Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “deployable payload mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

STS-95 Post Flight Presentation

The STS-95 flight crew, Cmdr. Curtis L. Brown, Pilot Steven W. Lindsey, Mission Specialists Scott E. Parazynski, Stephen K. Robinson, and Pedro Duque, and Payload Specialists Chiaki Mukai and John H. Glenn present a video mission over-view of their space flight. Images include prelaunch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the "whiteroom" for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. The primary objectives, which include the conducting of a variety of science experiments in the pressurized SPACEHAB module, the deployment and retrieval of the Spartan free-flyer payload, and operations with the HST Orbiting Systems Test (HOST) and the International Extreme Ultraviolet Hitchhiker (IEH) payloads are discussed in both the video and still photo presentation.

Source record↗

Resource Prospector (RP) - Early Prototyping and Development

The Resource Prospector (RP) is an In-Situ Resource Utilization (ISRU) technology demonstration mission under study by the NASA Human Exploration and Operations Mission Directorate's (HEOMD) Advanced Exploration Systems (AES) Division. The mission, currently planned to launch in 2020, will demonstrate extraction of oxygen from lunar regolith to validate ISRU capability. The mission will address key Strategic Knowledge Gaps (SKGs) for robotic and human exploration to the Moon, Near Earth Asteroids (NEAs), and ultimately Mars, as well as meet the strategic goals of the Global Exploration Roadmap (GER), offered by the International Space Exploration Coordination Group (ISECG). In this roadmap, the use of local resources is specifically addressed relating to human exploration. RP will provide knowledge to inform the selection of future mission destinations, support the development of exploration systems, and reduce the risk associated with human exploration. Expanding human presence beyond low-Earth orbit to asteroids and Mars will require the maximum possible use of local materials, so-called in-situ resources. The moon presents a unique destination to conduct robotic investigations that advance ISRU capabilities, as well as providing significant exploration and science value. Lunar regolith contains useful resources such as oxygen, water, silicon, and light metals, like aluminum and titanium. Oxygen can be separated from the regolith for life support (breathable air), or used to create rocket propellant (oxidizer). Regolith can be used to protect against radiation exposure, be processed into solar cells, or used to manufacture construction materials such as bricks and glass. RP will characterize the constituents and distribution of water and other volatiles at the poles of the Moon, enabling innovative uses of local resources, in addition to validating ISRU capabilities. This capability, as well as a deeper understanding of regolith, will be valuable in the exploration of near-Earth asteroids (NEAs) and Mars. In order to reduce risk and explore system designs, the RP project is attempting two-fold approaches to development as it looks towards flight. We continue to explore flight planning, requirements, and interfaces definition by using Engineering Test Units (ETUs), looking towards lunar deployment, while also using fiscal year 2015 to develop, build and test an earth-terrestrial prototype rover and payload system. This terrestrial prototype, called "RP15", is built to both inform the system design, and to be a partnership advocacy tool for this unique mission. RP15 must be affordable within the resource and time constraints of fiscal year 2015, while working to the following Needs, Goals, and Objectives provided by HEOMD/AES: 1. Demonstrate rover mobility in a 1g environment 2. The Surface Segment (prototype rover + payload system) shall represent the flight system concept with as much fidelity as affordable (limited by cost and schedule) - Surface Segment shall be the approximate size/dimension/footprint -Surface Segment shall package all the expected devices (instruments, systems, etc.), even if some facets are mocked-up due to time/cost constraints -Overall Surface Segment fidelity negotiable to make achievable 3. Priority should be given to illustrating mission functionality over support functionality, which exists solely to support mission functionality This paper will provide an overview of RP project developments, including the design and build, capturing the development and initial integrated testing of RP15 in relevant environments.

