Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development design testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

NTRCI Legacy Engine Research and Development Project Final Technical Report

The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engine's commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was designed, manufactured and demonstrated in the GEN2.5B prototype.

33 ADVANCED PROPULSION SYSTEMS↗

Drive-train dynamics technology - State-of-the-art and design of a test facility for advanced development

A program for the development and verification of drive-train dynamic technology is described along with its basis and the results expected from it. A central feature of this program is a drive-train test facility designed for the testing and development of advanced drive-train components, including shaft systems, dampers, and couplings. Previous efforts in designing flexible dynamic drive-train systems are reviewed, and the present state of the art is briefly summarized. The design of the test facility is discussed with major attention given to the formulation of the test-rig concept, dynamic scaling of model shafts, and the specification of design parameters. Specific efforts envisioned for the test facility are briefly noted, including evaluations of supercritical test shafts, stability thresholds for various sources and types of instabilities that can exist in shaft systems, effects of structural flexibility on the dynamic performance of dampers, and methods for vibration control in two-level and three-level flexible shaft systems.

Badgley, R. H.↗

Test chip assembler and test program generator

One of the major problems in working at the geometry level for the generation of either test structure or functional circuit designs is the amount of labor involved in the design phase. To reduce the amount of labor involved in both the design and test of the structures used, JPL has developed a design and test program consisting of a Test Chip Assembler (TCA) and a Test Program Generator (TPG), which creates the geometrical description of the structures and generates the necessary test information using a high-level language. This system reduces the design time for a test chip by a factor of 30. To analyze the data obtained from wafer probing, a statistical package called STMJPL was developed. Some of the capabilities of the JPL software (STMJPL) are described.

Pina, C. A.↗

Review of sonic fatigue technology

From the early-1960s until the mid-1980s, there was very little theoretical development for sonic fatigue prediction. Design nomographs based on simple theoretical models and results of specially designed tests were developed for most common aircraft structures. The use of advanced composites in the 1980s, however, generated an increased interest in development of more sophisticated theoretical models because of the possibilities for a much wider range of structural designs. The purpose of this report is to review sonic fatigue technology and, in particular, to assess recent developments. It also suggests a plan for a coordinated program of theoretical and experimental work to meet the anticipated needs of future aerospace vehicles.

Clarkson, B. L.↗

Specimen Designs for Testing Advanced Aeropropulsion Materials Under In-Plane Biaxial Loading

A design study was undertaken to develop specimen designs for testing advanced aeropropulsion materials under in-plane biaxial loading. The focus of initial work was on developing a specimen design suitable for deformation and strength tests to be conducted under monotonic loading. The type of loading initially assumed in this study was the special case of equibiaxial, tensile loading. A specimen design was successfully developed after a lengthy design and optimization process with overall dimensions of 12 by 12 by 0.625 in., and a gage area of 3.875 by 3.875 by 0.080 in. Subsequently, the scope of the work was extended to include the development of a second design tailored for tests involving cyclic loading. A specimen design suitably tailored to meet these requirements was successfully developed with overall dimensions of 12 by 12 by 0.500 in. and a gage area of 2.375 by 2.375 by 0.050 in. Finally, an investigation was made to determine whether the specimen designs developed in this study for equibiaxial, tensile loading could be used without modification to investigate general forms of biaxial loading. For best results, it was concluded that specimen designs need to be optimized and tailored to meet the specific loading requirements of individual research programs.

Ellis, John R.↗

Hardware Design of a 1.7 kV SiC MOSFET Based MMC for Medium Voltage Motor Drives

Abstract—This paper presents the hardware design of a 7 kV dc bus,1 MVA, 0-1,000 Hz, 1.7 kV SiC MOSFET based medium voltage variable speed drive (MVVSD)1. The system is based on a 7-level three-phase modular multilevel converter (MMC). The full in-depth design, development, and testing of this prototype are provided, including MMC submodule development, arm inductor design, control hardware realization, system integration and thermal analysis. Finally, experimental results demonstrate the excellent performance of the 1.7 kV SiC MOSFET based submodule and the 1 MW, 7 kV MVVSD as a unity in various operation modes

SiC MOSFET, Modular Multilevel Converter, Medium V↗

Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide

The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.

