Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “information infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Recommendations for Minimum Required Diagnostics Information

The rapid growth of electrified transportation, including light- and medium-duty electric vehicles (EVs) as a mobility solution requires a reliable EV-charging infrastructure. To advance charging reliability, the ChargeX Consortium reports “Recommendations for Minimum Required Error Codes for Electric Vehicle Charging Infrastructure” and “Implementation Guide for Minimum Required Error Codes in Electric Vehicle Charging Infrastructure” provided recommendations for a set of minimum required error codes (MRECs), their functional and responsibility classifications, and a guide for their implementation, using Open Charge Point Protocol (OCPP) versions 1.6J4 and 2.0.1.5 These reports outline a recommended practice for consistent error reporting and interpretation, which is essential for communicating issues uniformly across the complex and diverse EV-charging ecosystem. However, MRECs are just one part of diagnosing issues; another critical part is obtaining enough information about the current state and performance of the various charging components to identify root causes for each of the error codes. This additional diagnostics data can be used by technicians or automated systems to understand the context around an issue, allowing for timely resolution, decreased maintenance costs, and increased charging reliability. During everyday operations, data are regularly collected and analyzed across the ecosystem. Although sharing of all that available data would be great for diagnostics, concerns on data ownership, privacy, and original equipment manufacturer (OEM) intellectual property pose a challenge. To overcome this obstacle, this report proposes a set of minimum required diagnostic information (MRDI) and recommends that the industry implement these uniformly across the North American EV charging ecosystem. MRDI provides a means to exchange only data deemed necessary for root cause determination.

33 ADVANCED PROPULSION SYSTEMS↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Wendell

This report is a solar resource and infrastructure assessment for the town of Wendell, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Wendell. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Wendell are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. It appears that National Grid is planning an upgrade to the Wendell Depot substation, which might then allow in-process projects are to proceed, and potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Dynamic Queue Prediction at Signalized Intersections with Fusing Sensory Information and Connected Vehicles

Queue length is one of the most essential metrics for indicating traffic conditions at signalized intersections. Most existing studies mainly focus on queue length estimation in a retrieving way which cannot effectively predict the future state of vehicle in queue. This paper proposes an innovative dynamic queue prediction model in a vehicle-infrastructure cooperative way. The proposed dynamic queue predictor can customize the queue prediction using the trajectories of preceding vehicles from radar detection with varying information from loop detectors and connected vehicles (CVs). The dynamic queue prediction accuracy can be further improved with at least one present CV in the same cycle. With the accurate dynamic queue prediction, we present a case study of Queue-Aware Eco-Approach and Departure (QEAD) to provide an online optimal vehicle trajectory considering both the signal status and preceding vehicle's future status in queue. The proposed framework and algorithms are of pragmatic significance and one of its advanced features is the ability to work under low penetration rate of CVs. The test using Next Generation SIMulation (NGSIM) dataset and a case study in VISSIM microscopic simulation show promising results.

Ye, Fei↗

Los Alamos National Laboratory LiDAR Processing and Hydro-Enforcement Report

This report describes a project conducted by Los Alamos National Laboratory (LANL) and 3AE Green to process and hydro-enforce LiDAR data over approximately 170 square miles. A variety of Government Furnished Information (GFI) including LiDAR (2021), 3-inch pixel resolution natural-color imagery (2018), stormwater infrastructure, culvert, bridge, and building features were analyzed to develop a hydro-enforced digital elevation model (DEM). Where overland flow was obstructed by elevation surface feature, representational cutline features were placed and integrated into the LiDAR-based elevation surface to allow for more appropriate flow across roadbeds and other impediments to natural flow. This hydro-enforced DEM was utilized to model and develop more than 6.5 million three-dimensional (3D) vector flow line features (prior to line joining / merging) representing the derived digital drainage network deliverable.

