Impacts of simultaneous operating faults on cooling performance of a high efficiency residential heat pump
Not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not provided.
Abstract Cohen BS, Redmond JE, Haven CC, Foulis SA, Canino MC, Frykman PN, Sharp MA. Occupational Experience Effects on Physiological and Perceptual Responses of Common Soldiering Tasks. J Strength Cond Res 37(4): 894–901, 2023—This study measured the impact of occupational experience (i.e., time spent deployed, in military service, and in job and task performance frequency in training, deployment, and study practice) on the physiological (heart rate [HR] and oxygen consumption [VO 2 ]) and perceptual (rate of perceived exertion [RPE]) responses to performance of critical physically demanding tasks (CPDTs). Five CPDTs (road march, build a fighting position, move under fire, evacuate a casualty, and drag a casualty to safety), common to all soldiers, were performed by 237 active duty soldiers. Linear regression models examined the association between measures of experience and physiological and perceptual performance responses to task demands. The level of significance was adjusted for multiple comparisons and set at ρ ≤ 0.0125 for this study. Significant and notable effect sizes included the impact of time spent deployed on the physiological measures of the road march (PostHR F = 24.84, p < 0.0001, β=-9.65), sandbag fill (PostHR F = 8.26, p = 0.005, β = −2.83), and sandbag carry (MeanHR F = 7.51, p = 0.007, β = −1.12; PostHR F = 7.35, p = 0.007, β = −0.87). For the road march task, there was a nearly 10 bpm decrease in postperformance HR for every year spent deployed. Road march, sandbag fill, and sandbag carry tasks PostHRs were also notably negatively associated with the experience measures of time in their MOS (job and time in military service but not for other physiological and perceptual responses, including VO 2 and RPE. Frequency of task performance in training, deployment, and study practice was not meaningfully associated with experience. The results suggest that increasing task familiarization through on-the-job occupational operational experience may result in greater proficiency and reduced physiological effort.
The scope of this project was to pursue specific SAS4A liquid-metal cooled reactor (LMR) safety analysis software extensions to simulate postulated accidents with fuel failures for oxide-fueled Lead-cooled Fast Reactors (LFRs). Since most U.S. LMR experience is on sodium-cooled fast reactor options based on past testing and operation experience with EBR-II and FFTF, the DOE’s legacy fast reactor safety analysis capabilities were focused on metal-fueled pool-type concepts with sodium coolant. In recent years, Westinghouse Electric Company (WEC) has decided to pursue an LFR design as one of their next generation nuclear technology options because of its favorable safety and economics attributes. Oxide fuel is considered among other fuel options due to previous WEC experience with this fuel form. Development of this new technology requires the availability of adequately accurate computational tools, some of which can be adapted from versions of similar software used for analysis of other LMRs. Although Argonne National Laboratory’s (ANL) SAS4A/SASSYS-1 safety analysis software suite (shortened as SAS4A code hereafter for brevity) has the basic capabilities to model LFR system designs, the SAS4A code modules used in the analysis of accidents with fuel/cladding failures lack appropriate models for the unique phenomena that govern as-irradiated oxide-fuel damage mechanisms in lead coolant. Therefore, the objective of this project was to extend the capabilities of SAS4A with mechanistic oxide-fuel failure models in lead coolant for margin to failure assessments, analysis of failure modes, location and timing of failures under different accident scenarios consistent with the whole-plant dynamic response including the reactivity feedback, and assessment of the potential for fuel damage propagation due to potential fission gas jet and fuel-fragment/molten fuel impingement to neighboring fuel pins in an assembly. This report provides mainly a summary of Argonne’s technical contributions in the joint project, but the reports and publications by the Participant team are included as references at the end of the report.
