Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Identification challenges for large space structures

The paper examines the on-orbit modal identification of large space structures, stressing the importance of planning and experience, in preparation for the Space Station Structural Characterization Experiment (SSSCE) for the Space Station Freedom. The necessary information to foresee and overcome practical difficulties is considered in connection with seven key factors, including test objectives, dynamic complexity of the structure, data quality, extent of exploratory studies, availability and understanding of software tools, experience with similar problems, and pretest analytical conditions. These factors affect identification success in ground tests. Comparisons with similar ground tests of assembled systems are discussed, showing that the constraints of space tests make these factors more significant. The absence of data and experiences relating to on-orbit modal identification testing is shown to make identification a uniquely mathematical problem, although all spacecraft are constructed and verified by proven engineering methods.

Pappa, Richard S.↗

Development and verification testing of automation and robotics for assembly of space structures

A program was initiated within the past several years to develop operational procedures for automated assembly of truss structures suitable for large-aperture antennas. The assembly operations require the use of a robotic manipulator and are based on the principle of supervised autonomy to minimize crew resources. A hardware testbed was established to support development and evaluation testing. A brute-force automation approach was used to develop the baseline assembly hardware and software techniques. As the system matured and an operation was proven, upgrades were incorprated and assessed against the baseline test results. This paper summarizes the developmental phases of the program, the results of several assembly tests, the current status, and a series of proposed developments for additional hardware and software control capability. No problems that would preclude automated in-space assembly of truss structures have been encountered. The current system was developed at a breadboard level and continued development at an enhanced level is warranted.

Rhodes, Marvin D.↗

Aerodynamic characteristics of a propeller-powered high-lift semispan wing

A small-scale semispan high-lift wing-flap system equipped under the wing with a turboprop engine assembly was tested in the LaRC 14- by 22-Foot Subsonic Tunnel. Experimental data were obtained for various propeller rotational speeds, nacelle locations, and nacelle inclinations. To isolate the effects of the high lift system, data were obtained with and without the flaps and leading-edge device. The effects of the propeller slipstream on the overall longitudinal aerodynamic characteristics of the wing-propeller assembly were examined. Test results indicated that the lift coefficient of the wing could be increased by the propeller slipstream when the rotational speed was increased and high-lift devices were deployed. Decreasing the nacelle inclination (increased pitch down) enhanced the lift performance of the system much more than varying the vertical or horizontal location of the nacelle. Furthermore, decreasing the nacelle inclination led to higher lift curve slope values, which indicated that the powered wing could sustain higher angles of attack near maximum lift performance. Any lift augmentation was accompanied by a drag penalty due to the increased wing lift.

Gentry, Garl L., Jr.↗

Development of NASA's Sample Cartridge Assembly: Summary of GEDS Design, Development Testing, and Thermal Analyses

NASA's Sample Cartridge Assembly (SCA) project is responsible for designing and validating a payload that contains materials research samples in a sealed environment. The SCA will be heated in the European Space Agency's (ESA) Low Gradient Furnace (LGF) that is housed inside the Material Science Research Rack (MSRR) located on the International Space Station (ISS). The first Principle Investigator (PI) to utilize the SCA will focus on Gravitational Effects on Distortion in Sintering (GEDS) research. This paper will give a summary of the design and development test effort for the GEDS SCA and will discuss the role of thermal analysis in developing test profiles to meet the science and engineering requirements. Lessons learned will be reviewed and salient design features that may differ for each PI will be discussed.

O'Connor, Brian↗

Assembly, alignment, and cold focus test methods utilized on CLAES optics

This paper describes the techniques and the equipment used in the assembly and alignment of the Cryogenic Limb Array Etalon Spectrophotometer (CLAES) Telescope and Spectrometer, together with those used to test the system at operating temperatures in order to establish the correct focus for the detector array and other system components. In addition, cryogenic tests were used to determine the stability of the optics over the specified environment, and blur size measurements were performed at operational temperatures.

