Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unpredictability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

AERoBOND Project Summary

Under NASA’s Convergent Aeronautics Solutions (CAS) project, the Adhesive-Free Bonding of Complex Composites (AERoBOND) project investigated off-stoichiometric epoxy polymers for fast, reliable assembly of epoxy matrix composite structures. The project goal was to demonstrate feasibility of the AERoBOND joining method by demonstrating mechanical properties greater than 80% of conventional co-cured materials while reducing structure weight by 1%. The project consisted of three convergent research areas: material and process development, systems analysis, and material and process modeling. Material and process development was the largest component of AERoBOND with approximately 6 FTE and 1WYE of support to formulate and characterize new resins, prepare carbon fiber prepregs, fabricate laminates, measure mechanical properties, analyze failure results, and select material and process improvements. The systems analysis activity estimated the potential reduction in part count and aircraft weight by comparing models of composite wing boxes with no fasteners (co-cured structure), fasteners in major joints (co-cured stringers), and fasteners in all joints. The materials and process modeling activity included a molecular model of the AERoBOND materials system to predict mechanical properties of resins with offset stoichiometry and a process model to predict the effect of resin formulation and processing conditions on the extent of mixing and degree of cure in a finished joint. As the number of airline passenger trips doubles in the next 20 years (IATA/Tourism Economics Air Passenger Forecasts, April 2019), the increased demand for new commercial aircraft is now the single greatest technical challenge to the airframe manufacturing industry. To meet efficiency requirements, new aircraft must be fabricated primarily from high performance structural composites, but manufacturing processes are inherently slow with the largest bottleneck attributed to assembly and installation of fasteners (NASA/TM–2019-220428). Manufactures of commercial transport aircraft are compelled to install more than 100,000 redundant fasteners into bonded joints to prevent failures due to unpredictable weak bonds. In structural adhesive bonds, the interface between adherend and adhesive is nearly two-dimensional making it susceptible to minute quantities of contamination, which can cause weak bonds. Currently, bond strength assessment is only possible through destructive testing (i.e., breaking the joint). For these reasons, regulatory organizations such as the Federal Aviation Administration (FAA) often require redundant load paths in secondary-bonded, primary-structures to alleviate concerns with bond performance. The AERoBOND process enables reflow of matrix resin during assembly to eliminate the material discontinuity at the interface, thereby eliminating the dependence of mechanical performance on interfacial adhesion. The AERoBOND joint is equivalent to the interlaminar region obtained during a co-cure process, so joint performance depends on the cohesive properties of the matrix resin. Conventional co-cured structures, although too costly and complex for large-scale manufacturing, are trusted by manufacturers and regulators, and are certified for flight with few or no redundant fasteners.Systems analysis performed on a composite wing model at the scale of a single-aisle commercial transport aircraft indicated that >20,000 redundant fasteners per wing could be eliminated by implementing the AERoBOND joining method. A total weight reduction of 15% was predicted in a wing box by eliminating fasteners and thinning components that must no longer support localized fastener loads and accommodate fastener dimensions. Interlaminar shear fracture toughness measured by the end-notched flexure test was greater than 1 kJ/m2 (nearly 140% of the co-cured benchmark property), which is greatly in excess of the project goals for mechanical properties. Testing was planned to measure interlaminar tensile fracture toughness as well as interlaminar tensile and shear strengths using the same AERoBOND configuration, but was delayed due to closure of LaRC facilities during the COVID-19 pandemic. The AERoBOND process model is partially validated and available for experimental use. It allows the user to input AERoBOND process parameters such as material composition, laminate configuration, and cure cycle to predict the final cure state of the AERoBOND joint. A preliminary, multi-scale material model was developed to predict AERoBOND joint mechanical properties (stiffness and strength) based on the cure state of the joint provided by the process model. The timing for transition of this technology within NASA is excellent as NASA initiates new enduring projects to address composites manufacturing rate challenges. AERoBOND technology is well suited to AAVP/AATT objectives for rapid manufacturing of a composite wing. A minimal effort (1 FTE/$15k procurement/0 WYE) is proposed in FY21 to continue a minor mechanical testing effort and maintain a SAA with ASX composites to develop commercial quality prepreg material. An RFI with the composites industry is suggested to quantify the technology gap between the current TRL and the TRL needed for transition to industry. A moderate effort [3-4 FTE/$150k/1 WYE (~$115k)] is proposed in FY22 for the “high rate composites manufacturing” project currently in planning. The partnership with ASX Composites will be expanded to produce material for sub-element/element-scale “panel-off” activities. Industry partnerships with airframe manufacturers is an expected component to explore damage tolerance and environmental stability. Further development of multi-scale modeling tools (process model, meso-scale model, and molecular model) is planned to enhance and deliver tools for rapid manufacturing infusion.