Lunar↗

Smashing the Stovepipe: Leveraging the GMSEC Open Architecture and Advanced IT Automation to Rapidly Prototype, Develop and Deploy Next-Generation Multi-Mission Ground Systems

Satellite/Payload Ground Systems - Typically highly-customized to a specific mission's use cases - Utilize hundreds (or thousands!) of specialized point-to-point interfaces for data flows / file transfers Documentation and tracking of these complex interfaces requires extensive time to develop and extremely high staffing costs Implementation and testing of these interfaces are even more cost-prohibitive, and documentation often lags behind implementation resulting in inconsistencies down the road With expanding threat vectors, IT Security, Information Assurance and Operational Security have become key Ground System architecture drivers New Federal security-related directives are generated on a daily basis, imposing new requirements on current / existing ground systems - These mandated activities and data calls typically carry little or no additional funding for implementation As a result, Ground System Sustaining Engineering groups and Information Technology staff continually struggle to keep up with the rolling tide of security Advancing security concerns and shrinking budgets are pushing these large stove-piped ground systems to begin sharing resources - I.e. Operational / SysAdmin staff, IT security baselines, architecture decisions or even networks / hosting infrastructure Refactoring these existing ground systems into multi-mission assets proves extremely challenging due to what is typically very tight coupling between legacy components As a result, many "Multi-Mission" ops. environments end up simply sharing compute resources and networks due to the difficulty of refactoring into true multi-mission systems Utilizing continuous integration / rapid system deployment technologies in conjunction with an open architecture messaging approach allows System Engineers and Architects to worry less about the low-level details of interfaces between components and configuration of systems GMSEC messaging is inherently designed to support multi-mission requirements, and allows components to aggregate data across multiple homogeneous or heterogeneous satellites or payloads - The highly-successful Goddard Science and Planetary Operations Control Center (SPOCC) utilizes GMSEC as the hub for it's automation and situational awareness capability Shifts focus towards getting GS to a final configuration-managed baseline, as well as multi-mission / big-picture capabilities that help increase situational awareness, promote cross-mission sharing and establish enhanced fleet management capabilities across all levels of the enterprise.

GMSEC↗

Skylab Operations Handbook: Orbital Workshop (OWS), Airlock Module (AM), Multiple Docking Adapter (MDA): Systems Descriptions - Volume 1

The Skylab Program consists of three low-earth-orbit missions of the Orbital Assembly (OA) (figure 1.0-1), extending over.an a-month period. The OA consists of the CSM docked to the Saturn Workshop.(SWS). This handbook describes the systems for three of the four major components of the SWS (OWS, AM, and MDA), and also discusses significant interfaces with the Instrument Unit (IU), ATM, and CSM. The other major component of the SWS, the ATM, is treated separately in its own handbook. The OWS, AM, MDA, ATM Deployment Assembly (ATM-DA), Fixed Airlock Shroud (FAS), Payload Shroud (PS), and IU are addressed throughout this document as individual modules from a structural standpoint only. Although normally considered a part of the launch vehicle, the IU is treated in this document as part of the SWS because of its function in preparing the SWS for orbital operation. Section 1.0 describes vehicle and mission configurations of the Skylab program and provides general descriptions of the various systems. Section 2.0 provides detailed systems data covering system interfaces, functional description, subsystems and major components description, component operation, failure modes, performance and design data, operational limitations and restrictions, and instrumentation, and briefly outlines the experiments. Section 3.0 contains illustrations of all panels and identifies the controls and displays, panels, reference designators, nomenclature, functions, circuit breakers, and power sources. The Table of Contents lists in order of appearance all sections, subsections, major paragraphs, illustrations, and tables and provides their respective page locations. Appendix A defines the abbreviations and acronyms employed throughout this handbook, and Appendix B explains the symbols used. Appendix C is a locator index that references component controls contained in Section 3.0. Appendix D is an alphabetical index of paragraph headings, illustrations, and tables, according to the key word, with applicable page numbers. Additional items of significance to the user have been included in the index. The technical level to which this document is written assumes the reader to have general knowledge of engineering terms and principles.