Dawson, Juan C.↗

Microbial load monitor

Attempts are made to provide a total design of a Microbial Load Monitor (MLM) system flight engineering model. Activities include assembly and testing of Sample Receiving and Card Loading Devices (SRCLDs), operator related software, and testing of biological samples in the MLM. Progress was made in assembling SRCLDs with minimal leaks and which operate reliably in the Sample Loading System. Seven operator commands are used to control various aspects of the MLM such as calibrating and reading the incubating reading head, setting the clock and reading time, and status of Card. Testing of the instrument, both in hardware and biologically, was performed. Hardware testing concentrated on SRCLDs. Biological testing covered 66 clinical and seeded samples. Tentative thresholds were set and media performance listed.

Caplin, R. S.↗

Development of helicopter transmission seals, task 2

High speed helicopter transmission seal concepts were designed, fabricated and tested. The concepts were a dual element split ring seal and a circumferential seal. The tests were performed in a rig using an actual input quill assembly. The test conditions were selected to simulate transmission operation and were 230 F oil temperature, and a sliding speed of 9400 ft/min. The split ring seal exhibited gross leakage and was considered unsatisfactory, while the circumferential seal leakage was less than 1 c.c./hour; this leakage is within acceptable limits. The circumferential seal wear was only to .0005 inches during a 100 hour run (40 starts and stops). During a 40 hour contamination test (mesh silica flour) the seal total wear was a maximum of .004 inches. This wear is considered acceptable.

Hayden, T. S.↗

Development of a Test Article to Demonstrate the Long Duration Storage of Liquid Hydrogen via a Two-Stage Active Cooling Approach

A NASA team is developing a test article for the purpose of demonstrating the long duration storage of liquid hydrogen utilizing passive Cryogenic Fluid Management and cryocoolers via a two-stage active cooling approach. Funded by NASA’s Technology Demonstration Mission Program and managed by the Cryogenic Fluid Management Portfolio Project, the team is leveraging demonstrations conducted under pervious NASA activities to develop a fully integrated test article that will demonstrate the zero boil-off storage of liquid hydrogen. This paper discusses the previous activities being leveraged from NASA’s Cryogenic Propellant Storage and Transfer project, the test article design and build, hardware and instrumentation selections, control methodology, and the planned primary and secondary test objectives. The test article assembly and demonstration are both to be conducted in the East Test Area at NASA Marshall Space Flight Center and are currently scheduled for Fiscal Year 2024.

Active Cooling↗

Heritage to Flight; The Test Program that Brought an Inflation System Back to Life for the Low Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID)

Following the success of the Inflatable Reentry Vehicle Experiment-3 (IRVE-3) project, the Terrestrial Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Orbital Reentry (THOR) project was stood up with a “built to print” Inflation System utilizing the IRVE-3 flight spares. When THOR was canceled, this Inflation System had already been tested and assembled, ready for use. Thus, when the Low Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) was spun up, the THOR system seemed like a good candidate to salvage flight ready hardware. There were, however, some key differences in the IRVE/THOR system and the LOFTID one. LOFTID’s HIAD was two times the size of IRVE for starters and would require much higher flows to accommodate inflating such an article within a specific timeframe. With new requirements and a tight schedule, the LOFTID Inflation team set to work to verify flight readiness under LOFTID conditions and eliminate the need to requalify new hardware. LOFTID, utilizing an Inflation System built primarily hardware from IRVE-3 spares, successfully flew in November of 2022. This paper will outline the mission differences, the test campaign used to prepare LOFTID’s Inflation System for flight, and some lessons learned in repurposing older hardware.

Inflation System↗

Heritage to Flight: The Test Program that Brought an Inflation System Back to Life for LOFTID

Following the success of the Inflatable Reentry Vehicle Experiment-3 (IRVE-3) project, the Terrestrial Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Orbital Reentry (THOR) project was stood up with a “built to print” Inflation System utilizing the IRVE-3 flight spares. When THOR was canceled, this Inflation System had already been tested and assembled, ready for use. Thus, when the Low Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) was spun up, the THOR system seemed like a good candidate to salvage flight ready hardware. There were, however, some key differences in the IRVE/THOR system and the LOFTID one. LOFTID’s HIAD was two times the size of IRVE for starters and would require much higher flows to accommodate inflating such an article within a specific timeframe. With new requirements and a tight schedule, the LOFTID Inflation team set to work to verify flight readiness under LOFTID conditions and eliminate the need to requalify new hardware. LOFTID, utilizing an Inflation System built primarily hardware from IRVE-3 spares, successfully flew in November of 2022. This paper will outline the mission differences, the test campaign used to prepare LOFTID’s Inflation System for flight, and some lessons learned in repurposing older hardware.

