Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimal scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Co-optimization of repairs and dynamic network reconfiguration for improved distribution system resilience

In this work, a post-disaster distribution system repair and restoration (DSRR) strategy is proposed to improve distribution system resilience. The DSRR strategy is formulated as a two-stage optimization. The first stage is a comprehensive co-optimization of repair crew scheduling, dynamic network reconfiguration, and distributed energy resource (DER) dispatch based on the forecast load profile. The goal is to minimize the accumulative operating cost caused by the load reduction payment as well as DER operating cost. In particular, since the number of available repair crews is usually smaller than the number of faulted lines after a disaster event, the DSRR strategy determines the optimal scheduling for repairing faulted lines. The second stage is a re-dispatch of the DER power output and load shedding based on the real-time load demand of each bus. The proposed algorithm is validated by case studies of the IEEE 33-bus and 123-bus test systems. We consider those scenarios in which faults occur in multiple heavy-loaded feeders. The simulation results demonstrate that the DSRR strategy effectively coordinate the repair scheduling, network reconfiguration and load shedding to minimize the operating cost.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy Resource Optimization Using a Software as Service (SaaS) Approach at the University of California, Davis Campus

Together with OSIsoft LLC as its private sector partner and matching sponsor, the Lawrence Berkeley National Laboratory (Berkeley Lab) won an FY09 Technology Commercialization Fund (TCF) grant from the U.S. Department of Energy. The goal of the project is to commercialize Berkeley Lab's optimizing program, the Distributed Energy Resources Customer Adoption Model (DER-CAM) using a software as a service (SaaS) model with OSIsoft as its first non-scientific user. OSIsoft could in turn provide optimization capability to its software clients. In this way, energy efficiency and/or carbon minimizing strategies could be made readily available to commercial and industrial facilities. Specialized versions of DER-CAM dedicated to solving OSIsoft's customer problems have been set up on a server at Berkeley Lab. The objective of DER-CAM is to minimize the cost of technology adoption and operation or carbon emissions, or combinations thereof. DER-CAM determines which technologies should be installed and operated based on specific site load, price information, and performance data for available equipment options. An established user of OSIsoft's PI software suite, the University of California, Davis (UCD), was selected as a demonstration site for this project. UCD's participation in the project is driven by its motivation to reduce its carbon emissions. The campus currently buys electricity economically through the Western Area Power Administration (WAPA). The campus does not therefore face compelling cost incentives to improve the efficiency of its operations, but is nonetheless motivated to lower the carbon footprint of its buildings. Berkeley Lab attempted to demonstrate a scenario wherein UCD is forced to purchase electricity on a standard time-of-use tariff from Pacific Gas and Electric (PG&E), which is a concern to Facilities staff. Additionally, DER-CAM has been set up to consider the variability of carbon emissions throughout the day and seasons. Two distinct analyses of value to UCD are possible using this approach. First, optimal investment choices for buildings under the two alternative objectives can be derived. Second, a week-ahead building operations forecaster has been written that executes DER-CAM to find an optimal operating schedule for buildings given their expected building energy services requirements, electricity prices, and local weather. As part of its matching contribution, OSIsoft provided a full implementation of PI and a server to install it on at Berkeley Lab. Using the PItoPI protocol, this gives Berkeley Lab researchers direct access to UCD's PI data base. However, this arrangement is in itself inadequate for performing optimizations. Additional data not included in UCD's PI database would be needed and the campus was not able to provide this information. This report details the process, results, and lessons learned of this commercialization project.

25 ENERGY STORAGE↗

Integrated End-to-end Performance Prediction and Diagnosis for Extreme Scientific Workflows

