Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “payload assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Analysis of Possible Explosions at Kennedy Space Center Due to Spontaneous Ignition of Hypergolic Propellants

NASA's Constellation Program plan currently calls for the replacement of the Space Shuttle with the ARES I & V spacecraft and booster vehicles to send astronauts to the moon and beyond. Part of the ARES spacecraft is the Orion Crew Exploration Vehicle (CEV), which includes the Crew Module (CM) and Service Module (SM). The Orion CM's main propulsion system and supplies are provided by the SM. The SM is to be processed off line and moved to the Vehicle Assembly Building (V AB) for stacking to the first stage booster motors prior to ARES move to the launch pad. The new Constellation Program philosophy to process in this manner has created a major task for the KSC infrastructure in that conventional QD calculations are no longer viable because of the location of surrounding facilities near the VAB and the Multi Purpose Processing Facility (MPPF), where the SM will be serviced with nearly 18,000 pounds of hypergolic propellants. The Multi-Payload Processing Facility (MPPF) complex, constructed by NASA in 1994, is located just off E Avenue south of the Operations and Checkout (O&C) building in the Kennedy Space Center industrial area. The MPPF includes a high bay and a low bay. The MPPF high bay is 40.2 m (132 ft) long x 18.9 m (60 ft) wide with a ceiling height of 18.9 m (62 ft). The low bay is a 10.4 m (34 ft) long x 10.4 m (34 ft) wide processing area and has a ceiling height of6.1 m (20 ft). The MPPF is currently used to process non-hazardous payloads. Engineering Analysis Inc. (EAI), under contract with ASRC Aerospace, Inc. in conjunction with the Explosive Safety Office, NASA, Kennedy Space Center (KSC), has carried out an analysis of the effects of explosions at KSC in or near various facilities produced by the spontaneous ignition ofhypergolic fuel stored in the CEV SM. The facilities considered included (1) Vehicle Assembly Building (VAB) (2) Multi-Payload Processing Facility (MPPF) (3) Canister Rotation Facility (CRF) Subsequent discussion deals with the MPPF analysis. Figure 1 provides a view of the MPPF from the northwest. An interior view ofthe facility is shown in Figure 2. The study was concerned with both blast hazards and hazardous fragments which exceed existing safety standards, as described in Section 2.0. The analysis included both blast and fragmentation effects and was divided into three parts as follows: (1) blast (2) primary fragmentation (3) secondary fragmentation Blast effects are summarized in Section 3.0, primary fragmentation in Section 4.0, and secondary fragmentation (internal and external) in Section 5.0. Conclusions are provided in Section 6.0, while references cited are included in Section 7.0. A more detailed description of the entire study is available in a separate document.

Brown, Stephen↗

Alignment, Assembly and Testing of High Energy X-Ray Optics

We are developing grazing-incidence x-ray imaging optics for a balloon-borne hard x-ray telescope (HERO). The HERO payload, scheduled for launch in May 2005, currently consists of 8 mirror modules each containing 12 mirror shells fabricated using electroform-nickel replication off super-polished cylindrical mandrels. An optical system developed for aligning and assembling the shells in the modules will be described. Sources for systematic errors associated with this process will be discussed and results from on-ground x-ray testing of each module will be presented.

