Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distributed scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Feedback on the Electric Emergency Incident and Disturbance Report, OE-417

The US Department of Energy (DOE) Office of Electricity (OE) mandates requirements for reporting electric emergencies and disruptions in the United States. Specific electric power industry organizations (such as balancing authorities, reliability coordinators, some generating entities, and electric utilities) report this information through the OE-417 Electric Emergency Incident and Disturbance Report via Form OE-417. Entities are required to submit Form OE-417 when at least one of the qualifying 26 criteria is met pursuant to Section 13(b) of the Federal Energy Administration Act of 1974 (Public Law 93-275). Entities are required to report, within 6 hours of the incident, loss of electric service to 50,000 customers or more for 1 hour or longer. The deadline for submitting Form OE-417 depends on the nature of the incident. An updated Form OE-417 Schedule 1 and all of Schedule 2 are both due within 72 hours of the incident to provide complete disruption information. Additionally, a Final Report must be filed within 72 hours of the incident, unless an interim update has been provided. If the incident meets specific criteria, the form must be filed within one hour, six hours, or by the later of 24 hours after the recognition of the incident or by the end of the next business day.1 The ability of DOE to respond quickly to energy emergencies that could affect the nation’s infrastructure and help alleviate or prevent further disruptions depends on the industry’s prompt and complete submission of information. This report summarizes current issues with Form OE-417 and the reporting process and presents recommendations for improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling and Optimizing Pumped Storage in a Multi-stage Large Scale Electricity Market under Portfolio Evolution

To leverage the fast-ramping capability of resources to provide great value to the grid, electricity system operators such as the Midcontinent Independent System Operator (MISO) continue to evolve their approaches for integrating energy storage resources, including pumpedstorage hydro (PSH), into the electricity markets. However, new challenges arise in modeling and optimizing these energy-limited resources across multiple market clearing processes and planning studies with uncertainties and imperfect information. For instance, current market practices of PSH owners specifying pumping/generating hours can result in sub-optimal generation dispatch. Letting grid operators optimize PSH with the consideration of multiple operating modes and energy limitation constraints can potentially bring economic benefits to both the system and the PSH owners. However, in multi-stage clearing process of electricity markets, utilizing the PSH flexibility to deal with realized uncertainties can cause deviation in the multi-stage scheduling processes. The resulting financial risks from the schedule deviation may not be acceptable to PSH owners. In addition, to effectively utilize this energy limited resource, the state of charge (SOC) constraints of PSH needs to be continuously optimized and the marginal cost of deviation need to reflect the expected cost to purchase or sell energy at future times to compensate for deviations. This project aims to develop a prototype enhanced PSH model and improved price signals in the multi-stage market clearing process with proper consideration of the unique characteristics of PSH, in order to better align underlying PSH capabilities with evolving grid needs, particularly including the needs for more frequent and larger cycling to manage variability and uncertainty from renewables.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Data-Driven Method for Adaptive Reserve Requirement Estimation via Probabilistic Net Load Forecasting

The University of Colorado Boulder Boulder, CO, 80309, USA With the increasing penetration of renewable energy, power systems are subject to more uncertainty. This makes power system reserve scheduling more challenging. Most of the current reserve requirement determination methods calculate reserve requirements based on historical data, which does not consider the real-time or future system uncertainty. In this paper, a data-driven method is developed to determine the non-spinning reserve requirement (NSRR) in the Electric Reliability Council of Texas (ERCOT) system. The method follows the procedure of the current ERCOT method while adaptively determining the NSRR based on probabilistic net load forecasts. Case studies with two years of ERCOT data show that the developed method significantly reduces the NSRR by introducing an adaptive temporal resolution and update rate. Sensitivity analysis with different forecasting and percentile thresholds indicates the flexibility of the developed method.

non-spinning reserve↗

A computationally efficient algorithm for computing convex hull prices

Electricity markets worldwide allow participants to bid non-convex production offers. While non-convex offers can more accurately reflect a resource's capabilities, they create challenges for market clearing processes. For example, system operators may be required to execute side payments to participants whose costs are not covered through energy sales as determined via traditional locational marginal pricing schemes. Convex hull pricing minimizes this and other types of side payments while providing uniform (i.e., locationally and temporally consistent) prices. Computing convex hull prices involves solving either a large-scale linear program or the Lagrangian dual of the corresponding non-convex scheduling problem. Further, the former approach requires explicit descriptions of market participants' convex hulls. While linear programs for computing convex hull prices are large, their structure is naturally decomposable by generators. Here, in this work, we propose and empirically analyze a Benders decomposition approach to computing convex hull prices that leverages recent advances in convex hull formulations for thermal generating units. We demonstrate across a large set of test instances that our decomposition approach only requires modest computational effort, obtaining solutions at least an order of magnitude faster than the equivalent large-scale linear programming approach. Overall, we provide a computationally feasible method for computing convex hull prices for industrial scale market clearing problems, enabling the possibility of practical adoption of this advanced pricing mechanism.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Rethinking the Price Formation Problem–Part 1: Participant Incentives under Uncertainty

