Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lessons”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations

Report highlights the increase in resources, project speed, and scale that is required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals and summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Telematics Framework for Federal Agencies: Lessons from the Marine Corps Fleet

Executive Order 13693 requires federal agencies to acquire telematics for their light- and medium-duty vehicles as appropriate. This report is intended to help agencies that are deploying telematics systems and seeking to integrate them into their fleet management process. It provides an overview of telematics capabilities, lessons learned from the deployment of telematics in the Marine Corps fleet, and recommendations for federal fleet managers to maximize value from telematics.

97 MATHEMATICS AND COMPUTING↗

Lessons Learned From the Planning of Recent Wind Energy Technologies Office Field Campaigns

The U.S. Department of Energy (DOE) Wind Energy Technology Office (WETO) has funded several wind-energy-focused field campaigns in recent years. While essential to advance our understanding of the interactions between atmosphere and wind turbines, the planning of such campaigns has presented several challenges to the institutions involved in these efforts. In this document, we focus on the planning phase of the field campaigns and summarize the lessons learned from the recent AWAKEN, RAAW, and WFIP-3 field projects. We cover a variety of aspects to offer a proposed methodological pipeline that we recommend is followed when future similar endeavors are planned.

17 WIND ENERGY↗

Lessons Learned: Summary of Insights From the HERO WEC and Waves to Water Deployments Between 2022 and 2024

In 2020, a team from the National Renewable Energy Laboratory (NREL) partnered with the East Carolina University Coastal Studies Institute to develop a small, modular, wave-powered point absorber desalination prototype. That prototype, known as the hydraulic and electric reverse osmosis wave energy converter (HERO WEC), was intended to de-risk the installation activities planned for the Waves to Water Prize sponsored by the Water Power Technologies Office. The NREL team was given approximately 18 months to design, build, bench test, and deploy the HERO WEC prototype. Since the initial HERO WEC development, it has been used for two in-lab test programs and three ocean deployments. The first in-lab test program focused on ensuring that the overall operation of the device occurred as expected and on validating the operation of safety systems such as pressure relief valves or electrical breakers for load mitigation. The second in-lab test program was the first time the NREL team leveraged NREL’s large-amplitude motion platform to characterize the performance of the HERO WEC. Of the three in-water deployments, the first deployment was effectively an installation and recovery practice with no meaningful wave activity during the time that it was installed. The second deployment was a 2-week effort that enabled both the electric and hydraulic configurations of the device to be in the water for approximately 5 days each. This deployment was also the first time that the team had the opportunity to perform a drivetrain swap on the Coastal Studies Institute research vessel. The third deployment had to be split into two separate installations due to minor damage incurred from the WEC spinning during the initial installation. This report summarizes the deployments, the challenges encountered with each deployment, and the lessons learned for future work.

16 TIDAL AND WAVE POWER↗

High-Temperature Aquifer Thermal Energy Storage (HT-ATES) Projects in Germany and the Netherlands—Review and Lessons Learned

Aquifer thermal energy storage (ATES) is a concept that can help to address heating and cooling needs through the use of the subsurface as a seasonal thermal energy storage (STES) system. Over 2800 ATES systems have been deployed with storage temperatures typically below 25 °C and only a few with higher temperatures (>40 °C), which would increase the energy density and utility of the stored thermal fluids. Until now, only a few high-temperature aquifer thermal energy storage (HT-ATES) projects have been initiated and are still in operation. These HT-ATES projects have encountered a range of technical and non-technical challenges. This study reviews ten such projects: four in Germany and six in the Netherlands. The non-technical issues include public acceptance, a lack of regulatory framework for these systems, managing overlapping uses of the subsurface, managing changes with the providers and off-takers of thermal energy, and obtaining financing to implement these projects. Common technical issues include geological factors such as incomplete characterization of the subsurface and reservoir heterogeneity; geochemical issues such as mineral scaling, corrosion, and biofouling; lower than expected thermal recovery; and issues with system design and reliability. This review highlights benefits and challenges faced by HT-ATES projects with the goal to use the lessons learned to improve the siting, design, development, and operation of such systems. Recommendations include improved initial subsurface site characterization, use of coupled process models to optimize system design and predict system performance, cascaded uses of stored thermal energy to better utilize the stored heat, monitoring networks to provide feedback on system performance, and expanded system scale to allow for continued operation even when maintenance of some system components is required. Techno-economic modeling and risk analysis could be used to optimize such HT-ATES project design and identify key factors that will affect sustained economic viability. In addition, design flexibility is important for these systems to allow for changing conditions regarding the supply and demand of thermal energy. Adopting these findings should improve the performance and reduce the risks for future HT-ATES projects worldwide.