42 ENGINEERING↗

Congestion levels on existing infrastructure

Congestion occurs when available least-cost energy cannot be delivered to some loads because transmission facilities do not have sufficient capacity to deliver the energy. When a transmission constraint is binding (i.e., its limit is reached) it has an associated shadow price – the marginal value of relieving the constraint (i.e., of increasing the asset’s flow limit). This report contains one page dedicated to each ISO and RTO in the U.S. documenting empirical outcomes related to binding constraints during 2022 through 2024 for both the day-ahead and real-time markets. For each system operator and market timeline, the report contains two maps of infrastructure elements that are color-coded based on congestion characteristics. The first map provides information on how often each element has a binding constraint, that is, the frequency of congestion on the element. The second map reflects the intensity of congestion, measured as the sum of shadow prices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Application of Accelerator Technology to Quantum Information Science

The intersection of accelerator and quantum information science (QIS) offers a unique platform to advance both fields through shared technology and infrastructure. This talk will discuss the synergies which exist between these two vastly different but complementary domains. We demonstrate how we leverage pre-existing infrastructure and knowledge to perform research and development which helps to realize dramatic improvements in both 10 km long accelerators and 10 cm large quantum processors. We will explore niobium superconducting radio-frequency (SRF) cavities, a highly advanced technology that excels in efficiently storing electromagnetic energy, enabling ultra-long photon lifetimes critical for quantum processors and facilitating the characterization of quantum materials with parts-per-billion precision. We will also discuss how advancements in superconducting materials, cryogenic systems, and control techniques help to reduce cost and improve performance for both quantum systems and particle accelerators. Moreover, we will discuss cross-disciplinary applications such as dark-matter searches and demonstrate the convergence of these fields in addressing fundamental scientific questions.

Bafia, Daniel [Fermilab]↗

Intersections of Disadvantaged Communities and Renewable Energy Potential: Analyses to Inform Equitable Investment Prioritization

Renewable energy development can bolster local economies through job creation, local tax revenues, and reduced energy costs; however, communities most in need of economic development and employment opportunities often see lower levels of renewable energy deployment. Megan Day and Liz Ross, along with their co-authors and supported by NREL's Sustainable Communities Catalyzer, identified areas where disadvantaged community indicators intersect with high potential for renewable energy deployment. Through a geospatial intersection of energy burden, environmental hazard, and sociodemographic data with the technical generation potential and levelized cost of energy for multiple renewable energy technologies, we identified trends across disadvantaged community indicators and renewable energy deployment potential. Combining metrics across several tools, including the State and Local Planning for Energy (SLOPE) platform, the Low-Income Energy Affordability (LEAD) tool, and the Environmental Justice Screening and Mapping (EJSCREEN) tool, we compiled a dataset that can be used to inform national- and state-level energy-related assistance programs, economic development efforts, and infrastructure programs seeking to prioritize investments in disadvantage communities.

catalyzer↗

Intersections of Disadvantaged Communities and Renewable Energy Potential: Analyses to Inform Equitable Investment Prioritization

Renewable energy development can bolster local economies through job creation, local tax revenues, and reduced energy costs; however, communities most in need of economic development and employment opportunities often see lower levels of renewable energy deployment. We sought to identify areas where indicators of disadvantaged communities intersect with high generation potential from cost- effective renewable energy opportunities. This presentation highlights the geospatial intersection of the technical potential and levelized cost of energy for three renewable technologies (residential solar, utility solar, and land-based wind) and three sociodemographic metrics (energy burden, unemployment, and employment in mining, quarrying, and oil and gas extraction). This research and the associated county-level data set are intended to inform national- and state-level energy-related assistance programs, economic development efforts, and infrastructure programs seeking to prioritize investments in disadvantaged communities.

disadvantaged communities↗

DisasterAWARE – A Global Alerting Platform for Flood Events

The rising number of flooding events combined with increased urbanization is contributing to significant economic losses due to damages to structures and infrastructures. From a risk reduction and resilience perspective, it is not only essential to forecast flood risk and potential impacts, but also to disseminate the information to stakeholders on the ground for rapid implementation of mitigation and response measures. This paper provides (i) an introduction to DisasterAWARE®, a global alerting system, that is used to disseminate flood risk information to stakeholders across the globe, and (ii) a discussion of the models implemented using earth observation data (Synthetic Aperture Radar and optical imagery) for near real-time assessment of flood severity and potential flood impacts to infrastructures. While the models are still in their nascent stage, a case study implementation of the models for the 2020 flooding event in Africa is presented to showcase the model integration with DisasterAWARE®.

