Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “minimum energy control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Direct Air Capture and Utilization System (DACUS): FEED Study of CarbonCapture Inc. DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat

The effects of climate change are drastically perceived through the alarming rates of severe events such as flooding, hurricanes, wildfires, global temperature rise, sea-level rise, and ocean acidification etc., which has prompted the nations across the globe to control & reduce greenhouse gas (GHG) emissions, by massive adoption of electric vehicles, switching to renewal energy sources and promoting sustainable green products. However, recent climate studies have shown that such efforts will not be enough to keep the global temperature rising under 1.5° Celsius by the year 2050, which lead to the development of multiple Direct Air Capture (DAC) technologies. A DAC system extracts CO2 directly from the atmosphere, which is either stored underground for long term or utilized in other processes. The DACUS proposed at U.S. Steel Corporation’s Gary Works Plant in Gary, Indiana, will include an innovative DAC technology from CarbonCapture Inc. (CCI), which will be collocated and powered by waste heat from the steel plant to capture CO2 from ambient air, and CarbonCure CO2 utilization technology- which is a commercial technology that is already installed and in use by early adopters in more than 150 concrete mixing plants across North America and Asia. The University of Illinois at Urbana Champaign spearheaded this Front-End Engineering Design (FEED) study project, which was funded by US Department of Energy (DOE), aimed at designing a state-of-the art DACU system that can remove minimum of 5,000 tonne/year net CO2 from air (based on cradle-to-gate LCA) and converting the captured CO2 into low carbon intensity products. The off takers of the low Carbon product produced by the DACUS have also been identified near the steel plant in the Indiana, Illinois & Wisconsin Region. This creates a full CO2 value chain and provides a means to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. DACUS is a promising new technology for reducing greenhouse gas in the atmosphere. Operation costs are minimized by locating CCI’s innovative DAC collector at United States Steel's Gary Works site where waste heat is utilized. Carbon emissions are minimized in CO2 transportation. The captured CO2 will be permanently sequestered in concrete used as construction material. This DOE funded FEED study demonstrates a full CO2 value chain for a DACU system, supported by an industrial facility. If this project were constructed, it would have a very positive and lasting impact on both the environment and the community.

42 ENGINEERING↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

EGS Collab Experiment 1: SIMFIP Notch-164 GRL Paper

Characterizing the stimulation mode of a fracture is critical to assess the hydraulic efficiency and the seismic risk related to deep fluid manipulations. We have monitored the three-dimensional displacements of a fluid-driven fracture during water injections in a borehole at ~1.5 km depth in the crystalline rock of the Sanford Underground Research Facility (USA). The fracture initiates at 61% of the minimum horizontal stress by micro-shearing of the borehole on a foliation plane. As the fluid pressure increases further, borehole axial and radial displacements increase with injection time highlighting the opening and sliding of a new hydrofracture growing ~10 m away from the borehole, in accordance with the ambient normal stress regime and in alignment with the microseismicity. Our study reveals how fluid-driven fracture stimulation can be facilitated by a mixed-mode process controlled by the complex hydromechanical evolution of the growing fracture. The data presented in this submission refer to the SIMFIP measurements and analyses of the stimulation tests conducted on the 164 ft (50 m) notch of the Sanford Underground Research Facility (SURF), during the EGS-Collab test 1. In addition to the datafiles, there is the draft of a manuscript submitted to Geophysical Research Letters (GRL).

