Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “utility resource planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Net Zero World COP28 Outcomes Report – Indonesia

This report describes Net Zero World Initiative activities initiated with Indonesia in 2023. The Net Zero World Initiative is a collaborative effort of eight countries, nine U.S. government agencies, 10 U.S. Department of Energy (DOE) national laboratories, and partnering philanthropies and nongovernmental organizations. Its goal is to elevate and enact climate ambition pledges and accelerate the transition to net-zero, resilient, and inclusive energy systems globally. The Net Zero World team, the Government of Indonesia’s Ministry of Energy and Mineral Resources (MEMR), and other stakeholders jointly identified and are advancing action in the four priority focus areas -- Energy Infrastructure Analysis, Island Energy Transition, Building Decarbonization, and Sustainable Transport.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Toward Urban Water Security: Broadening the Use of Machine Learning Methods for Mitigating Urban Water Hazards

Due to the complex interactions of human activity and the hydrological cycle, achieving urban water security requires comprehensive planning processes that address urban water hazards using a holistic approach. However, the effective implementation of such an approach requires the collection and curation of large amounts of disparate data, and reliable methods for modeling processes that may be co-evolutionary yet traditionally represented in non-integrable ways. In recent decades, many hydrological studies have utilized advanced machine learning and information technologies to approximate and predict physical processes, yet none have synthesized these methods into a comprehensive urban water security plan. In this paper, we review ways in which advanced machine learning techniques have been applied to specific aspects of the hydrological cycle and discuss their potential applications for addressing challenges in mitigating multiple water hazards over urban areas. We also describe a vision that integrates these machine learning applications into a comprehensive watershed-to-community planning workflow for smart-cities management of urban water resources.

54 ENVIRONMENTAL SCIENCES↗

Energy Finance Training [Slides]

The Energy 101: Energy Financing Training presentation, developed for the Energy Technology Innovation Partnership Project (ETIPP), provides an overview of energy project financing. It covers fundamental concepts, technologies, considerations, case studies, and additional resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Powering Up Secure and Reliable Operations at the Port of Honolulu's Kapalama Container Terminal

The National Laboratory of the Rockies (NLR) is providing resilience planning support to the Pasha Group, the operator of Kapalama Container Terminal (KCT) at the Port of Honolulu, by exploring how distributed clean energy resources could help the terminal sustain a 36-hour outage and continue emergency operations. The Department of Energy's Energy Transitions Initiative (ETI) aims to advance self-reliant island and remote communities by promoting resilient, affordable, and sustainable clean energy resources.

25 ENERGY STORAGE↗

Eligibility Assessment of Items in the TA-60 Rack Assembly and Alignment Complex Legacy Storage Yard

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (NA-LA), documented and evaluated seven structures in the Technical Area 60 (TA-60) Rack Assembly and Alignment Complex (RAAC) legacy storage yard at Los Alamos National Laboratory (LANL or Laboratory) for listing in the National Register of Historic Places (National Register). This documentation and evaluation was conducted in compliance with Section 106 of the National Historic Preservation Act of 1966, as amended; the Code of Federal Regulations (36 CFR 800); the Programmatic Agreement among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office and the Advisory Council on Historic Preservation Concerning Management of the Historic Properties at Los Alamos National Laboratory, Los Alamos New Mexico (PA)1; and A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (LANL’s Cultural Resources Management Plan (2017). NA-LA makes the following National Register eligibility determinations: la cuna; the rack transporter (jeep, rack trailer, and steering dolly); the Mexia diagnostic rack; the Mexia device canister; the Mexia device mounting stand; and the Mexia target stand are eligible for listing in the National Register, and the second steering dolly is not eligible for listing in the National Register. This National Register evaluation was completed because LANL proposes to develop a consolidated waste facility in TA-60 next to the former RAAC. Across 3.56 acres, LANL proposes to construct an 8,000-square-foot, pre-engineered waste storage building; a 1,500-square-foot office/warehouse building; and 28,500 square feet of covered storage. The development will also include access control features and fencing, parking spaces, and utilities. Additionally, the Laboratory will continue to use the southern part of TA-60-0017 and reuse TA-60-0086 and TA-60-0324 in the development. The consolidated waste facility will operate as a central accumulation area—storing universal waste, mixed low-level (radioactive) waste, hazardous chemicals, and New Mexico special waste—until the waste can be shipped off site.