54 ENVIRONMENTAL SCIENCES↗

Center of Excellence for Operational Technology

The Center of Excellence for Operational Technology Traditional Presentation Abstract 2025 National Laboratories Information Technology Summit | Denver, CO Traditional Presentation Session Managing cybersecurity risk in Operational Technology (OT) presents a significant challenge across the Department, and critically, at many of the national laboratories. This includes IT-OT convergence, aging OT systems, cost of updating OT systems, and increased Advanced Persistent Threat efforts against OT including the 16 critical infrastructure sectors as listed in Presidential Policy Directive 21. DoE’s Office of Science and NNSA’s Office of the Chief Information Officer are taking the lead in addressing this challenge to include critical systems, by establishing the Center of Excellence (CoE) for Operational Technology. Championed by NNSA Deputy Chief Information Officer Steven McAndrews and the Office of Science Chief Information Officer Shila Cooch, the CoE for OT was chartered in February 2025 to address the challenges of OT cybersecurity and compliance. The CoE for OT will create partnerships and leverage expertise from across the NNSA National Security Enterprise and DOE Labs, Plants and Sites. The CoE will also collaborate with colleagues in other government agencies, industry partners and academia. The CoE for OT discussion at the National Laboratories Information Technology Summit ’25 will include the genesis of the CoE, stated goals, organizational structure, and the effort to attract OT subject matter experts to join the CoE effort to share knowledge and expertise. The discussion will include opportunities to get involved and contribute to this important effort. This session will be led by CoE for OT Co-Chairs Matt Kwiatkowski, Fermi National Laboratory Chief Information Security Officer, and Steven Weldon, Savannah River National Laboratory Cyber Program Director at the Georgia Cyber Center. The session will be of particular interest to CIOs, CTOs, CISOs, as well as IT and OT practitioners.

Kwiatkowski, Matt [Fermilab]↗

A Data Processing Pipeline To Extract A Knowledge Graph From Heterogeneous Data For Socio-technical Analysis Of Critical Infrastructure Influence

The code is written in Python and consists of the following pipeline that is implemented in Apache Airflow. This pipeline intends to understand the companies that are directly or indirectly involved with a type of critical infrastructure system at some point in that system's lifecycle. The pipeline takes a configuration file that specifies a list of initial companies to consider, a geographic region of interest, and a set of SEC form types as well as other data sources (e.g. CrunchBase) from which to extract entities and relations. There are four main components to this pipeline as currently implemented: Entity Extraction, Network Construction, Analysis, and Visualization. First, Entity Extraction, is implemented as the `topear-extract_organizations` Apache Airflow workflow. Given an initial query that specifies a geographic region of interest and a time interval, the software will extract CI facilities of interest and organizations that have a direct influence relationship to those facilities (e.g. ownership). During the course of the LDRD, we focused on Electric Vehicle charging stations and this information is available via the Department of Energy (DOE) database on fueling stations maintained by NREL. Within the context of the DOE CESER project, we have focused on Battery Energy Storage Systems (BESS). Second, the Network Extraction component will iteratively construct a social network graph given the set of organizations and people extracted in the previous step. Organizations (and eventually People if desired) are then fed as a query to the `topgear-construct_social_network` Apache Airflow workflow which given a set of initial companies and data sets (e.g. SEC EDGAR form types, OpenCorporates, Crunchbase). This Airflow workflow will iteratively query such data sources to discover relationships with new organizations and people. For example, this module can iteratively query SEC EDGAR for metadata that documents the number of each type of form for the given set of companies and their location. This forms metadata represents a catalog of data sources from SEC EDGAR for the extracted social network knowledge graph. The pipeline then downloads these forms from the website and saves them in a build directory for further processing. These documents are then parsed for entities and relations. Again, we note that in additional to SEC data sources, this step can also pull in information on organizations via API services such as CrunchBase and OpenCorporates or bulk data sources. At the end of this step, the resultant social network, the Critical Infrastructure network, and the edges that encode relationships between organizations and CI facilities, form the Adversarial Socio-Technical Network (ASTN) that informs the analysis. Third, the Analysis component processes these generated ASTN. Previously, that has included the ability to compare prevalence of different vendors for a given infrastructure component type across different regions as well as identify common public and private investors across those vendors. This was demonstrated for EV Charging Stations across several different metropolitan areas within an IEEE PES GridEdge publication. More recently, we have looked at ways to identify infrastructure owners and operators of BESS with the most nameplate capacity across different states as well as other indictors of risk resulting from changes in ownership over time. Finally, the Visualization component consists of an HTML/CSS/JS framework by which users can interact geospatial, operational, and organizational relationships across a given portfolio of Critical Infrastructure facilities. The objective is to provide a library of UI/UX modules that can be repurposed for stakeholder-specific dashboards. All of the modules are related via a common event model that enables UI actions in one view to percolate across the other views.