15 GEOTHERMAL ENERGY↗

Mars Sample Return Landed with Red Dragon

A Mars Sample Return (MSR) mission is the highest priority science mission for the next decade as recommended by the recent Decadal Survey of Planetary Science. However, an affordable program to carry this out has not been defined. This paper describes a study that examined use of emerging commercial capabilities to land the sample return elements, with the goal of reducing mission cost. A team at NASA Ames examined the feasibility of the following scenario for MSR: A Falcon Heavy launcher injects a SpaceX Dragon crew capsule and trunk onto a Trans Mars Injection trajectory. The capsule is modified to carry all the hardware needed to return samples collected on Mars including a Mars Ascent Vehicle (MAV), an Earth Return Vehicle (ERV) and Sample Collection and Storage hardware. The Dragon descends to land on the surface of Mars using SuperSonic Retro Propulsion (SSRP) as described by Braun and Manning [IEEEAC paper 0076, 2005]. Samples are acquired and deliverd to the MAV by a prelanded asset, possibly the proposed 2020 rover. After samples are obtained and stored in the ERV, the MAV launches the sample-containing ERV from the surface of Mars. We examined cases where the ERV is delivered to either low Mars orbit (LMO), C3 = 0 (Mars escape), or an intermediate energy state. The ERV then provides the rest of the energy (delta V) required to perform trans-Earth injection (TEI), cruise, and insertion into a Moon-trailing Earth Orbit (MTEO). A later mission, possibly a crewed Dragon launched by a Falcon Heavy (not part of the current study) retrieves the sample container, packages the sample, and performs a controlled Earth re-entry to prevent Mars materials from accidentally contaminating Earth. The key analysis methods used in the study employed a set of parametric mass estimating relationships (MERs) and standard aerospace analysis software codes modified for the MAV class of launch vehicle to determine the range of performance parameters that produced converged spacecraft designs capable of meeting mission requirements. Subsystems modeled in this study included structures, power system, propulsion system, nose fairing, thermal insulation, actuation devices, and GN&C. Best practice application of loads and design margins for all resources were used. Both storable and cryogenic propellant systems were examined. The landed mass and lander capsule size provide boundary conditions for the MAV design and packaging. We estimated the maximum mass the Dragon capsule is capable of landing. This and the volume capability to store the MAV was deduced from publically available data from SpaceX as well as our own engineering and aerodynamic estimates. Minimum gross-liftoff mass (GLOM) for the MAV were obtained for configurations that used pump-fed storable bi-propellant rocket engines for both the MAV and the ERV stage. The GLOM required fits within our internal estimate of the mass that Dragon can land at low elevation/optimal seasons on Mars. Based on the analysis, we show that a single Mars launch sample return mission is feasible using current commercial capabilities to deliver the return spacecraft assets.

Mars Ascent Vehicle (MAV)↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - Simulated Marine Hydrokinetic Tidal Turbine

The U.S. Department of Energy and National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis, hydrogen compression and storage, and variable hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) initiative. This dataset is part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with other energy technologies. This dataset contains inputs and outputs from simulations of a floating marine hydrokinetic turbine over approximately half a tidal cycle (~6.6 hours). Inflow conditions were derived from field measurements in Alaska’s Cook Inlet and represent a tidal environment in which the current speed ramps from near 0 m/s to a peak of 3 m/s and back. The original acoustic doppler current profiler dataset is publicly available on the Marine and Hydrokinetic Data Repository. In a full tidal cycle, the flow reverses and the rotor would reorient; this reversal was not modeled. In the Cook Inlet campaign , turbulence intensity was similar in both directions. Two inflow cases are included. In the first case, labeled “raw” in the files, the measured current time series was used directly in the InflowWind module of OpenFAST. Speed and direction were applied as a function of time and elevation, uniformly in the horizontal direction. With full spatial coherence, this approach captures high turbulent variability and results in pronounced power fluctuations, so it is considered a conservative, near-worst-case representation of loading. In the second case, labeled “average” in the files, a 30-minute moving average was applied to extract the slowly varying mean speed. The residual fluctuations about this mean were used to generate spatially varying, full-field turbulence inputs with TurbSim, giving a more physically realistic representation of the inflow across the rotor disk. Two random realizations were used to produce distinct inflow conditions for two OpenFAST simulations representing a two-turbine array. The same turbulence intensity is applied across the full time series, producing larger fluctuations at the start and end, where the mean speed is low. The second case is the more appropriate framework for performance and power assessment but overpredicts turbulence at lower flow speeds and underpredicts it at higher speeds. As the floating platform moves and the rotor changes its x-position, Taylor’s frozen turbulence hypothesis used by InflowWind assumes a constant rather than a time-varying mean velocity, introducing some inaccuracy in the velocity plane sampling. The turbine modeled is the 500-kW Reference Model 1, a horizontal-axis two-bladed hydrokinetic turbine on a four-column floating semisubmersible substructure . Simulations were performed using OpenFAST v4.1 with the Reference Open Source Controller (ROSCO) v2.10. All input files required to reproduce the simulations are included. The electrolyzer is a 1.25-MW proton exchange membrane type MC250 system manufactured by Nel . This unit supports up to 2.5 MW, but NLR has only a single 1.25-MW stack. The datasets report hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. The system controls hydrogen production by varying direct current applied to the stack, from a maximum of 3,000 A to a minimum safe operating current of 300 A, or 10%. Because the current–voltage characteristic changes as the stack ages and efficiency degrades, the actual minimum safe operating power changes over time. The simulated tidal turbine time series data was translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz. Each zip file represents a single tidal electrolysis experiment and is named: {technology}_{inflow method}_{number of 500 kW tidal turbines connected} For instance, “tidal-500kW-RM1_average_2.zip” is a 6-hour experiment using the 500-kW tidal reference model, scaled by 2x (1-MW) to better match the electrolyzer maximum of 1.25MW, fed with the 30-minute moving average current case. Each zip folder contains the following files: A .csv file of raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production in kilograms per hour, electrolysis power consumption, and input wave power. A .csv file combines all tidal profiles as "combined_tidal_experiments.csv." A separate experiment, “characterization_200.zip,” shows the MC250 electrolyzer steady-state response with 30-minute load steps over 5 hours and is accessible with this entry.

