Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Network-Aware and Welfare-Maximizing Dynamic Pricing for Energy Sharing: Preprint

The proliferation of behind-the-meter (BTM) distributed energy resources (DER) within the electrical distribution network presents significant supply and demand flexibilities, but also introduces operational challenges such as voltage spikes and reverse power flows. In response, this paper proposes a network-aware dynamic pricing framework tailored for energy-sharing coalitions that aggregate small, but ubiquitous, BTM DER downstream of a distribution system operator's (DSO) revenue meter that adopts a generic net energy metering (NEM) tariff. By formulating a Stackelberg game between the energy-sharing market leader and its prosumers, we show that the dynamic pricing policy induces the prosumers toward a network-safe operation and decentrally maximizes the energysharing social welfare. The dynamic pricing mechanism involves a combination of a locational ex-ante dynamic price and an ex-post allocation, both of which are functions of the energy sharing's BTM DER. The ex-post allocation is proportionate to the price differential between the DSO NEM price and the energy sharing locational price. Simulation results using real DER data and the IEEE 13-bus test systems illustrate the dynamic nature of network-aware pricing at each bus, and its impact on voltage.

energy communities↗

A System Level Comparative Study of SecondarySide Rectifiers for UAV Wireless Power Transfer in High-Altitude Airborne Energy Platforms

Wireless power transfer (WPT) systems for unmanned aerial vehicles (UAVs) must satisfy stringent design requirements to ensure reliable operation under constraints related to efficiency, thermal performance, altitude, weight, and reliability, particularly in airborne and high-altitude environments. Thermal management becomes increasingly challenging at higher altitudes due to reduced air density, while reliability is strongly affected by the number and complexity of active components. The weight and compactness of secondary-side rectifiers directly impact UAV flight endurance and system integration, influencing energy consumption and payload allocation. These factors collectively define the practical feasibility of UAV WPT systems and guide rectifier topology selection. This paper presents a comparative and experimentally validated evaluation framework for secondary-side rectifiers under UAV-specific constraints. Three representative rectifier architectures are analyzed using component-based assessment of weight, thermal behavior, and reliability, together with experimental efficiency measurements obtained from a 1 kW WPT prototype. The results show that the single-switch active rectifier achieves the highest peak efficiency of approximately 93.2% and an overall efficiency of 91%, while also offering advantages in weight and reliability. The findings demonstrate how constraint-oriented analysis, combined with experimental validation, enables informed selection of secondary-side rectifiers for UAV wireless power transfer applications, including emerging airborne and high-altitude platforms.

Asa, Erdem [ORNL] (ORCID:0000000190884812)↗

Reliability and resilience of environmental flows under uncertainty: reconsidering water year types and inconsistent flow requirements in California

Abstract Environmental water allocation in California is a complex legal process involving various government agencies and stakeholders. E-flow requirements can be based on annual runoff typologies called water year types (WYTs), which dictate water volume, timing, and duration. In this study, we examined hydropower licensing documents of the major water and power projects in the Central Sierra Nevada to catalog e-flow requirements by WYT. In this study case, we identify how WYT classification systems and categories vary across and within different basins. Additionally, we assessed the impacts of climate change on hydrology, the frequency of WYTs identified, and the reliability and resilience of e-flows using future projections (2031–2060) of 10 Global Circulation Models (GCMs). We then propose a potential adaptation strategy using a 30 year moving percentiles approach to recalculate WYTs. We identified eight WYT classifications systems were identified, and their WYT distributions statistically significantly changes across all GCMs, even though most GCMs indicate no statistically significant change in hydrology. Disparities in future impacts are observed among and within hydropower projects, with some river reaches showing negative impacts on reliability and resilience. The adaptation strategy can generally boost resilience and improve reliability, but simply updating existing WYT thresholds without flexible regulatory frameworks reconsidering WYTs and e-flows thresholds, may not yield substantial improvements. Challenges in managing e-flows in California within regulatory and hydroclimatic contexts are intricate due to the lack of standardized approaches, leading to inconsistencies and potential conflicts among stakeholders, that will likely be exacerbated by climate change. Thus, we emphasize that targeted, site-specific, and adaptive management strategies are crucial, besides the need for a harmonized and consistent approach to defining and applying WYT categories and methods and/or e-flow assessments.