Weaver, Gabriel [Idaho National Laboratory (INL), ↗

Facilitating Data Collection of Maintenance Events to Populate the Hydrogen Component Reliability Database (HyCReD)

The Hydrogen Component Reliability Database (HyCReD) is a collaborative project between the National Renewable Energy Laboratory, the University of Maryland, and hydrogen stakeholders to improve safety and reliability for hydrogen facilities by implementing component reliability data taxonomies that support hydrogen infrastructure failure rate analysis. The project aims to quantify failure rates of hydrogen components through high-quality data collection and analysis on root causes and maintenance needed. HyCReD provides a common database for cataloging hydrogen component failures which exists for reliability research in many other mature industries [2]. The database fills a gap for the hydrogen community by providing a scientifically rigorous approach to quantitative risk assessment (QRA), prognostic health management (PHM), and reliability-centered maintenance (RCM) analysis. High level results will be aggregated and anonymized to protect company sensitive information; detailed results will be used to help address issues of hydrogen components. These advanced analytics will support accelerated deployment of hydrogen infrastructure by enabling better: design and safety of projects (safety codes and standards development), infrastructure reliability and cost (component failure rates, maintenance protocols), and component R&D needs (robust supply chain). A key to a successful HyCReD implementation is facilitating the ease of reporting and data quality in the database that can be used for analysis. Maintenance data was a previously identified gap in initial efforts to populate and validate the database taxonomies [3]. Collection of maintenance data will be instrumental in identifying failure modes and rates, identifying incipient component failures or reduced performance, cataloging best practices for maintenance routines and methods for prognostic health management, and quantifying the risk and effect of different failure modes. Several key priorities are identified for streamlined data collection to achieve quality and detailed failure data: Applicability, Ease of Use, Accessibility, and Information Security. The HyCReD team has now begun deployment of the database to several companies and groups that have signed non-disclosure agreements to facilitate the data collection of failures in industry hydrogen refueling station infrastructure. This paper will provide an update into the process of HyCReD deployment including the development of a coding guide for facility personnel to reference and ensure data quality and consistency from one station to another as well as implementation of contextually dependent data fields of system taxonomy and formatted entries to provide ease of use. The goal is to communicate the lessons learned from the roll-out to technicians and engineers in the field, and the addition of need for high level of security to protect all stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Design and Evaluation of Zero Trust Architecture for Electric Vehicle Charging Infrastructure: EVs @ Scale Series on EV Charging Station Cybersecurity