Frank Louis Palmieri↗

Lunar Landing and Launch Pad Construction – Concepts and Criteria

When a lander vehicle launches or lands on the Moon, the rocket engine exhaust plume impinges on the surface and interacts with the regolith to create blast ejecta and associated cratering of the surface. Lunar regolith blast ejecta travels at high velocities (>2,000 m/s) for long distances (kilometers) in a vacuum environment [1] creating hazards for surrounding assets and it can also impact the bottom of the lander vehicle, risking damage to the engines, thermal insulation and sensors. Ballistic particles can possibly enter cislunar space and achieve orbit as debris, if the ejecta is sufficiently energetic. The cratering and regolith erosion can endanger the vehicle itself by affecting the soil stability under the landing gear. Landing on unpredictable terrain with varying topography, natural craters and rock hazards is also hazardous risks tipping a lander at dangerous angles in extreme conditions that may also violate maximum slope angles for subsequent launch operations. During launch (Figure 1), an overpressure pulse created by the ignition of the rocket engines can pose significant ejecta risks to the vehicle. Dust clouds raised during landing limit the efficacy of sensors and reduce visibility for the astronaut pilots, creating significant real-time risk during landing site selection by the pilot or computer navigation system. Future lunar spaceports will require mitigations to these launch and landing risks [2]. There are four main objectives of this effort:1) To establish the state of the art in LLP construction methodologies. 2) To propose criteria for trade studies of LLP concepts. 3) To publicly share the authors’ ideas for potential LLP solutions. 4) To serve as the starting point for future development of LLP technologies. Establishing the state of the art in the area of off-Earth Launch & Landing Pad concepts will base-line the work that has been completed thus far and highlight the wide span between current Technology Readiness Levels (TRLs)and operational readiness. The authors aim to communicate the need for funding in this area in the near term by illustrating that there is much work to be completed before a truly viable option exists. Setting forth criteria for trade studies of LLP concepts is important for several reasons. The first and most straightforward is to establish a framework for performing trade studies on LLP concepts. This will enable NASA to select the most promising concepts for continued development, and it will also help technology developers understand how their concepts compare with others and the priorities of development effort.

landing pad↗

ISS Payload Operations Training During the COVID-19 Pandemic: Impacts and Solutions

Introduction: The onset and the protracted duration of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity in 2020. The world’s space agencies and their missions were not immune to the unpredictable and wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that critical function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rapidly rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their scientific missions, providing recurring proficiency and currency material to flight controllers, as well as ensuring new team members are ready to join their colleagues on console. Every element of training was impacted by COVID restrictions. From orientation and introductory classes for new controllers, training for scientists and payload developers, to simulations and advanced lessons, critical On the Job Training (OJT) and final evaluations; all aspects faced new challenges. Operations trainers at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, were forced to rethink, retool, and become more efficient with trainees and training resources in order to continue supporting payload operations on the ISS. Impacts and Barriers to Operations Training: The pandemic started in the United States in early March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to the ISS Payload Operations Center was restricted to only those people supporting console operations. Thus, use of on-site NASA facilities and any trainer to trainee face-to-face interaction was not authorized. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem since NASA had already prepared Information Technology (IT) resources that facilitated remote access to mission resources like classes, documents and teleconferences. However, instructors quickly discovered the classes that they were accustomed to delivering in a large classroom environment did not translate well to remote teaching. The lack of non-verbal communication with the class became a major barrier to instruction. Another significant hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of planning and executing even small simulations proved to be challenging, almost impossible, due to IT technology and public internet limitations. With simulations essentially stopped, as well as the restrictions on most OJT training, trainees were essentially stopped in their advancement towards certification. An additional barrier that had to be overcome was the formal documentation of the curriculum objectives. Even though NASA had been deliberately transitioning to electronic documents for years, some organizations were still relying on “pen and ink” documents to formalize training completion. The logistics of implementing secure and controlled e-signature documents in a standardized, NASA approved format had to be addressed. Lesson Learned and Efficiencies: Once the various limitations were identified, ISS trainers at MSFC discussed, proposed, and prioritized new options and techniques. Transitioning to all electronic learning materials and certifications was a relevantly easy fix. Teaching courses to large and diverse groups took additional shifts in the NASA training paradigm. Likewise, methods and procedures for preparing astronauts for their missions were forced to be revised. Simulation supervisors and their teams were also forced to find more efficient techniques to provide realistic training experience. Communication and approvals from management was essential. In every case, the ISS payload operations instructors found novel and efficient solutions to all functions listed above. This paper will discuss the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS Operations↗

