Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “readiness review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Microgreens for Human Nutrition in Spaceflight

For long-duration spaceflight missions, providing adequate nutritional needs of the crew is a documented risk. This can be mitigated with dietary supplementation of nutrient-dense young vegetables including microgreens. Why microgreens? Traditional crops can take months to mature, but microgreens are ready to harvest in within two weeks, and they can be grown in small volumes. This rapid turn-around time makes them practical for any spaceflight scenario where crew time is limited, or when power, mass, and volume limitations prevent growing crops to maturity. In this literature review we will introduce microgreens that have been screened by the USDA for nutritional content, and discuss their nutritional benefits in relation to the specific needs of astronauts, as defined by the NASA Human Research Program. We will specifically highlight the benefits of iron, magnesium, potassium, and carotenoids. We also discuss potential lighting and fertilizer regimens that could be used to further improve nutrient content of microgreens grown in microgravity. Developing microgreens for spaceflight will give us access to crops that are specifically designed to meet crew nutritional needs for future exploration missions.

Johnson, C. M.↗

Technology review of flight crucial flight control systems (application of optical technology)

The survey covers the various optical elements that are considered in a fly-by-light flight control system including optical sensors and transducers, optical data links, so-called optical actuators, and optical/electro-optical processing. It also addresses airframe installation, maintenance, and repair issues. Rather than an in-depth treatment of optical technology, the survey concentrates on technology readiness and the potential advantages/disadvantages of applying the technology. The information was assembled from open literature, personal interviews, and responses to a questionnaire distributed specifically for this survey. Not all of the information obtained was consistent, particularly with respect to technology readiness. The synthesis of information into the perception of the state-of-technology is presented.

Rediess, H. A.↗

8-Meter UV/Optical Space Telescope

This slide presentation proposes using the unprecedented capability of the planned Ares V launch vehicle, to place a 8 meter monolithic space telescope at the Earth-Sun L2 point. This new capability enables a new design pardigm -- simplicity. The six to eight meter class telescope with a massive high Technical Readiness Level ground observatory class monolithic primary mirror has been determined feasible. The proposed design, structural analysis, spacecraft design and shroud integration, thermal analysis, propulsion system, guidance navigation and pointing control assumptions about the avionics, and power systems, operational lifetime, and the idea of in-space servicing are reviewed.

Stahl, H. Philip↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture to where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publicatoin5, in 2006 development was started to baseline Extra- Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Process for Upgrading Cognitive Assessment Capabilities Onboard the International Space Station

MOTIVATION: Spaceflight poses varied and unique risks to the brain and cognitive functioning including radiation exposure, sleep disturbance, fatigue, fluid shifts (increased intracranial pressure), toxin exposure, elevated carbon dioxide, and traumatic brain injury, among others. These potential threats to cognitive functioning are capable of degrading performance and compromising mission success. Furthermore, the threats may increase in severity, and new types of threats may emerge for longer duration exploration missions. This presentation will describe the process used to identify gaps in our current approach, evaluate best practices in cognitive assessment, and transition new cognitive assessment tools to operational use. OVERVIEW: Risks to brain health and performance posed by spaceflight missions require sensitive tools to assess cognitive functioning of astronauts in flight. The Spaceflight Cognitive Assessment Tool for Windows (WinSCAT) is the automated cognitive assessment tool currently deployed onboard the International Space Station (ISS). WinSCAT provides astronauts and flight surgeons with objective data to monitor neurocognitive functioning. WinSCAT assesses 5 discrete cognitive domains, is sensitive to changes in cognitive functioning, and was designed to be completed in less than 15 minutes. However, WinSCAT does not probe other areas of cognitive functioning that might be important to mission success. Researchers recently have developed batteries that may expand current capabilities, such as increased sensitivity to subtle fluctuations in cognitive functioning. Therefore, we engaged in a systematic process review in order to improve upon our current capabilities and incorporate new advances in cognitive assessment. This process included a literature review on newer measures of neurocognitive assessment, surveys of operational flight surgeons at NASA regarding needs and gaps in our capabilities, and expert panel review of candidate cognitive measures and assessment issues and procedures. SIGNIFICANCE: Our process and the results that flowed from it may be helpful to aeromedical professionals charged with transitioning research findings to operational use. Our specific findings regarding cognitive assessment tools are of significance to professionals who must assess readiness to perform in mission critical situations in environments involving threats to cognition and performance

Picano, J. J.↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publication, in 2006 development was started to baseline Extra-Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Predictive Thermal Control (PTC) Technology to Enable Thermally Stable Telescopes: Year Three Status