West, W. D.↗

NASA's Space Launch System: A Transformative Capability for Deep Space Missions

Already making substantial progress toward its first launches, NASA’s Space Launch System (SLS) exploration-class launch vehicle presents game-changing new opportunities in spaceflight, enabling human exploration of deep space, as well as a variety of missions and mission profiles that are currently impossible. Today, the initial configuration of SLS, able to deliver more than 70 metric tons of payload to low Earth orbit (LEO), is well into final production and testing ahead of its planned first flight, which will send NASA’s new Orion crew vehicle around the moon and will deploy 13 CubeSats, representing multiple disciplines, into deep space. At the same time, production work is already underway toward the more-capable Block 1B configuration, planned to debut on the second flight of SLS, and capable of lofting 105 tons to LEO or of co-manifesting large exploration systems with Orion on launches to the lunar vicinity. Progress being made on the vehicle for that second flight includes initial welding of its core stage and testing of one of its engines, as well as development of new elements such as the powerful Exploration Upper Stage and the Universal Stage Adapter “payload bay.” Ultimately, SLS will evolve to a configuration capable of delivering more than 130 tons to LEO to support humans missions to Mars. In order to enable human deep-space exploration, SLS provides unrivaled mass, volume, and departure energy for payloads, offering numerous benefits for a variety of other missions. For robotic science probes to the outer solar system, for example, SLS can cut transit times to less than half that of currently available vehicles or substantially increased spacecraft mass. In the field of astrophysics, SLS’ high payload volume, in the form of payload fairings with a diameter of up to 10 meters, creates the opportunity for launch of large-aperture telescopes providing an unprecedented look at our universe. This presentation will give an overview of SLS’ capabilities and its current status, and discuss the vehicle’s potential for human exploration of deep space and other game-changing utilization opportunities.

Creech, Stephen D.↗

STS-43 Space Shuttle mission report

The STS-43 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem operations during the forty-second flight of the Space Shuttle Program and the ninth flight of the Orbiter Vehicle Atlantis (OV-104). In addition to the Atlantis vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-47 (LWT-40); three Space Shuttle main engines (SSME's) (serial numbers 2024, 2012, and 2028 in positions 1, 2, and 3, respectively); and two Solid Rocket Boosters (SRB's) designated as BI-045. The primary objective of the STS-43 mission was to successfully deploy the Tracking and Data Relay Satellite-E/Inertial Upper Stage (TDRS-E/IUS) satellite and to perform all operations necessary to support the requirements of the Shuttle Solar Backscatter Ultraviolet (SSBUV) payload and the Space Station Heat Pipe Advanced Radiator Element (SHARE-2).

Fricke, Robert W.↗

A power extension package /PEP/ for the Shuttle Orbiter

A concept for solar array augmentation of the power normally provided by the Shuttle Orbiter fuel cells in support of payloads is discussed. Justification for the use of solar arrays rather than additional cryogenic fuel kits for extension of on-orbit stay time is presented. This is followed by a description of the array power system and an examination of its interfaces with the existing Orbiter fuel cell system. The system produces 29 kW total with 14 kW allocated to the Orbiter and 15 kW to payloads and permits an increase in on-orbit mission duration from 6 to approximately 20 days at 21 kW with four cryo kits. It is capable of producing full output in diverse vehicle orientations since the array is deployed and oriented by the Orbiter remote manipulator system (RMS). Power produced by the arrays is reduced to 32.25 to 32.5 volts by pulse-width-modulated buck voltage regulators to force the Orbiter fuel cells into an idle mode during the sunlighted portions of the orbit.

Ness, H. C.↗

STS-75 Flight Day 3

On this third day of the STS-75 mission, the flight crew, Cmdr. Andrew Allen, Pilot Scott Horowitz, Payload Cmdr. Franklin Chang-Diaz, Payload Specialist Umberto Guidoni (Italy), and Mission Specialists Jeffrey Hoffman, Maurizio Cheli (ESA) and Claude Nicollier (ESA), are shown, with Mission Control's help, still trying to correct the problems with the 'Smart Flex' computer system which is delaying the deployment of the Tethered Satellite System Reflight (TSS-1R). There is imaging shown of the shuttle's exhaust system using water vapor.