08 HYDROGEN↗

In-Situ Nondestructive Evaluation of Kevlar(Registered Trademark)and Carbon Fiber Reinforced Composite Micromechanics for Improved Composite Overwrapped Pressure Vessel Health Monitoring

NASA has been faced with recertification and life extension issues for epoxy-impregnated Kevlar 49 (K/Ep) and carbon (C/Ep) composite overwrapped pressure vessels (COPVs) used in various systems on the Space Shuttle and International Space Station, respectively. Each COPV has varying criticality, damage and repair histories, time at pressure, and pressure cycles. COPVs are of particular concern due to the insidious and catastrophic burst-before-leak failure mode caused by stress rupture (SR) of the composite overwrap. SR life has been defined [1] as the minimum time during which the composite maintains structural integrity considering the combined effects of stress level(s), time at stress level(s), and associated environment. SR has none of the features of predictability associated with metal pressure vessels, such as crack geometry, growth rate and size, or other features that lend themselves to nondestructive evaluation (NDE). In essence, the variability or surprise factor associated with SR cannot be eliminated. C/Ep COPVs are also susceptible to impact damage that can lead to reduced burst pressure even when the amount of damage to the COPV is below the visual detection threshold [2], thus necessitating implementation of a mechanical damage control plan [1]. Last, COPVs can also fail prematurely due to material or design noncompliance. In each case (SR, impact or noncompliance), out-of-family behavior is expected leading to a higher probability of failure at a given stress, hence, greater uncertainty in performance. For these reasons, NASA has been actively engaged in research to develop NDE methods that can be used during post-manufacture qualification, in-service inspection, and in-situ structural health monitoring. Acoustic emission (AE) is one of the more promising NDE techniques for detecting and monitoring, in real-time, the strain energy release and corresponding stress-wave propagation produced by actively growing flaws and defects in composite materials [3,4,5,6,7,8]. To gain further insight into the mechanisms responsible for composite rupture, broadband modal acoustic emission analysis was used. Also, since AE data reduction proved to be very time consuming, specialized data reduction software was written to automate the process.

Waller, Jess↗

Ares I Reaction Control System Propellant Feedline Decontamination Modeling

The objective of the work presented here is to quantify the effects of purge gas temperature, pressure, and mass flow rate on Hydrazine (Hz) decontamination rates of the Ares I Roll Control System and Reaction Control System. A survey of experts in this field revealed the absence of any decontamination rate prediction models. Three basic decontamination methods were identified for analysis and modeling. These include low pressure eduction, high flow rate purge, and pulse purge. For each method, an approach to predict the Hz mass transfer rate, as a function of system pressure, temperature, and purge gas mass flow rate, is developed based on the applicable physics. The models show that low pressure eduction is two orders of magnitude more effective than the high velocity purge, which in turn is two orders of magnitude more effective than the pure diffusion component of pulse purging of deadheads. Eduction subjects the system to low pressure conditions that promote the extraction of Hz vapors. At 120 F, Hz is saturated at approximately 1 psia. At lower pressures and 120 F, Hz will boil, which is an extremely efficient means to remove liquid Hz. The Hz boiling rate is predicted by equating the rate at which energy is added to the saturated liquid Hz through heaters at the tube outer wall with the energy removed from the liquid through evaporation. Boil-off fluxes were predicted by iterating through the range of local pressures with limits set by the minimum allowed pressure of 0.2 psia and maximum allowed wall temperature of 120 F established by the heaters, which gives a saturation pressure of approximately 1.0 psia. Figure 1 shows the resulting boil-off fluxes as a function of local eduction pressure. As depicted in figure 1, the flux is a strong inverse function of eduction pressure, and that minimizing the eduction pressure maximizes the boil-off flux. Also, higher outer wall temperatures lead to higher boil-off fluxes and allow for boil-off over a greater range of eduction pressures.