99 GENERAL AND MISCELLANEOUS↗

Dataset for Blueprinting Electrified Transit System Implementation

This dataset contains the figures and tabulated results generated from a system-level optimization study of transit fleet electrification planning. The dataset does not include executable modeling code required to reproduce the optimization. The dataset includes results for optimized charging infrastructure deployment by location and power level and service block assignments by fuel type, battery capacity selections, and distributed energy resource sizing. It also contains aggregated financial results, capital expenditures, operating cost summaries, net present cost comparisons across scenarios, and quantified air quality impacts. Results are structured to reflect multiple planning scenarios, including heuristic electrification plans, system-optimized configurations, and sensitivity cases with alternative objective weightings. The modeling was developed using publicly available General Transit Feed Specification data from Omnitrans and standardized modeling assumptions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dataset for Blueprinting Electrified Transit System Implementation

This dataset contains the figures and tabulated results generated from a system-level optimization study of transit fleet electrification planning. The dataset does not include executable modeling code required to reproduce the optimization. The dataset includes results for optimized charging infrastructure deployment by location and power level and service block assignments by fuel type, battery capacity selections, and distributed energy resource sizing. It also contains aggregated financial results, capital expenditures, operating cost summaries, net present cost comparisons across scenarios, and quantified air quality impacts. Results are structured to reflect multiple planning scenarios, including heuristic electrification plans, system-optimized configurations, and sensitivity cases with alternative objective weightings. The modeling was developed using publicly available General Transit Feed Specification data from Omnitrans and standardized modeling assumptions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Addressing Regulatory Challenges to Tribal Solar Deployment (Abbreviated Final Technical Report)

Tribal land in the United States represents approximately 2% of the country’s total landmass and holds more than 5% of the solar photovoltaic potential (Doris, Lopez, and Beckley 2013). Though many Tribes have explored options to install solar photovoltaic (PV) generation capacity on their land, regulatory hurdles have often prevented them from doing so. The National Renewable Energy Laboratory (NREL) and the Midwest Tribal Energy Resources Association (MTERA) partnered on this 3-year project, Addressing Regulatory Challenges to Tribal Solar Deployment. The project sought to unlock Tribal solar potential by bringing together Tribal, regulatory, utility, and other stakeholders to articulate key barriers to Tribal solar PV adoption and develop replicable solutions.

14 SOLAR ENERGY↗

Wind as a Distributed Energy Resource

Distributed wind can be installed in a wide range of locations and wind conditions, supporting millions of systems and thousands of gigawatts of power production capacity. As a result, utilities, communities, and nations are looking to distributed generation as an effective way to meet future energy needs. This fact sheet provides an overview of distributed wind, including where distributed wind projects can be located, and how U.S. and international research supports distributed wind applications. This fact sheet was produced as a resource for the International Energy Agency Task 41 members to use as an educational resource.

behind-the-meter wind energy↗

City of Largo Clear Sky Assessment Process: Prioritizing Solar + Storage for Resilient Facilities & Communities

The Clear Sky Tampa Bay project was a 15-month collaborative research effort to support solar + storage deployment for community resilience in Florida. The Clear Sky Decision Support Toolkit is a collection of resources designed to support users in conducting solar + storage prioritization and feasibility screening assessments at critical facilities. The Tampa Bay Regional Planning Council worked with four local governments in the region to test and apply the Toolkit. This case study series describes how each partner government used the Toolkit and highlights key insights and lessons learned that other users could follow to replicate the process. The City of Largo used the Clear Sky Decision Support Toolkit to advance community solar + storage resilience goals by collaborating with staff across departments and disciplines and engaging with utility stakeholders. The City of Largo conducted an analysis of its Wastewater Treatment Facility (WWTF), which processes an average of 43 million gallons of wastewater daily. Water treatment operations are both critical and energy intensive, requiring sustained energy throughout the day.

14 SOLAR ENERGY↗

Robust VAR Capability Curve of DER with Uncertain Renewable Generation

Active distribution system with high penetration of inverter based distributed energy resources(DER), can be utilized for var-related ancillary services at the transmission side interface. In order to utilize the DER flexibility, transmission system operator must be presented the aggregated DER flexibility of distribution system. However, the uncertainty in renewable generation, questions the credibility of aggregated capability curve in practice. In this paper, we incorporate the uncertainty into aggregation process to develop capability curve while preserving the real physics (unbalance and lossy nature) of distribution system. The Resulting capability curve with the associated probability can be harnessed by the TSO for decision making for both planning and operation.