Gubarev, Mikhail↗

Telemetry Boards Interpret Rocket, Airplane Engine Data

For all the data gathered by the space shuttle while in orbit, NASA engineers are just as concerned about the information it generates on the ground. From the moment the shuttle s wheels touch the runway to the break of its electrical umbilical cord at 0.4 seconds before its next launch, sensors feed streams of data about the status of the vehicle and its various systems to Kennedy Space Center s shuttle crews. Even while the shuttle orbiter is refitted in Kennedy s orbiter processing facility, engineers constantly monitor everything from power levels to the testing of the mechanical arm in the orbiter s payload bay. On the launch pad and up until liftoff, the Launch Control Center, attached to the large Vehicle Assembly Building, screens all of the shuttle s vital data. (Once the shuttle clears its launch tower, this responsibility shifts to Mission Control at Johnson Space Center, with Kennedy in a backup role.) Ground systems for satellite launches also generate significant amounts of data. At Cape Canaveral Air Force Station, across the Banana River from Kennedy s location on Merritt Island, Florida, NASA rockets carrying precious satellite payloads into space flood the Launch Vehicle Data Center with sensor information on temperature, speed, trajectory, and vibration. The remote measurement and transmission of systems data called telemetry is essential to ensuring the safe and successful launch of the Agency s space missions. When a launch is unsuccessful, as it was for this year s Orbiting Carbon Observatory satellite, telemetry data also provides valuable clues as to what went wrong and how to remedy any problems for future attempts. All of this information is streamed from sensors in the form of binary code: strings of ones and zeros. One small company has partnered with NASA to provide technology that renders raw telemetry data intelligible not only for Agency engineers, but also for those in the private sector.

Source record↗

Heat transfer and core neutronics considerations of the heat pipe cooled thermionic reactor

The authors summarize the results of detailed neutronic and thermal-hydraulic evaluations of the heat pipe cooled thermionic (HPTI) reactor design, identify its key design attributes, and quantify its performance characteristics. The HPTI core uses modular, liquid-metal core heat transfer assemblies to replace the liquid-metal heat transport loop employed by in-core thermionic reactor designs of the past. The nuclear fuel, power conversion, heat transport, and heat rejection functions are all combined into a single modular unit. The reactor/converter assembly uses UN fuel pins to obtain a critical core configuration with in-core safety rods and reflector controls added to complete the subassembly. By thermally bonding the core heat transfer assemblies during the reactor core is coupled neutronically, thermally, and electrically into a modular assembly of individual power sources with cross-tied architecture. A forward-facing heat pipe radiator assembly extends from the reactor head in the shape of a frustum of a cone on the opposite side of the power system from the payload. Important virtues of the concept are the absence of any single-point failures and the ability of the core to effectively transfer the TFE waste heat load laterally to other in-core heat transfer assemblies in the event of multiple failures in either in-core and radiator heat pipes.

Determan, W. R.↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

In-space Assembly↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

Lunar Infrastructure↗

RH Packaging Operations Manual (Rev. 6)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shuttle/spacelab MMAP/electromagnetic environment experiment phase B definition study

Progress made during the first five months of the Phase B definition study for the MMAP/Electromagnetic Environment Experiment (EEE) was described. An antenna/receiver assembly has been defined and sized for stowing in a three pallet bay area in the shuttle. Six scanning modes for the assembly are analyzed and footprints for various antenna sizes are plotted. Mission profiles have been outlined for a 400 km height, 57 deg inclination angle, circular orbit. Viewing time over 7 geographical areas are listed. Shuttle interfaces have been studied to determine what configuration the antenna assembly must have to be shared with other experiments of the Microwave Multi-Applications Payload (MMAP) and to be stowed in the shuttle bay. Other results reported include a frequency plan, a proposed antenna subsystem design, a proposed receiver design, preliminary outlines of the experiment controls and an analysis of on-board and ground data processing schemes.

Horton, J. B.↗

Fabrication of composite shell structure for advanced space transportation

It is pointed out that future space missions, such as those involving spacecraft and structural assemblies to be used in geosynchronous orbits, will require ultralightweight composite structures to achieve maximum payloads. Of equal importance is the requirement to provide designs that are cost-competitive with metal designs. For space structures that must resist buckling, graphite-epoxy materials offer an attractive potential for providing lightweight, low-cost structural components that will meet future space mission requirements. A description is presented of a program which was conducted to evaluate the merits of graphite-epoxy cylindrical shells and to continue the development of a design data base for ultralightweight structures. An objective of the program was to design, fabricate, and test a corrugated graphite-epoxy cylinder 10 ft in diameter and 10 ft long.

