Monthly hydropower generation data for Western Canada to support Western-US interconnect power system studies

Hydroelectric power generation in Western Canada significantly contributes to power grid operations of the North American Western Interconnection through substantial generation, some of which is exported to the United States (U.S.). However, the lack of publicly available hydropower generation datasets poses challenges for future market projections and resource adequacy evaluations. We present a simulation-based monthly power system model-ready hydropower generation dataset for 110 facilities in British Columbia and Alberta from 1981 to 2019. These monthly hydropower generation estimates are developed from integrated hydrologic model simulations of runoff and reservoir-operated streamflow, followed by scaling that considers diversion inflow constraints based on hydropower water license information. To address the lack of comparable hydropower generation records, we conduct step-by-step evaluations for simulated runoff, regulated streamflow, and hydropower generation using available observations or estimates. The presented hydropower dataset aims to enhance the representation of hydropower resources in Western Canada, supporting power grid system studies for the Western Interconnection of the U.S. and Canada.

13 HYDRO ENERGY↗

Recommendations for Data-in-Transit Requirements for Securing DER Communications

With the adoption of Distributed Energy Resource (DER) interoperability standards, common communication protocols are now being deployed between power system operators and DER devices. In 2018, a revision to the US interconnection and interoperability standard, Institute of Electrical and Electronics Engineers (IEEE) Std. 1547, required DER equipment to have an IEEE 2030.5, IEEE 1815, or SunSpec Modbus communication exchange interface. This change supports the future transition to secure connection and exchange of information between the DER equipment and implementing parties, such as grid operators. Adoption of standardized communication protocols and associated information models is a critical step toward interoperability between power system operators and DER, such as photovoltaic (PV) and energy storage systems. However, security requirements for these standardized communication protocols are not comprehensive, resulting in non-standard and vendor-specific implementation that may leave DER equipment susceptible to cyberattacks. This paper examines the data-in-flight security requirements for standardized DER communication protocols, per IEEE 1547-2018 revision, as it relates to device authentication, key management, and encryption. The state of the art for these security features is also explored, addressing their impact on communication and performance of low-cost single board computers, which are typical of DER devices. In conclusion, a recommendation is provided to adopt a common set of communication requirements, which are intended to achieve interoperability and implement data security over DER network pathways, while ensuring reliable, secure, and real-time information delivery.

42 ENGINEERING↗

Large-Scale Adoption of Self-Synchronized Universal Droop Controller-Based Inverters to Enable Ancillary Services for Different Modes of Distribution System Operations

This work proposes the large-scale adoption of self-synchronized universal droop controller (SUDC)-based inverters to enable ancillary services for different modes of distribution system operations. The IEEE 123 bus system was modeled on a real-time simulator to study the performance of large-scale adoption of SUDC inverters in a distribution system. The resulting data collected shows that the voltage and the frequency were regulated within ranges, such as less than 5% for voltage and less than 0.5% for frequency, under different load variations and grid operations. Also, the black start was achieved within 0.4 s without any voltage overshoot. Through the simulation and validation on a small microgrid and the IEEE 123 bus distribution system, it can be concluded that the SUDC was successfully adopted to regulate the voltage and the frequency within the given ranges, and black start achieved within 1 s without voltage overshoot for different modes of distribution system operations.

14 SOLAR ENERGY↗

Assimilation of Quality Controlled AIRS Temperature Profiles using the NCEP GFS

We have previously conducted a number of data assimilation experiments using AIRS Version-5 quality controlled temperature profiles as a step toward finding an optimum balance of spatial coverage and sounding accuracy with regard to improving forecast skill. The data assimilation and forecast system we used was the Goddard Earth Observing System Model , Version-5 (GEOS-5) Data Assimilation System (DAS), which represents a combination of the NASA GEOS-5 forecast model with the National Centers for Environmental Prediction (NCEP) operational Grid Point Statistical Interpolation (GSI) global analysis scheme. All analyses and forecasts were run at a 0.5deg x 0.625deg spatial resolution. Data assimilation experiments were conducted in four different seasons, each in a different year. Three different sets of data assimilation experiments were run during each time period: Control; AIRS T(p); and AIRS Radiance. In the "Control" analysis, all the data used operationally by NCEP was assimilated, but no AIRS data was assimilated. Radiances from the Aqua AMSU-A instrument were also assimilated operationally by NCEP and are included in the "Control". The AIRS Radiance assimilation adds AIRS observed radiance observations for a select set of channels to the data set being assimilated, as done operationally by NCEP. In the AIRS T(p) assimilation, all information used in the Control was assimilated as well as Quality Controlled AIRS Version-5 temperature profiles, i.e., AIRS T(p) information was substituted for AIRS radiance information. The AIRS Version-5 temperature profiles were presented to the GSI analysis as rawinsonde profiles, assimilated down to a case-by-case appropriate pressure level p(sub best) determined using the Quality Control procedure. Version-5 also determines case-by-case, level-by-level error estimates of the temperature profiles, which were used as the uncertainty of each temperature measurement. These experiments using GEOS-5 have shown that forecasts resulting from analyses using the AIRS T(p) assimilation system were superior to those from the Radiance assimilation system, both with regard to global 7 day forecast skill and also the ability to predict storm tracks and intensity.

