Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Use of an ISOCS-based Waste Assay System for Decommissioning Waste at Trawsfynydd - 19526

Magnox UK Ltd. are decommissioning the former Magnox nuclear power stations in the UK, a process that generates a significant amount of radioactive waste, much of it in the Low Level or Very Low Level categories. It is therefore necessary to perform radiometric assay of the decommissioning waste in order to determine the disposal route and to identify items of waste that are Out of Scope of regulatory control and can therefore be free-released. They have recently commissioned a Canberra On Site Assay System (OSAS) for this purpose. OSAS is a high-resolution gamma-ray spectrometry based waste assay system, which makes use of the ISOCS methodology in order to perform the necessary efficiency calibration of the system for use when assaying the various different containers for the decommissioning waste employed at Trawsfynydd: 210 litre drums, Dolav boxes, wheeled bins and Pac-Tec bulk bags of heavier waste. This publication describes the approach used by Magnox in the processing of the decommissioning waste at Trawsfynydd. It also presents details of the OSAS system and how it was calibrated along with the results from the proof testing of the new system, involving comparison with the results from the assay of waste previously assayed using other monitors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Postclosure Inspection and Monitoring Report for Surface Corrective Action Unit 417 at the Central Nevada Test Area, Nevada, Site

This report presents results of the biennial postclosure site inspection conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the surface Corrective Action Unit (CAU) 417 at the Central Nevada Test Area (CNTA), Nevada, site. The report has been prepared in accordance with the Post-Closure Monitoring Plan contained in the CAU 417 Closure Report (NNSA/NV 2001) and a Federal Facility Agreement and Consent Order (FFACO) (FFACO 1996). Responsibility for environmental site restoration of the CNTA was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office to LM on October 1, 2006. This report summarizes investigation activities associated with CAU 417 that LM conducted from July 2014 through July 2016. A postclosure inspection was conducted in 2016 to document the physical condition of the CAU 417 soil covers, monuments, signs, fencing, and use-restricted areas.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

Corrective Action Unit (CAU) 105 is located in Area 2 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 105 is a geographical grouping of sites where there has been a suspected release of contamination associated with atmospheric nuclear testing. This document describes the planned investigation of CAU 105, which comprises the following corrective action sites (CASs): • 02-23-04, Atmospheric Test Site - Whitney • 02-23-05, Atmospheric Test Site T-2A • 02-23-06, Atmospheric Test Site T-2B • 02-23-08, Atmospheric Test Site T-2 • 02-23-09, Atmospheric Test Site - Turk These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 105. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with all CAU 105 CASs are from atmospheric nuclear testing activities. The presence and nature of contamination at CAU 105 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted after the plan is approved.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Investigation Plan for Corrective Action Unit 569: Area 3 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

Corrective Action Unit (CAU) 569 is located in Area 3 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 569 comprises the nine numbered corrective action sites (CASs) and one newly identified site listed below: (1) 03-23-09, T-3 Contamination Area (hereafter referred to as Annie, Franklin, George, and Moth); (2) 03-23-10, T-3A Contamination Area (hereafter referred to as Harry and Hornet); (3) 03-23-11, T-3B Contamination Area (hereafter referred to as Fizeau); (4) 03-23-12, T-3S Contamination Area (hereafter referred to as Rio Arriba); (5) 03-23-13, T-3T Contamination Area (hereafter referred to as Catron); (6) 03-23-14, T-3V Contamination Area (hereafter referred to as Humboldt); (7) 03-23-15, S-3G Contamination Area (hereafter referred to as Coulomb-B); (8) 03-23-16, S-3H Contamination Area (hereafter referred to as Coulomb-A); (9) 03-23-21, Pike Contamination Area (hereafter referred to as Pike); and (10) Waste Consolidation Site 3A.