The Predictive Thermal Control (PTC) project is a multiyear effort initiated in Fiscal Year 2017, to mature the Technology Readiness Level (TRL) of technologies required to enable ultra-thermally-stable ultraviolet/optical/infrared (UVOIR) space telescope primary-mirror assemblies for ultra-high-contrast observations of exoplanets. PTC has three objectives: validate thermal optical performance models, derive thermal system stability specifications, and demonstrate predictive thermal control. This paper reviews recent and previous accomplishments

H Philip Stahl↗

Summary and Annotated Bibliography of Measurement Error Corrections with Potential Application in Future Quesst Mission Community Noise Studies

This document is motivated by likely needs of the Quesst mission community response tests, which will culminate in data collection and estimation of dose-response regression relationships for consideration by domestic and international aviation regulators. Furthermore, basic research questions evaluating interactions between rates of community annoyance, dose levels, and indicators of the presence of rattle, vibration, and startle hinge on hypothesis testing in the context of regression models. For a variety of reasons, noise doses may be known only imprecisely and may not reflect the actual level experienced by responding subjects. These differences between true dose and estimated dose, be they systematic or random, constitute covariate measurement error. Available statistics literature speaks to the impacts of measurement error on regression models, both in terms of bias in estimated coefficients and predicted values, and in terms of the loss of statistical power for hypothesis testing. Given the particulars of a categorical annoyance response variable and a continuous noise dose predictor variable subject to measurement error during testing, the emphasis of this report is on findings and methods pertinent to generalized linear (and mixed) models likely to be employed during the Quesst mission community tests. We reach the following conclusions: 1. Of four reviewed methods, structural Bayesian measurement error models and simulation extrapolation (SIMEX) may be the most readily applicable to Quesst mission community noise study objectives. 2. If warranted, a linear measurement model can help model systematic sources of measurement error that the classical measurement error does not. 3. For its ready implementation and small additional input requirements, simulation extrapolation may be ideally suited for addressing secondary research questions involving interactions between annoyance, noise dose, and other factors through hypothesis testing. 4. For their flexibility and ability to propagate uncertainty, structural Bayesian hierarchical models have great appeal for mission purposes; some care may be needed in developing appropriate probability models describing actual noise exposure during testing. An annotated bibliography logs additional papers and resources that may be of value to analysts in other projects and disciplines.

Dose-Response Model↗

Irradiation Testing of Sensors - ASI Program Review 2022

This is a powerpoint presentation for the annual Advanced Sensors and Instrumentation (ASI) program webinar. The following is a summary of the presentation. Advanced instrumentation enables testing of nuclear fuels and materials in support of the US advanced nuclear technology industry. A number of promising sensor technologies are in the pipeline. The early part of sensor development can be done outside of the reactor environment, but full technical readiness requires experience gained from in-core performance testing. Customers usually have only one shot to conduct their irradiation experiments. Because of the high costs test sponsors are frequently reluctant to incorporate unproven technologies in reactor experiments. Therefore, it is vital to demonstrate newly-developed sensors in operational conditions, prior to incorporating them into long-term high-value experiments. Successful completion of these activities will create new monitoring capabilities in high-power test reactors (such as ATR) as well as specialty reactors such as TREAT.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Heuristic Evaluation Methods Applied to a Predictive Maintenance Chatbot

The need for an accessible iterative approach for evaluating prospective artificial intelligence (AI)/ML based technologies in the nuclear industry is needed, given the nature of algorithms and rapid advancements. This paper explores existing heuristic design principles for user-centered design and evaluates them based on their relevancy and usefulness for evaluating AI/ ML based technologies. Researchers at the Idaho National Laboratory (INL) have developed a machine learning software application called VIsualization for PrEdictive maintenance Recommendation (VIPER), which is used to help users understand and engage with the tool to learn more about work orders, data used, predictive maintenance, and machine learning (ML) algorithms. Early user research studies used to access VIPER?s technology readiness level have occurred; however, there is room for further improvement of the software through heuristic evaluations along with other methods and user testing. This work describes the applicability of heuristic evaluation methods and cognitive walkthroughs to help ensure human readiness for prospective AI/ ML based applications, using VIPER as a candidate use case. This work supports industry in ensuring that prospective AI/ML based technologies are usable and useful for plant personnel at nuclear power plants, ultimately leading to their safe, reliable, and efficient use. PowerPoint for conference that was reviewed in PRS and LRS PRS/CON-25-05379 and INL/CON-25-82946

99 - GENERAL AND MISCELLANEOUS↗

SAMSS: An in-progress review of the Spacecraft Assembly, Maintenance, and Servicing Study

The Spacecraft Assembly, Maintenance, and Servicing Study (SAMSS) is an effort to define and verify the most cost effective approach to spacecraft servicing, as a alternative to replacement, in the 1990's and beyond. The intent of the study is to assess the servicing of satellites in all orbit regimes. Elements of a space servicing infrastructure are developed and cost estimates are generated. Readiness is assessed and proof of concept demonstrations are identified. Cryogenic fuel resupply is discussed.