Hacker, Scott↗

Development of Reliable Life Support Systems

The life support systems on the International Space Station (ISS) are the culmination of an extensive effort encompassing development, design, and test to provide the highest possible confidence in their operation on ISS. Many years of development testing are initially performed to identify the optimum technology and the optimum operational approach. The success of this development program depends on the accuracy of the system interfaces. The critical interfaces include the specific operational environment, the composition of the waste stream to be processed and the quality of the product. Once the development program is complete, a detailed system schematic is built based on the specific design requirements, followed by component procurement, assembly, and acceptance testing. A successful acceptance test again depends on accurately simulating the anticipated environment on ISS. The ISS Water Recovery System (WRS) provides an excellent example of where this process worked, as well as lessons learned that can be applied to the success of future missions. More importantly, ISS has provided a test bed to identify these design issues. Mechanical design issues have included an unreliable harmonic drive train in the Urine Processor's fluids pump, and seals in the Water Processor's Catalytic Reactor with insufficient life at the operational temperature. Systems issues have included elevated calcium in crew urine (due to microgravity effect) that resulted in precipitation at the desired water recovery rate, and the presence of an organosilicon compound (dimethylsilanediol) in the condensate that is not well removed by the water treatment process. Modifications to the WRS to address these issues are either complete (and now being evaluated on ISS) or are currently in work to insure the WRS has the required reliability before embarking on a mission to Mars.

Carter, Layne↗

Development of Reliable Life Support Systems

The life support systems on the International Space Station (ISS) are the culmination of an extensive effort encompassing development, design, and test to provide the highest possible confidence in their operation on ISS. Many years of development testing are initially performed to identify the optimum technology and the optimum operational approach. The success of this development program depends on the accuracy of the system interfaces. The critical interfaces include the specific operational environment, the composition of the waste stream to be processed and the quality of the product. Once the development program is complete, a detailed system schematic is built based on the specific design requirements, followed by component procurement, assembly, and acceptance testing. A successful acceptance test again depends on accurately simulating the anticipated environment on ISS. The ISS Water Recovery System (WRS) provides an excellent example of where this process worked, as well as lessons learned that can be applied to the success of future missions. More importantly, ISS has provided a test bed to identify these design issues. Mechanical design issues have included an unreliable harmonic drive train in the Urine Processor's fluids pump, and seals in the Water Processor's Catalytic Reactor with insufficient life at the operational temperature. Systems issues have included elevated calcium in crew urine (due to microgravity effect) that resulted in precipitation at the desired water recovery rate, and the presence of an organosilicon compound (dimethylsilanediol) in the condensate that is not well removed by the water treatment process. Modifications to the WRS to address these issues are either complete (and now being evaluated on ISS) or are currently in work to insure the WRS has the required reliability before embarking on a mission to Mars.

Carter, Layne↗

Tritium processing for the European test blanket systems: current status of the design and development strategy

Tritium processing technologies of the two European Test Blanket Systems (TBS), HCLL (Helium Cooled Lithium Lead) and HCPB (Helium Cooled Pebble Bed), play an essential role in meeting the main objectives of the TBS experimental campaign in ITER. The compliancy with the ITER interface requirements, in terms of space availability, service fluids, limits on tritium release, constraints on maintenance, is driving the design of the TBS tritium processing systems. Other requirements come from the characteristics of the relevant test blanket module and the scientific programme that has to be developed and implemented. This paper identifies the main requirements for the design of the TBS tritium systems and equipment and, at the same time, provides an updated overview on the current design status, mainly focusing onto the tritium extractor from Pb-16Li and TBS tritium accountancy. Considerations are also given on the possible extrapolation to DEMO breeding blanket. (authors)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

30 cm Engineering Model thruster design and qualification tests

Development of a 30-cm mercury electron bombardment Engineering Model ion thruster has successfully brought the thruster from the status of a laboratory experimental device to a point approaching flight readiness. This paper describes the development progress of the Engineering Model (EM) thruster in four areas: (1) design features and fabrication approaches, (2) performance verification and thruster to thruster variations, (3) structural integrity, and (4) interface definition. The design of major subassemblies, including the cathode-isolator-vaporizer (CIV), main isolator-vaporizer (MIV), neutralizer isolator-vaporizer (NIV), ion optical system, and discharge chamber/outer housing is discussed along with experimental results.