Small Particle Glovebox Experiments - Preliminary Results

A substantial portion of the asteroid samples returned by the HAYABUSA2 and OSIRIS-REx missions will consist of small (submm) components (due to the collection of those particles on the asteroid surface and due to the fragmenting of larger, friable material post-collection). In order to minimize the alteration/oxidation of asteroid regolith, the bulk collections will be stored and curated in nitrogen purged gloveboxes. The processing of small particles in an N2 glovebox will present challenges that are different from those experienced during lunar and meteorite sample processing. Particles in this size range are susceptible to unpredictable electrostatic charging that can result in sample loss during processing operations. Methods for the handling of sub-mm particles have been well developed for environments with ambient atmospheric conditions and relative humidity (RH) ranges between 40-70%. In such conditions, a number of factors can be successfully employed to minimize the effects of triboelectric charging, including the use of Po-210 sources that neutralize excess charge and the utilization of conductive manipulation tools and sample substrates. However, relative humidity levels above 40% also contribute significantly to dissipation of triboelectric effects. We had not previously investigated our charge mitigation methods in a completely dry, nitrogen-purged environment, or whether they would be sufficient in enabling the successful processing of sub-mm samples. Current glovebox configurations in use in our lunar and meteorite curation laboratories are optimized for the processing of macroscopic samples and tools; these glovebox designs are likely unsuitable for the processing of collections for which the bulk collection is comprised of sub-mm components. Small particle sample preparation requires the use of an optical magnification instrument – typically a stereo binocular microscope with at least 20x magnification. Current glovebox designs are not optimized for the utilization or integration of stereo microscopes; while many current cabinets include microscope viewports that enable the use of small, externally mounted stereo microscopes, the focusing methods (usually involving the use of a lab jack) lack the fidelity and precision required for small particle manipulation and imaging. Working distances of higher (>50x magnification) objective lenses may preclude the external use of a stereo microscope through a viewport; in order to successfully manipulate and image very small (< 20m) particles, stereo and digital microscope systems that are integrated within the glovebox should be investigated. Finally, ergonomic considerations for small particle work within a glovebox must be considered to minimize risk of injury to sample processors. In order to investigate some of the unknown parameters relating to small particle processing within an N2 glovebox, we conducted preliminary, qualitative experiments utilizing a small lunar cabinet that was originally used for film development.

C. J. Snead↗

NASA Facts: AERoBOND Project

Sustainability of the commercial air travel industry requires new aircraft with ultra-efficient structures and designs, which will depend largely on lightweight polymer composites and new assembly methods. Manufacturers of commercial transport aircraft are compelled to install thousands of redundant fasteners into bonded joints to prevent failures due to unpredictable weak bonds. The Adhesive-Free Bonding of Complex Composites (AERoBOND) process enables re-flow of matrix resin during assembly to eliminate the material discontinuity at the interface, thereby eliminating the dependence of mechanical performance on interfacial adhesion.