This report details recent progress for the ASCR funded project “Integrated End-to-end Performance Prediction and Diagnosis for Extreme Scientific Workflows”. We refer to the project as IPPD/2, reflecting the 2017 renewal under expanded scope and partners In IPPD/2, we increased our research scope to include data motion. We are focusing on three major aspects: a) observe how data is generated, distributed, and used; b) analyze how data is (repeatedly) consumed with a focus both on repeated patterns and anomalies; and c) explore how to optimize data motion. This new work on data motion will augment and complement IPPD/2’s research that focused on the computational aspects of tasks. We leverage and extend our existing tools and demonstrate our work on the Belle II workflow suite as well as on workflows from NSLS-II. The highlights of our work are as follows: Provenance for Workflows: Provenance is used to provide information enabling quality control, re-run computational workflows, and reproduce results. IPPD/2 has been building a scalable provenance management system that enables the capture of provenance from the high-level workflow through all relevant system levels in one integrated environment. Leveraging this work, our recent efforts have included using provenance as an enabling technique. Workload characterization: Leveraging provenance and analysis, we characterize data movement within network, storage, and memory over a variety of workloads. This characterization enables an understanding by performance analysts and application developers of the range of behaviors that could be expected. Performance Prediction for Workflows: The goal of modeling distributed workflows is to understand performance bottlenecks and enable more intelligent task scheduling to optimize selected metrics of interest (e.g., task throughput or output data rate). IPPD/2 has utilized both analytical and AI/ML modeling methodologies for performance modeling. Advanced Scheduling and Fault Modeling for Workflows: Scheduling of large-scale scientific workflows on geographically distributed resources is a challenging problem. To improve workflow throughput, we combined novel scheduling algorithms with task predictions from performance modeling and fault modeling. Dynamically Alleviating Bottlenecks in Workflows: Exploiting our provenance, analysis, and modeling efforts, we have explored and developed several techniques for dynamically detecting and alleviating bottlenecks in data movement. In particular, we have spent considerable effort demonstrating our techniques on production-like workflow configurations.

97 MATHEMATICS AND COMPUTING↗

Dispatch optimization of electric thermal energy storage within System Advisor Model

A stand-alone electric thermal energy storage (ETES) system converts low-value electricity into heat using resistance heating elements. During periods of high-value electricity, an ETES system uses a thermodynamic power cycle to convert stored thermal energy back to electricity. These dispatchable systems derive value from their ability to store energy when prices are low and generate electricity when prices are favorable, i.e., energy arbitrage. Consequently, dispatch optimization of system operations, through maximizing revenue subject to system constraints, is essential to evaluate the economic value of a particular system design. While stand-alone ETES systems offer potential advantages as dispatchable grid storage technologies, there is a lack of a neutral third-party, publicly available, open-source model to evaluate the performance, dispatch, and financial viability of these systems. To address this problem, we have developed a techno-economic model for stand-alone ETES systems, within National Renewable Energy Laboratory's (NREL's) System Advisor Model (SAM). We implement a mixed-integer linear program to determine an ETES optimal operating schedule that maximizes electricity sales less maintenance costs caused by operation and cycling given temporal-varying grid electricity prices. Our contributions include a mixed-integer linear program for energy arbitrage of an ETES system, an ETES performance model through a publicly-available software (i.e., SAM), and an exercise of our model through case studies that compare ETES operational strategies and annual financial metrics. With our dispatch optimization model, we were able to improve revenue by 20% compared to a myopic heuristic while reducing the operational cost of the ETES system through decreases in cycle starts, cycles per day, and heater starts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of model predictive control-enabled home energy management on large-scale distribution systems with photovoltaics

Residential customers use more than one-quarter of the electricity in the world. Optimally managing home energy consumption is an effective way of easing the operational challenges facing the electric grid with increasing solar photovoltaics (PV). This paper studies the impact of the future proliferation of home energy management systems (HEMS) in the presence of PV on large-scale distribution systems. First, we present a stochastic HEMS model that minimizes residential customers' thermal discomfort and energy costs under uncertainty. The HEMS model schedules the optimal operations of residential appliances in the presence of PV within a mixed-integer linear programming-based model predictive control framework that links the proposed HEMS to a quasi-steady-state time-series simulation tool. Additionally, extensive simulations are conducted for a stand-alone residential home using two tariff structures and for 1977 homes on an 8,500-node distribution feeder. Simulation results quantify the impact of the future proliferation of HEMS on the large-scale distribution system with PV.

