaningful engagement and contribution to DOE-led working groups, the project team focused on engaging with regional communities including Tribal Nations, economic development groups, and regional government organizations. The project’s CORE-CM development and commercialization plan identified diverse CORECM feedstocks, potential routes towards integration with existing industries, methods for supply-chain development that leverage existing infrastructure and businesses considering the regional economy, identified entry barriers for incorporating traditional and new technologies in those supply chains, recognized opportunities for public-private partnerships to develop technology innovation centers, identified diverse workforces, and conducted stakeholder outreach and education to build a community of understanding on CORE-CM potential in the GGRB-WRB region. Detailed task descriptions can be found in each chapter.

01 COAL, LIGNITE, AND PEAT↗

OPTOM: Optimization of Parabolic Trough - Operations & Maintenance

The US Department of Energy’s SunShot goals look to reduce the cost of Concentrating Solar Power (CSP) technology to 5¢/kWh for baseload plants. This is about a 50% reduction from current costs. To achieve this cost target, a significant reduction in operation and maintenance (O&M) costs of 40 to 50% is likely needed. Advances are needed in the O&M practices of CSP plants if the technology is to achieve the SunShot cost goals. Digitization of plant performance and O&M data has become a new best practice in the world of renewable energy asset management. Owners and operators of large photovoltaic and wind power plants are working to digitize performance and O&M data at their existing assets, to improve their management of the facilities, to increase performance, reduce O&M costs, and lower the overall life cycle cost of ownership. CSP power plants are behind the curve of other technologies on the digitization of plant information to aid in the plant asset management. This project directly addresses the objective of digitizing the O&M data of the solar field, focusing on three areas: 1) creating a framework for sharing data and information, 2) creating a system for monitoring and managing the maintenance of the solar field collectors, and 3) developing analytic tools to identify issues in the solar field. According to the NREL CSP Best Practices Study, the current practice at many CSP plants is to rely on paper lists, spreadsheets, and email for monitoring and managing problems and maintenance in the solar field. The key element to digitize solar field O&M is the creation of a centralized data archive that all users and systems can interface with. This project developed a centralized relational database framework that allows users and applications to access and share data. Conventional power plants utilize Computerized Maintenance Management Systems (CMMSs) to track the corrective, preventive (scheduled), and predictive maintenance of equipment and subsystems in the power plant. CSP plants use these systems in the power block, but while these systems specialize at tracking maintenance on up to thousands of pieces of equipment, they are not well suited for tracking the tens or hundreds of thousands of components in large commercial CSP or photovoltaic solar fields. In this project we developed a new software application referred to as FieldStatus (TM). This is a specialized database program that is used to track the status of each collector and its components. This application is designed to complement the existing CMMS to enable improved tracking and management of maintenance activities in the solar field. One of the major maintenance tasks for solar fields is maintaining the cleanliness of the mirrors. Although seemingly a relatively straight forward task, it has often proven challenging to maintain high levels of cleanliness in an efficient and cost-effective manner. This project developed new tools and metrics for monitoring and optimizing solar field cleaning resources and overall solar field cleanliness.

14 SOLAR ENERGY↗

Hydrogen Energy Storage Integrated with a Combined Cycle Plant

A project is being developed that will build upon the existing infrastructure and resources at the Intermountain Power Project (IPP) site to provide reliable, dispatchable energy and to support the transmission of renewable energy resources while transitioning to an economical green energy future. The concept study depicted in this report outlines a techno-economic optimization to fulfill the demand for 30% vol hydrogen co-firing in the IPP 840 MW advanced class combined cycle power plant. In an initial step, a site assessment concluded the site has sufficient land available to co-locate a hydrogen production and storage facility. The team evaluated and defined a scalable concept that considered technology characteristics, including input and output models to be used for optimization purposes. The concept for the hydrogen production and storage system integrates multiple technologies, to determine system size and scalable approach, for each of the technologies evaluated, the team defined component and subcomponent sizes, minimum and maximum capacity, modularity, component utility consumption (electric, water), component flexibility and servicing, layout, and technology status, as well as technology alternatives. For hydrogen generation, the project considers Siemens Energy’s Silyzer-300 (S300) technology, a 17.5 MW modular Proton Exchange Membrane (PEM) electrolyzer. For the S300 configuration, the team determined that three S300 arrays, or approximately 1,000 kg/hr, per block would yield a compact block design. This configuration results in a fairly wide and flexible arrangement that fits well into the spaces available at the site. Therefore, the overall design approach is based on multiple identical blocks of 3 arrays to minimize engineering cost and optimize constructability. In parallel, a transmission screening study was conducted to determine any potential transmission constraints from the energy sources that could feed the hydrogen production equipment. The study results show that minimum transmission constraints would be encountered to deliver 400 MW renewable generation from southern California, or south-central Wyoming. At last, the techno-economic analysis concluded that a scenario that uses solar and wind power yields the lowest levelized cost of hydrogen (LCOH 2 ) production and the lowest cost per tonne of CO 2 reduced. In this optimized scenario, the hydrogen production plant was determined as 6,201 kg/hr and the hydrogen storage (underground cavern) was determined as 4,600 tonnes. The resulting capacity factor for the hydrogen production plant was 66.33% with 8,745 operating hours in one year. This techno-economic analysis provided various options for integrating hydrogen storage at the Intermountain Power Plant site to co-fire the CCPP units. The results provide insightful data about the magnitude of capacity needed and the economics of producing hydrogen and reducing CO 2 emissions.