Pasch, James J.↗

Effect of Li metal addition on corrosion control of Hastelloy N and stainless steel 316H in molten LiF-NaF-KF

Molten fluoride salts are used in various energy harvesting applications such as solar collectors and molten salt nuclear reactors (MSRs). Thermodynamically driven selective dissolution of alloying elements due to impurities present within the fluoride salts have been identified to be the main corrosion mechanism for structural alloys in molten fluoride salts. Impurities in these salts, during salt preparation as well as during operation, can be difficult to control. One way to prevent the selective dissolution of active alloying elements is to make the molten salt reducing by either purifying it to remove impurities or to add some reactive metal that will react with the impurities and make the salt reducing. Here this study is focused on the corrosion behaviour of Hastelloy N and 316H stainless steel in molten LiF-NaF-KF eutectic mixture (FLiNaK) at 700°C and how this behaviour changes with the addition of Li metal as a reducing impurity. Our results indicate that the active metal addition like Li can be very effective in controlling the redox behaviour of salt, which in-turn can mitigate corrosion. Even the addition of small quantities of Li metal can mitigate the selective dissolution of active alloying elements for the tested structural materials in FLiNaK. Our results also suggest that the presence of excess amounts of Li, above the minimum concentration required to react with the impurities in FLiNaK, does not have any detrimental effect in terms of formation of new intermetallic phases at the surface of the selected alloys under tested conditions.

36 MATERIALS SCIENCE↗

Hydraulic fracturing experiments at 1500 m depth in a deep mine: Highlights from the kISMET project

In support of the U.S. DOE SubTER Crosscut initiative, we established a field test facility in a deep mine and designed and carried out in situ hydraulic fracturing experiments relevant to enhanced geothermal systems (EGS) in crystalline rock to characterize the stress field, understand the effects of rock fabric on fracturing, and gain experience in monitoring using geophysical methods. The project also included pre- and post-fracturing simulation and analysis, and laboratory measurements and experiments. The kISMET (permeability (k) and Induced Seismicity Management for Energy Technologies) site was established in the West Access Drift of the Sanford Underground Research Facility (SURF) 4757 ft (1450 m) below ground (on the 4850 ft level (4850L)) in phyllite of the Precambrian Poorman Formation. We drilled and continuously cored five near-vertical boreholes in a line on 3 m (10 ft) spacing, deviating the two outermost boreholes slightly to create a five-spot pattern around the test borehole centered in the test volume 40 m below the drift invert (floor) at a total depth of ~1490 m (4890 ft). Laboratory measurements of core from the center test borehole showed P-wave velocity heterogeneity along each core indicating strong, fine-scale (~1 cm or smaller) changes in the mechanical properties of the rock. Field measurements of the stress field by hydraulic fracturing showed that the minimum horizontal stress at the kISMET site averages 21.7 MPa (3146 psi) trending approximately N-S (356 degrees azimuth) and plunging slightly NNW at 12°. The vertical and horizontal maximum stresses are similar in magnitude at 42-44 MPa (6090-6380 psi) for the depths of testing, which averaged approximately 1530 m (5030 ft). Hydraulic fractures were remarkably uniform suggesting core-scale and larger rock fabric did not play a role in controlling fracture orientation. Analytical solutions suggest that the fracture radius of the large fracture (stimulation test) was more than 6 m (20 ft), depending on the unknown amount of leak-off.

Oldenburg, C↗

Holistic Small-Signal Stability Analysis for Large-Scale Inverter-Intensive Power Systems with Coupled and Full-Order Dynamics from Control Systems and Power Networks

The increasing penetration of inverter-based resources (IBRs) into the existing power systems introduces tremendous benefits for enhanced sustainability but also poses inevitable challenges in terms of insufficient inertia, potential instability, and complex network dynamics, among others. However, the additional coupling introduced by the interactions among gridfollowing (GFL) and grid-forming (GFM) IBRs and the other components (i.e., synchronous generators [SGs], loads, and network, etc.) has not been clearly explored. A holistic, scalable, and quantitative stability analysis framework with the control systems and power networks is still missing. Here, in this paper, to fill in the technical gaps, a holistic small-signal model of the entire system with both rotating generation units and IBRs is established. An extended power flow model with operation dynamics from both generator control schemes and power networks is proposed to provide the varying steady-state operating points for small-signal modeling. The proposed method is compared with MATLAB solvers, and the results show that the proposed approach has a minimum calculation time, which can be less than 12 seconds for a large-scale power system with up to 2,000 buses. Furthermore, a quantitative method is developed to identify the impacts of IBRs on system performance with emphases on the potential stability issues with GFL IBRs, additional benefits of employing GFM IBRs, the feasibility of replacing SGs with GFM IBRs, and the impact of penetration level of different kinds of generation units. Finally, a field island power system is used to verify the proposed approach, and hardware-in-the-loop (HIL) tests are provided to further demonstrate the effectiveness of the proposed analysis.