Inflation System↗

Heritage to Flight: The Test Program that Brought an Inflation System Back to Life for LOFTID

Following the success of the Inflatable Reentry Vehicle Experiment-3 (IRVE-3) project, the Terrestrial Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Orbital Reentry (THOR) project was stood up with a “built to print” Inflation System utilizing the IRVE-3 flight spares. When THOR was canceled, this Inflation System had already been tested and assembled, ready for use. Thus, when the Low Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) was spun up, the THOR system seemed like a good candidate to salvage flight ready hardware. There were, however, some key differences in the IRVE/THOR system and the LOFTID one. LOFTID’s HIAD was two times the size of IRVE for starters and would require much higher flows to accommodate inflating such an article within a specific timeframe. With new requirements and a tight schedule, the LOFTID Inflation team set to work to verify flight readiness under LOFTID conditions and eliminate the need to requalify new hardware. LOFTID, utilizing an Inflation System built primarily hardware from IRVE-3 spares, successfully flew in November of 2022. This paper will outline the mission differences, the test campaign used to prepare LOFTID’s Inflation System for flight, and some lessons learned in repurposing older hardware.

Inflation System↗

Update of the Solar Concentrator Advanced Development Project

The Solar Concentrator Advanced Development Project, which has achieved the successful design, fabrication, and testing of a full-scale prototypical solar dynamic concentrator, is discussed. The design and fabrication process are summarized, and the test results for the reflective facet optical performance and the concentrator structural repeatability are reported. Initial testing of structural repeatability of a seven panel portion of the concentrator was followed by assembly and testing of the full nineteen-panel structure. The testing, which consisted of theodolite and optical measurements over an assembly-disassembly-reassembly cycle, demonstrated that the concentrator maintained the as-built contour and optical characteristics. The facet development effort, which entailed developing a vapor-deposited reflective facet, produced a viable design with demonstrated optical characteristics that are within the project goals.

Corrigan, Robert D.↗

Cryogenic Optical Performance of a Light-weight Mirror Assembly for Future Space Astronomical Telescopes: Optical Test Results and Thermal Optical Model

A 40 cm diameter mirror assembly was interferometrically tested at room temperature down to 250 degrees Kelvin for thermal deformation. The 2.5 m radius of curvature spherical mirror assembly was constructed by low temperature fusing three abrasive waterjet core sections between two face sheets. The 93% lightweighted Corning ULE mirror assembly represents the current state of the art for future UV, optical, near IR space telescopes. During the multiple thermal test cycles, test results of interferometric test, thermal IR images of the front face were recorded in order to validate thermal optical model.

Eng, Ron↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Report: AMSU-A1 Antenna Drive Subsystem, PN 1331720-2, S/N 106

This is the Performance Verification Report, AMSU-A1 Antenna Drive Subsystem, P/N 1331720-2, S/N 106, for the Integrated Advanced Microwave Sounding Unit-A (AMSU-A). The antenna drive subsystem of the METSAT AMSU-A1, S/N 106, P/N 1331720-2, completed acceptance testing per A-ES Test Procedure AE-26002/lD. The test included: Scan Motion and Jitter, Pulse Load Bus Peak Current and Rise Time, Resolver Reading and Position Error, Gain/ Phase Margin, and Operational Gain Margin. The drive motors and electronic circuitry were also tested at the component level. The drive motor test includes: Starting Torque Test, Motor Commutation Test, Resolver Operation/ No-Load Speed Test, and Random Vibration. The electronic circuitry was tested at the Circuit Card Assembly (CCA) level of production; each test exercised all circuit functions. The transistor assembly was tested during the W3 cable assembly (1356941-1) test.

