Systems cost/performance analysis (study 2.3). Volume 2, appendix A: Data base
Data on selected payload equipments (components) which were collected for the purpose of exercising the systems cost performance model are reported in an appendix. The reader should be aware that, although most of the data are accurate, approximations based on engineering judgment and experience are used wherever actual data were unavailable. The approximations are justified by the objective of the study which was to develop a cost/performance model. Assuming that the model is successfully developed and is accepted for use by a body of users, the data base should be expanded and the approximations replaced by actual data.