Frank Louis Palmieri↗

Atmospheric Remote Sensing by Microwave Radiometry

The Earth's atmosphere is a puzzle and a concern. Its unpredictable weather has always been a force to be recokoned with, but until recent times, our trust was implicit in the robustness of the atmospheric system as the foundation of our biosphere. Now we are not so sure.

microwave↗

Prototyping an Onboard Scheduler for the Mars 2020 Rover

Efficiently operating a rover on the surface of Mars is challenging. Two factors combine to make this job particularly difficult: 1) communication opportunities are limited, 2) certain aspects of rover performance are difficult to predict. With limited communications, the rover must be given instructions on what to do for one or more Martian days at a time. In addition, the duration of many rover activities can be hard to predict, which leads to unpredictable energy use. Traditionally, conservatism is used to keep the rover safe and healthy. This approach, however can lead to a measurable loss in rover productivity. To regain some of this productivity, the Mars 2020 mission is prototyping the use of onboard scheduling software. The primary objective of this software is to identify and utilize opportunities that arise when actual rover performance is more efficient than the original, conservative prediction.

Benowitz, Ed↗

Modeling Spacecraft Safe Mode Events

Spacecraft enter a ‘safe mode’ to protect the vehicle when a potentially harmful anomaly occurs. This minimally functioning state isolates faults, establishes contact with Earth, and orients the vehicle into a power positive attitude until operators intervene. Though ‘safings’ are inherently unpredictable, mission teams build in time margin during operations to determine root causes and restore functionality. Planning and managing this margin is both critical and enabling on mission architectures dependent on near-continuous operability – such as a low-thrust electric propulsion mission. To better quantify the occurrences and severity of safe mode anomalies, the Jet Propulsion Laboratory (JPL) has assembled a database of safings from past and active missions. Currently nearly 240 records are captured from 21 beyond-Earth missions, stemming from a collaboration between teams at JPL, Ames Research Center, Goddard Space Flight Center, and the Johns Hopkins University Applied Physics Laboratory. This paper discusses the event database, explores a statistical approach in modeling the occurrences and severity of safing events, presents a simulation technique, and details recommendations and future work to benefit future concepts.

Nicholas, Austin↗

Validation of Fault-Tolerant Plans for Europa Clipper

The Europa Clipper mission will explore that icy moon in a series of brief flybys through the Jovian radiation belts. A single event upset in the spacecraft flight computer during these critical scientific periods could jeopardize the success of the mission. Rather than safing and awaiting operator intervention, the Clipper mission envisions limited onboard autonomy that can restore spacecraft state sufficiently to resume the encounter observation plan as rapidly as possible. The contingency plan is contained in an Activity Restart Timeline (ART) that is transmitted in parallel with the nominal plan, which must be co-validated jointly against all spacecraft state and resource constraints amid unpredictable fault timing. A prototype validation tool was built that leverages declarative spacecraft models and automated search techniques to find such potential inconsistencies in the unified contingent mission plan. Early validation results within motivating scenarios are presented.

Ferguson, Eric↗

Evaluation of Opportunistic Contact Graph Routing in Random Mobility Environments

Routing in networks where nodes move randomly is particularly challenging due their potentially unpredictable, and rapidly changing topology. Several routing algorithms have been presented in the literature to address the needs of such networks, most of them implementing variants of controlled network flooding in the hope of successful data delivery. In this note, we compare the results of previous routing algorithms with Opportunistic Contact Graph Routing (OCGR), an enhanced version of Contact Graph Routing (CGR) that is suitable for networks where contacts cannot always be scheduled ahead of time. To perform the benchmark, we simulate a network of nodes moving in a certain space according to the Random Waypoint Mobility Model, and then take measurements of bundle delivery probabilty and overhead ratio as metrics of performance and cost respectively. Through this exercise, we demonstrate that the performance of OCGR is highly dependent on the type of network under consideration (e.g. very sparse vs. densely connected) and the assumed mobility model.