54 ENVIRONMENTAL SCIENCES↗

VCTR: A Versatile Coupled Test Reactor Concept

The United States has currently no domestic fast neutron test and irradiation capabilities necessary to pursue a strong research and development program related to fast neutron reactors. This lack prevents the testing of fast reactor fuels in a prototypic environment, the testing of new safety features and of new coolants. A new irradiation test reactor is a costly investment that will operate for several decades and the initial specifications are crucial to ensure the relevance of such a facility in the long run. This new test reactor should be highly reconfigurable and allow operation as a fast test reactor or a thermal test reactor or a cou-pled fast-thermal test reactor. This report presents the on-going effort at Idaho National Laboratory (INL) to design a versatile coupled test reactor (VCTR—pronounced Victor) that could fulfill the R&D needs requiring high fast neutron fluxes but also high thermal neutron fluxes in configurations that could not be met in current thermal neutron test reactors such as ATR. The objective of this report is to summarize the efforts undertaken at INL from May 2015 to March 2016 aimed at understanding the main options for designing and building a versatile test reactor, with a primary mission to provide thermal and fast neutrons for irradiation of fuels and materials in a manner complementary to the ATR and HFIR reactors. Other missions can also be considered, including the validation of computer codes and the development of specific reactor technologies.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Accelerated testing of module-level power electronics for long-term reliability

This work has applied a suite of long-term-reliability accelerated tests to a variety of module-level power electronics (MLPE) devices (such as microinverters and optimizers) from five different manufacturers. This dataset is one of the first (only the paper by Parker et al. entitled “Dominant factors affecting reliability of alternating current photovoltaic modules,” in Proc. 42nd IEEE Photovoltaic Spec. Conf., 2015, is reported for reliability testing in the literature), as well as the largest, experimental sets in public literature, both in the sample size (five manufacturers including both dc/dc and dc/ac units and 20 units for each test) and the number of experiments (six different experimental test conditions) for MLPE devices. The accelerated stress tests (thermal cycling test per IEC 61215 profile, damp heat test per IEC 61215 profile, and static temperature tests at 100 and 125 °C) were performed under powered and unpowered conditions. The first independent long-term experimental data regarding damp heat and grid transient testing, as well as the longest term (>9 month) testing of MLPE units reported in the literature for thermal cycling and high-temperature operating life, are included in these experiments. Additionally, this work is the first to show in situ power measurements, as well as periodic efficiency measurements over a series of experimental tests, demonstrating whether certain tests result in long-term degradation or immediate catastrophic failures. Lastly, the result of this testing highlights the performance of MLPE units under the application of several accelerated environmental stressors.

14 SOLAR ENERGY↗

TANK 18 AND 19-F TIER 1A EQUIPMENT FILL MOCK UP TEST SUMMARY

The United States Department of Energy (US DOE) has determined that Tanks 18-F and 19-F have met the F-Tank Farm (FTF) General Closure Plan Requirements and are ready to be permanently closed. The high-level waste (HLW) tanks have been isolated from FTF facilities. To complete operational closure they will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) discouraging future intrusion, and (4) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. Bulk waste removal and heel removal equipment remain in Tanks 18-F and 19-F. This equipment includes the Advance Design Mixer Pump (ADMP), transfer pumps, transfer jets, standard slurry mixer pumps, equipment-support masts, sampling masts, dip tube assemblies and robotic crawlers. The present Tank 18 and 19-F closure strategy is to grout the equipment in place and eliminate vertical pathways by filling voids in the equipment to vertical fast pathways and water infiltration. The mock-up tests described in this report were intended to address placement issues identified for grouting the equipment that will be left in Tank 18-F and Tank 19-F. The Tank 18-F and 19-F closure strategy document states that one of the Performance Assessment (PA) requirements for a closed tank is that equipment remaining in the tank be filled to the extent practical and that vertical flow paths 1 inch and larger be grouted. The specific objectives of the Tier 1A equipment grout mock-up testing include: (1) Identifying the most limiting equipment configurations with respect to internal void space filling; (2) Specifying and constructing initial test geometries and forms that represent scaled boundary conditions; (3) Identifying a target grout rheology for evaluation in the scaled mock-up configurations; (4) Scaling-up production of a grout mix with the target rheology (16 second flow cone value) from 0.25 cubic feet to 4.3 cubic feet. (Ten 0.43 cubic batches were produced because full-scale equipment was not available for the Tier 1A test.); (5) Demonstrating continuous gravity filling of the ADMP mock up test form; (6) Demonstrating continuous gravity filling of 1 inch and 2 inch schedule 40 pipe; and (7) Demonstrating filling of 1 inch and 2 inch schedule 40 pipe from the bottom up by discharging through a tube inserted into the pipes. The Tier 1A mock-up test focused on the ADMP and pipes at least one inch in diameter. The ADMP which is located in center riser of Tank 18-F is a concern because the column for this long-shaft (55 ft) pump is unique and modification to the pump prior to placing it in service limited the flow path options for filling by creating a single flow path for filling and venting the ADMP support column. The large size, vertical orientation, and complicated flow path in the ADMP warrants a detailed description of this piece of ancillary equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fabrication and Pre-irradiation Characterization of a Minor Actinide and Rare Earth Containing Fast Reactor Fuel Experiment for Irradiation in the Advanced Test Reactor