Source record↗

The Mega Mesospheric Parachute

The current understanding and modeling of the upper reaches of the atmosphere is incomplete. Upper atmospheric interactions with the lower atmosphere, effects of ionizing radiation, high altitude cloud phenomena, and the dynamical interaction with the magnetosphere require greater definition. The scientific objective of obtaining a greater understanding of the upper atmosphere can be achieved by designing, implementing, testing, and utilizing a facility that provides long period in-situ measurements of the mesosphere. Current direct sub-sonic measurements of the upper atmosphere are hampered by the approximately one minute sub-sonic observation window of a ballistic sounding rocket regardless of the launch angle. In-situ measurements at greater than transonic speeds impart energy into the molecular atmospheric system and distort the true atmospheric chemistry. A long duration, sub-sonic capability will significantly enhance our ability to observe and measure: (1) mesospheric lightning phenomena (sprites and blue jets) (2) composition, structure and stratification of noctilucent clouds (3) physics of seasonal radar echoes, gravity wave phenomena (4) chemistry of mesospheric gaseous ratio mixing (5) mesospheric interaction of ionizing radiation (6) dynamic electric and magnetic fields This new facility will also provide local field measurements which complement those that can be obtained through external measurements from satellite and ground-based platforms. The 400 foot (approximately 130 meter) diameter lightweight mega-mesospheric parachute system, deployed with a sounding rocket, is proposed herein as a method to increase sub-sonic mesospheric measurement time periods by more than an order of magnitude. The report outlines a multi-year evolving science instrumentation suite in parallel with the development of the mega meso-chute facility. The developmental issues surrounding the meso-chute are chiefly materials selection (thermal and structural) and deployment mechanism physics. Three mission cases were conceived and developed to include cost and schedules estimates. Each scenario has increasing scientific utility with paralleling launch weight, parachute hang-time, deployment altitude, and parachute size: (1) Case #1: $8.4M@24 months, 6kg payload, 20 min., 50km alt., 80 m. dia. (2) Case #2: $10.4M@24 months, 6kg payload, 20 min., 60km alt, 130m. dia. (3) Case #3: $13.6M@36 months, 30kg payload, 30 min., 90km alt., 200m. dia. The initial breakout cost for the parachute system is approximately $2M@24 months. This report identifies that although the challenges of the mega-meso-chute may be difficult, they can be surmounted and valuable results can be achieved.