14 SOLAR ENERGY↗

Robust Optimization for the Day-Ahead Scheduling of Cascaded Hydroelectric Systems

Uncertain electricity prices resulting from the re-structuring of electricity market have brought new opportu-nities and challenges for hydroelectric producers. This paper presents a data-driven robust optimization approach for the day-ahead scheduling of cascaded hydroelectric systems (CHS) with electricity price uncertainty. In this paper, a minimum volume enclosing ellipsoid (MVEE) is adopted to construct an ellipsoidal uncertainty set that fully identifies and exploits the historical characteristics data. Here, a second-order conic optimization formulation of the robust counterpart is derived for efficient computation. A real-world case study is conducted to demonstrate the capability of the proposed optimization approach compared with the traditional robust optimization approach.

13 HYDRO ENERGY↗

Modelling Concentrating Solar Power with Thermal Energy Storage for Integration Studies (Presentation)

Concentrating solar power with thermal energy storage (CSP-TES) can provide multiple benefits to the grid, including low marginal cost energy and the ability to levelize load, provide operating reserves, and provide firm capacity. It is challenging to properly value the integration of CSP because of the complicated nature of this technology. Unlike completely dispatchable fossil sources, CSP is a limited energy resource, depending on the hourly and daily supply of solar energy. To optimize the use of this limited energy, CSP-TES must be implemented in a production cost model with multiple decision variables for the operation of the CSP-TES plant. We develop and implement a CSP-TES plant in a production cost model that accurately characterizes the three main components of the plant: solar field, storage tank, and power block. We show the effect of various modelling simplifications on the value of CSP, including: scheduled versus optimized dispatch from the storage tank and energy-only operation versus co-optimization with ancillary services.

14 SOLAR ENERGY↗

Modelling Concentrating Solar Power with Thermal Energy Storage for Integration Studies: Preprint

Concentrating solar power with thermal energy storage (CSP-TES) can provide multiple benefits to the grid, including low marginal cost energy and the ability to levelize load, provide operating reserves, and provide firm capacity. It is challenging to properly value the integration of CSP because of the complicated nature of this technology. Unlike completely dispatchable fossil sources, CSP is a limited energy resource, depending on the hourly and daily supply of solar energy. To optimize the use of this limited energy, CSP-TES must be implemented in a production cost model with multiple decision variables for the operation of the CSP-TES plant. We develop and implement a CSP-TES plant in a production cost model that accurately characterizes the three main components of the plant: solar field, storage tank, and power block. We show the effect of various modelling simplifications on the value of CSP, including: scheduled versus optimized dispatch from the storage tank and energy-only operation versus co-optimization with ancillary services.

14 SOLAR ENERGY↗

Optimal operation of solid-oxide electrolysis cells considering long-term chemical degradation

Optimizing the performance of solid oxide electrolysis cells (SOECs) for long-term hydrogen (H 2 ) production at high temperatures is crucial, as prolonged operation leads to efficiency losses and shorter cell lifespans due to chemical degradation. Here, in this work, we adopt a quasi-steady state approach for dynamic optimization over extended operational periods to address the disparity in timescales between cell operation and degradation. Integrating a 2-D non-isothermal SOEC model with balance-of-plant (BOP) equipment, we explore three optimization objectives: minimizing terminal degradation, maximizing integral efficiency, and minimizing the levelized cost of H 2 (LCOH). Our dynamic optimization algorithm reduces LCOH by 9.5% and 16% compared to strategies focusing solely on terminal degradation and integral efficiency, respectively. For electricity prices of 0.03 $\$$/mWh and 0.3 $\$$ mWh optimal replacement schedules range from 5 to 2 years, depending on the operational mode. Furthermore, a flexible operational mode yields additional improvements in LCOH over traditional galvanostatic and potentiostatic modes.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Methods and Tools To Assess Robustness of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plant (NPP) operating cycle. Refueling outages are extremely costly for an NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities within 30 days on average. Despite detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjustment. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but are often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. This paper focuses on developing tools and methods to support NPPs with outage schedule optimization and it describes the initial development of tools to support outage management that leverage computational and machine learning methods.