Environmental Sciences & Ecology↗

AbacusSummit: Cosmological N-body Halos, Light Cones, Particles, Merger Trees, Initial Conditions, and Power Spectra

This is the primary data release of the AbacusSummit, a suite of large, high-accuracy cosmological N-body simulations. Documentation describing the suite and code, including links to refereed publications and instructions for manipulating the data contained in this release, may be found at the following URL: https://abacussummit.readthedocs.io/ The primary data products presented in this release are halo catalogs, light cones, and particle data. Several supplemental products are also presented: power spectra, initial conditions, and merger trees. Cleaned halo catalogs are also provided for the subset of simulations that were used in refereed publications at the time of this DOI. This release also contains several large scale-free and high-redshift simulations run as part of the same allocation used to produce AbacusSummit.

79 ASTRONOMY AND ASTROPHYSICS↗

The impact of WARC '79 on space applications and research

Prior to the 1979 World Administrative Radio Conference (WARC), no frequency bands were allocated for remote sensing measurements. Actions taken by the WARC insure that frequencies will be available for such use, and that operations can be conducted without harmful interference on a worldwide basis for the benefit of all nations. New global allocations for Space Research will permit worldwide acquisition of research data via relay satellites. Wideband allocations for deep-space research will allow more accurate position determination of deep-space probes and transmission of higher resolution data. The WARC had an impact on a number of other applications and research areas such as: meteorological satellites, land-mobile satellites, search and rescue systems, solar power satellites, standard-frequency satellites, radio astronomy and the search for extraterrestrial intelligence. The actions taken at the WARC affecting these services and applications will be described in the paper.

Kiebler, J. W.↗

Multiple beam antenna/switch system study

In the study of the Multiple Beam Antenna/Switch for the space to ground link (SGL) uplink and downlink services, several issues related to system engineering, antenna, transmit/receive, and switch systems were addressed and the results are provided. Bandwidth allocation at Ku band is inadequate to serve the data rate requirements for the forward and return services. Rain and depolarization effects at EHF, especially at Ka band, pose a significant threat to the link availabilities at heavy rain areas. Hardware induced effects such as the nonlinear characteristics of the power amplifier may necessitate the use of linearizers and limiters. It is also important to identify the components that are susceptible to the space radiation effects and shield or redesign them with rad-hard technologies for meeting the requirements of the space environment.

Source record↗

Situational Awareness of Grid Anomalies (SAGA)

The modern power industry becomes more vulnerable to cyber events due to the growing interconnectivity, interdependence, and complexity of the electric power grid. High-fidelity modeling and simulation tools that support the preventative risk analysis on potential cyber-relevant events is essential for ensuring the situational awareness of the system operator as it provides an inexpensive and risk-free environment to test the system responses under various cyber-relevant events and hereby can support research on cyber anomaly detection, optimal protective resource allocation, and mitigation measures. In this webinar, we will share NREL's cybersecurity research capabilities by highlighting the development of a scalable cyber-physical event test bed and demonstration with real hardware in the loop. The developed cyber-physical event test bed is backboned by an integrated transmission, distribution, and communication dynamic co-simulation framework and a plug-and-play cyber event generation module. It is designed to be modular and compatible with parallel computing, and thereby supports large-scale system simulations at an affordable computation cost. The test bed can capture millisecond-to-minutes dynamic frequency and voltage responses under cyber events from the bulk transmission system to the active distribution systems and distributed energy resources at the grid edge.

co-simulation↗

System Engineering for J-2X Development: The Simpler, the Better

The Ares I and Ares V Vehicles will utilize the J-2X rocket engine developed for NASA by the Pratt and Whitney Rocketdyne Company (PWR) as the upper stage engine (USE). The J-2X is an improved higher power version of the original J-2 engine used for Apollo. System Engineering (SE) facilitates direct and open discussions of issues and problems. This simple idea is often overlooked in large, complex engineering development programs. Definition and distribution of requirements from the engine level to the component level is controlled by Allocation Reports which breaks down numerical design objectives (weight, reliability, etc.) into quanta goals for each component area. Linked databases of design and verification requirements help eliminate redundancy and potential mistakes inherent in separated systems. Another tool, the Architecture Design Description (ADD), is used to control J-2X system architecture and effectively communicate configuration changes to those involved in the design process. But the proof of an effective process is in successful program accomplishment. SE is the methodology being used to meet the challenge of completing J-2X engine certification 2 years ahead of any engine program ever developed at PWR. This paper describes the simple, better SE tools and techniques used to achieve this success.