Penton, A. P.↗

Earth-to-orbit transportation for solar power satellites

The cargo transport capability and the cost of space transportation operations for transportation of solar power satellites (SPS) to space are addressed. The history of SPS launch vehicle evolution is shown. Alternative vehicle designs developed include: (1) a parallel burn, crossfeed configuration; (2) single stage to orbit airbreathing/rocket runway takeoff vehicle concept; and (3) a smaller HLLV concept. The smaller HLLV was analyzed to compare the nonrecurring cost benefits of a less challenging development with the recurring cost increases expected due to losses in efficiency associated with smaller vehicle size. The vehicle payload bay size was selected to be adequate to accommodate the SPS transmitter subarrays fully assembled. The resulting vehicle design is compared with the shuttle, the Saturn V, and the reference SPS HLLV. A nonrecurring savings of at least five billion dollars was obtained with a recurring cost penalty of 3% per SPS. The environmental benefits of the small vehicle were deemed more important than the slight increase in upper atmosphere propellant deposition. It is recommended that the small HLLV be adopted as the SPS reference launch system.

Woodcock, G. R.↗

The evolution of the geostationary platform concept

The paper will review the conceptual development over the last decade of the use of very large spacecraft, i.e., 'platforms', in geostationary orbit. Geostationary platforms were originally conceived as an efficient means of increasing the capacity at a point in the geostationary orbital arc. Also, geostationary platforms have been suggested for mounting very large antennas as will be required for mobile communications, or high power sources as will be required for broadcast services to small terminals. More recently these 'large satellite' platforms were also envisioned as including earth observation and other science payloads. The advent of the Space Station, which can provide a staging base for platform assembly and test in space at low earth orbit prior to launch to geostationary earth orbit, will introduce a new dimension to practical platform design. This paper describes the evolution of concepts for geostationary platforms over the last decade based on both communications and science user scenarios developed worldwide.

Edelson, Burton I.↗

STS-72 Space Shuttle Mission Report

The STS-72 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the seventy-fourth flight of the Space Shuttle Program, the forty-ninth flight since the return-to-flight, and the tenth flight of the Orbiter Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-75; three Block I SSME's that were designated as serial numbers 2028, 2039, and 2036 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-077. The RSRM's, designated RSRM-52, were installed in each SRB and the individual RSRM's were designated as 36OW052A for the left SRB, and 36OW052B for the right SRB. Appendix A lists the sources of data, both formal and informal, that were used to prepare this report. The primary objectives of this flight were to retrieve the Japanese Space Flyer Unit (JSFU) and deploy and retrieve the Office of Aeronautics and Space Technology-Flyer (OAST-Flyer). Secondary objectives were to perform the operations of the Shuttle Solar Backscatter Ultraviolet (SSBUV/A) experiment, Shuttle Laser Altimeter (SLA)/get-Away Special (GAS) payload, Physiological and Anatomical Rodent Experiment/National Institutes of Health-Cells (STL/NIH-C) experiment, Protein Crystal Growth-Single Locker Thermal Enclosure System (PCG-STES) experiment, Commercial Protein Crystal Growth (CPCG) payload and perform two extravehicular activities (EVA's) to demonstrate International Space Station Alpha (ISSA) assembly techniques). Appendix B provides the definition of acronyms and abbreviations used throughout the report. All times during the flight are given in Greenwich mean time (GMT) and mission elapsed time (MET).