Kloesel, Kurt J.↗

VERNE: Revealing the Mysteries and Histories of Venus

Introduction: The three Venus missions that were recently selected for upcoming flight (VERITAS, DAVINCI+, and EnVision) will be incredibly valuable to our understanding of Venus’ history, geology, and atmosphere. However, even once completed, key gaps in our knowledge of Venus, and more generally the formation and active processes on rocky, Earth-like planets, will still persist. Remaining questions include 1) how global intrinsic magnetic fields might be maintained on rocky worlds, and how they could then go extinct, and 2) what role atmospheric sulfur chemistry plays in climates of Earth-like planets, which is an increasingly timely subject as Earth’s own atmospheric sulfur content is climbing due to human activity. These questions require in-situ observations from Venus’ cloud deck, at the altitudes at which the UV absorber exists. The Venus Environment Research and Novel Exploration (VERNE) mission will address these questions with an aerial platform that will drift around the equatorial region of the planet for 9 days. VERNE will collect data to determine the identity of the mysterious UV absorber, while also taking magnetic field measurements over the tesserae, the regions on Venus that are most likely to retain remanent crustal magnetization, in order to understand the potential role of a past intrinsically-generated global magnetic field on Venus. Mission Objectives: The two major science objectives that drive the VERNE mission are: 1) Determine the identity of the Venusian unknown ultraviolet absorber(s). First observed approximately a century ago [1], the composition of Venus’ ultraviolet (UV) absorber is one of the oldest mysteries in Venus atmospheric chemistry [2,3]. While several candidate UV absorbers (mostly sulfur species) have been proposed, no consensus has been reached on its composition and its specific interactions with the atmosphere. Determining the identity of the UV absorber will aid climate models by showing how and where incident solar energy is absorbed by the atmosphere and make progress towards understanding the chemical and energetic processes taking place above Venus’ upper cloud deck [4]. 2) Determine if Venus retains evidence of a past, internally-generated magnetic field. While Venus does not currently have an intrinsically-generated magnetic field, evidence for the existence of a past field on Venus and a timeline of its decay will fill in a more holistic picture of the evolution of Venus’ geological record and atmosphere. As the oldest geologic units on the surface, Venus’ tesserae may still have remanent crustal magnetization signatures within the rocky composition [5]. In any case, the signatures detected will provide insight into Venus’ past geological and core dynamo activity. Mission Summary: VERNE includes a 3-part flight system made up of 1) an entry system with a HEEET (Heatshield for Extreme Entry Environment Technology) aeroshell, 2) an orbiter for data relay, and 3) an in-situ balloon and gondola. After entry into Venus’ atmosphere, the balloon will be deployed within the upper cloud deck, at an altitude of 62 km, over a tesserae region. The in-situ data collection will last for the duration of 2 full circumnavigations of the planet, which will take ~9 days. Instrumentation Suite: The four instruments that comprise VERNE’s instrument payload will enable the identification of the unknown UV absorber and the detection of remanent crustal magnetization if it exists in the tesserae. The proposed instrument suite cycle during mission operations is shown in Fig. 1. The four instruments are described below: 1) Adams (ion neutral mass spectrometer) has a range of 18-257 AMU and will detect and distinguish the mixing ratios of O₂, H₂O, H₂SO₄, S, S₂, S₃, S₄, S₅, S₆, S₇, S₈, SO, SO₂, OSSO, SO₃, Cl₂, FeCl₃ and other trace sulfur and organic species. The spatial (longitudinal) and temporal (day/night) variations will be observed throughout 2 circumnavigations with a sample cadence of 12 minutes. 2) Shelley (nephelometer) will determine the size distribution of the aerosols (0.4 to 36 um) in the atmosphere. With a size resolution of <0.7 um, it can determine which mode of H2SO4 is present and characterize the large (>30 um) organic particles previously detected by the Venera and Galileo missions [6,7]. 3) Herbert (UV imager) will measure UV radiance at 283 nm (the wavelength of SO2 absorption) and 365 nm (the unknown part of the absorber). UV images will be taken concurrently with the INMS and nephelometer to correlate UV absorption with abundances of the UV absorber species. 4) Vonnegut (magnetometer) has a range of >600 nT and a precision and accuracy of 1 nT. If magnetized by a past field, the crust may have retained a magnetization of up to 3 A/m2 [5]. With a noise floor of 10 nT, the magnetometer will be able to detect RCM from an altitude of 62 km, even if the thickness of the magnetized crust is just 1 km (Fig. 2). Mission Concept Design: VERNE will be launched with a mass of 3300 kg in an intermediate-high performance class vehicle with a 4-m fairing. The 475-day mission includes 466 days for the cruise, coasting, and orbit initialization phases before entry, descent, and balloon deployment. During the 9-day science phase, the aerial platform will make 2 circumnavigations of the planet at an altitude of 62 km. The INMS and the nephelometer will acquire data for 2 hours during the daytime and nighttime during each circumnavigation, while the UV imager will be on for the duration of the daytime, and the magnetometer will be operational throughout the entirety of the science phase. Data will be stored and processed with the JPL-designed Sphinx command and data handling system. Data will be sent from the balloon to the orbiter using an S-band relay link, stored on the orbiter, and then forwarded to Earth where it will be received by the DSN. Conclusion: VERNE will fill key gaps in our understanding of the history and ongoing processes related to the geology and atmosphere of Venus and rocky worlds in general. Even with adequate flight system contingencies and expected costs below the $900M New Frontiers cost cap, VERNE is not without its risks and challenges. Further trade spaces to explore include 1) using solely battery power vs. including solar panels to increase the mission duration and 2) investigating the use of lightweight materials and 3D-printed structures to reduce the gondola mass, among others. Acknowledgments: We would like to thank the JPL Planetary Science Summer School, especially our mentors Troy Hudson, Karl Mitchell, and Leslie Lowes, as well as our Team-X study lead Al Nash and the members of Team-X. We’d additionally like to thank our review panel for asking insightful questions and providing valuable feedback. References: [1] Ross, F. E. (1928) Astrophysical J., 68, 57-92. [2] Rossow, W. B. et al. (1980) J. Geophysical Research, 85, 8107-8128. [3] Pinto, J. P. et al. (2021) Nature Communications, 12, 175. [4] Titov, D. V. et al. (2007) Cosmic Research, 21, 401. [5] O’Rourke, J. et al. (2019) Geophysical Research Lett., 46, 5768–5777. [6] Limaye, S. S. et al. (2018) Astrobiology, 18(9), 1181-1198. [7] Grinspoon, D. H. et al. (2013) Planetary and Space Sci., 41(7), 515-542. [8] Parker, R. L. (2003) J. Geophysical Research, 108, 5006. *The cost information contained in this document is of a budgetary and planning nature and is intended for informational purposes only. It does not constitute a commitment on the part of JPL and/or Caltech.