Kelly, William M.↗

Round-Trip Solar Electric Propulsion Missions for Mars Sample Return

Mars Sample Return (MSR) missions could benefit from the high specific impulse of Solar Electric Propulsion (SEP) to achieve lower launch masses than with chemical propulsion. SEP presents formulation challenges due to the coupled nature of launch vehicle performance, propulsion system, power system, and mission timeline. This paper describes a SEP orbiter-sizing tool, which models spacecraft mass & timeline in conjunction with low thrust round-trip Earth-Mars trajectories, and presents selected concept designs. A variety of system designs are possible for SEP MSR orbiters, with large dry mass allocations, similar round-trip durations to chemical orbiters, and reduced design variability between opportunities.

Solar Electric Propulsion↗

NASA's Space Launch System: Deep-Space Delivery for Smallsats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed CubeSats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the CubeSats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth- Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

NASA's Space Launch System: Deep-Space Opportunities for SmallSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed cubesats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the cubesats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the 2 Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth-Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

Enabling DER Participation in Frequency Regulation Markets

Distributed energy resources (DERs) are playing an increasing role in ancillary services for the bulk grid, particularly in frequency regulation. In this article, we propose a framework for collections of DERs, combined to form microgrids and controlled by aggregators, to participate in frequency regulation markets. Our approach covers both the identification of bids for the market clearing stage and the mechanisms for the real-time allocation of the regulation signal. The proposed framework is hierarchical, consisting of a top layer and a bottom layer. The top layer consists of the aggregators communicating in a distributed fashion to optimally disaggregate the regulation signal requested by the system operator. The bottom layer consists of the DERs inside each microgrid whose power levels are adjusted so that the tie line power matches the output of the corresponding aggregator in the top layer. The coordination at the top layer requires the knowledge of cost functions, ramp rates, and capacity bounds of the aggregators. We develop meaningful abstractions for these quantities respecting the power flow constraints and taking into account the load uncertainties and propose a provably correct distributed algorithm for optimal disaggregation of regulation signals among the microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Fast and Scalable Genetic Algorithm-Based Approach for Planning of Microgrids in Distribution Networks: Preprint

As a result of climate change, extreme weather events are occurring more frequently and with increasing impact. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks; thus, the level of proactive preparation of the distribution system to be able to handle severe impacts of extreme weather events represents the system's resilience. One method that distribution systems use to prepare for extreme events is to form multiple microgrids and thereby isolate themselves from the grid supply by using local generation as much as possible to supply critical loads. But partitioning an existing system into multiple feasible islands capable of supporting critical loads is still challenging for distribution systems - first, because of the size of the graph partitioning problem and, second, because of the difficulty in properly formulating the desired attributes of such islands or microgrids. Therefore, this paper presents a genetic algorithmbased approach that facilitates incorporating multiple objectives for grid partitioning by formulating two types of problems - node allocation and edge elimination - and it considers multiple topological and resilience-enhancing objectives. The performance of the proposed genetic algorithm-based approach is numerically evaluated on multiple test systems as well as on a real distribution feeder in Colorado, USA.

edge elimination↗

Allocation and Operation of A Hydropneumatic Energy Storage with Building Microgrid

Behind-meter application for a recently invented hydropneumatic Ground-Level Integrated Diverse Energy Storage (GLIDES) is focused in this research. Considering possible uncertainties from solar radiation and electricity load in a building microgrid, two-stage stochastic programming is adopted for 15-min operation and a mixed-integer nonlinear stochastic model is built with integrated energy systems of GLIDES, solar panel and power generating unit. In order to make the model computationally tractable, we use sample average approximate method to decrease associated complexity with sample size and improve solving efficiency. The experimental results in deterministic and stochastic operation indicate that best candidate solution from SAA are superior to the solution from expected value problem in terms of optimality gap and variance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Training the Powered-Lift Evaluation Pilot