The United States Department of Energy, seeks to develop and demonstrate the technologies needed to transmute the long-lived transuranic actinide isotopes contained in spent nuclear fuel into shorter lived fission products, thereby decreasing the volume of material requiring disposal and reducing the long-term radiotoxicity and heat load of high-level waste sent to a geologic repository. This transmutation of the long lived actinides plutonium, neptunium, americium and curium can be accomplished by first separating them from spent Light Water Reactor fuel using a pyro-metalurgical process, then reprocessing them into new fuel with fresh uranium additions, and then transmuted to short lived nuclides in a liquid metal cooled fast reactor. An important component of the technology is developing actinide-bearing fuel forms containing plutonium, neptunium, americium and curium isotopes that meet the stringent requirements of reactor fuels and materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Robust Design of Reliability Test Plans Using Degradation Measures.

With short production development times, there is an increased need to demonstrate product reliability relatively quickly with minimal testing. In such cases there may be few if any observed failures. Thus, it may be difficult to assess reliability using the traditional reliability test plans that measure only time (or cycles) to failure. For many components, degradation measures will contain important information about performance and reliability. These measures can be used to design a minimal test plan, in terms of number of units placed on test and duration of the test, necessary to demonstrate a reliability goal. Generally, the assumption is made that the error associated with a degradation measure follows a known distribution, usually normal, although in practice cases may arise where that assumption is not valid. In this paper, we examine such degradation measures, both simulated and real, and present non-parametric methods to demonstrate reliability and to develop reliability test plans for the future production of components with this form of degradation.

Lane, Jonathan Wesley↗

Test Results and Comparison of Triaxial Strength Testing of Waste Isolation Pilot Plant Clean Salt

This memorandum documents laboratory thermomechanical triaxial strength testing of Waste Isolation Pilot Plant (WIPP) clean salt. The limited study completed independent, adjunct laboratory tests in the United States to assist in validating similar testing results being provided by the German facilities. The testing protocol consisted of completing confined triaxial, constant strain rate strength tests of intact WIPP clean salt at temperatures of 25°C and 100°C and at multiple confining pressures. The stratigraphy at WIPP also includes salt that has been labeled “argillaceous.” The much larger test matrix conducted in Germany included both the so-called clean and argillaceous salts. When combined, the total database of laboratory results will be used to develop input parameters for models, assess adequacy of existing models, and predict material behavior. These laboratory studies are also consistent with the goals of the international salt repository research program. The goal of this study was to complete a subset of a test matrix on clean salt from the WIPP undertaken by German research groups. The work was performed at RESPEC in Rapid City, South Dakota. A rigorous Quality Assurance protocol was applied, such that corroboration provides the potential of qualifying all of the test data gathered by German research groups.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCT: Module 2.06, Air Sampling Program and Methods, Course 8772

The inhalation of radioactive particles is the largest cause of an internal radiation dose. Airborne radioactivity measurements are necessary to ensure that the control measures are and continue to be effective. Regulations govern the allowable effective dose equivalent to an individual. The effective dose equivalent is determined by combining the external and internal dose equivalent values. Typically, airborne radioactivity levels are maintained well below allowable levels to keep the total effective dose equivalent small. This course will prepare the student with the skills necessary for RCT qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and will provide in-the-field skills.