Reacting to potential on-orbit collision risk in an operational environment requires timely and accurate communication and exchange of data, information, and analysis to ensure informed decision-making for safety of flight and responsible use of the shared space environment. To accomplish this mission, it is imperative that all stakeholders effectively manage resources: devoting necessary and potentially intensive resource commitment to responding to high-risk conjunction events and preventing unnecessary expenditure of resources on events of low collision risk. After 10 years of operational experience, the NASA Robotic Conjunction Assessment Risk Analysis (CARA) is modifying its Concept of Operations (CONOPS) to ensure this alignment of collision risk and resource management. This evolution manifests itself in the approach to characterizing, reporting, and refining of collision risk. Implementation of this updated CONOPS is expected to have a demonstrated improvement on the efficacy of JSpOC, CARA, and owner/operator resources.
Since the beginning of human spaceflight, the value of understanding mechanisms of physiological adaptation to microgravity became apparent to life scientists who were interested in maintining crew health and developing countermeasures agains adverse effects of the mission. However, several characteristics associated the the logistics of spaceflight presented significant limitations to the scientific study of human adaptation to microgravity. Because space missions are so infrequent and involve minimal numbers of crewmembers, meaninful statistical analysis of data are limited. Reproducibility of results from spaceflight experiments is difficult to assess since there are few repeated space missions involving the same crewmembers. Since the emphasis of space missions is placed on operations, experiments are compromised without adequate control over various factors (e.g., time, diet, physical activities, etc.) that can impact measured responses. With the mimimal opportunity to collect spaceflight data, there is a high risk of experiments that simultaneously interfere with other experiments by the increasing demand on the crewmembers to participate in mumerous experiments proposed by multiple investigators. The technology and ability to measure physiological functions necessary to test specific hypotheses can be severely limited by physical space and power constraints of the space enviroment. Finally, technical and logistical aspects of space missions such as launch delays, extended missions, and inflight operational emergencies can significantly compromise the timing and control of experiments. These limitations have stimulated scientists to develop ground-based analogs of microgravity in an effort to investigate the effects of spaceflight on physiological function in a controlled experimental setting. The purpose of this paper is to provide a selected comparison of data collected from ground-based experiments with those obtained from spaceflight in an effort to assess the adequacy of ground analogs of actual flight for the study of human physiological adaptation to microgravity. Specifically, results from ground and spaceflight will be used to provide insight into mechanisms underlying adaptations of blood pressure regulation and reduced orthostatic performance to the microgravity environment.
The NASA/Mir Phase I Program is a precursor to the assembly and operations of the International Space Station (ISS). The Phase I Program covers a four-year period and encompasses over ten shuttle flights to the Mir, culminating with the flight of STS-91 in June 1998. The Mir-Orbiting Station (Mir-OS) provides an excellent environment, both onboard and on the ground, for learning and studying the characteristics associated with crew-tended operations on long duration missions. By the end of the Phase I program, NASA astronauts will have accumulated over two years of continuous operations experience working and living onboard the Mir-OS. Ground controllers, working in Russia and at remote sites in the United States, will have gained valuable experience in the generation, maintenance, and coordination of the information and products required to support the long duration crew members onboard the Mir-OS. The experience gained by the crew and ground support personnel in the area of long duration mission operations has resulted in a number of factors that need to be considered in the definition and implementation of the processes and products for the ISS. While there are many areas in which experience has been gained, this paper focuses on the lessons learned regarding the level of detail and flexibility of crew timelines. Provided in this paper is an overview of the characteristics associated with long duration mission timeline development and execution, a summary of applicable lessons learned identified and documented through participation in the NASA/Mir Phase I Program, a detailed discussion of "Gross Timelines" as implementation which addresses the lessons learned. Also discussed are the challenges that must be overcome in getting the ISS program to recognize, evaluate, and learn from the crew and ground controller experience gained through participation in the NASA/Mir Phase I Program.
A common way to manipulate a quantum system, for example spins or artificial atoms, is to use properly tailored control pulses. In order to accomplish quantum information tasks before coherence is lost, it is crucial to implement the control in the shortest possible time. Here we report the near time-optimal preparation of a Bell state with fidelity higher than 99% in an NMR experiment, which is feasible by combining the synergistic capabilities of modeling and experiments operating in tandem. In this work, the pulses preparing the Bell state are found by experiments that are recursively assisted with a gradient-based optimization algorithm working with a model. Thus, we exploit the interplay between model-based numerical optimal design and experimental-based learning control. Utilizing the balanced synergism between the dual approaches, as dictated by the case specific capabilities of each approach, should have broad applications for accelerating the search for optimal quantum controls.