14 SOLAR ENERGY↗

CO 2 to Bioplastics: Beneficial Re-use of Carbon Emissions from Coal-fired Power Plants using Microalgae

This project sought to address the technical and economic barriers to carbon dioxide (CO 2 ) capture and utilization using microalgae. Specifically, a dual photobioreactor (PBR)/open raceway pond (ORP) cultivation system was evaluated with respect to capital and operational costs, productivity, and culture health, and compared to an ORP-only cultivation system. In the dual (or “hybrid”) system, a cyclic flow PBR was used to provide inoculum for two open raceway ponds after each harvest, with the hypothesis that this PBR + pond system should result in improved performance compared to traditional raceway ponds. Two other raceway ponds were operated conventionally as a control, the experiments being performed at Duke Energy’s East Bend Station in northern KY using coal-derived flue gas as the CO 2 source. Although algae productivity achieved was mediocre due to the fact that the experiments had to be performed late in the growing season when climatic conditions were not optimal for high growth, the hybrid cultivation system showed a higher level of algae productivity (statistically significant) compared to the traditional ponds. In order to realize the maximum value of the algal biomass produced, fractionation of the biomass was examined. Bioplastic compounding and material characterization was subsequently performed using three feed stocks: whole biomass, lipid-extracted biomass and the proteinaceous residue from full fractionation. In general, the whole and lipid-extracted biomass gave similar results in terms of the properties of the resulting bioplastics, while the proteinaceous residue showed promise for the production of a polybutylene adipate terephthalate (PBAT) blend. Finally, sustainability assessment of a putative biorefinery system was conducted, including techno-economic and life cycle impact assessment. Nine different production scenarios were considered, comprising combinations of the three different biomass growth architectures (ORP, PBR and dual PBR-ORP systems) coupled with three different algae biomass processing pathways (drying only, lipid extraction and fractionation). Results show that the minimum selling price of the bioplastic feed stock (BPFS) is within the realm of economic competition with prices as low as $970 USD tonne -1 . Additionally, life cycle impact assessment results indicate drastic improvements in performance of the produced BPFS, with reductions in greenhouse gas emissions ranging between 67 and 116% compared to a petroleum based plastic feedstock.

01 COAL, LIGNITE, AND PEAT↗

Characterization of Orography-Influenced Riming and Secondary Ice Production and Their Effects on Precipitation Rates Using Radar Polarimetry and Doppler Spectra (CORSIPP-SAIL)

The Characterization of Orography-Influenced Riming and Secondary Ice Production and Their Effects on Precipitation Rates Using Radar Polarimetry and Doppler Spectra (CORSIPP) project was conducted to help improve the understanding of precipitation formation in orographically influenced terrain. Special focus is put on the two processes of riming and secondary ice production and their external drivers. Two instruments, a polarimetric W-band simultaneous transmission simultaneous reception (STSR) Doppler cloud radar manufactured by Radiometer Physics GmbH (RPG, instrument type RPG-FMCW-94-DP), from now on named LIMRAD94, and the video in situ snowfall sensor (VISSS), were deployed at the U. S. Department of Energy Atmospheric Radiation Measurement (ARM) user facility’s Surface Atmosphere Integrated Field Laboratory (SAIL) site in Gothic, Colorado between November 2022 and June 2023 during the second SAIL winter. Note that the exact dates of data availability differ between the instruments. Both instruments arrived at Gothic on November 2, 2022, 09:20 local time. VISSS, described by Maahn et al., is equipped with two camera systems with telecentric lenses. The two cameras are at a 90° angle to each other. This configuration allows for size-independent measurements by capturing images of hydrometeors from two sides at a high frame rate of 250 Hz. With a minimum detection size of 200 μm, VISSS provides valuable insights into particle size, number, shape, complexity, and fall velocity. The VISSS was deployed on the grassland next to the ARM facility with the amazing help of the ARM employees on site. The setup started on November 2, 2022, and was finished on November 5, 2022, without major problems. VISSS measurements were started on November 6, 2022. LIMRAD94 was installed on a scaffolding platform near Orehouse (Gothic) on November 9, 2022, with the great help of RMBL staff. LIMRAD94 was mounted on a cold temperature scanner prototype. After a short test of the setup on November 9, 2022, the digital control of the scanner elevation stopped working for (at that time) unknown reasons. All attempts to resolve the problem failed. This malfunction made it impossible to operate LIMRAD94 in scanning mode. The scanner was then manually moved to zenith pointing mode and between November 10 and November 15, 2022, vertical observations for polarimetric calibration were performed. On November 15, 2022, after the polarimetric calibration was applied, the scanner was manually moved to 40° elevation with azimuthal view towards the Ka-band ARM Zenith Radar (KAZR) and measurements were continued at constant elevation. Investigation of the scanner malfunction on February 6, 2023, by Benn Schmatz revealed a disengagement between the cogwheel of the elevation motor and the cogwheel moving the scanner in elevation. This mechanical issue was temporarily solved by re-engaging the cogwheels. This made the scanner operational again for about four weeks, until mechanical force disengaged the cogwheels again on March 15, 2023. This repeated scanner failure remained undetected for about three weeks until April 8, 2023; during this time the scanner was stuck at 72° elevation. However, the radar software continued to produce data files falsely indicating that the scanner was still operational. After the scanner failure was noticed, scanning was stopped again, and we returned to constant elevation measurements. On May 15, 2023, the cogwheels of the elevation motor were secured with additional screws sent by the manufacturer. At some point in May, the cogwheels of the azimuth motor were also disengaged by mechanical force, which still allowed for range height indicator (RHI) but no plan position indicator (PPI) scans in the last weeks of the campaign. The azimuth motor was repaired in Germany after the end of the campaign. Throughout the campaign, RMBL and ARM staff kept the radar and the VISSS free of snow.