Kar, Aditya Shankar↗

Guidelines for Home Energy Professionals: Standard Work Specifications (SWS) Maintenance Charter and Procedures

The SWS were built by industry, for industry, and DOE and NREL facilitated the process to create them. The goal of the SWS maintenance process is to continue the consensus-based engagement to ensure the SWS content remains a relevant resource for promoting industry- accepted practices and maintaining consistency throughout the industry. This SWS Maintenance Charter and Procedures document defines the SWS maintenance process to provide transparency to stakeholders in how the SWS are maintained.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Powering Data Centers with Clean Energy: A Techno-Economic Case Study of Nuclear and Renewable Energy Dependability

Rising data demands from artificial intelligence (AI) and large language models (LLMs) generating images, videos, and text have prompted increased need for larger and more robust data centers in the United States. Major companies interested in these larger data centers face the choice of linking them to existing regional grids, building stand-alone power supplies onsite, or a combination of both. The request, review, and approval process for new transmission lines to grids in the United States, however, has grown in recent years to times spans rivaling those of new construction for nuclear power plants. Building an islanded power supply for each data center is therefore becoming a prominent option. In this case study, several technologies are modeled in techno-economic simulations for long-term system costs subject to fixed electricity demand from a singular data center. A 250 MWe data center is assumed with additional 50 MWe for resiliency. Techno-economic simulations are conducted using the Holistic Energy Resource Optimization Network (HERON) software, which is a part of the Framework for Optimization of Resources and Economics (FORCE) tool suite. Technologies considered include solar, wind, lithium-ion batteries, and several types of nuclear reactors: large-scale reactors, small modular reactors, and microreactors. A low- and high-cost estimate for each technology is assumed to develop a range of expected economic performance. Low-cost estimates included several clean energy production tax credits. Different combinations of renewable energy generators with nuclear reactors are considered, ranging from a fully renewable-powered data center to a fully nuclear-powered data center. Historic time series of wind and solar availability from the Texas grid are used to train a reduced order model; this model then generates unique time series with similar characteristics of the training dataset. Multiple scenarios of weather and subsequent operations are simulated for each renewable-nuclear combination to determine total costs throughout the project lifetime. Fully renewable-powered configurations required large amounts of installed capacity (GW scale) in the simulations to meet the fixed demand of the data center. This is due to some scenarios in the historical dataset which captured low-wind and low-solar days, requiring over-building of these technologies as well as batteries to compensate for the low amounts of electricity generation. Fully nuclear-powered configurations outperformed the fully renewable and mixed renewable-nuclear configurations in terms of cost, with ranges between $1B and $10B in 2023 USDs compared to $40B+ for fully renewable configurations. Of the nuclear technologies, small modular reactors performed better economically than large-scale nuclear models due to lower projected capital costs, and both performed better than the microreactor models. These results demonstrate the applicability of firm, dispatchable electricity resources from baseload generators like nuclear power plants for operating facilities that run at constant power without daily variability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Power Supply Options for the Marpi Landfill, Saipan: Feasibility Study

The Marpi Landfill, located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase the use of sustainable energy within the CNMI. CNMI has a 20% target for renewable energy consumption, as documented in Sustainable Development Goal #7 in the Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (GPO 2014). To accomplish these goals, the U.S. Department of Energy, through its Interagency Reimbursable Work Agreement with the Federal Emergency Management Agency, funded this feasibility study to assess and prioritize power supply options for the landfill. The availability of solar and wind resources varies seasonally, as does the load. A BESS can help to balance mismatches between generation and load on short (hourly or daily) timescales, but not across seasons. The microgrid scenarios evaluated for Marpi consider options for technology combinations that will both meet the load and utilize available resources, despite the challenge presented by higher loads and lower solar and wind availability during the rainy season, depicted in Figure ES-2. The seven scenarios evaluated are summarized in Table ES-1. Each scenario’s configuration was optimized to include component capacities that reduce capital and operating costs, meet the load, and minimize carbon emissions, as feasible. The costs and levelized cost of energy (LCOE) shown do not assume the use of any grant funding or incentives, although these options were also evaluated. To assist with decision-making, a prioritization matrix (Table ES-3) was created to compare the microgrid scenarios evaluated in this feasibility study according to various stakeholder priorities. The prioritization metrics were chosen based on discussions with OPD and will be finalized through stakeholder feedback. The scenarios were given a score between 1 and 7 for each prioritization metric (the lower the score, the higher the priority), and total scores were calculated using assigned weights based on the relative priority of each metric. The total scores were then ranked to produce a prioritized list of microgrid scenarios based on the metrics most important to the project stakeholders. As shown, scenario 4 (100 kW of solar PV, a 75 kW/300 kWh BESS, and 160 kW of diesel generation) ranks highest.