The technical aspects of the University of California IMP-F experiment aboard the Explorer-34 and the University of California IMP-G (S1) and (S2) experiments aboard the Explorer-41. The experiment detectors and electronics are discussed for each experiment as well as the fabrication, preflight and post-flight history. A description of the ground support equipment is also given for each experiment. These three experiments were essentially all different. The IMP-G experiment was essentially the IMP-F experiment with the addition of four Geiger-Mueller detectors. The IMP-G (S-2) was a supplementary experiment and differed completely from the IMP-F and IMP-G experiments. It was concluded that the ground support equipment approach used for the IMP-F and IMP-G experiments where emphasis was placed on a thorough exercise and monitoring of the experiment operation during various testing phases provided a high degree of confidence and reliability in these experiments. No known electronic failures have occurred during the spacecraft lifetime although some detector problems were experienced.
The development of space shuttle separation devices is reviewed to illustrate the mechanisms involved in separating the Orbiter from the Boeing 747 carrier aircraft and from the externally mounted propellant tank. Other aspects of the separation device development discussed include design evolution, operational experience during the orbiter approach and landing tests, and the work required to produce an operational system.
An optical lightning detector was constructed and flown, along with Vinton cameras and a Fairchild Line Scan Spectrometer, on a U-2 during the summer of 1979. The U-2 lightning data was obtained in daylight, and was supplemented with ground truth taken at Langmuir Laboratory. Simulations were prepared as required to establish experiment operating procedures and science training for the astronauts who would operate the Night/Day Optical Survey of Thunderstorm Lightning (NOSL) equipment during the STS-2 NOSL experiment on the Space Shuttle. Data was analyzed and papers were prepared for publication.
The 'Tank Pressure Control Experiment/Thermal Phenomena (TPCE/TP)' is a reflight of the tank pressure control experiment (TPCE), flown on STS-43 in a standard Get-Away Special (GAS) container in August 1991. The TPCE obtained extensive video and digital data of the jet induced mixing process in a partially filled tank in low gravity environments. It also provided limited data on the thermal processes involved. The primary objective of the reflight of TPCE is to investigate experimentally the phenomena of liquid superheating and pool nucleate boiling at very low heat fluxes in a long duration low gravity environment. The findings of this experiment will be of direct relevance to space based subcritical cryogenic fluid system design and operation. Experiment hardware and results from the first TPCE are described in outline and graphic form.
The U. S., Russia, and, China have each addressed the question of human-rating spacecraft. NASA's operational experience with human-rating primarily resides with Mercury, Gemini, Apollo, Space Shuttle, and International Space Station. NASA s latest developmental experience includes Constellation, X38, X33, and the Orbital Space Plane. If domestic commercial crew vehicles are used to transport astronauts to and from space, Soyuz is another example of methods that could be used to human-rate a spacecraft and to work with commercial spacecraft providers. For Soyuz, NASA's normal assurance practices were adapted. Building on NASA's Soyuz experience, this report contends all past, present, and future vehicles rely on a range of methods and techniques for human-rating assurance, the components of which include: requirements, conceptual development, prototype evaluations, configuration management, formal development reviews (safety, design, operations), component/system ground-testing, integrated flight tests, independent assessments, and launch readiness reviews. When constraints (cost, schedule, international) limit the depth/breadth of one or more preferred assurance means, ways are found to bolster the remaining areas. This report provides information exemplifying the above safety assurance model for consideration with commercial or foreign-government-designed spacecraft. Topics addressed include: U.S./Soviet-Russian government/agency agreements and engineering/safety assessments performed with lessons learned in historic U.S./Russian joint space ventures
The development of space shuttle separation devices is reviewed to illustrate the mechanisms involved in separating the orbiter from the Boeing 747 carrier aircraft and from the externally mounted propellant tank. Other aspects of the separation device development discussed include design evolution, operational experience during the orbiter approach and landing tests, and the work to be accomplished before an operational system becomes a reality.