Fricke, Robert W., Jr.↗

Overview of the Solar-B Mission

The Solar-B mission is a collaboration between the Japan Aerospace Exploration Agency, Institute of Space and Astronautical Science, the National Aeronautics and Space Administration (NASA) and the Particle Physics and Astronomy Research Council (PPARC) of the United Kingdom and the European Space Agency. The principal scientific goals of the mission are to understand the processes of magnetic field generation, transport and ultimate dissipation of solar magnetic fields and how the release of magnetic energy is responsible for the heating and structuring of the chromosphere and corona. The scientific payload consists of three instruments: the Solar Optical Telescope that consists of the Optical Telescope Assembly and the Focal Plane Package (FPP), the X-ray Telescope and the EUV Imaging Spectrometer Each instrument is a result of the combined talents of all the members of the international team and their design and performance is described in separate papers in this session. The instruments are designed to work together as an 'observatory' simultaneously studying the target, at which the spacecraft is pointed, at different levels in the atmosphere. The spacecraft is scheduled for launch in September 2006 from the Uchinoura Space Center into a 600 km circular, sun-synchronous, polar orbit with a nominal elevation of 97.9 degrees. The orbit provides at least two morning and two evening contacts in Japan. Morning contacts are used for recovering quick look science data and the evening contacts for uploading commands. In addition ESA will provide 15 contacts per day from the Norwegian high latitude (78deg 14' N) ground station at Svalbard. The data downloads are transmitted to the ISAS Sirius database. They will be reformatted into FITS files and archived as Level 0 data on the ISAS DARTS system and made available to the scientific community. Scientific operations will be conducted from the IS AS facility located in Sagamihara, Japan. They are separated into planning, implementation and archiving. The planning process involves monthly, weekly and daily planning meetings. All scientific data will be made available after the first six month approximately one week after its collection.

Davis, John M.↗

The Imaging X-Ray Polarimetry Explorer (IXPE): Overview

Mission background: Imaging x-ray polarimetry in 2–8 kiloelectronvolt band; NASA Astrophysics Small Explorer (SMEX) selected in 2017 January. Orbit: Pegasus-XL (airborne) launch in 2021, from Kwajalein; Equatorial circular orbit at greater than or approximately equal to 540 kilometers (620 kilometers, goal) altitude. Flight system: Spacecraft, payload structure, and integration by Ball Aerospace - Deployable payload boom from Orbital-ATK, under contract to Ball; X-ray Mirror Module Assemblies by NASA/MSFC; X-ray (polarization-sensitive) Instruments by IAPS/INAF (Istituto di Astrofisica e Planetologia Spaziali / Istituto Nazionale di Astrofisica) and INFN (Istituto Nazionale di Fisica Nucleare). Ground system: ASI (Agenzia Spaziale Italiana) Malindi ground station, with Singapore backup; Mission Operations Center at LASP (Laboratory for Atmospheric and Space Physics, University of Colorado); Science Operations Center at NASA/MSFC; Data archive at HEASARC (High Energy Astrophysics Science Archive Research Center), (NASA/GSFC), mirror at ASI Data Center. Science: Active galactic nuclei; Microquasars; Radio pulsars and pulsar wind nebulae; Supernova remnants; Magnetars; Accreting x-ray pulsars.

X-ray polarimetry space missio↗

VIPER: Systems Integration Status

NASA’s Artemis Program plans to return humans to the Moon for an extended stay. To do so will require substantial resources to sustain that continued human presence, including continuous supplies delivered from the Earth. Given the expense and complexity of resource deliveries from Earth, if some resources were indigenously available, substantial logistical savings could be available by “living off the land”, wherever possible. The LCROSS[1] , LRO and other missions have confirmed the presence of resources such as water-ice and other volatiles in lunar polar regions, so the next step is to understand the scientific nature and physical distribution of those candidate resources. Those local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss the latest systems-level integration activities by the VIPER team, following our initial introduction to this mission at IAC2021[2] . The VIPER team successfully passed its Systems Integration Review (SIR) in late-2022, and in early 2023, began system-level surface segment (rover) flight hardware assembly. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model with partner, Astrobotic, Inc.