Susskind, Joel↗

Integration of Superconducting Magnetic Energy Storage (SMES) Systems Optimized with Second-Generation, High-Temperature Superconducting (2G-HTS) Technology with a Major Fossil-Fueled Asset

Utility companies and fossil fueled generation assets are seeking combinations of “hybrid energy storage” to allow power to be provided in advance of, and to otherwise complement, peaking natural gas-fired generation. American Maglev Technology of Florida Inc. (AMT) learned during the Phase I program based on interactions with NRG Energy (NRG) that energy storage such as superconducting magnetic energy storage (SMES) can qualify as a Black Start unit in most markets, ensuring orderly re-start of grid operations and fossil fueled power plants and serving as an important asset of hybrid energy storage technology. In conjunction with the University of Houston (UH), AMT and NRG are working together to scale up low-cost, high- efficiency, second-generation high-temperature superconducting (2G-HTS) technology for deployment across several markets, with a primary focus on the commercial development of utility grid-scale SMES (g-SMES) systems. Ultimately the program confirmed that the novel g-SMES design can meet the performance and financial requirements of the fossil power plant industry, while exhibiting continuous grid-voltage regulation; cost-effective, peak-hour energy storage with almost infinite life; increased input/output efficiency; and the capability to undergo millions of charging cycles, without degradation, representing a significant improvement over lithium ion and other conventional storage technologies. We believe wide scale deployment of this technology is feasible and practical when compared to the higher life cycle cost and relatively short lifespan of chemical batteries. Based on these findings, the future for deployment of SMES at many fossil-fueled power plants exceeding 100MW capability is bright. Further de-risking g-SMES technology would pave the way for the construction of a subscale prototype. Eventually, scaled-down versions of SMES are expected to be competitive with the multi-billion-dollar lithium-ion market for a wide range of commercial, industrial, and transportation uses. There is long-term potential for commercialization and widespread deployment of this disruptive technology, which would spawn a new worldwide supply chain and create domestic, high-tech manufacturing jobs in the green industry.

20 FOSSIL-FUELED POWER PLANTS↗

Dynamic Temporal Graph Sequence Data for Resilience-Oriented Distribution Network Reconfiguration

This dataset comprises temporal dynamic graph sequences generated from power grid simulations focused on grid reconfiguration to enhance resilience. The simulations model failure propagation under varying conditions, with nodes assigned distinct failure probabilities. For each time step, the dataset captures the evolution of node states (functional or failed) and features critical to grid operations, such as pv_output, load_profile, load_dispatch, dg_output, loss, and voltage. Node types include sources, normal loads, and nodes with specific equipment like PVs, micro turbines, or shunt capacitors. The dataset is structured to support the training of dynamic graph neural networks, facilitating research on node feature prediction and edge dynamics under failure scenarios. Three distinct configurations are included, providing a robust foundation for modeling power grid resilience.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Work With Us to Advance Cybersecurity for the Current and Future Grid

The energy sector is undergoing rapid change. Advanced technologies and controls, digitally connected devices, and a mix of generation sources offer increased energy reliability and security, reduced energy costs, and enhanced grid operations. But they can also carry physical and cybersecurity risks that are not yet fully understood. With deep expertise in advanced energy technologies, the National Laboratory of the Rockies is examining the cybersecurity implications of evolving systems and developing cutting-edge tools, novel approaches, and innovative research capabilities to address sector-wide challenges. Together with our partners, we are working to achieve a more secure, defensible, and reliable grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Multiscale Electricity Modeling for Evaluating Carbon Capture and Sequestration Technologies (MEME-CCS)