This poster describes a project to prepare pilots for a study assessing novel aircraft automation concepts for electric Vertical Takeoff and Landing (eVTOL) aircraft using NASA’s Vertical Motion Simulator (VMS). By exploring the operational and learning challenges related to transitioning between forward flight and vertical landing, we seek to establish baselines of pilot workload and aircraft handling qualities across varying atmospheric conditions and automation states. The simulated eVTOL design differentiates flight control allocations as a function of airspeed across four speed ranges as the vehicle transitions between fully thrust-borne lift and wing-borne lift. As speed increases, side stick controls command: translational ground speeds, vertical and lateral acceleration, vertical rate, vertical flight path angle, and bank angle. This novel approach to flight control allocation creates a significant learning challenge for pilots. Since initial eVTOL aircraft may have limitations on hover capabilities, automation and flight guidance cues also vary with airspeed to provide efficient landing profiles while still providing cues suitable for cruise flight. The NASA team prepared the study pilots to follow these flight guidance cues along curved Required Navigation Performance (RNP) approaches and along 6o and 12o glide paths to energy-efficient assistive-hover landing and goarounds. The pre-VMS preparation sought to prepare pilots from diverse levels of experience and background. To do this, NASA researchers designed and developed a fixed-based, large field-ofview simulator with terrain, structures, and air traffic. With one day of combined classroom learning and skill development in the fixedbase simulator, pilots were largely able to fly the simulated eVTOL in the VMS with sufficient mastery to provide handling quality assessments using the Cooper-Harper Handling Qualities Rating and workload assessments through the Bedford Workload Scale.

AAM↗

Investigation of test methods, material properties, and processes for solar cell encapsulants

Photovoltaic (PV) modules consist of a string of electrically interconnected silicon solar cells capable of producing practical quantities of electrical power when exposed to sunlight. To insure high reliability and long term performance, the functional components of the solar cell module must be adequately protected from the environment by some encapsulation technique. The encapsulation system must provide mechanical support for the cells and corrosion protection for the electrical components. The goal of the program is to identify and develop encapsulation systems consistent with the PV module operating requirements of 30 year life and a target cost of $0.70 per peak watt ($70 per square meter) (1980 dollars). Assuming a module efficiency of ten percent, which is equivalent to a power output of 100 watts per square meter in midday sunlight, the capital cost of the modules may be calculated to be $70.00 per square meter. Out of this cost goal, only 20 percent is available for encapsulation due to the high cost of the cells, interconnects, and other related components. The encapsulation cost allocation may then be stated as $14.00 per square meter, included all coatings, pottant and mechanical supports for the cells.

Source record↗

A Model for Hybrid Systems for Production Cost Modeling Studies Considering Ancillary Services: Preprint

This paper introduces a model for simulating hybrid plants participating in energy and ancillary services for bulk power system studies. The model considers a hybrid plant comprised of a renewable energy source, a thermal power unit, a storage unit, fixed power loads, or any combination of these technologies. The model focuses on Production Cost Modeling (PCM) studies under the assumption of centralized dispatch. We present an example case study to illustrate the use of the model in a single-stage production cost model similar to those conducted by planning agencies. We explore the allocation of behind-themeter ancillary services products and total energy participation to hybrid plant sub-assets and the resulting impacts on the system's ancillary service allocation. The model is implemented and simulated in a unit commitment problem in the RTS test system, which was modified to include a hybrid plant asset.

ancillary services↗

Rain Fade Compensation for Ka-Band Communications Satellites

This report provides a review and evaluation of rain fade measurement and compensation techniques for Ka-band satellite systems. This report includes a description of and cost estimates for performing three rain fade measurement and compensation experiments. The first experiment deals with rain fade measurement techniques while the second one covers the rain fade compensation techniques. The third experiment addresses a feedback flow control technique for the ABR service (for ATM-based traffic). The following conclusions were observed in this report; a sufficient system signal margin should be allocated for all carriers in a network, that is a fixed clear-sky margin should be typically in the range of 4-5 dB and should be more like 15 dB in the up link for moderate and heavy rain zones; to obtain a higher system margin it is desirable to combine the uplink power control technique with the technique that implements the source information rate and FEC code rate changes resulting in a 4-5 dB increase in the dynamic part of the system margin. The experiments would assess the feasibility of the fade measurements and compensation techniques, and ABR feedback control technique.

Mitchell, W. Carl↗