Burleigh, Scott↗

Probabilistic Blast Damage Modeling Uncertainties and Sensitivities

Blast overpressure is the predominant source of ground damage posed by potentially hazardous asteroid strikes. Estimates of the extent, severity, and likelihoods of potential blast damage regions will be one of the key metrics needed to mount civil defense or disaster response plans in the face of an impending impact. However, there are many inherent sources of uncertainty in evaluating the damage, both in characterizing the properties of the incoming object and in the approaches used to model the entry/impact and resulting damage, which make it difficult to produce a single ‘accurate’ or ‘best guess’ prediction of ground damage. The current 2021 PDC hypothetical impact scenario poses a particular challenge due to its short warning time. The need for rapid disaster response to prepare for an immanent impact, combined with lack of observational opportunities to refine basic knowledge about the object’s basic size and properties, make understanding the range and relative likelihood of consequences particularly critical. The potential damage caused by these blasts can be evaluated using a range of modeling and simulation approaches and levels of fidelity. Fast-running engineering-level models can be used to run large numbers of probabilistically sampled cases covering wide variations of uncertain properties or parameters. High-fidelity simulations, on the other hand, can capture more detailed/accurate blast physics, but can only be performed for a small selection of specific cases, requiring many assumptions to be made about the initial object and its unpredictable entry/breakup characteristics. In order to provide a more complete picture of the potential threat for effective disaster response, both types of analysis need to be employed together. In this approach, high-fidelity simulations are used to refine and anchor engineering models, and the probabilistic engineering models are used to evaluate broad parameters spaces and guide selection of the most pertinent simulation cases for a given scenario. This presentation expands upon the probabilistic asteroid impact risk assessments being performed as part of the 2021 PDC hypothetical impact exercise, focusing on key aspects of blast damage modeling uncertainties and sensitivities. We review the current modeling and simulation approaches employed in the current assessment, compare the relative levels of uncertainty stemming from each main element of the problem (i.e., knowledge of the asteroid properties, modeling of the atmospheric entry/breakup and airburst, and estimates of the ground damage from the resulting blasts waves), and highlight any notable trends and sensitivities for the current scenario case.

SMD↗

Interactions Between Two Existential Threats: COVID-19 and Climate Change

The COVID-19 pandemic and climate change are complex existential threats, unpredictable in many ways and unprecedented in modern times. There are parallels between the scale and scope of their impacts and responses. Understanding shared drivers, coupled vulnerabilities, and criteria for effective responses will help societies worldwide prepare for the simultaneous threats of climate change and future pandemics. We summarize some shared characteristics of COVID-19 and climate change impacts and interventions and discuss key policy implications and recommendations.

Climate change adaptation↗

Analyzing Optical Energy Behavior in Tropical Cyclones During Rapid Intensitication

Forecasting rapid intensification (RI) in tropical cyclones is an unpredictable task taken on by forecasters every year. Hurricane Laura made its way through the Gulf of Mexico in August 2020, undergoing RI on August 26, 2020 and strengthening from a category 1 hurricane to a category 4 hurricane in less than 18 hours. The goal of this project was to use data from the Geostationary Lightning Mapper (GLM) aboard the GOES-16 satellite to track lightning over the Western Hemisphere and investigate optical energy during this period of RI. Data was taken from the entire hurricane using a fixed area that captured Laura from 0000-2359 UTC on August 26 and using Python, the sum of the optical energy, average flash extent density (FED), and average flash area were investigated using time series plots to determine if there were any patterns before, during, and after RI. Variations at the beginning and end of RI point to a change in lightning behavior. Along with time series plots, investigating the distribution of values during RI may be a useful in determining if these parameters have any discernable pattern. Applying this methodology to a larger sample of tropical cyclones can provide a better understanding as to how these parameters vary during RI periods.

Kiahna Mollette↗

Latent Cure Epoxy Resins for Reliable Joints in Secondary-Bonded Composite Structures

In high-performance polymer matrix composite assemblies, adhesive bonding is generally superior to mechanical fastening in structural performance and manufacturing efficiency. However, adhesive bonds are susceptible to minute levels of contamination accumulated during assembly that can lead to unpredictable, weak bonds. Current methods of measuring bond strength are all destructive mechanical tests. To overcome these challenges, redundant load paths (e.g., mechanical fasteners) are often implemented in secondary-bonded, primary-structures, which can greatly reduce structural performance. This study investigated reformulated aerospace epoxy matrix resins with stoichiometric offset to inhibit cure of the matrix resin prior to assembly. Inhibited resins can reflow and mix across the joint interface, which eliminates the material discontinuity and forms a homogenous joint with reliable fracture properties. The goal of this study was to develop and demonstrate secondary composite assemblies that are mechanically and microscopically indistinguishable from a co-cured composite joint. This article describes the development of latent epoxy resins, the fabrication of test articles, and the mechanical properties measured from experimental joints compared with conventional, co-cured laminates. Methods of in-line quality control using and infrared spectroscopy and post-assembly forensics are also described. The final mode-II fracture toughness measured from precracked AERoBOND specimens was similar to that measured from co-cured laminates indicating that later cure epoxy materials could be a suitable replacement for secondary bonding.