This effort employs and adapts an existing, rigorous multiscale electricity modeling platform at the National Renewable Energy Laboratory (NREL) to evaluate carbon capture and sequestration (CCS) and negative emissions technologies (NET) from the ARPA-E FLECCS program. NREL's modeling platform includes the Regional Energy Deployment System (ReEDS) electric sector capacity expansion model, which projects future electricity generation mixes at sub-state-level resolution that are downscaled to the unit-level to enable hourly, zonal or nodal electricity production cost modeling in the PLEXOS model. The resulting hourly price data from PLEXOS is provided to technology developers under the ARPA-E FLECCS program to enable technology-specific economic analysis. The ReEDS-PLEXOS modeling suite is well-established for examining electric sector futures with high renewable energy penetrations, energy storage, electrification, and distributed generation. The key advancement proposed herein utilizes collaboration with CCS experts at the University of Wyoming and the FLECCS teams to create innovative methods for representing CCS and NET in the ReEDS and PLEXOS models. Expanded technology options, new operational parameterizations, and detailed data defining CO2 capture, transportation, and storage systems are being integrated into these models to allow an unprecedented combination of scope and resolution for exploring the future of CCS and NET. The resulting capabilities will take advantage of high-performance computing resources to permit wide-ranging scenario analysis to assess CCS and NET deployment under alternative CO2 prices, fossil fuel prices, electricity demand growth, and other electric sector characteristics. Final outcomes will include publicly available hourly grid operation and price data for any U.S. region of interest along with open-access capacity expansion tools for evaluating CCS/NET systems. These products will help an emerging CCS/NET industry in the United States by providing economics-driven guidance to technology developers while informing policy and investment decisions in the public and private sectors.

air capture↗

NG-CT Peaker Upgrades with Bottoming Cycle: Preliminary Analysis

The National Energy Technology Laboratory (NETL) has conducted a preliminary analysis exploring a significant opportunity to increase the nation's power grid capacity and reliability. The study focuses on retrofitting under-utilized natural gas combustion turbines (NG-CTs), often called "peaker" plants, with a bottoming cycle to capture waste heat and generate additional electricity. This analysis shows that upgrading these existing assets could add approximately 26,250 MW of new power capacity across the United States. A detailed study of the PJM Interconnection, the nation's largest grid operator, confirmed the benefits of these upgrades. Key findings for the PJM region include: - A median increase in the plants' capacity factor by 17 percentage points. - A projected 36.2% median reduction in the levelized cost of electricity (LCOE) for the upgraded plants, with nearly 88% of them expected to break even. - An average reduction in the regional wholesale price of electricity by approximately 3.0% in the year 2030. - A significant boost to grid reliability, with a 46% reduction in projected Loss of Load Hours (LOLH). These findings suggest that retrofitting peaker plants is a promising and economically viable strategy to enhance grid performance, reduce electricity costs, and meet future demand without the challenges associated with building entirely new facilities.

bottoming cycle↗

Accelerating Resilience of the Community through Holistic Engagement and use of Renewables (ARCHER) Planning Framework

The primary objective of the Accelerating Resilience of the Community through Holistic Engagement and Use of Renewables (ARCHER) initiative was to identify and incorporate the unique variations in energy burden, social vulnerability, living conditions, and access to essential services that differ across communities. By accounting for these localized factors—down to the neighborhood level—the project supports more targeted and effective investments in community resilience. The framework seeks to establish practical planning guidance, methods, and performance measures for community energy resilience, integrate community-level and electric utility system resilience planning, and assess its effectiveness through comparison with conventional and operational planning approaches. A key component of the project was its data exchange platform, which is used to evaluate and demonstrate the tools, methodologies, and planning approaches developed through ARCHER. This open-source platform enables developers and vendors of distribution and outage management systems to build upon the research by incorporating its concepts into their own tools and workflows. This capability is enabled by the transparent availability of data, functional requirements, and the underlying information model. The project yielded several important insights. First, meaningful engagement with communities is essential to achieving comprehensive resilience outcomes. Second, resilience planning is most effective when electric grid considerations and broader community needs are addressed in a coordinated manner. Third, the use of platforms that allow for real-time input from communities can enhance utility responsiveness during restoration activities. Fourth, a structured and systematic planning approach can successfully translate ARCHER concepts into practice. Fifth, the development of an integrated metric that reflects both grid performance and community impacts provides a more holistic basis for evaluating resilience. Finally, incorporating community engagement and equity considerations into grid operations is critical, particularly during severe weather events that result in extended outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Towards Improved Decision Making for the Smarter Grid: Geomagnetic Disturbance Implicit Modeling Uncertainty Quantification