54 ENVIRONMENTAL SCIENCES↗

An Investigation of Low Earth Orbit Internal Charging

Low Earth orbit is usually considered a relatively benign environment for internal charging threats due to the low flux of penetrating electrons with energies of a few MeV that are encountered over an orbit. There are configurations, however, where insulators and ungrounded conductors used on the outside of a spacecraft hull may charge when exposed to much lower energy electrons of some 100's keV in a process that is better characterized as internal charging than surface charging. For example, the minimal radiation shielding afforded by thin thermal control materials such as metalized polymer sheets (e.g., aluminized Kapton or Mylar) and multilayer insulation may allow electrons of 100's of keV to charge underlying materials. Yet these same thermal control materials protect the underlying insulators and ungrounded conductors from surface charging currents due to electrons and ions at energies less than a few keV as well as suppress the photoemission, secondary electron, and backscattered electron processes associated with surface charging. We investigate the conditions required for this low Earth orbit "internal charging" to occur and evaluate the environments for which the process may be a threat to spacecraft. First, we describe a simple one-dimensional internal charging model that is used to compute the charge accumulation on materials under thin shielding. Only the electron flux that penetrates exposed surface shielding material is considered and we treat the charge balance in underlying insulation as a parallel plate capacitor accumulating charge from the penetrating electron flux and losing charge due to conduction to a ground plane. Charge dissipation due to conduction can be neglected to consider the effects of charging an ungrounded conductor. In both cases, the potential and electric field is computed as a function of time. An additional charge loss process is introduced due to an electrostatic discharge current when the electric field reaches a prescribed breakdown strength. For simplicity, the amount of charge lost in the discharge is treated as a random percentage of the total charge between a set maximum and minimum amount so a user can consider partial discharges of insulating materials (small loss of charge) or arcing from a conductor (large loss of charge). We apply the model to electron flux measurements from the NOAA-19 spacecraft to demonstrate that charging can reach levels where electrostatic discharges occur and estimate the magnitude of the discharge.

NeergaardParker, Linda↗

Demonstration and Concept of Operations for a Zero-Knowledge Protocol Passive Imaging Measurement for Arms Control

Here, we present an imaging system that employs zero-knowledge protocols to protect sensitive geometrical information, along with procedures to increase confidence in the result. The goal of this work is to enable the inclusion of warhead confirmation measurements in future arms control treaties. We present a demonstration of both true positive and true negative measurements that validate models and establish authenticating procedures toward meeting acceptance requirements for use in nuclear facilities. We use a two-dimensional time-encoded fast neutron imaging system with an anti-symmetric mask pattern; the fast neutron count values exceeding minimum or maximum thresholds indicate that two measured items are not identical. Laboratory measurements over twenty trials show that alarm rates for negative confirmation measurements are within uncertainties of model predictions. Positive confirmation measurements indicate that alarm rates are large enough to encourage treaty compliance.