VIPER↗

Overview of the Capture, Containment, and Return System (CCRS)

The Mars Sample Return (MSR) campaign is one of the most ambitious and complex planetary exploration missions currently underway. With the participation of NASA, ESA, and a large number of industry partners, MSR aims to bring Martian soil, rock, and atmospheric samples back to Earth, in order to answer key questions about Mars’ biological evolution. To accomplish this goal the campaign relies on four coordinated missions, each fulfilling a fundamental role to bring the samples to Earth. The Mars Perseverance rover, the first of the four missions, landed safely on Mars on February 18, 2021 and has already acquired candidate samples for Earth return. A selection of the samples of Martian soil and atmosphere that Perseverance has captured during its mission will be recovered, launched into Mars orbit, and transported back to Earth. The Sample Fetch Rover and Mars Ascent System, both parts of the Sample Return Lander project, perform the Mars surface missions to retrieve the collected samples and launch them into Mars orbit. NASA’s Capture, Containment, and Return System (CCRS), hosted on ESA’s Earth Return Orbiter (ERO), brings the samples back to Earth from Mars orbit. These retrieval and return missions are currently in the planning and design stages of development. The NASA-provided CCRS is the payload of the ESA ERO and is the focus of this presentation. ERO will enter Mars orbit and provide communication relay to Earth for the other MSR elements. The Sample Return Lander systems will fetch the sample tubes and integrate them into a protective vessel – the Orbiting Sample (OS) system – which is then launched into low Mars orbit. ERO will perform rendezvous maneuvers, allowing its CCRS payload to capture the OS, contain it, and perform the first automated in-space assembly of a spacecraft, the Earth Entry System (EES), while in Mars orbit. ERO will then begin its journey back to Earth, with CCRS and its assembled EES spacecraft. Three days prior to arrival, CCRS will release the EES on an Earth entry trajectory from a distance beyond the orbit of the Moon. The passive EES spacecraft will then enter Earth’s atmosphere, flying on a ballistic trajectory, followed by a terminal descent (without a parachute) and landing at the Utah Test and Training Range (UTTR). This presentation will show the current design of the CCRS system and its concept of operations. ERO and CCRS will perform several firsts in planetary exploration: (a) orbital rendezvous and capture in Mars orbit, (b) in-space sterilization and containment, (c) on-orbit spacecraft assembly at Mars, and (d) fully-passive entry, descent, and landing sequence for sample return.

Carlie H. Zumwalt↗

Lunar Utilization Control Area (LUCA): Configurable Mission Control Rooms and the Benefits to Future Spaceflight

Configurable Control Rooms provide the ability to rapidly change capabilities from mission to mission and customer to customer. Future missions will likely not have the 24/7/365 need for a dedicated mission support room, and CCR could easily be adapted for continuous support if needed. CCRs offer physical, centralized locations for teams to support, and the HOSC provides a secure, reliable facility with constant monitoring by network specialists. Institutions and payload teams can cost save by utilizing a CCR at MSFC eliminating the need to assemble an entire custom control room at their location. This new paradigm in flight operations can ease the creation of any mission from a cubesat to a New Frontiers or Flagship program and anything in between.

Configurable Control Rooms↗

International Space Station Space Environments Performance and Anomaly Resolution

The International Space Station is the largest and most complex on-orbit platform for space science utilization in low Earth orbit. The Space Environments Team addresses natural and induced environments for the ISS Program including external contamination, ionizing radiation, neutral atmosphere and solar ultraviolet radiation, plasma effects, and acoustics. For the ISS to fulfill its mission as a long-duration science platform, space environments effects are assessed, monitored, and controlled through design or operational mitigation. Interactions of ISS hardware with the natural and induced space environments, and the assessment and mitigation of those effects play a critical role in ISS mission operations. The Space Environments Team has complete system integration responsibility in these area for U.S./International Partner/Russian hardware, visiting vehicles, ISS payloads and operation. Lessons learned and processes developed for ISS are applicable to the design, assembly, and operations of long-duration space systems.

space environments↗