Geomagnetic disturbances can greatly disrupt the power grid operation. This is caused by low-frequency changes in the earth’s magnetic field, which upon interaction with the deep earth conductivity induces a changing electric field at the earth’s surface. This in turn induces quasi-direct currents which have the potential to cause protective devices to operate, widespread damage to high-voltage transformers, or voltage collapse due to induced reactive power losses. While these impacts have been known since the 1940s, only recently have standards for GMD response been implemented. Because these standards are heavily based on models, it is important to understand when it is appropriate to make certain modeling assumptions. In this work, implicit modeling uncertainty is quantified for the purpose of enhanced decision making for disturbance impact mitigation. Considering electromagnetic models, modeling assumptions of non-uniform grounding, imbalanced operation, transformer saturation, and geomagnetically induced currents, voltage estimation values are analyzed. Statistical characteristics of modeling uncertainty are obtained by analysis of synthetically generated data. Results statistically characterize geomagnetic disturbances modeling uncertainty, providing an important tool for impact mitigation.

grid analysis↗

Towards Non-Intrusive Real-Time Monitoring of Behind the Meter Residential Distributed Energy Resources

The growing adoption of residential distributed energy resources (DERs) introduces more uncertain variability in power grid operation. More importantly, the residential DERs operate behind customers’ energy meters, and therefore, the utility cannot “directly” monitor them. Prior approaches to enable visibility into behind-the-meter (BTM) DERs either depend on estimations or require intrusive instrumentation on the customer side. To address the critical need for direct real-time monitoring of BTM DERs, in this paper, we propose a novel approach for utility-side direct real-time monitoring of residential BTM DERs. We utilize high-frequency (> 10kHz) conducted electromagnetic interference (EMI) from residential DERs’ grid-tied inverters to monitor their power generation. We discuss the working principle of our approach and present supporting results using three of-the-shelf grid-tied inverters.

14 SOLAR ENERGY↗

Cyber-Power Co-Simulation for End-to-End Synchrophasor Network Analysis and Applications

The resiliency, reliability and security of the next generation cyber-power smart grid depend upon efficiently leveraging advanced communication and computing technologies. Also, developing real-time data-driven applications is critical to enable wide-area monitoring and control of the cyber-power grid given high-resolution data from Phasor Measurement Units (PMUs). North American Synchrophasor Initiative Network (NASPlnet) provides guidance for PMU data exchanges. With the advancement in networking and grid operation, it is necessary to evaluate the performance of different data flow architectures suggested by NASPInet and analyze the impact on applications. Therefore, we need a cyber-power co-simulation framework that supports very large-scale co-simulation capable of running in parallel, high-performance computing platforms and capturing real-life network behavior. This work presents an end-to-end automated and user-driven cyber-power co-simulation using NS3 to model communication networks, GridPACK to model the power grid, and HELICS as a co-simulation engine. Comparative analysis of latency in synchrophasor networks and a performance evaluation of a power system stabilizer application utilizing PMU data in an IEEE 39 bus test system is presented using this cosimulation testbed.

Mustafa, Hussain M.↗

An open-source framework for balancing computational speed and fidelity in production cost models

Studies of bulk power system operations need to incorporate uncertainty and sensitivity analyses, especially around exposure to weather and climate variability and extremes, but this remains a computational modeling challenge. Commercial production cost models (PCMs) have shorter runtimes, but also important limitations (opacity, license restrictions) that do not fully support stochastic simulation. Open-source PCMs represent a potential solution. They allow for multiple, simultaneous runs in high-performance computing environments and offer flexibility in model parameterization. Yet, developers must balance computational speed (i.e. runtime) with model fidelity (i.e. accuracy). In this paper, we present Grid Operations (GO), a framework for instantiating open-source, scale-adaptive PCMs. GO allows users to search across parameter spaces to identify model versions that appropriately balance computational speed and fidelity based on experimental needs and resource limits. Results provide generalizable insights on how to navigate the fidelity and computational speed tradeoff through parameter selection. We show that models with coarser network topologies can accurately mimic market operations, sometimes better than higher-resolution models. It is thus possible to conduct large simulation experiments that characterize operational risks related to climate and weather extremes while maintaining sufficient model accuracy.