Schnelker, D. E.↗

Design, fabrication, and dynamic testing of a V-groove radiator mechanical development unit

This paper describes the design, fabrication, and dynamic testing of a V-groove radiator development unit. The intended goal was to survive the dynamic environment of the Mars Observer mission. The development unit was designed to achieve a temperature of 80 K with a heat load of about 80 milliwatts. An analysis was performed to predict the thermal performance of the development unit. The radiator with a mass mockup of a Gamma Ray Spectrometer detector, the most massive of the candidate Mars Observer instrument detectors (1.7 Kg), passed vibration and acoustic testing to the Mars Observer requirements in effect at that time.

Petrick, S. Walter↗

CRADA Number NFE-18-07313 with Nth Cycle, Inc. (CRADA Final Report)

Cooperative Research and Development Agreement (CRADA) NFE-18-07313 between Oak Ridge National Laboratory (ORNL) and Nth Cycle Inc. focused on developing a technology for sustainable recycling of rare earth and specialty metals (e.g., Y, Co, Li; RESE), as well as bulk and precious metals from industrial manufacturing and waste streams through the use of electrochemical carbon nanotube-enabled filters. The project outcome was expected to be a stronger mechanistic understanding of the electrochemical recovery of metals from real manufacturing process streams and e-waste streams, and the development of an optimized high-throughput pilot-scale device ready for commercialization. Testing, design, and development of a v1 prototype to prove the technology was unsuccessful (we were not able to reach the go/no-go outlined in Objective 1) and we were unable to continue our redesign due to COVID-19 lockdown and no access to lab from March 2020 – until our graduation from the program.

36 MATERIALS SCIENCE↗

Testing and Calibration of the NASA COR1 Coronagraph for the Solar Terrestrial Relations Observatory (STEREO)

This proposal is for a no cost extension on the period of performance of the existing grant. The period of performance shall be extended to the end of FY 2003. This extension is required due to schedule changes in the COR1 program. Funding for Phase II and Phase III of this grant has been obtained. This unsolicited proposal was for scientific and engineering collaboration between NASA s Goddard Space Flight Center (GSFC) and HAO. Performance testing of the COR1 engineering test unit has been partially completed. The COR1 coronagraph engineering test unit requires further testing at NASA s GSFC and the National Center for Atmospheric Research (NCAR) Mauna Loa Solar Observatory (MLSO), operated by the High Altitude Observatory (HAO). HAO personnel have recently supported efforts to test component and breadboard versions of the COR1 using the NCAR Vacuum Tunnel Facility (NVTF). HAO personnel will continue to work closely with scientists and engineers at NASA/GSFC in the development, design, assembly, testing, and operation of this key element of NASA's Solar Terrestrial Relations Observatory (STEREO) mission. The element is an internally-occulted coronagraphic telescope, and the design and development effort is already underway at GSFC.

Burkepile, J. T.↗

Deployment Mechanism for Thermal Pointing System

The Deployment Mechanism for the Total and Spectral Solar Irradiance Sensor (TSIS) is responsible for bringing the Thermal Pointing System (TPS) from its stowed, launch locked position to the on-orbit deployed, operational position. The Deployment Mechanism also provides structural support for the TSIS optical bench and two-axis gimbal. An engineering model of the Deployment Mechanism has been environmentally qualified and life tested. This paper will give an overview of the TSIS mission and then describe the development, design, and testing of the Deployment Mechanism.