H Alpert↗

NASA's Space Launch System: A New Opportunity for CubeSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. Together with the Orion crew vehicle and ground operations at NASA's Kennedy Space Center in Florida, SLS is a foundational capability for NASA's Journey to Mars. From the beginning of the SLS flight program, utilization of the vehicle will also include launching secondary payloads, including CubeSats, to deep-space destinations. Currently, SLS is making rapid progress toward readiness for its first launch in 2018, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight, Exploration Mission-1, SLS will launch an uncrewed test flight of the Orion spacecraft into distant retrograde orbit around the moon. Accompanying Orion on SLS will be 13 CubeSats, which will deploy in cislunar space. These CubeSats will include not only NASA research, but also spacecraft from industry and international partners and potentially academia. Following its first flight and potentially as early as its second, which will launch a crewed Orion spacecraft into cislunar space, SLS will evolve into a more powerful configuration with a larger upper stage. This configuration will initially be able to deliver 105 t to LEO and will continue to be upgraded to a performance of greater than 130 t to LEO. While the addition of the more powerful upper stage will mean a change to the secondary payload accommodations from Block 1, the SLS Program is already evaluating options for future secondary payload opportunities. Early discussions are also already underway for the use of SLS to launch spacecraft on interplanetary trajectories, which could open additional opportunities for CubeSats. This presentation will include an overview of the SLS vehicle and its capabilities, including the current status of progress toward first launch. It will also explain the opportunities the vehicle offers for CubeSats and secondary payloads, including an overview of the CubeSat manifest for Exploration Mission-1 in 2018.

Hitt, David↗

Propellantless AOCS Design for a 160-m, 450-kg Sailcraft of the Solar Polar Imager Mission

An attitude and orbit control system (AOCS) is developed for a 160-m, 450-kg solar sail spacecraft of the Solar Polar Imager (SPI) mission. The SPI mission is one of several Sun- Earth Connections solar sail roadmap missions currently envisioned by NASA. A reference SPI sailcraft consists of a 160-m, 150-kg square solar sail, a 250-kg spacecraft bus, and 50-kg science payloads, The 160-m reference sailcraft has a nominal solar thrust force of 160 mN (at 1 AU), an uncertain center-of-mass/center-of-pressure offset of +/- 0.4 m, and a characteristic acceleration of 0.35 mm/sq s. The solar sail is to be deployed after being placed into an earth escaping orbit by a conventional launch vehicle such as a Delta 11. The SPI sailcraft first spirals inwards from 1 AU to a heliocentric circular orbit at 0.48 AU, followed by a cranking orbit phase to achieve a science mission orbit at a 75-deg inclination, over a total sailing time of 6.6 yr. The solar sail will be jettisoned after achieving the science mission orbit. This paper focuses on the solar sailing phase of the SPI mission, with emphasis on the design of a reference AOCS consisting of a propellantless primary ACS and a microthruster-based secondary (optional) ACS. The primary ACS employs trim control masses running along mast lanyards for pitch/yaw control together with roll stabilizer bars at the mast tips for quadrant tilt (roll) control. The robustness and effectiveness of such a propellantless primary ACS would be enhanced by the secondary ACS which employs tip-mounted, lightweight pulsed plasma thrusters (PPTs). The microPPT-based ACS is mainly intended for attitude recovery maneuvers from off-nominal conditions. A relatively fast, 70-deg pitch reorientation within 3 hrs every half orbit during the orbit cranking phase is shown to be feasible, with the primary ACS, for possible solar observations even during the 5-yr cranking orbit phase.