08 HYDROGEN↗

PR100 One-Year Progress Summary Report: Preliminary Modeling Results and High-Resolution Solar and Wind Data Sets

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a 2-year study by the U.S. Department of Energy's (DOE's) Grid Deployment Office and six national laboratories to comprehensively analyze stakeholder-driven pathways to Puerto Rico's clean energy future. In Year 1 of the study, the PR100 team rigorously modeled and analyzed scenarios that meet Puerto Rico's renewable energy targets and achieve short-term recovery goals and long-term energy resilience. This report, which summarizes PR100 progress in Year 1, provides considerations that can inform potential funding and implementation decisions by key federal and local agencies and stakeholders. The summary report follows the publication in July 2022 of a PR100 Six-Month Progress Update (in English and Spanish), as well as public webinars in February 2022 to kick off the study and in July 2022 to present the 6-month update. A final written report and web-based visuals will be published in late 2023. All publications and public events associated with the study will be available in Spanish and English. This report is also available in Spanish https://www.nrel.gov/docs/fy23osti/85144.pdf.

100%↗

Irrigation Modernization Task 4: Accelerating Energy Solutions (FY2022 Final Report)

This report offers insights on energy solutions for irrigation modernization that serve the needs of farmers as well as residents and industry in the local community. Solutions are found in the irrigation districts where local generation from renewable energy sources – solar, hydro, and wind – can be combined with energy storage and customer loads. These combined resources configured in microgrids can lower costs during peak loads and provide resiliency by maintaining electricity supply during outages. The goal of this project, as stated in the FY2022 AOP, is to promote realization of energy solutions that are tailored to physical location, community, infrastructure, and energy value streams. Further, it is to develop examples of how to increase value of, and overcome barriers to, energy solutions in the context of irrigation modernization. In pursuit of that goal, the project looked at options for: 1) Reducing the cost of energy consumed in irrigation systems, 2) Increasing the revenue from surplus power generation, and 3) Deploying new power generation configured as part of a local microgrid. Potential solutions to reducing energy costs and increasing surplus power revenue revolve around addressing regulatory and legal constraints tied to how power is purchased by and sold to the irrigator or irrigation district. Some headway was made in identifying barriers and ways to push utilities to be more accommodating to distributed energy sources; however, for the most part, real progress hinges on changes at the regulatory and legislative level. Deployment of local, renewable generation systems can be implemented provided the economics of the project and the location are favorable. In concert with Famers Conservation Alliance and Energy Trust of Oregon, a number of approaches were studied in the past year, including off-grid solar powered pumps, grid-tied community solar projects, and in-conduit canal hydropower systems. Ultimately three viable projects were identified: 1) North Unit Irrigation District/City of Redmond, Oregon Critical Facility Microgrid – offers combined in-conduit hydro and solar power generation. 2) Wallowa County/Joseph, Oregon Irrigation System Upgrades – centered on upgrades to a non-powered dam that will add a turbine as well as in-conduit power in canal feeders downstream. 3) Medford, Oregon Wastewater Treatment Plant Biogas Cogeneration System – centered on building out biogas storage and grid upgrades to power the plant, sell excess power, and provide emergency backup power (supplanting a diesel generator). Each of these projects has characteristics that broaden the understanding of the value of microgrids employing renewable energy to achieve resiliency and net-zero carbon goals. The first two projects are centered on new hydropower systems. Although the Medford project is only tangentially tied to an irrigation district, it was selected for study analysis as it was the only one mature enough (with sufficient data) to complete an analysis within this project year. Thus, we chose to move forward developing a case study, in concert with the Community Water-Power Resilience project, to demonstrate a method for evaluating such projects. Essentially, this case study serves as a template for studies to be carried out next year that more directly involve irrigation system hydropower, e.g., the project at the Wallowa County/Joseph, Oregon Irrigation System. Lastly, it is recognized that the locations and case studies in this report are all located in Oregon. We recognize this as a limitation. While the intent is not to ignore other states or regions, this result is driven by the fact that we have cultivated a collaboration with non-profit entities in Oregon that focus on these topics – Farmers Conservation Alliance and Energy Trust of Oregon. These partners were central to identifying projects that may be good fits for this program. A goal in the coming year is to establish collaboration with entities in other states/regions that, similarly, can connect us to potential projects in their geographic area. The potential benefits from the WPTO’s support for demonstration projects as energy solutions in irrigation districts include: (1) Alternative power supplies for communities and farms using renewable, carbon-free energy resources, (2) Cost savings for electricity for communities and farms, (3) Resiliency of power supplies for critical loads when electricity from the grid is not available, (4) Resiliency of power supplies for critical infrastructure in the event of catastrophic events, and (5) Demonstration of irrigation modernization projects that provide resilience and a reduced carbon footprint to irrigation districts and nearby communities. These deployments can serve as vanguards/archetypes spurring similar projects in other districts and states.

13 HYDRO ENERGY↗