Koski, Kraig↗

Miniature linear-to-rotary motion actuator

A miniature hydraulic actuation system capable of converting linear actuator motion to control surface rotary motion has been designed for application to active controls on dynamic wind tunnel models. Due to space constraints and the torque requirements of an oscillating control surface at frequencies up to 50 Hertz, a new actuation system was developed to meet research objectives. This new actuation system was designed and developed to overcome the output torque limitations and fluid loss/sealing difficulties associated with an existing vane type actuator. Static control surface deflections and dynamic control surface oscillations through a given angle are provided by the actuation system. The actuator design has been incorporated into a transonic flutter model with an active trailing edge flap and two active spoilers. The model is scheduled for testing in the LaRC 16 Foot Transonic Dynamics Tunnel during Summer 1993. This paper will discuss the actuation system, its design, development difficulties, test results, and application to aerospace vehicles.

Sorokach, Michael R., Jr.↗

Computer Programs (Turbomachinery)

NASA computer programs are extensively used in design of industrial equipment. Available from the Computer Software Management and Information Center (COSMIC) at the University of Georgia, these programs are employed as analysis tools in design, test and development processes, providing savings in time and money. For example, two NASA computer programs are used daily in the design of turbomachinery by Delaval Turbine Division, Trenton, New Jersey. The company uses the NASA splint interpolation routine for analysis of turbine blade vibration and the performance of compressors and condensers. A second program, the NASA print plot routine, analyzes turbine rotor response and produces graphs for project reports. The photos show examples of Delaval test operations in which the computer programs play a part. In the large photo below, a 24-inch turbine blade is undergoing test; in the smaller photo, a steam turbine rotor is being prepared for stress measurements under actual operating conditions; the "spaghetti" is wiring for test instrumentation

Source record↗

TECHNOLOGY DEVELOPMENT AND DEPLOYMENT OF SYSTEMS FOR THE RETRIEVAL AND PROCESSING OF REMOTE-HANDLED SLUDGE FROM HANFORD K-WEST FUEL STORAGE BASIN

In 2011, significant progress was made in developing and deploying technologies to remove, transport, and interim store remote-handled sludge from the 105-K West Fuel Storage Basin on the Hanford Site in south-central Washington State. The sludge in the 105-K West Basin is an accumulation of degraded spent nuclear fuel and other debris that collected during long-term underwater storage of the spent fuel. In 2010, an innovative, remotely operated retrieval system was used to successfully retrieve over 99.7% of the radioactive sludge from 10 submerged temporary storage containers in the K West Basin. In 2011, a full-scale prototype facility was completed for use in technology development, design qualification testing, and operator training on systems used to retrieve, transport, and store highly radioactive K Basin sludge. In this facility, three separate systems for characterizing, retrieving, pretreating, and processing remote-handled sludge were developed. Two of these systems were successfully deployed in 2011. One of these systems was used to pretreat knockout pot sludge as part of the 105-K West Basin cleanup. Knockout pot sludge contains pieces of degraded uranium fuel ranging in size from 600 {mu}m to 6350 {mu}m mixed with pieces of inert material, such as aluminum wire and graphite, in the same size range. The 2011 pretreatment campaign successfully removed most of the inert material from the sludge stream and significantly reduced the remaining volume of knockout pot product material. Removing the inert material significantly minimized the waste stream and reduced costs by reducing the number of transportation and storage containers. Removing the inert material also improved worker safety by reducing the number of remote-handled shipments. Also in 2011, technology development and final design were completed on the system to remove knockout pot material from the basin and transport the material to an onsite facility for interim storage. This system is scheduled for deployment in 2012. The prototype facility also was used to develop technology for systems to retrieve remote-handled transuranic sludge smaller than 6350 {mu}m being stored in underwater containers. After retrieving the sludge, the system will be used to load and transport the sludge for interim storage. During 2011, full-scale prototype systems were developed and tested to a Technology Readiness Level 6 as defined by U.S. Department of Energy standards. This system is scheduled for deployment in 2013. Operations also are scheduled for completion in 2014.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