Operators of organized wholesale electricity markets attempt to form prices in such a way that the private incentives of market participants are consistent with a socially optimal commitment and dispatch schedule. In the U.S. context, several competing price formation schemes have been proposed to address the non-convex production cost functions characteristic of most generation technologies. Here, this paper considers how the design and analysis of price formation policies for non-convex markets are affected by the uncertainty inherent in electricity demand and supply. We argue that by excluding uncertainty, the analytical framework underlying existing policies mischaracterizes the incentives of market participants, leading to inefficient price formation and poor incentives for flexibility. We establish favorable theoretical properties of a new construct, ex ante convex hull pricing , and demonstrate the difference between this idealized benchmark and existing methods on a large-scale test system. Given increased operational uncertainty with a transition to wind and solar generation, distortions caused by poor incentives for flexibility are likely to grow without improved price formation in organized wholesale markets.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrifying education: Exploring the electrification potential of U.S. School bus fleets

We analyze the operations of 270 diesel school buses across the United States to assess their electrification potential and evaluate the impact of various charging strategies on electricity demand. We find that school buses typically follow a two-route schedule on weekdays, featuring extended dwell times between morning and evening trips. Weekday trip distances average 25 miles, while weekend trips average 42 miles. Charging simulations indicate over 90% of the U.S. school bus fleet could be electrified using current technologies (300-mile range at 1.21 kWh/mile with 19.2-kW depot charging) without modifying existing operating patterns. Depot charging is a key enabler of school bus electrification, however, the strategic placement of charging stations at other locations (e.g., schools) can further increase electrification potential. Additionally, we find electric school bus charging to be highly flexible, with charge management capable of reducing peak charging loads at depots by up to 77%.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Energy Scheduling and Sensitivity Analysis for Integrated Power-Water-Heat Systems

The conventionally independent power, water, and heating networks are becoming more tightly connected, which motivates their joint optimal energy scheduling to improve the overall efficiency of an integrated energy system. However, such a joint optimization is known as a challenging problem with complex network constraints and couplings of electric, hydraulic, and thermal models that are nonlinear and nonconvex. We formulate an optimal power-water-heat flow (OPWHF) problem and develop a computationally efficient heuristic to solve it. The proposed heuristic decomposes OPWHF into subproblems, which are iteratively solved via convex relaxation and convex-concave procedure. Simulation results validate that the proposed framework can improve operational flexibility and social welfare of the integrated system, wherein the water and heating networks respond as virtual energy storage to time-varying energy prices and solar photovoltaic generation. Moreover, we perform sensitivity analysis to compare two modes of heating network control: by flow rate and by temperature. Our results reveal that the latter is more effective for heating networks with a wider space of pipeline parameters.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal-Hydraulics Modeling and Simulations of Hot Pool Using the SAS-CFD Coupled Code

