Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “corporate”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Electric Vehicle Efficiency Ratios for Light-Duty Vehicles Registered in the United States

Electric vehicles (EVs) use energy more efficiently than gasoline vehicles. This is one of their primary attributes, enabling other benefits such as improved torque and reduced operating costs and greenhouse gas emissions. An electric vehicle efficiency ratio (EVER) is therefore important when calculating the financial and environmental benefits of EVs, calculating the impact that EVs have on a manufacturer's Corporate Average Fuel Economy rating, calculating credits in trading schemes such as California's Low Carbon Fuel Standard, fuel price leveling, designing electricity tariffs from utility-owned public charging infrastructure, creating EV alternatives to gasoline excise taxes, and more.

33 ADVANCED PROPULSION SYSTEMS↗

MFC Transient Testing and Fuel Fabrication Capabilities

MFC Transient Testing Capabilities and Fuel Fabrication capabilities are summarized in this slide deck. Slides are included for TREAT and TREAT capabilities, EFF, FASB, FMF, ZPPR, AFF, and the Fuels Fabrication Modernization Capability. First use of this slide deck is for presentation at Westinghouse Electric Corporation, but there will be other uses later.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DER Digital Supply Chain Gap Analysis

Solar photovoltaic (PV) cybersecurity is a growing field of research. As deployments of solar PV have increased, cyber risk has also increased. Utility solar PV installations, however, are not required to comply with the North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) plan unless they meet a minimum generation threshold of 75 MW. Individual residential-scale solar PV deployments will not meet that generation threshold and are therefore excluded from the NERC CIP requirements. With most solar installations less than 75 MW, solar PV has been deployed with minimal oversight and highly variable cybersecurity maturity. The resources that comprise the digital supply chain can include software, code, data, and other digital components. But as clean energy technologies advance, cybersecurity threats and vulnerabilities continue to evolve and grow in sophistication. Supply chain cybersecurity represents a critical area for ensuring safe operations as the U.S. moves toward a clean energy future.

cybersecurity↗

Deployment Feasibility Futures Analysis of Natural Gas Combined Cycle with Carbon Capture in Five U.S. Regions

A broad suite of technologies will be required to enable the United States to meet the current goal of a zero-carbon power sector by 2035, while continuing to provide the U.S. consumer with reliable, secure, stable, and affordable electricity. This study was conducted to evaluate the competitiveness of a natural gas combined cycle (NGCC) with carbon capture and storage (CCS) in five independent system operating areas, the PJM interconnection (PJM) regional transmission organization, Midcontinent Independent System Operator (MISO), Western Electricity Coordinating Council’s (WECC) Northwest Power Pool (NWPP) region, the Electric Reliability Council of Texas (ERCOT) and the SERC Reliability Corporation (SERC) in the 2030 to 2035 time horizon. The modeling and simulation efforts focused on determining the dispatch characteristics and the economic feasibility of constructing an NGCC plant with CCS in each of those regions. The analysis indicates that a NGCC system with CCS can be economically viable in the ERCOT and PJM regions. Additional revenue stream and/or capacity payments are required in MISO, NWPP, and SERC to enable successful commercial deployment of a NGCC with CCS.

Pickenpaugh, Gavin↗

Thermal Integration of DETAIL Systems

A thermal connection between the Microreactor AGile Non-nuclear Experimental Testbed (MAGNET) and the thermal energy distribution system (TEDS) has been a key part of the Dynamic Energy Transport and Integration Laboratory (DETAIL) plan since the development of the Integrated Energy Systems Roadmap in 2020. This connection provides an expanding demonstration capability for integrated system operations. The thermal connection between MAGNET and TEDS required the selection of a heat exchanger and valves to isolate flow. Research staff within the NEET Crosscutting Technology Development program selected equipment after receiving proposals from multiple vendors. A helical coil heat exchanger from Graham Corporation was selected for its small volume relative to its heat transfer surface area to fit in the limited space available. Triple offset butterfly valves with pneumatic actuators from Flowserve were selected to isolate and/or control flow of the hot gas through the heat exchanger. Staff from Idaho National Laboratory’s (INL) Facilities and Site Services Engineering department designed the piping and structural support. A mechanical construction firm was contracted to install the system. This report documents the design and construction of this thermal connection.