Luu, D.↗

Design, manufacture, and test of coolant pump-motor assembly for Brayton power conversion system

The design, development, fabrication, and testing of seven coolant circulating pump-motor assemblies are discussed. The pump-motor assembly is driven by the nominal 44.4-volt, 400-Hz, 3-phase output of a nominal 56-volt dc input inverter. The pump-motor assembly will be used to circulate Dow Corning 200 liquid coolant for use in a Brayton cycle space power system. The pump-motor assembly develops a nominal head of 70 psi at 3.7 gpm with an over-all efficiency of 26 percent. The design description, drawings, photographs, reliability results, and developmental and acceptance test results are included.

Gabacz, L. E.↗

SBASI: Actuated pyrotechnic time delay initiator

A precision pyrotechnic time delay initiator for missile staging was developed and tested. Incorporated in the assembly is a single bridgewire Apollo standard initiator (SBASI) for initiation, a through-bulkhead-initiator to provide isolation of the SBASI output from the delay, the pyrotechnic delay, and an output charge. An attempt was made to control both primary and secondary variables affecting functional performance of the delay initiator. Design and functional limit exploration was performed to establish tolerance levels on manufacturing and assembling operations. The test results demonstrate a 2% coefficient of variation at any one temperature and an overall 2.7% coefficient of variation throughout the temperature range of 30 to 120 F. Tests were conducted at simulated operational altitude from sea level to 200,000 feet.

Salter, S. J.↗

Reciprocating Feed System Development Status

The reciprocating feed system (RFS) is an alternative means of providing high pressure propellant flow at low cost and system mass, with high fail-operational reliability. The RFS functions by storing the liquid propellants in large, low-pressure tanks and then expelling each propellant through two or three small, high-pressure tanks. Each RFS tank is sequentially filled, pressurized, expelled, vented, and refilled so as to provide a constant, or variable, mass flow rate to the engine. This type of system is much lighter than a conventional pressure fed system in part due to the greatly reduced amount of inert tank weight. The delivered payload for an RFS is superior to that of conventional pressure fed systems for conditions of high total impulse and it is competitive with turbopump systems, up to approximately 2000 psi. An advanced version of the RFS uses autogenous pressurization and thrust augmentation to achieve higher performance. In this version, the pressurization gases are combusted in a small engine, thus making the pressurization system, in effect, part of the propulsion system. The RFS appears to be much less expensive than a turbopump system, due to reduced research and development cost and hardware cost, since it is basically composed of small high- pressure tanks, a pressurization system, and control valves. A major benefit is the high reliability fail-operational mode; in the event of a failure in one of the three tank-systems, it can operate on the two remaining tanks. Other benefits include variable pressure and flow rates, ease of engine restart in micro-gravity, and enhanced propellant acquisition and control under adverse acceleration conditions. We present a system mass analysis tool that accepts user inputs for various design and mission parameters and calculates such output values payload and vehicle weights for the conventional pressure fed system, the RFS, the Autogenous Pressurization Thrust Augmentation (APTA) RFS, and turbopump systems. Using this tool, a preliminary design of a representative crew exploration vehicle (CEV) has been considered. The design parameters selected for a representative system were modeled after the orbital maneuvering system (OMS) on the Shuttle Orbiter, with an increase of roughly a factor of ten in the delta- V capability and a greater thrust (30,000 lbs, vs. 12,000 lbs). Both storable and cryogenic propellants were considered. Results show that a RFS is a low mass alternative to conventional pressure fed systems, with a substantial increase in payload capability and that it is weight-competitive with turbopump systems at low engine pressure (a few hundred psi); at high engine pressures, the APTA RFS appears to offer the highest payload. We also present the status of the RFS test bed fabrication, assembly, and checkout. This test bed is designed to provide flow rates appropriate for engines in the roughly 10,000 to 30,000 lb thrust range.

Trewek, Mary↗

Quality and Reliability of BGA and SMT Components

Spacecraft electronics including those used at the Jet Propulsion Laboratory (JPL), demand production of highly reliable assemblies. More than 400 test vehicles were assembled using ceramic and plastic ball grid arrays (BGAs), LCCs, J-leads, and gull wing components.

BGA components SMT components BGA SMT spacecraft e↗