The main goal of this activity is to test the dynamic coupling of the SAS4A/SASSYS-1 (SAS) and CFD models, using a recently patched version of the SAS code intended to address an undocumented limitation that hindered the Versatile Test Reactor (VTR) simulation efforts in FY21. As described in previous VTR calculation reports, the undocumented limitation in SAS v5.4 does not allow the user to activate the CFD coupling option during restart calculations. Since the analysts were unaware of this limitation, prior SAS-CFD simulation results for the protected station blackout (PSBO) transient were erroneous. Root-cause analysis was performed to determine the cause of this undocumented limitation in SAS v5.4, the SAS software was updated in a new patch, and the SAS-CFD simulations were repeated with this patched software. The results of the SAS-CFD simulations documented in this report show that the software patch does address the cited issue, and that the patched software indeed supports the activation of the CFD coupling model in restart calculations. The SAS development team will determine the schedule for implementing the patch in an official software release. This report documents updated SAS-CFD simulations of the PSBO transient response in the VTR. The hot pool is modeled with the CFD code STAR-CCM+, which is coupled at the flow boundaries to the SAS model of the primary heat transport system. SAS computes the mass flow rate and temperature at each core subassembly outlet, the thermal insulation cavity bypass, and the IHX inlet windows. CFD in turn computes the absolute pressure and temperature at each of these boundaries. The SAS code will ignore the temperature data at flow boundaries where flow is directed into the hot pool, i.e., at the core subassembly outlets unless flow reversal occurs. Similarly, CFD will ignore temperature data at boundaries where the flow is directed out of the hot pool, i.e., at the IHX inlets except under flow reversal. The focus of this work is to ensure that the SAS software patch addresses the undocumented limitation described in prior VTR calculation reports, rather than the accurate assessment of thermal stratification in the VTR during protected transients. This motivates the development of a new, simplified CFD model with a coarser mesh to accelerate the testing process. The updated model, and simplifying assumptions, are documented in this report. In future work, the thermal stratification assessment should be performed in more detail. The simplified CFD model can be improved by performing grid convergence studies sensitivity studies of turbulence parameters (e.g., Prandtl number, turbulence production and dissipation parameters) on temperature distributions and thermal stratification.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Frequency-Nadir-Constrained Unit Commitment for Low-Inertia, High-IBR Island Power Systems [Slides]

The process of energy decarbonization in island power systems is accelerated due to the swift integration of inverter-based renewable energy resources (IBRs). The unique features of such systems, including rapid frequency changes resulting from potential generation outages or imbalances due to the unpredictability of renewable power, pose a significant challenge in maintaining the frequency nadir without external support. This paper presents a unit commitment (UC) model with data-driven frequency nadir constraints, including either frequency nadir or minimum inertia requirements, helping to limit frequency deviations after significant generator outages. The constraints are formulated using a linear regression model that takes advantage of real-world, year-long generation scheduling and dynamic simulation data. The efficacy of the proposed UC model is verified through a year-long simulation in an actual island power system using historical weather data. The alternative minimum inertia constraint, derived from actual system operation assumptions, is also evaluated. Findings demonstrate that the proposed frequency nadir constraint notably improves the system's frequency nadir under high photovoltaic (PV) penetration levels, albeit with a slight increase in generation costs, when compared to the alternative minimum inertia constraint.

14 SOLAR ENERGY↗

Continuous-time look-ahead flexible ramp scheduling in real-time operation

This paper develops a novel continuous-time look-ahead optimization model for co-optimizing balancing energy and flexible ramp products in real-time power systems operation. In addition, a continuous-time day-ahead operation model is developed to commit and schedule an adequate subset of generating units for providing balancing energy and ramping requirements in real-time operation. The up and down flexible ramp products are defined as continuous-time decision trajectories that continuously supply the real-time up and down ramping requirements of the system. The deliverability of flexible ramp products is secured through reserving the respective power requirements in generation capacity constraints of generating units. A function space solution method is proposed to reduce the dimensionality of day-ahead and real-time models through projecting them into finite-dimensional function spaces spanned by Bernstein polynomials, where the real-time operation decisions are modeled with a higher accuracy level than day-ahead decisions. Simulations are conducted on the IEEE-RTS system using CAISO load data, and the numerical results showcase the effectiveness of the proposed model in supplying the energy and flexible ramp requirements and avoiding ramping scarcity in the system, while reducing the operation costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-layered Energy Management Framework for Extreme Fast Charging Stations Considering Demand Charges, Battery Degradation, and Forecast Uncertainties

To achieve a cost-effective and expeditious charging experience for extreme fast charging station (XFCS) owners and electric vehicle (EV) users, the optimal operation of XFCS is crucial. It is however challenging to simultaneously manage the profit from energy arbitrage, the cost of demand charges, and the degradation of a battery energy storage system (BESS) under uncertainties. This paper, therefore, proposes a multi-layered multi-time scale energy flow management framework for an XFCS by considering long- and short-term forecast uncertainties, monthly demand charges reduction, and BESS life degradation. In the proposed approach, an upper scheduling layer (USL) ensures the overall operation economy and yields optimal scheduling of the energy resources on a rolling horizon basis, thereby considering the long-term forecast errors. A lower dispatch layer (LDL) takes the short-term forecast errors into account during the real-time operation of the XFCS. Per the latest research, monthly demand charges can be as high as 90% of the total monthly bills for EV fast charging stations; to this end, this paper takes the first attempt at the reduction of demand charges cost by considering the trade-off between the energy cost and monthly demand charges. Contrasting literature, this work allocates an energy reserve in the BESS stored energy to deal with the impact of short-term forecast errors on the optimized real-time operation of the XFCS. Moreover, degradation modeling considers the trade-off between short-term benefits and long-term BESS life degradation. As a result, case studies and a comparative analysis prove the efficacy of the proposed framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The ABCs of On-Demand Transit (ODT)