25 ENERGY STORAGE↗

Assessing the Impact of Mass Production on Microreactor Costs

Microreactors have attracted significant attention and investment. By virtue of their smaller size (typically less than ~20 MWe), they are expected to be significantly easier to build, demonstrate, and deploy than larger reactors. This has led to several U.S. companies pursuing active demonstration efforts with a wide variety of designs under development. For example, the Ultra Safe Nuclear Corporation (USNC), has recently announced they are planning to build a microreactor assembly plant in Alabama. The cost reduction of the microreactors via factory fabrication and mass production is expected to be the primary driver to the economic competitiveness of microreactors. While several entities are focused on first-of-a-kind demonstration of the technology, it is important to provide insights on longer-term considerations for mass production. The evaluation shown here was conducted primarily in collaboration with Munro & Associates Inc. The findings of this microreactor factory fabrication and mass production study were recently published in. In this paper, we start by summarizing the findings of this study. Next, we apply these findings to quantify the cost reduction of a heat pipe-cooled fast reactor (as an example of microreactors).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Explained: Maintaining a Reliable Future Grid with More Wind and Solar

Since the early 2000s, maintaining grid reliability has become more complex due to a variety of factors, including the changing generation mix, the creation of wholesale energy markets, and a growing number of extreme weather events. Parts of the U.S. grid are already operating with significant amounts of wind and solar generation - with 2022 annual wind and solar generation in the range of 25% to 40%. Even without considering the effects of extreme weather, maintaining reliability will require new capacity to address both growth in electric demand and retiring capacity. Based on the 2022 North American Electric Reliability Corporation (NERC) Long-Term Reliability Assessment, the combination of both growth in peak demand and retirements suggests a need for more than 100 gigawatts (GW) of new capacity by 2032. In general, there are a five categories of resources that are expected to be deployed and used to meet the challenge of maintaining an adequate source of supply in the coming decades: new wind and solar resources (accounting for their reliability contributions), energy storage, demand response resources, expanded transmission, and continued use of thermal generators.

power grid↗

Community Engagement - A Citizen-Centric Approach to Seeking a Social License - 20017

The long regulatory road has finally been completed-after years of effort a Record of Decision has been signed and a Permit to Construct has been granted or a Permit to Operate has been obtained. But what about the other road that should be taken in parallel-community engagement? Working with the public is not a sequential activity, rather it is a consequential one and needs to be integrated with overall project planning. Unless you have effectively, meaningfully, and patiently engaged with the project's communities of impact, you may find your project trying to obtain a social license or a social license to operate (SLO). The SLO has its origins in the mining industry and its roots in the business model of corporate social responsibility and sustainability. These latter practices are well known to the US DOE and its contractor community. Aspects of the SLO are emerging as individuals and communities are becoming more informed and have increased expectations for being able to influence and shape decisions. When local community issues are not sought out, listened to, or addressed early, and questions are left unanswered, they can become agenda items for larger unaffiliated groups, and project loss (through delays and/or cancellation) can occur. Issues can transition from resolvable to intractable, a type of SLO face-off. Social media campaigns, serial negative media coverage, and protest signs at project sites opposing regulatory decisions already made are no longer anomalies. These types of incidents demonstrate the increasingly delicate relationship between approved regulatory/technical decisions and public acceptance of those decisions. A SLO is not a requirement. However, the building-blocks of a SLO - working with members of affected communities to build understanding, potentially to obtain and maintain community acceptance or even gain approval or support - are evidence of leadership by project sponsors. Actions taken, or not taken, by project sponsors truly have the ability to influence an outcome. While projects are not assured of success or failure, engaging the community in an empowered process is an investment of time and resources toward success for the project and thus for the communities of impact. Authors Note: Extensive literature searches were performed in developing this paper. The majority of the published literature on SLO as a 'movement' was found from sources in Canada, the European Union (Germany and France in particular), South Asia, South Korea, and many Latin American countries. The literature addressed resource development (mining), infrastructure, and energy projects. Articles written by US sources often spoke to origins and structural theory, specific project issues such as Not in My Back Yard (NIMBY) and to protests/demonstrations related to those projects, rather than systemic opposition/conflict phenomena. For these reasons many international SLO experiences and sources are cited in the discussion. The authors recognize these non-US experiences with SLO as having a 'forecast' value to US projects, especially those related to nuclear projects of any type, waste treatment and disposal, energy development (especially fossil fuels as well as alternative sources), mining, and infrastructure. The body of future SLO experiences in the US will shape the future responses to it. (authors)

99 GENERAL AND MISCELLANEOUS↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing Mixed Reality Tools to Support Mission Delivery at Hanford - 20520

Mission Support Alliance's (MSA) Public Works and Information Systems organizations have been working with Microsoft Corporation to develop and implement mixed reality operational solutions using their HoloLens technology. This collaborative effort is intended to drive innovative solutions and significantly improve MSA's efficiency in performing work at the Hanford Site. HoloLens, a mixed reality tool, is a commercial off-the-shelf technology that combines a head-mounted viewing screen with applications to help people and organizations learn, communicate, and collaborate more effectively through the use of mixed reality. https://microsoft.com/en-us/hololens MSA's initial pilot successfully demonstrated its ability to use mixed reality utilizing HoloLens' advanced features in a variety of ways, illustrating the potential efficiency gains previously stated as goals of this pilot. These achievements include the development of proprietary technology that allows synchronization between a HoloLens device and a mobile device or alternate global positioning system (GPS) device. This synchronization enables the HoloLens device to access real time GPS location data anywhere on the Hanford Site. This real time location data, combined with MSA's improved Hanford Geographical Information System (GIS) data, enables the mixed reality pilot application to identify underground utility systems as well as related utility attributes. This ability will aid utility workers in several areas, including excavation activities, the placement of large cranes, identifying interactions and conflicts with future underground utility placements and, eventually, recognizing and de-conflicting tank waste transfer system valve alignments. The HoloLens mixed reality application is also able to provide full or small scale holographic images of a facility's digital twin. This feature will allow MSA's Water and Sewer Utilities team to train and validate procedures associated with the new water treatment facility virtually, before it is constructed. This reduces the amount of time it takes to complete the training and procedure validation, and accelerates the overall construction schedule. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Systematic Evidence Based Performance Approach to Regulation of Nuclear Sites in England and Wales - 20058