42 ENGINEERING↗

Multi-Agent Graph-Attention Deep Reinforcement Learning for Post-Contingency Grid Emergency Voltage Control

Grid emergency voltage control (GEVC) is paramount in electric power systems to improve voltage stability and prevent cascading outages and blackouts in case of contingencies. While most deep reinforcement learning (DRL)-based paradigms perform single agents in a static environment, real-world agents for GEVC are expected to cooperate in a dynamically shifting grid. Moreover, due to high uncertainties from combinatory natures of various contingencies and load consumption, along with the complexity of dynamic grid operation, the data efficiency and control performance of the existing DRL-based methods are challenged. To address these limitations, we propose a multi-agent graph-attention (GATT)-based DRL algorithm for GEVC in multi-area power systems. Here, we develop graph convolutional network (GCN)-based agents for feature representation of the graph-structured voltages to improve the decision accuracy in a data-efficient manner. Furthermore, a cutting-edge attention mechanism concentrates on effective information sharing among multiple agents, synergizing different-sized subnetworks in the grid for cooperative learning. We address several key challenges in the existing DRL-based GEVC approaches, including low scalability and poor stability against high uncertainties. Test results in the IEEE benchmark system verify the advantages of the proposed method over several recent multi-agent DRL-based algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

The US Western Interconnection is facing unprecedented challenges in the form of less predictable peak demand, increasingly diverse generating resources, and fast-growing loads due to the onset of artificial intelligence, hyperscale computing, and electrification. Projecting where future generation may be developed is critical to maintaining a robust and resilient electric grid under this mounting uncertainty and variability. Using an integrated multisectoral, multiscale modeling framework that links a human-Earth systems model, an hourly load model, a geospatial power plant siting model, and an hourly grid operations model, we evaluate the power plant landscape evolution under eight alternative futures between 2020 and 2055. These futures represent a wide but plausible range of atmospheric conditions, emissions constraints, and economic, technological, and population growth assumptions. We find that local-level development can vary substantially both by generation type and capacity buildout across these futures. Specific regions of the Western Interconnection are projected to see large amounts of capacity development regardless of the future scenario. We additionally determine that projected power plant locations are more heavily influenced by the cost to interconnect to the electric grid than the locational energy value.

Mongird, Kendall↗

Packetized Energy Management: Coordinating Transmission and Distribution (Final Report)

The project Packetized Energy Management (PEM): Coordinating Transmission and Distribution was part of the ARPA-E NODES program from 2015 to 2023. The high-level goal of the project was to develop and demonstrate novel, scalable, and impactful technologies related to the coordination of networked distributed energy resources (DERs). By demonstrating responsive means by which fleets of DERs could be coordinated to enhance grid operation and reliability, the U.S. could accelerate renewable integration and electrification efforts and meet decarbonization goals.

25 ENERGY STORAGE↗

Exploring sustainable electricity system development pathways in South America’s MERCOSUR sub-region

South America has abundant natural water and energy resources, and exploiting these resources to achieve a clean energy future is central to the continent’s economic and sustainable development objectives for the next several decades. Designing pathways to achieving this clean energy future requires better understanding the structural, techno-economic, and policy forces that may influence the future development of the electricity sector in the region. Here, we focus on an interconnected electricity system of five South American countries – Argentina, Brazil, Chile, Paraguay, and Uruguay – which represent major electricity generation, consumption, and trade dynamics in the region. We explore the implications of various forces that could shape the future composition of the power sector in the sub-region, including: evolving renewable energy cost and performance, natural gas prices, cross-border interconnection facilities, early retirement of installed hydropower, and different decarbonization goals. We use a model framework based on a power system planning platform (GridPath) to co-optimize investment and operations of generation, storage, and transmission facilities out to 2050. Our results in a Reference scenario indicate that the electricity system can maintain a relatively clean energy portfolio by leveraging existing hydropower capacity and integrating increasingly cost-competitive wind and solar power. However, dependence on natural gas in the region is likely to remain high. A low-carbon electricity system can cost-effectively be achieved through policy interventions (e.g., renewable portfolio standards) and by diversifying investments in wind, solar, battery storage, and some new hydropower capacity. We also find that existing hydropower is critical for maintaining reliable future grid operations. Enhanced regional electricity trade, mostly based on existing interconnection capacities with nominal investment in new transmission, can significantly benefit the clean energy transition in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