Wie, Bong↗

The Microgravity Research Experiments (MICREX) Data Base

An electronic data base identifying over 800 fluids and materials processing experiments performed in a low-gravity environment has been created at NASA Marshall Space Flight Center. The compilation, called MICREX (MICrogravity Research Experiments), was designed to document all such experimental efforts performed (1) on U.S. manned space vehicles, (2) on payloads deployed from U.S. manned space vehicles, and (3) on all domestic and international sounding rockets (excluding those of China and the former U.S.S.R.). Data available on most experiments include (1) principal and co-investigators (2) low-gravity mission, (3) processing facility, (4) experimental objectives and results, (5) identifying key words, (6) sample materials, (7) applications of the processed materials/research area, (8) experiment descriptive publications, and (9) contacts for more information concerning the experiment. This technical memorandum (1) summarizes the historical interest in reduced-gravity fluid dynamics, (2) describes the experimental facilities employed to examine reduced gravity fluid flow, (3) discusses the importance of a low-gravity fluids and materials processing data base, (4) describes the MICREX data base format and computational World Wide Web access procedures, and (5) documents (in hard-copy form) the descriptions of the first 600 fluids and materials processing experiments entered into MICREX.

Winter, C. A.↗

The Microgravity Research Experiments (MICREX) Data Base

An electronic data base identifying over 800 fluids and materials processing experiments performed in a low-gravity environment has been created at NASA Marshall Space Flight Center. The compilation, called MICREX (MICrogravity Research Experiments), was designed to document all such experimental efforts performed (1) on U.S. manned space vehicles, (2) on payloads deployed from U.S. manned space vehicles, and (3) on all domestic and international sounding rockets (excluding those of China and the former U.S.S.R.). Data available on most experiments include (1) principal and co-investigators, (2) low-gravity mission, (3) processing facility, (4) experimental objectives and results, (5) identifying key words, (6) sample materials, (7) applications of the processed materials/research area, (8) experiment descriptive publications, and (9) contacts for more information concerning the experiment. This technical memorandum (1) summarizes the historical interest in reduced-gravity fluid dynamics, (2) describes the experimental facilities employed to examine reduced gravity fluid flow, (3) discusses the importance of a low-gravity fluids and materials processing data base, (4) describes the MICREX data base format and computational World Wide Web access procedures, and (5) documents (in hard-copy form) the descriptions of the first 600 fluids and materials processing experiments entered into MICREX.

Winter, C. A.↗

The Microgravity Research Experiments (MICREX) Data Base

An electronic data base identifying over 800 fluids and materials processing experiments performed in a low-gravity environment has been created at NASA Marshall Space Flight Center. The compilation, called MICREX (MICrogravity Research Experiments) was designed to document all such experimental efforts performed (1) on U.S. manned space vehicles, (2) on payloads deployed from U.S. manned space vehicles, and (3) on all domestic and international sounding rockets (excluding those of China and the former U.S.S.R.). Data available on most experiments include (1) principal and co-investigator (2) low-gravity mission, (3) processing facility, (4) experimental objectives and results, (5) identifying key words, (6) sample materials, (7) applications of the processed materials/research area, (8) experiment descriptive publications, and (9) contacts for more information concerning the experiment. This technical memorandum (1) summarizes the historical interest in reduced-gravity fluid dynamics, (2) describes the importance of a low-gravity fluids and materials processing data base, (4) describes thE MICREX data base format and computational World Wide Web access procedures, and (5) documents (in hard-copy form) the descriptions of the first 600 fluids and materials processing experiments entered into MICREX.

Winter, C. A.↗

The Microgravity Research Experiments (MICREX) Data Base, Volume 4

An electronic data base identifying over 800 fluids and materials processing experiments performed in a low-gravity environment has been created at NASA Marshall Space Flight Center. The compilation, called MICREX (MICrogravity Research Experiments), was designed to document all such experimental efforts performed (1) on U.S. manned space vehicles, (2) on payloads deployed from U.S. manned space vehicles, and (3) on all domestic and international sounding rockets (excluding those of China and the former U.S.S.R.). Data available on most experiments include (1) principal and co-investigators (2) low-gravity mission, (3) processing facility, (4) experimental objectives and results, (5) identifying key words, (6) sample materials, (7) applications of the processed materials/research area, (8) experiment descriptive publications, and (9) contacts for more information concerning the experiment. This technical Memorandum (1) summarizes the historical interest in reduced-gravity fluid dynamics, (2) describes the importance of a low-gravity fluids and materials processing data base, (4) describes the MICREX data base format and computational World Wide Web access procedures, and (5) documents (in hard-copy form) the descriptions of the first 600 fluids and materials processing experiments entered into MICREX.