On-demand mobility - also referred to as on-demand transit (ODT) - is a form of public mobility that is flexible with respect to where and when service is provided, and ODT deployments have increased significantly in recent years. Transit agencies are becoming increasingly interested in ODT, and due to differing definitions and various service design and business model options, it can be difficult to learn about the emerging industry. This work provides an overview of the definitions of ODT, recent trends internationally and in the U.S., ODT's benefits and challenges (particularly compared to fixed-route transit), three primary service design options, system costs and funding considerations, and a metrics framework for evaluating ODT systems to ensure continued successful performance. Identified benefits include increased service areas, short ride and wait times, increased user flexibility, potential to reduce energy consumption and emissions through shared trips and smaller, right-sized vehicles, increased safety and comfort through door-to-door service, and rich data streams including granular spatio-temporal data that can be analyzed to continuously improve the service. Challenges include scaling ODT service up as small increases in ridership require additional supply to keep service quality high, serving peak times including keeping low wait times, the lack of fixed schedule being challenging for commuters, integrating ODT services with nearby transit systems, and equity for riders without smartphones who cannot track the vehicle in a mobile app. Finally, an overview of seven ODT case studies (in Texas, Missouri, New York, and Ontario, Canada) performed by NREL and related analysis of travel time, energy and emissions, costs, and equity are presented. Initial key findings include: ODT can be cost- and energy-effective compared to fixed-route transit, ODT serves more people than other transit options, and ODT system deployments can be followed by rapid growth.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PORFLOW modeling of Vadose zone flow and transport for the E-area intermediate level vault

In support of the E-Area Performance Assessment, a two-dimensional model of water flow and radionuclide transport through the E-Area Intermediate Level Vault (ILV) and local vadose zone has been developed using the PORFLOWTM software. The purpose of the model is to calculate flux to the water table for radionuclides eluted from the ILV during its operational life, the period of institutional control, and times following site closure. Results of model calculations will be used by a three-dimensional PORFLOW model of transport through the aquifer to determine radionuclide concentrations at a hypothetical 100 meter well and at the site boundary where contaminated groundwater could be assessed by members of the public following site closure. While newly developed, the model structure closely follows that used in the 2008 PA while incorporating a refined computational mesh, updated material properties for the vadose zone soil and vault concrete, revised infiltration rates, and new solid-liquid distribution coefficients. The model also addresses degradation of concrete hydraulic properties by blending soil and concrete water retention curves over a 500 year period. That is, the hydraulic properties of ILV concrete start out as fresh concrete at the time of site closure and degrade to soil properties over a 500 year time period. This approach has not been used previously in E-Area PA’s. The model has been used to calculate water flow through the ILV vadose zone and, on a trial basis, transport of a limited number of radionuclides from the waste region inside the ILV to the water table. Figure ES-1 provides a view of the model and an example of water flow after the concrete has substantially degraded. Figure dimensions are in centimeters. The red area in the left hand side figure is the waste disposal region within the ILV. Colored bands in the figures indicate different soil and concrete regions. Figure ES-2 shows a calculation of flux to the water table (mol/yr) for U-234 and its one-year half-life decay chain (U-234 → Th-230 → Ra-226 → Pb-210). Pb-210 flux is too small to show on the same scale used for Th-230 and Ra-226 in Figure ES-2. The model has also been used to make a preliminary evaluation of the release of tritium from TPBAR disposal containers that will be place in the ILV. A separately calculated tritium release rate as a function of time was used as a source in the PORFLOW model. The TPBAR disposal schedule and tritium release rate differ from the values used in the 2008 PA. Results from these initial trial runs are compared to calculations made for the 2008 PA ILV analysis. In brief, a new PORFLOW model of flow and transport through the ILV vadose zone has been developed and tested. The model is ready to be used for PA calculations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of wind power scenario creation methods for stochastic power systems operations