Sweany, Melinda Dominique [Sandia National Laborat↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - Simulated Wave

The U.S. Department of Energy and the National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis, hydrogen compression and storage, and variable hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) initiative. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence (AI) data centers and other variable loads. This dataset entry describes hydrogen production using a single, simulated wave energy conversion device. The electrolyzer is a 1.25-MW proton exchange membrane type MC250 system manufactured by Nel Hydrogen. While the unit supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack. For the wave energy, NLR used a wave energy converter model from PacWave. These devices can be equipped with accumulators and pressure relief values to smooth the power output by storing and releasing hydraulic energy. Using a peak power output of 10 MW, the model created two 25-minute profiles: one with and one without the accumulators and pressure relief valves. To down select the profile data from the native resolution of 20 Hz to 1 Hz, NLR took the mean of every 20 data points. NLR experimented with two simulated wave energy power plants: one that peaks at 10 MW, and one that peaks at 5 MW. These profiles were scaled for the physical 1.25 MW electrolyzer by multiplying the original profiles by one eighth and one quarter, respectively. The first profile matches the capacity rating of eight of the 1.25 MW electrolyzers, while the second matches four electrolyzers. Finally, NLR experimented with two settings for the electrolyzer power supply minimum and maximum current ramp rates (gain and slew): 200 and 400 amperes per second. The simulated profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single wave electrolysis experiment and is formatted as follows: {technology}-{accumulator?}_{number of 1.25 MW electrolyzers connected}-{electrolyzer ramp rate in amperes/second} For instance, “wavePacWave-Noacc_4-400.zip” represents the 25 minute-long experiment using the PacWave’s wave energy converter model, equipped with no accumulator, connected to four 1.25-MW electrolyzers with their power supplies set to a maximum current ramp rate (gain and slew) of 400 A/s. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production in kilograms per hour, electrolysis power consumption, and input wave power. An experiment, labeled “characterization_200.zip”, demonstrates the MC250 electrolyzer steady-state response with 30 minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all wave profiles combined into one dataset labeled "combined_wave_experiments.csv". NLR also built an AI/machine-learning predictive model based on these datasets. The model ingests the electrolyzer current command in amperes, as well as various pressures and temperatures across the system, and predicts hydrogen output in kilograms per hour. The complete model can be found at https://huggingface.co/NatLabRockies/ptmelt-hydrogen-electrolysis.

08 HYDROGEN↗

Solar CIV Vacuum-Ultraviolet Fabry-Perot Interferometers

Aims: A tunable, high spectral resolution, high effective finesse, vacuum ultraviolet (VUV) Fabry-Perot interferometer (PPI) is designed for obtaining narrow-passband images, magnetograms, and Dopplergrams of the transition region emission line of CIV (155 nm). Methods: The integral part of the CIV narrow passband filter package (with a 2-10 pm FWHM) consists of a multiple etalon system composed of a tunable interferometer that provides high-spectral resolution and a static low-spectral resolution interferometer that allows a large effective free spectral range. The prefilter for the interferometers is provided by a set of four mirrors with dielectric high-reflective coatings. A tunable interferometer, a VUV piezoelectric-control etalon, has undergone testing using the surrogate F2 eximer laser line at 157 nm for the CIV line. We present the results of the tests with a description of the overall concept for a complete narrow-band CIV spectral filter. The static interferometer of the filter is envisioned as being hudt using a set of fixed MgF2 plates. The four-mirror prefilter is designed to have dielectric multilayer n-stacks employing the design concept used in the Ultraviolet Imager of NASA's Polar Spacecraft. A dual etalon system allows the effective free spectral range to be commensurate with the prefilter profile. With an additional etalon, a triple etalon system would allow a spectrographic resolution of 2 pm. The basic strategy has been to combine the expertise of spaceflight etalon manufacturing with VUV coating technology to build a VUV FPI which combines the best attributes of imagers and spectrographs into a single compact instrument. Results. Spectro-polarimetry observations of the transition region CIV emission can be performed to increase the understanding of the magnetic forces, mass motion, evolution, and energy release within the solar atmosphere at the base of the corona where most of the magnetic field is approximately force-free. The 2D imaging of the full vector magnetic field at the height of maximum magnetic influence (minimum plasma beta) can be accomplished, albeit difficult, by measuring the Zeeman splitting of the CIV resonance pair. Designs of multiple VUV FPIs can be developed for integration into future orbiting solar observatories to obtain rapid cadence, spectral imaging of the transition region.