Burt, William W.↗

SP-100 power system development status

The SP-100 ground engineering system development project objectives, approach and status are described. The SP-100 GES development project is phase II of a three-phase program funded and directed by three United States Federal Agencies (NASA, DOD and DOE) to develop space reactor power systems for space applications in the 10 to 1000 KWe power range. The first phase of the program lasted three years, and this was completed at the end of FY 1985. SP-100 Phase I analytically and experimentally reviewed all near-term space reactor power system candidates and selected one system that best met the project mission requirements for future civilian and military space applications. The SP-100 Phase II started in fiscal year 1986 to develop the Phase I selected space reactor power system to be technically ready for space applications in the mid- to late 1990s.

Mondt, Jack F.↗

Advances in solid state switchgear technology for large space power systems

High voltage solid state remote power controllers (RPC's) and the required semiconductor power switches to provide baseline technology for large, high power distribution systems in the space station, all electric airplane and other advanced aerospace applications were developed. The RPC's were developed for dc voltages from 28 to 1200 V and ac voltages of 115, 230, and 440 V at frequencies of 400 Hz to 20 kHz. The benefits and operation of solid state RPC's and highlights of several developments to bring the RPC to technology readiness for future aerospace needs are examined. The 28 V dc Space Shuttle units, three RPC types at 120 V dc, two at 270/300 V dc, two at 230 V ac and several high power RPC models at voltages up to 1200 V dc with current ratings up to 100 A are reviewed. New technology programs to develop a new family of (DI)2 semiconductor switches and 20 kHz, 440 V ac RPC's are described.

Sundberg, G. R.↗

Advanced in solid state switchgear technology for large space power systems

High voltage solid state remote power controllers (RPC's) and the required semiconductor power switches to provide baseline technology for large, high power distribution systems in the Space Station, all electric airplane and other advanced aerospace applications were developed. The RPC's were developed for dc voltages from 28 to 1200 V and ac voltages of 115, 230, and 440 V at frequencies of 400 Hz to 20 kHz. The benefits and operation of solid state RPC's and highlights of several developments to bring the RPC to technology readiness for future aerospace needs are examined. The 28 V dc Space Shuttle units, three RPC types at 120 V dc, two at 270/300 V dc, two at 230 V ac and several high power RPC models at voltages up to 1200 V dc with current ratings up to 100 A are reviewed. New technology programs to develop a new family of (DI)2 semiconductor switches and 20 kHz, 440 V ac RPC's are described.

Sundberg, G. R.↗

NASA Earth Science Data Rescue Efforts

Historically, at the end of a NASA mission, earth and space science data were stored at NASA's National Space Science Data Center (NSSDC). The original data archive consisted of both magnetic tapes and film media. As data storage technology improved, data from later missions were stored on disks and platters and higher capacity magnetic media for online accessibility. To conserve physical space at NASA archive sites and to meet disaster recovery guidelines, historical data originally stored on magnetic tapes and film were moved to the Federal Archives and Record Center (FRC) as a temporary holding area until its long-term value was determined by NASA. All records at the FRC are controlled by the NASA Records Retention Schedule (NRRS) which determines the disposal date for each record. On that date, responsible NASA parties are notified that all scheduled records should be reviewed and assessed to determine if they continue to hold significant historical, scientific or administrative value. For Earth Science data records being held at FRC, the Earth Science Data and Information System (ESDIS) Project office is the party responsible for making the value assessment that determines which records warrant preservation and which are ready for proper disposal according to NASA guidelines. Once the data's long-term value is determined, ESDIS takes definitive steps to preserve this data for future discovery and access. Deteriorating media containing historic data of value are recalled from FRC and brought back to ESDIS. Through a tedious, laborious process, digital data are recovered and restored to modern formats with improved metadata and documentation to aid discovery. The restored digital products are then incorporated into our modern online archive, and made immediately accessible to the public. In this paper, we will discuss how we identify data-at-risk, ways to minimize data loss, how we plan for recovery, how we delegate recovery activities to our archive facilities, and how we make recovered data more accessible.