Probabilistic scenarios of renewable energy production, such as wind, have been gaining popularity for use in stochastic variants of power systems operations scheduling problems, allowing for optimal decision-making under uncertainty. The quality of the scenarios has a direct impact on the value of the resulting decisions, but until now, methods for creating scenarios have not been compared under realistic operational conditions. Here, we compare the quality of scenario sets created using three different methods, based on a simulated re-enactment of stochastic day-ahead unit commitment and subsequent dispatch for a realistic test system. We create scenarios using a dataset of forecasted and actual wind power values, scaled to evaluate the effects of increasing wind penetration levels. We show that the choice of scenario set can significantly impact system operating cost, renewable energy use, and the ability of the system to meet demand. This result has implications for the ability of system operators to efficiently integrate renewable production into their day-ahead planning, highlighting the need for the use of performance-based assessments for scenario evaluation.

17 WIND ENERGY↗

Energy performance of an operational government building retrofitted with ceiling phase change material tiles in a mixed-humid climate

The aging U.S. building stock requires various retrofit measures to enhance their energy efficiency. Here, this study explores the integration of thermal energy storage and advanced building controls as viable retrofit solutions for load flexibility and peak demand response while maintaining the occupants' comfort. A detailed assessment is conducted on the energy use of an administrative building in Sumner County, Kansas, focusing on the implementation of phase change materials (PCMs) in the ceiling of occupied zones. First, a time-resolved, whole-building energy model is developed in EnergyPlus, incorporating complex thermal behaviors such as air exchange between the plenum space and occupied zones, envelope leakage, and operational schedules. The model is then validated using experimental field test data, and subsequently a parametric assessment of key PCM properties and application strategies is performed to evaluate cooling electricity demand benefits. The parametric study shows that the optimal retrofit strategy, comprising a PCM with 23°C peak melting temperature, 0.125 in. (3.17 mm) thickness, and 150 kJ/kg latent heat, combined with active controls that include 8 h of precooling, forced convection under the ceiling, and a 2°C thermostat setback during peak hours, can result in a maximum load shift during the peak period of 99.6 % and the total electricity savings during the peak period of 98.9 % for the optimum case and thus provide significant cost savings under time-of-use pricing scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility Sector Impacts of Reduced Electricity Demand: Updates to Methodology and Results

This report presents revisions to the methodology for estimating the utility sector impacts associated with electricity demand reductions, first published in our 2014 study. The earlier report described how to calculate utility impact factors based on data from the Energy Information Agency's Annual Energy Outlook (AEO) projections of electricity supply and demand. The 2014 methodology relied on data from the AEO Reference case, and side cases implementing demand-side policies with a substantial impact on total demand. Beginning in 2015, the AEO publication schedule was revised to limit the number of side cases published with each AEO, and no suitable demand-focused side cases have been released since 2014. Hence, this paper presents a generalization of the methodology that allows a uniform approach irrespective of the nature of the side cases published with the AEO. The impact factors we calculate represent coeffcients of variation between a unit reduction to site electricity demand and corresponding supply-side changes, including reductions to electric power generation and primary fuel consumption by fuel type, emissions of criteria pollutants (Hg, NO x and SO 2 ) and greenhouse gases (CO 2 , N 2 O and CH 4 ), and total installed capacity by plant type. The impact factors are time-dependent, and also depend on the demand sector and end use. In this report, we apply the methodology to all AEO publications from 2014-2019, and all scenarios. We quantify the variation in factors across different side cases within each AEO, and across different AEO publications, and compare this to the variation due to changes in methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measuring Societal Infrastructure Service Burden

Social Infrastructure Service Burden (abbr. Social Burden) is defined as the burden to a population for attaining services needed from infrastructure. Infrastructure services represent opportunities to acquire things that people need, such as food, water, healthcare, financial services, etc. Accessing services requires effort, disruption to schedules, expenditure of money, etc. Social Burden represents the relative hardship people experience in the process of acquiring needed services. Social Burden is comprised of several components. One component is the effort associated with travel to a facility that provides a needed service. Another component of burden is the financial impact of acquiring resources once at the providing location. We are applying Social Burden as a resilience metric by quantifying it following a major disruption to infrastructure. Specifically, we are most interested in quantifying this metric for events in which energy systems are a major component of the disruption. We do not believe this is the only such use of the Social Burden metric, and therefore we will also be exploring its use to describe blue-sky conditions of a society in the future. Furthermore, while the construct can be applied to a dynamically changing situation, we are applying it statically, directly following a disruption. This notably ignores recovery dynamics that are a key capability of resilient systems. This too will be explored in future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