Gary, G. Allen↗

Implementation of a Model Predictive Control Strategy to Regulate Temperature Inside Plug-Flow Solar Reactor With Countercurrent Flow

Abstract Solar-driven thermochemical energy storage systems are proven to be promising energy carriers (solar fuels) to utilize solar energy by using reactive solid-state pellets. However, the production of solar fuel requires a quasi-steady-state process temperature, which represents the main challenge due to the transient nature of solar power. In this work, an adaptive model predictive controller (MPC) is presented to regulate the temperature inside a tubular solar reactor to produce solid-state solar fuel for long-term thermal storage systems. The solar reactor system consists of a vertical tube heated circumferentially over a segment of its length by concentrated solar power, and the reactive pellets (MgMn2O4) are fed from the top end and flow downwards through the heated tube. A countercurrent flowing gas supplied from the lower end interacts with flowing pellets to reduce it thermochemically at a temperature range of 1000—1500 °C. A low-order physical model was developed to simulate the dynamics of the solar reactor including the reaction kinetics, and the proposed model was validated numerically by using a 7-kW electric furnace. The numerical model then was utilized to design the MPC controller, where the control system consists of an MPC code linked to an adaptive system identification code that updates system parameters online to ensure system robustness against external disturbances (sudden change in the flow inside the reactor), model mismatches, and uncertainty. The MPC controller parameters are tuned to enhance the system performance with minimum steady-state error and overshoot. The controller is tested to track different temperature ranges between 500 °C and 1400 °C with different particles/gas mass flowrates and ramping temperature profiles. Results show that the MPC controller successfully regulated the reactor temperature within ± 1 °C of its setpoint and maintained robust performance with minimum input effort when subjected to sudden changes in the amount of flowing media and the presence of chemical reaction.

Engineering↗

Destructive PIE and Safety Testing of Six AGR-2 UO 2 Capsule 3 Compacts

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program’s second irradiation experiment (AGR-2) was irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from June 2010 to October 2013 (Collin 2014). The fuel compacts in this experiment held either tristructural isotropic (TRISO)-coated spherical kernels of uranium oxide (UO2) or TRISO-coated kernels containing both uranium carbide and uranium oxide phases (UCO). There were six separately monitored and controlled capsules in the AGR-2 test train. Capsule 3 held twelve compacts containing UO2-TRISO particles fabricated by BWX Technologies Nuclear Operations Group. The AGR-2 TRISO particles were fabricated in a pilot-scale fluidized-bed chemical vapor deposition (FB-CVD) furnace with a coating chamber inner diameter of 150 mm (Phillips, Barnes, and Hunn 2010), which was a change from the first irradiation experiment (AGR-1) particles that had been coated in a lab-scale FB-CVD coating system with a chamber inner diameter of 50 mm (Lowden 2006). The TRISO particles were overcoated with resinated graphite flake at Oak Ridge National Laboratory (ORNL), and the overcoated particles were pressed into one-inch-long, half-inch-diameter cylinders (Hunn, Montgomery, and Pappano 2010). Each cylindrical compact held an average of 1,543 TRISO particles with 9.6% enriched UO2 kernels that had a nominal diameter of 500 μm (Hunn, Savage, and Silva 2012). Capsule 3 compacts were irradiated to average calculated burnups of 9.01–10.69% fissions per initial metal atom (FIMA), and the average calculated fluences of fast neutrons with energies E n > 0.18 MeV were 3.05–3.53×10 25 n/m 2 (Sterbentz 2014). The calculated time-average, volume-average Capsule 3 compact temperatures were 996–1,062°C. However, Capsule 3 compact temperatures varied several hundred degrees across each compact, and the timeaverage minimum (TA min ) and time-average maximum (TA max ) temperatures were between 889–999°C and 1,072–1,105°C, respectively (Hawkes 2014). After irradiation, the AGR-2 test train was transferred from ATR to the INL Materials and Fuels Complex for inspection and disassembly (Ploger, Demkowicz, and Harp 2015). The initial inspection included dimensional metrology of the compacts and graphite fuel holders. Like all the AGR-2 compacts, the compacts in Capsule 3 shrank slightly during irradiation, as expected, with an average length reduction of 1.07–1.24% and an average diameter reduction of 0.13–0.41%. Post-irradiation examination (PIE) of the capsule components was completed to measure select fission products ( 90 Sr, 110m Ag, 134 Cs, 137 Cs, 144 Ce, and 154 Eu) outside the compacts (Stempien and Demkowicz 2020). This involved gamma counting of the graphite and graphoil spacers at the top and bottom of each capsule, acid leaching for radiochemical analysis of fission products on the metallic capsule components, and burn-leach analysis of the graphite holders. The total amount of 110mAg measured on the Capsule 3 components was 13% of the calculated capsule inventory. This was significantly lower than the amount of 110m Ag measured on the three UCO capsule components, which ranged from 32–70%. The lower 110m Ag release in Capsule 3 was likely due to lower peak temperatures compared with the UCO fuel capsules (Hawkes 2014). Measured inventories of the other select fission products were also lower in Capsule 3.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