61 RADIATION PROTECTION AND DOSIMETRY↗

RCT: Module 2.11, Radiological Work Coverage, Course 8777

Radiological work is usually approved and controlled by radiation protection personnel by using administrative and procedural controls, such as radiological work permits (RWPs). In addition, some jobs will require working in, or will have the potential for creating, very high radiation, contamination, or airborne radioactivity areas. Radiological control technicians (RCTs) providing job coverage have an integral role in controlling radiological hazards. This course will prepare the student with the skills necessary for RCT qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and will provide in-the-field skills.

61 RADIATION PROTECTION AND DOSIMETRY↗

RCT: Module 2.03, Counting Errors and Statistics, Course 8768

Radiological sample analysis involves the observation of a random process that may or may not occur and an estimation of the amount of radioactive material present based on that observation. Across the country, radiological control personnel are using the activity measurements to make decisions that may affect the health and safety of workers at those facilities and their surrounding environments. This course will present an overview of measurement processes, a statistical evaluation of both measurements and equipment performance, and some actions to take to minimize the sources of error in count room operations. This course will prepare the student with the skills necessary for radiological control technician (RCT) qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and by providing in the field skills.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RCT: Module 2.07, Respiratory Protection, Course 8773

Internal dosimetry controls require the use of engineering controls to prevent the internal deposition of radioactive and nonradiological contaminants. However, when engineering and administrative controls are not available or feasible, respiratory protection may be necessary. The radiation control technician (RCT) should know and apply the considerations used in determining the respiratory protection equipment that is most appropriate for the job. The inappropriate use of or the use of the wrong respiratory protection equipment may result in undesirable health effects. This course will prepare the student with the skills necessary for RCT qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and will provide in-the-field skills.

61 RADIATION PROTECTION AND DOSIMETRY↗

RCT: Module 2.08, Radiological Source Control, Course 8774

radioactive source is material used for its emitted radiation. Sources are sealed or unsealed and are classified as accountable or exempt. Radioactive sources are used for response checks, functional checks, and the calibration of instruments and monitors to traceable standards. To ensure the safety and welfare of all personnel, it is important to maintain control of radioactive sources to minimize the potential for the spread of contamination, unnecessary exposure to personnel, loss or theft, and improper disposal. This course will prepare the student with the skills necessary for RCT qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and will provide in-the-field skills.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

RCT: Module 2.04, Dosimetry, Course 8769

This course will introduce the types of instruments used to measure external and internal radiation to people. Dosimetry is the quantitative assessment of radiation received by the human body. Several types of dosimeters are used worldwide. This information is valuable to all radiological control personnel because dosimeters are the only direct method to measure and document personnel radiation exposure and ensure regulatory compliance with applicable limits. This course will cover dosimetry terms, Department of Energy (DOE) limits, Los Alamos National Laboratory (LANL) administrative guidelines, thermoluminescent dosimeters (TLDs), LANL dosimetry, and bioassay assessment methods. This course will prepare the student with the skills necessary for radiological control technician (RCT) qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and providing in-thefield skills.

61 RADIATION PROTECTION AND DOSIMETRY↗

RCT: Module 2.10, Access Control and Work Area Setup, Course 8776

This course presents information on radiological work permits (RWPs), various types of postings used in radiological areas, radiological area setups, access controls, and releases of material from radiological areas. All of these are fundamental duties of RCTs. This course will prepare the student with the skills necessary for radiological control technician (RCT) qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and providing in-thefield skills.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

54 ENVIRONMENTAL SCIENCES↗