15 - GEOTHERMAL ENERGY↗

The Lessons Learned Process: An Effective Countermeasure Against Avoidable Risk

The potential for errors in engineering judgement arguably present the highest level of risk when applied to interplanetary spaceflight. JPL has been refining its lessons learned process to optimize the collection and transfer of critical success factors applicable to current and future spaceflight projects.

lessons learned information system process improve↗

Lessons learned from the NEPTUNE power system and other deep-sea adventures

The development of underwater science systems presents some challenging technical issues. It seems that the best efforts of the engineers and scientists involved are sometimes inadequate, and projects that once seemed straightforward end up being late, or overbudget, or cancelled. This paper will review some of the lessons that may be learned from the examples of three science projects in the deep ocean: the DUMAND neutrino detector, the H20 observatory, and the power system part of the NEPTUNE regional cabled observatory.

ocean science↗

Challenges and lessons learned in the application of autonomy to space operations

NASA's Space Operations Management Office (SOMO) is working toward a goal of providing an integrated infrastructure of mission and data services for space missions undertaken by NASA enterprises. A significant portion of this effort is focused on reducing the cost of these services. We are interested in the potential of autonomy to reduce operations costs. Some attempts have already been made to apply autonomy and automation in these areas in the past with varying degrees of success. We present brief case histories and the lessons inferred from them. Combining this past experience with anticipated future needs, we attempt to clarify the challenges that must be met in order to realize the benefits of autonomy.

challenges↗

Lessons Learned from Coordinating Relay Activities at Mars

The Mission Management Office at the Jet Propulsion Laboratory was tasked with coordinating the relay of data between multiple spacecraft at Mars in support of the Mars Exploration Rover Missions in early 2004. The confluence of three orbiters (Mars Global Surveyor, Mars Odyssey, and Mars Express), two rovers (Spirit and Opportunity), and one lander (Beagle 2) has provided a challenging operational scenario that required careful coordination between missions to provide the necessary support and to avoid potential interference during simultaneous relay sessions. As these coordination efforts progressed, several important lessons were learned that should be applied to future Mars relay activities.

coordination↗

EOS MLS Lessons Learned: Design Ideas for Safer and Lower Cost Operations

The Earth Observing System (EOS) Microwave Limb Sounder (MLS) is a complex instrument with a front end computer and 32 subsystem computers. MLS is one of four instruments on NASA's EOS Aura spacecraft With almost 8 years in orbit, MLS has a few lessons learned which can be applied during the design phase of future instruments to effect better longevity, more robust operations and a significant cost benefit during operations phase.

flight software design↗

Stardust-next : Lessons Learned from a Comet Flyby Mission

The Stardust-NExT (New Exploration of Tempel) mission, a follow-on to the Stardust prime mission, successfully completed a flyby of comet Tempel-1 on 2/14/11. However there were many challenges along the way, most significantly low propellant margin and detection of the comet in imagery later than antici-pated. These challenges and their ramifications forced the project to respond with flexibility and ingenuity. As a result, the flyby at an altitude of 178 km was nearly flawless, accomplishing all its science objectives. Lessons learned on Stardust-NExT may have relevance to other spacecraft missions.

Tempel 1↗

Service Oriented Robotic Architecture for Space Robotics: Design, Testing, and Lessons Learned

This paper presents the lessons learned from six years of experiments with planetary rover prototypes running the Service Oriented Robotic Architecture (SORA) developed by the Intelligent Robotics Group (IRG) at the NASA Ames Research Center. SORA relies on proven software engineering methods and technologies applied to space robotics. Based on a Service Oriented Architecture and robust middleware, SORA encompasses on-board robot control and a full suite of software tools necessary for remotely operated exploration missions. SORA has been eld tested in numerous scenarios of robotic lunar and planetary exploration. The experiments conducted by IRG with SORA exercise a large set of the constraints encountered in space applications: remote robotic assets, ight relevant science instruments, distributed operations, high network latencies and unreliable or intermittent communication links. In this paper, we present the results of these eld tests in regard to the developed architecture, and discuss its bene ts and limitations.

service oriented architecture↗

X-43A lessons learned

The primary discussion in this paper is about the lessons learned in the loss of the first Hyper-X vehicle and how those problems were overcome.

lessons learned↗

Lessons Learned in Thermal Coatings from the DSCOVR Mission

Finding solutions to thermal coating issues on the Deep Space Climate Observatory (DSCOVR) mission was a very challenging and unique endeavor. As a passive thermal control system, coatings provide the desired thermal, optical, and electrical charging properties, while surviving a harsh space environment. DSCOVR mission hardware was repurposed from the late 1990s satellite known as Triana. As a satellite that was shelved for over a decade, the coating surfaces consequently degraded with age, and became fairly outdated. Although the mission successfully launched in February 2015, there were unfamiliar observations and unanticipated issues with the coating surfaces during the revival phases of the project. For example, the thermal coatings on DSCOVR experienced particulate contamination and resistivity requirement problems, among other issues. While finding solutions to these issues, valuable lessons were learned in thermal coatings that may provide great insight to future spaceflight missions in similar situations.

thermal coatings↗

How Do Lessons Learned on the International Space Station (ISS) Help Plan Life Support for Mars?

How can our experience in developing and operating the International Space Station (ISS) guide the design, development, and operation of life support for the journey to Mars? The Mars deep space Environmental Control and Life Support System (ECLSS) must incorporate the knowledge and experience gained in developing ECLSS for low Earth orbit, but it must also meet the challenging new requirements of operation in deep space where there is no possibility of emergency resupply or quick crew return. The understanding gained by developing ISS flight hardware and successfully supporting a crew in orbit for many years is uniquely instructive. Different requirements for Mars life support suggest that different decisions may be made in design, testing, and operations planning, but the lessons learned developing the ECLSS for ISS provide valuable guidance.

Lessons learned↗