Data Systems; Social and Information sciences↗

A Delay Tolerant Networking-Based Approach to a High Data Rate Architecture for Spacecraft

Historically, it has been the case that SWaP placed such severe constraints on radios that the links between spacecraft and the ground were relatively slow. This meant that the radio link was normally a significant bottleneck in returning scientific data. Over recent years, however, a combination of more efficient radio design, intelligent waveforms, and highly directed, high-frequency RF / optical systems have led to a rapid increase in the amount of data that can be pushed through radio and optical links. This has led to some cases where the radio links are capable of moving data much more quickly than the spacecraft and instruments are capable of actually generating it! In some instances, scientific data can therefore be lost not because the downlink is too slow to support the data rate, but instead because the spacecraft was not designed in a way that would let it fully utilize both the radio and the networking services available to it.The High Data Rate Architecture (HiDRA) project describes a packet-based approach to building modern, distributed spacecraft systems. It presents a means for spacecraft and other assets to participate in both present and future Delay Tolerant Networks (DTN), while simultaneously ensuring that the asset is able to fully utilize the new, high-speed links that have been seeing more widespread development and deployment in recent years. With this in mind, this paper begins with a discussion regarding HiDRA's evolution. Next, it discusses the capabilities and limitations of NASA's present DTN-enabled networks. Of particular note is the way in which principles of network design at the terrestrial level (e.g. use of programmable networks / software-defined networks, separation between data and control plane, infusion of COTS Ethernet switch chips, etc.) can all be translated into the space environment as well. After this, the paper discusses the design and implementation of a present prototype reference implementation of High-Rate DTN (HDTN), which is intended to demonstrate future high-rate networking concepts as part of a coherent demonstration on the International Space Station (ISS). The goal, of both the research and of this implementation, is to help develop a ready-made toolbox of ideas, approaches, and examples from which mission designers can draw when putting together new missions. Assuming all goes as planned, this should not only work to reduce the cost of individual mission design, but also improve the rate at which science data can be returned for mission participants to review.

Hylton, Alan↗

A Delay Tolerant Networking-Based Approach to a High Data Rate Architecture for Spacecraft

Historically, it has been the case that SWaP (Size, Weigh a lot, And consume Power) placed such severe constraints on radios that the links between spacecraft and the ground were relatively slow. This meant that the radio link was normally a significant bottleneck in returning scientific data. Over recent years, however, a combination of more efficient radio design, intelligent waveforms, and highly directed, high-frequency RF / optical systems have led to a rapid increase in the amount of data that can be pushed through radio and optical links. This has led to some cases where the radio links are capable of moving data much more quickly than the spacecraft and instruments are capable of actually generating it! In some instances, scientific data can therefore be lost not because the downlink is too slow to support the data rate, but instead because the spacecraft was not designed in a way that would let it fully utilize both the radio and the networking services available to it. The High Data Rate Architecture (HiDRA) project describes a packet-based approach to building modern, distributed spacecraft systems. It presents a means for spacecraft and other assets to participate in both present and future Delay Tolerant Networks (DTN), while simultaneously ensuring that the asset is able to fully utilize the new, high-speed links that have been seeing more widespread development and deployment in recent years. With this in mind, this paper begins with a discussion regarding HiDRA's evolution. Next, it discusses the capabilities and limitations of NASA's present DTN-enabled networks. Of particular note is the way in which principles of network designate the terrestrial level (e.g., use of programmable networks / software-defined networks, separation between data and control plane, infusion of COTS (Commercial Off-The-Shelf) Ethernet switch chips, etc.) can all be translated into the space environment as well. After this, the paper discusses the design and implementation of a present prototype reference implementation of High-Rate DTN (HDTN),which is intended to demonstrate future high-rate networking concepts as part of a coherent demonstration on the International Space Station (ISS). The goal, of both the research and of this implementation, is to help develop a ready-made toolbox of ideas, approaches, and examples from which mission designers can draw when putting together new missions. Assuming all goes as planned, this should not only work to reduce the cost of individual mission design, but also improve the rate at which science data can be returned for mission participants to review.

Hylton, Alan↗

Advanced component technologies for energy-efficient turbofan engines

The paper reviews NASA's Energy Efficient Engine Project which was initiated to provide the advanced technology base for a new generation of fuel-conservative engines for introduction into airline service by the late 1980s. Efforts in this project are directed at advancing engine component and systems technologies to a point of demonstrating technology-readiness by 1984. Early results indicate high promise in achieving most of the goals established in the project.

Saunders, N. T.↗