14 SOLAR ENERGY↗

Hillsborough County Clear Sky Assessment Process: Prioritizing Solar + Storage for Resilient Facilities & Communities

The Clear Sky Tampa Bay project was a 15-month collaborative research effort to support solar + storage deployment for community resilience in Florida. The Clear Sky Decision Support Toolkit is a collection of resources designed to support users in conducting solar + storage prioritization and feasibility screening assessments at critical facilities. The Tampa Bay Regional Planning Council worked with four local governments in the region to test and apply the Toolkit. This case study series describes how each partner government used the Toolkit and highlights key insights and lessons learned that other users could follow to replicate the process. Hillsborough County used the Clear Sky Decision Support Toolkit to analyze solar + storage as an additional resiliency feature at its Brandon Support Operation Complex (BSOC). During normal operations, the BSOC houses water utility administration services and workspaces for water and wastewater engineers, facilities maintenance, and environmental management staff. During emergency management activation, the BSOC serves as an emergency hub for Emergency Support Function 3 (ESF-3), which includes public utilities, public works, and engineering staff support members. The BSOC is designated as a critical facility by the County.

14 SOLAR ENERGY↗

Enhancing Cloud Cybersecurity: Prescriptive Controls for Operational Technology

This whitepaper provides strategic insights and recommendations into security cloud-based solutions for electric utilities, encompassing operational technology (OT), virtual power plants (VPP), distributed energy resources (DERs), applications, networks, and data storage as they transition to and leverage cloud infrastructure through managed service providers (MSPs) and cloud service providers (CSPs). Principles derived from established frameworks serve as a foundation for best practices across cybersecurity projects and remove the constraints of settling on a single framework. For organizations that prefer not to integrate a specific framework altogether, elements of the proposed approach could be adopted or tailored to best fit defined requirements and expected functionalities. The Cirrus assessment, a utility cloud feasibility tool, and the roadmap it provides serve as a precursor to this paper, which seeks to be a valuable resource for defining next steps following cloud technology integration feasibility appraisal. With its comprehensive approach to adoption, the Cirrus framework offers strategic guidance on responsibly preparing for or deploying a utility cloud solution. The previously published whitepaper, “Use Case-Informed Framework for Utility Cloud Migration,” details the guiding strategy, research, and deployment of cloud solutions within electric and interconnected grid systems. Before implementing the controls suggested in this document, it is recommended that stakeholders complete Cirrus's cloud integration assessment and pair the results with their unique cybersecurity controls to form a comprehensive cloud-based utility cybersecurity plan. The Cirrus outcome will consider a series of future architectures for the grid before and after the energy transition and evaluate the arguments for and against cloud applications for each electric and interconnected grid layer. This document is a companion to the original whitepaper, "Use Case-Informed Framework for Utility Cloud Migration" to further identify and recommend security controls based on Cirrus’s cloud integration assessment output. The following whitepaper outlines the cybersecurity controls that secure cloud-service models pertinent to the electric sector using the predefined categories identify, protect, detect, and respond and recover. The objective is to outline prescriptive security controls based on the type of architecture and data stored in the cloud. The focus includes dissecting the shared responsibility model and elucidating what on-premises Infrastructure as a Service (IaaS), Platform as a Service (PaaS), and Software as a Service (SaaS) entail. A pivotal consideration in this context is allocating responsibility for foundational cybersecurity aspects—having used Cirrus for the cloud integration assessment. The ensuing controls detailed herein also represent a checklist of controls necessary for a secure cloud transition, equipping utilities with the knowledge to navigate this digital transformation with confidence and strategic foresight in a safe and responsible manner.

42 ENGINEERING↗

GMLC Technical Assistance to States: DER Interconnection Workshop #2 [Slides]

NREL hosted this workshops to help state public utility commissions (PUCs) understand the materials and support available to assist in distributed energy resource (DER) interconnection activities. This workshop focused on "Modern DER Capabilities and Deployment Concerns" and included four speakers, whose material will be posted at https://www.nrel.gov/grid/ieee-standard-1547/workshops.html. The slides in this deck were for the facilitator to provide context to the attendees, as well as additional resources on the topics discussed.

1547↗

Energy Management Information Systems Technical Resources Report

This report illustrates how energy management information systems (EMIS) can enable federal agencies to improve energy performance, reduce costs, and meet energy goals. The guide discusses how to identify and implement needed EMIS functions and capabilities, covering the entire EMIS life cycle including system design, procurement, implementation, and ongoing maintenance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