Polymer-matrix composites (PMCs)↗

Using Flexible Execution, Replanning, and Model Parameter Updates to Address Environmental Uncertainty for a Planetary Lander

Planning in an unknown environment presents a number of challenges: incorrect world models, unpredictable variation in execution, and fixed depletable resources. Productivity in the face of these challenges requires an integrated approach to planning and execution that is capable of accomplishing goals, reacting to variation, and maximizing overall utility. We examine this problem in the context of a Europa Lander concept mission. We model the problem as a hierarchical task network, framing it as a utility maximization problem with a depletable energy resource. Then, we propose a planning and execution framework that responds to feedback using three techniques: flexible execution, periodic replanning, and online parameter estimation and re-goaling. We demonstrate the efficacy of each of these techniques through simulation of a Europa Lander mission, showing higher utility achievement compared to simpler approaches, when presented with variation in energy consumption. We demonstrate that an approach to scheduling and execution that is grounded in decision theory and integrated planning and execution will be an enabling technology for future tightly-constrained planetary surface missions.

Chien, Steve↗

Using Flexible Execution, Replanning, and Model Parameter Updates to Address Environmental Uncertainty for a Planetary Lander

When planning in unknown environments, a planner must ensure robustness to unknown phenomena and manage unpredictable variation in execution. Productivity in the face of these challenges requires an integrated approach to planning and execution that is capable of reacting to variation while still maximizing overall utility. We examine this problem in the context of the Europa Lander mission concept. We propose a planning and execution framework that responds to feedback using three techniques: (1) flexible execution, (2) periodic replanning, and (3) online model parameter and utility updates. The efficacy of each of these techniques is examined through simulation of the Europa Lander concept, showing higher utility achievement compared to baseline approaches.

Chien, Steve A.↗

Reducing Risk of InSight Surface Operations Through High-Fidelity Command Sequence Modeling

Simulating spacecraft behavior is crucial for the success of deep space missions, and failure to do so may result in damages to or the loss of the spacecraft. Many previous deep space missions have made use of ground-simulation of sequenced commanding, at speeds far greater than real time, to predict spacecraft state over time through the execution of onboard sequences. This type of modeling can be done at any fidelity, and most missions have opted to decrease fidelity to reduce cost and complexity. However, NASA’s Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) mission expanded the scope of ground modeling considerably, which has led to numerous benefits over past implementations. This paper will discuss the process and products that InSight created, as well as the lessons learned from successfully operating the spacecraft on Mars. InSight is the first JPL mission to expand the scope of ground modeling to include the uplink of files from Earth to the spacecraft, rather than making the simplification that any command sequences already exist onboard the spacecraft. The advantages of modeling the uplink of files are numerous. First, it allows for accurate modeling of the onboard filesystem of the spacecraft at all points in time, meaning that all file loads and deletions throughout the mission are modeled at the exact moment they are predicted to actually happen. Second, operators can be more certain that dependencies between sequences are not broken due to the dynamic nature of the filesystem as files are deleted, copied, and uplinked. Lastly, spacecraft filesystem tracking allows for management of sequences prior to uplink, limiting the uplink to only new sequences. The onboard filesystem model became crucial to mission success, emphasizing the importance of investing in accurate models before the need for them arises. During daily tactical operations of a spacecraft on Mars, a model is only useful if the results can be interpreted quickly. In this fast-paced environment, it is essential that command products are modeled and reviewed, errors are found and diagnosed, and new command products are redelivered, remodeled, re-reviewed in a timely manner. It is impossible to review the entire model and therefore the results of the model must be condensed and presented in a fashion that is intuitive, easy-to-navigate, complete, and trustworthy. InSight developed a number of innovative sequence review products that are designed to provide operators with the information required to quickly assess the validity of command products and diagnose potential issues. Together, these products provide a complete, yet succinct picture of the command and sequence model to the operators and facilitate a quick assessment of all sequence command products. This paper will cover planning and sequencing innovations made during InSight surface operations, and will compare the tools, processes, and results to those on other missions. Additionally, the paper will cover the flexible, yet robust nature of the planning and sequencing system architecture and how that flexibility allowed for rapid development and response to the unpredictability of Mars.

Cloutier, Kyle↗