Winter, C. A.↗

Future Lunar Geophysical Mission Opportunities Including the Lunar Geophysical Network and CLPS

In the next few years, several opportunities are underway to take new geophysical observations of the Moon including geodetic and seismic. NASA’s novel Commercial Lunar Payload Services (CLPS) program seeks to acquire delivery services from 14 US companies. Nine funded task orders have been selected with payloads from multiple disciplines. Here we review the upcoming geophysical CLPS payloads and their measurement objectives then we provide a review of the Lunar Geophysical Network mission in development for New Frontiers 5. The Lunar Geophysical Network (LGN) mission is proposed to land on the Moon in the early 2030’s and deploy packages at four locations to enable continuous geophysical measurements for a minimum of 6 and a goal of 10 years. Returning to the lunar surface with a long-lived geophysical network is a key next step to advance lunar and planetary science. LGN will greatly expand our primarily Apollo-based knowledge of the deep lunar interior by identifying and characterizing mantle melt layers, as well as core size and state. To meet the mission objectives, the instrument suite provides complementary seismic, geodetic, heat flow, and electromagnetic (EM) observations. We discuss the network landing site requirements and provide example sites that meet these requirements. Landing sites include the P-5 region within the Procellarum KREEP Terrane (PKT; (lat:15˚; lon:-35˚), Schickard basin (lat:-44.3˚; lon:-55.1˚), Crisium basin (lat:18.5˚; lon:61.8˚), and the farside Korolev basin (lat:-2.4˚; lon:-159.3˚) (Figure 1). Network optimization considers the best locations to observe seismic core phases, e.g., ScS and PKP. Ray path density and proximity to young fault scarps are also analyzed to provide increased opportunities for seismic observations. Geodetic constraints from laser ranging require the LGN to have at least three nearside stations at maximum limb distances. Heat flow and EM measurements should be obtained away from terrane boundaries and from magnetic anomalies at locations representative of global trends. In our recent paper, an in-depth case study is provided for Mare Crisium. We also discuss the consequences for scientific return of less-than-optimal locations or number of stations.

Moons↗

Future Lunar Geophysical Mission Opportunities Including the Lunar Geophysical Network, Artemis and CLPS

In the next few years, several opportunities are underway to take new geophysical observations of the Moon including geodetic and seismic. NASA’s novel Commercial Lunar Payload Services (CLPS) program seeks to acquire delivery services from 14 US companies. Nine funded task orders have been selected with payloads from multiple disciplines. Here we review the upcoming geophysical CLPS payloads and their measurement objectives then we provide a review of the Lunar Geophysical Network mission in development for New Frontiers 5. The Lunar Geophysical Network (LGN) mission is proposed to land on the Moon in the early 2030’s and deploy packages at four locations to enable continuous geophysical measurements for a minimum of 6 and a goal of 10 years. Returning to the lunar surface with a long-lived geophysical network is a key next step to advance lunar and planetary science. LGN will greatly expand our primarily Apollo-based knowledge of the deep lunar interior by identifying and characterizing mantle melt layers, as well as core size and state. To meet the mission objectives, the instrument suite provides complementary seismic, geodetic, heat flow, and electromagnetic (EM) observations. We discuss the network landing site requirements and provide example sites that meet these requirements. Landing sites include the P-5 region within the Procellarum KREEP Terrane (PKT; (lat:15˚; lon:-35˚), Schickard basin (lat:-44.3˚; lon:-55.1˚), Crisium basin (lat:18.5˚; lon:61.8˚), and the farside Korolev basin (lat:-2.4˚; lon:-159.3˚) (Figure 1). Network optimization considers the best locations to observe seismic core phases, e.g., ScS and PKP. Ray path density and proximity to young fault scarps are also analyzed to provide increased opportunities for seismic observations. Geodetic constraints from laser ranging require the LGN to have at least three nearside stations at maximum limb distances. Heat flow and EM measurements should be obtained away from terrane boundaries and from magnetic anomalies at locations representative of global trends. In our recent paper, an in-depth case study is provided for Mare Crisium. We also discuss the consequences for scientific return of less-than-optimal locations or number of stations.

Moons↗