97 - MATHEMATICS AND COMPUTING↗

Dispatch Optimization, System Design and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage

Variable renewable energy availability has increased the volatility in energy prices in most markets. Nuclear power plants, with a large ratio of capital to variable costs, have historically operated as base load energy suppliers but the need for more flexible operation is increasing. We simulate the techno-economic performance of a 950 MWt nuclear power plant, based on the Westinghouse lead-cooled fast reactor, coupled with molten salt thermal storage as a method for flexible energy dispatch. We use the System Advisor Model to model the nuclear reactor thermal power input and power cycle operating modes. We combine this robust engineering model with a mixed-integer linear program model for optimized dispatch scheduling. We then simulate the coupled nuclear and thermal storage system under different market scenarios with varying price volatility. We find that the coupled plant outperforms the base plant under markets where energy price peaks fluctuate by a factor of two or more about the mean price. We show that a calculated power purchase agreement price for the plant improves by up to 10% when operating under California energy market conditions. Sensitivity analysis on the thermal storage cost shows that the optimal design remains unchanged even when doubling costs.

25 ENERGY STORAGE↗

Research Highlight - Dispatch Optimization, System Design and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage

We highlight our work from our previous publication titled "Dispatch Optimization, System Design, and Cost Benefit Analysis of a Nuclear Reactor with Molten Salt Thermal Storage" published in MDPI Energies 2022 (doi.org/10.3390/en15103599). Variable renewable energy availability has increased the volatility in energy prices in most markets. Nuclear power plants, with a large ratio of capital to variable costs, have historically operated as base load energy suppliers but the need for more flexible operation is increasing. We simulate the techno-economic performance of a 950 MWt nuclear power plant, based on the Westinghouse lead-cooled fast reactor, coupled with molten salt thermal storage as a method for flexible energy dispatch. We use the System Advisor Model to model the nuclear reactor thermal power input and power cycle operating modes. We combine this robust engineering model with a mixed-integer linear program model for optimized dispatch scheduling. We then simulate the coupled nuclear and thermal storage system under different market scenarios with varying price volatility. We find that the coupled plant outperforms the base plant under markets where energy price peaks fluctuate by a factor of two or more about the mean price. We show that a calculated power purchase agreement price for the plant improves by up to 10% when operating under California energy market conditions. Sensitivity analysis on the thermal storage cost shows that the optimal design remains unchanged even when doubling costs.

97 MATHEMATICS AND COMPUTING↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement: Preprint

Distribution system resilience enhancement is an important topic to ensure customers have access to the power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecasts. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement

Distribution system resilience enhancement is an important topic to ensure customers have access to power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecast. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Modeling and Control Design for a Turboelectric Single Aisle Aircraft Propulsion System

A nonlinear dynamic model with full flight envelope controller is developed for the propulsion system of a partially turboelectric single-aisle aircraft. The propulsion system model consists of two turbofan engines with a large percentage of power extraction, feeding an electric tail fan for boundary layer ingestion. The dynamic model is compared against an existing steady state design model. An electrical system model using a simple power flow approach is integrated into existing modeling tools used for dynamic simulation of the turbomachinery of the vehicle. In addition to the simple power flow model of the electrical system, a more detailed model is used for comparison at a key vehicle transient flight condition. The controller is a gain scheduled proportional-integral type that is examined throughout the flight envelope for performance metrics such as rise time and operability margins. Potential improvements in efficiency for the vehicle are explored by adjusting the power split between the energy used for thrust by the turbofans and that extracted to supply power to the tail fan. Finally, an operability study of the vehicle is conducted using a 900 nautical mile mission profile for a nominal vehicle configuration, a deteriorated propulsion system at the end of its operating life, and an optimized power schedule with improved efficiency.

Turboelectric↗

Technical Assessment of the Application of Digital Twin and Prognostic Tools for Condition Monitoring