Implementing a zero trust architecture can significantly bolster the security of electric vehicle (EV) charging infrastructure. EV charging infrastructure includes numerous networked interfaces, each of which can present potential vulnerabilities. When these vulnerabilities are exploited, they can compromise the entire system, leading to severe operational and security risks. Zero trust is a security model that operates on the principle of "never trust, always verify," which helps manage the attack surface and limit the scope of any potential compromises. Fundamentally, this model ensures that no entity, whether inside or outside the network, is trusted by default. The design principles of zero trust include continuous verification, strict deny-by-default access controls, and micro-segmentation. Continuous verification ensures that every request is thoroughly checked, regardless of its origin. Strict access controls enforce the principle of least privilege, allowing users and devices only the minimum necessary access to perform their functions. Micro-segmentation involves dividing the network into smaller, isolated segments to prevent lateral movement in case of a breach. In the context of EV charging infrastructure, zero trust can be implemented through various strategies. For example, multi-factor authentication (MFA) can be required for engineers to access the management interfaces and control systems of charging stations. Real-time monitoring and analysis of network traffic can help detect and respond to anomalies. Systems that do not need to communicate with each other can be micro-segmented to enhance security. All communications should adhere to predefined policies to be permitted. Additionally, encrypting communications can protect sensitive information exchanged between chargers and management systems. This paper presents a zero trust architecture specifically designed for EV charging infrastructure. Implementing zero trust not only mitigates risks but also builds a resilient infrastructure capable of withstanding and quickly recovering from cyber threats. The architecture addresses six defined security objectives. A comprehensive test plan is developed to assess the architecture against these objectives, and the results of the evaluation are reported. This approach is essential for maintaining the reliability and integrity of EV charging services in an increasingly interconnected and vulnerable digital landscape. This is the first in a planned series of papers exploring the implementation of zero trust in EV charging infrastructure. Each paper will delve into different aspects and applications of zero trust, highlighting how various work processes and requirements can lead to distinct architectural designs. These architectures will be tailored to address specific security challenges and operational needs within the EV charging ecosystem, ensuring a robust and adaptable security framework.

33 ADVANCED PROPULSION SYSTEMS↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

National Reactor Innovation Center (NRIC) Grid Connection Roadmap

In an effort to define the roadmap for establishing the necessary electrical infrastructure at the Idaho National Laboratory to fully support connection of NRIC reactors, this roadmap serves to identify the current forecasted reactors planned for installation at INL and provide a consolidated list of the identified infrastructure improvements that will be necessary to support testing of NRIC reactors. Additionally, the roadmap will leverage this information to establish an integrated timeline to support detailed planning and execution of system improvements. To drive this planning, requirements, as derived from authoritative sources, will be identified. A clear definition of impacted stakeholders will be established, as well as a list of risks that will need to be managed as the program moves forward.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Valuation of pollination services from habitat management: a case study of utility scale solar energy facilities in the United States

Creating and maintaining pollinator habitats following the ecological infrastructure concept in degraded or unutilized land, such as solar energy facilities, is a practical way to synergistically advance the food, energy, and ecology nexus. Given the large land-use requirements for solar farming—the fastest growing renewable energy technology–considerable attention has been focused on strategies to maximize multiple ecosystem services. In this study, we coupled the principles of agronomy and ecology with economics and integrated national-scale data on crops, pollinators, and solar facilities to identify locations for creating pollinator habitats and estimating the economic value of pollination from the habitats. We examined opportunities for pollination services from pollinator-friendly utility-scale solar facilities adjacent to 42 million hectares of pollination-dependent crops in the conterminous United States at high resolution of 1 ha. We used the net income method to estimate the potential economic value of creating habitat in the land adjacent to solar facilities in the eight states with the greatest number of solar installations. Creating pollinator habitats at the 217 utility-scale solar facilities in these states could support adjacent 80,000 hectares of high pollinator dependent crops, which could potentially generate a pollination value of $\$$120 to $\$$264 million USD. The location-specific information and high-resolution maps generated for the United States demonstrate integration of grey and green infrastructure to support the food, energy, and environment nexus.

14 SOLAR ENERGY↗