The National Aeronautics and Space Administration (NASA) is addressing airport capacity enhancements during instrument meteorological conditions through the Terminal Area Productivity (TAP) program. Within TAP, the Reduced Spacing Operations (RSO) subelement at the NASA Langley Research Center is developing an Aircraft VOrtex Spacing System (AVOSS). AVOSS will integrate the output of several systems to produce weather dependent, dynamic wake vortex spacing criteria. These systems provide current and predicted weather conditions, models of wake vortex transport and decay in these weather conditions, and real-time feedback of wake vortex behavior from sensors. The goal of the NASA program is to provide the research and development to demonstrate an engineering model AVOSS in real-time operation at a major airport. The demonstration is only of concept feasibility, and additional effort is required to deploy an operational system for actual aircraft spacing reduction. This paper describes the AVOSS system architecture, a wake vortex facility established at the Dallas-Fort Worth International Airport (DFW), initial operational experience with the AVOSS system, and emerging considerations for subsystem requirements. Results of the initial system operation suggest a significant potential for reduced spacing.
The NASA Microgravity Science and Applications Division (MSAD) sponsors science experiments on a variety of microgravity carriers, including Orbiter missions and Russia's Mir space station. The MSAD sponsors the Space Acceleration Measurement System (SAMS) at the NASA Lewis Research Center (LERC) to support these science experiments by providing acceleration measurements to characterize the microgravity environment to which the experiments were exposed. The LeRC Principal Investigator Microgravity Services (PIMS) project supports principal investigations of microgravity science experiments as they evaluate the effects of varying acceleration levels on their experiments. In 1994, a SAMS unit was installed on the Mir space station. In a manner similar to Orbiter mission support, the SAMS unit supports science experiments from the U.S. and Russia by measuring the microgravity environment during experiment operations. Previous reports have summarized the SAMS data acquired during the period from September 1994 to November 1995. During the time period from November 1995 to March 1996, the primary SAMS-supported experiment was a Protein Crystal Growth (PCG) experiment. SAMS data were obtained during the PCG operations on Mir in accordance with the requirements specified by the PCG Principal Investigator. Also included in this data are mission events of interest, such as the undocking of STS-74 from Mir (November 1995) and the docking of Atlantis (STS-76) to Mir in March 1996. This report presents an overview of the SAMS data recorded in the interval from November 1995 to March 1996.
This report presents an enhanced performance evaluation of turbine-driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2018 as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The TDP failure modes considered are failure to start (FTS), failure to run less than or equal to one hour (FTR≤1H), failure to run more than one hour (FTR>1H), and normally running systems FTS and failure to run (FTR). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. A highly statistically significant decreasing trend was identified in the standby TDP unavailability estimates.
This report presents an enhanced performance evaluation of air-operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The AOV failure modes considered are failure-to-open/close (FTOC), failure to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following trends were identified for the most recent 10-year period: o Extremely statistically significant increasing trend for the frequency of FTOC demands (demands per reactor year) for low-demand (= 20 demands per year) AOVs o Extremely statistically significant increasing trend for the frequency of FTOC demands for high-demand (> 20 demands per year) AOVs o Highly statistically significant decreasing trend for the failure rate of FTOP for low-demand AOVs o Highly statistically significant decreasing trend for the frequency of FTOP events (failures per reactor year) for low-demand AOVs o Statistically significant decreasing trend for the failure rate of SO for low-demand AOVs o Statistically significant decreasing trend for the frequency of SO events (failures per reactor year) for low-demand AOVs.
This report presents an enhanced performance evaluation of turbine-driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10-year period: The following decreasing trends were identified for TDPs for the most recent 10-year period: • Standby TDP FTR>1H failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands (demands per reactor year) • Normally running TDP frequency of run hours (hours per reactor year).