This report was prepared for the U.S. Nuclear Regulatory Commission (NRC) to present use cases of the application of advanced technologies toward meeting the current and future regulatory requirements for maintenance and condition monitoring of structures, systems, and components (SSCs). The advanced technologies considered in this work, collectively referred to as digital twin (DT) technologies, are advanced sensors and instrumentation, data analytics, machine learning and artificial intelligence (ML/AI), and physics-based models. The report presents two use cases of reactor coolant pumps (RCPs) and heat pipes in nuclear power plants (NPPs) with technical and regulatory considerations and opportunities in using advanced technologies for conditional monitoring. Key findings from the exploration of these considerations are as follows: - Uncertainties in sensor data and model predictions must be rigorously addressed through validation and verification processes - Regulatory compliance is paramount, necessitating data driven models to be developed in line with existing codes and standards, as well as considering potential future guidelines for advanced reactors - Explainability and transparency in ML/AI models are essential for developing operator trust and regulatory review, including methods that enhance the interpretability of complex data-driven predictions - Condition monitoring programs must be evaluated for their effectiveness in reducing maintenance-preventable function failures (MPFF) and aligning with plant performance criteria - The deployment of advanced technologies for condition monitoring could lead to a transition from periodic to continuous monitoring, thereby optimizing maintenance schedules - Collaborative efforts between industry stakeholders, regulatory bodies, and technology developers are crucial for the successful adoption of advanced technologies for condition monitoring systems in nuclear facilities In summary, the introduction of advanced technologies into condition monitoring programs represents a significant leap forward in the domain of NPP maintenance. By harnessing the capabilities of advanced sensors, data analytics, and ML/AI, NPP operators can transition from a time-based to a condition-based maintenance approach. This shift can potentially enhance the reliability and safety of critical plant components while optimizing maintenance efforts and minimizing unnecessary outages. The NRC is continuing to explore the regulatory aspects of advanced technologies as part of inservice inspection and inservice testing (ISI and IST) programs by pursuing additional research in this technical area.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

The High Capacity Type B Waste Transport Cask to Serve Dismantling Project - 18344

The United States have already announced around 20 reactor shutdown and many more in the next 10 year. Financial constraints on plant operators and the low cost of fossil energy contribute to accelerate the shutdown of additional reactors. The industry has been gaining experience with reactor dismantling and is continuously trying to improve the cost efficiency of the upcoming projects. To do so, larger and more capacitive transport casks are needed to transport increasing volume of Low Level Waste (LLW) at a more attractive cost. Waste disposal is also a major cost element in a dismantling project. Consequently, the capacity to segment, package and transport the waste in the most optimized configuration will result in significant cost savings. While for LLW, the constraints for package requirements are limited, activated waste resulting mainly from reactor vessel and vessel internals segmentation require additional shielding to meet disposal and transportation regulations. The key element to succeed is the availability on the market of a licensed type B transport package with a larger payload that allows at the same time an optimization of the waste segmentation. AREVA TN has designed and licensed versatile high capacity type B casks for the transport of spent fuel canisters as part of the NUHOMS{sup R} system that can also be used to transport radioactive waste. While it will take a few more years to transport spent fuel to a consolidated interim storage facility and even more to a repository, the type B casks can be used to transport activated LLW from dismantled reactors to disposal sites. A first of a kind project will be performed with AREVA's partner NorthStar at Vermont Yankee Nuclear Power Plant. AREVA's team will perform the reactor segmentation and package the material into an AREVA's large capacity type B cask. This unmatched cask capacity is expected to significantly decrease the LLW disposal costs, as well as the onsite operations costs, while optimizing the schedule. The package will be transported by rail to waste disposal facilities. This paper will present the main characteristics of the package, provide an update of the overall schedule, and explain the innovations that contribute to simpler and more cost effective transport and operation. Finally, it will emphasize the benefits of using larger type B casks for immediate and future transportation needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Parallel Hybrid Turboprop Performance Modeling and Optimization

NASA’s Electrified Powertrain Flight Demonstration (EPFD) project conducts ground and flight tests of integrated Megawatt (MW) class hybrid-electric powertrain systems on regional turboprop aircraft demonstrators. To meet the increased demand for assessment of potential capabilities and benefits from these novel vehicle configurations, NASA is developing tooling and models to estimate the performance of hybridized regional turboprops. This paper covers the development of a parametrically driven performance model for a De Havilland Canada Dash 8-400 (Q400) regional turboprop integrated with a novel parallel hybrid architecture using the Gascon framework. Gascon is a modern reimplementation of the General Aviation Synthesis Program (GASP) built using the Condor mathematical modeling framework in Python. Within Gascon, a parametric representation of the parallel hybrid architecture was synthesized, which features the electric motor coupled to the power turbine. This capability allows for in-the-loop optimization of the parametric parallel hybrid architecture to characterize the mission capabilities and fuel savings of the design and determine optimal power scheduling strategies for efficient electric power management for a given mission. The study shows that a fuel savings of up to 20% can be achieved, but that increased fuel savings comes at the expense of payload capacity.

Gascon↗