The Environment Agency for England has developed a systematic evidence-based approach to pursue our strategic environmental objectives for the regulation of nuclear sites. We use an annual evidence review process to ensure effective and efficient targeting of limited resources to achieve those objectives. Over the last 8 years, we have been developing and refining this approach to ensure risk-based and value driven regulation. The approach comprises nuclear site and nuclear sector review processes known as Site Environment Review (SER) and Nuclear Environment Review (NER). This approach complements our regulation of nuclear site permit holders under the Environmental Permitting Regulations (EPR). We deliver our regulation of nuclear sites in England and Wales alongside the Office for Nuclear Regulation. The SER process involves the lead regulator for each nuclear site assessing the permit holder's environmental performance across 14 themes, set within the context of the site's main activities and associated waste disposals. Our themes include environmental leadership, resources and climate change, radioactive waste management, facility management and decommissioning, groundwater, and environmental radiological protection. We use evidence from site inspections and working within our subject matter groups to grade current and predicted future environmental performance. We are particularly interested in sustainability and the application of Best Available Techniques (BAT) to prevent the creation, and minimise the disposal, of radioactive wastes. We use risk analysis (strengths, weaknesses, threats and opportunities) to examine performance against our strategic environmental objectives, which are set out, in our 5-year Nuclear Delivery Plan (NDP). The output supports the targeting of our resources at each nuclear site. We consult the relevant permit holders on the SER priorities and use their feedback to refine our plans. We expect all permit holders to take account of our priorities when considering their own programmes of work, objectives and plans. The NER process brings together what we learn and achieve through regulation across the sector. It provides input to planning priorities, supported by qualitative and semi-quantitative evidence. It covers the 28 nuclear sites in England and Wales and spans the same 14 environmental themes. During the process we collate, compile and summarise evidence from the SERs and other sources such as inspection reports and evidence from our other nuclear work programmes. The output is the NER annual report. This provides a snapshot of the status of the nuclear sector and gives insights to enable us to regulate more efficiently and effectively. It also takes account of cross-cutting issues and risks such as changes in international standards, domestic policy, regulatory framework, domestic standards and guidance, learning from experience such as incidents, events and good practice, and innovation, research and development. It provides graphics that illustrate the grading of environmental performance for the nuclear sector across the fourteen environmental themes. This analysis allows benchmarking of nuclear site's environmental performance and the visualisation provides a convenient comparison of performance across themes, sites, and over time. We use this intelligence to inform our investment in training and development of our staff, and our cross-cutting engagement on strategic issues with government, the Nuclear Decommissioning Authority (NDA) and other corporate organisations. Adopting this approach can provide benefits with organisational reputation, stakeholder participation and ensuring value from the public investment. This paper describes the history of the SER/NER process, a selection of outputs from the process and ideas for improvement. The paper will be of interest to other regulators and organisations across the world that are interested in supporting continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the Road to Achieving Safety Excellence at the Idaho Cleanup Project: The Initial Challenges, Solutions, and Positive Results of Striving to be the Best and Safest in the DOE Complex - 20518

When Fluor Idaho, LLC (Fluor Idaho) assumed the Idaho Cleanup Project Core contract (ICP Core) in mid-2016, it inherited the successful multi-faceted, employee-owned safety programs of two prior contractors supporting cleanup operations at the Idaho National Laboratory Site. Fluor Idaho incorporated the best of both safety programs along with Fluor Corporate's 106-year legacy of safety initiatives and successes. Fluor Idaho integrated the separate programs and cultures under a One Fluor approach - one project, one mission, One Fluor. Job changes, management changes, and procedures, processes, and system changes presented multiple challenges. Those challenges combined with the severe Winter of 2016/2017 resulted in numerous slips, trips, and falls first aids and reportable injuries. The road to safety excellence started off bumpy and stayed that way for some time. Since then, Fluor Idaho has successfully implemented several key initiatives including employee engagement; management engagement and time in the field; communications improvements; safety culture sustainment; injury/illness prevention; organizational learning; and DOE Voluntary Protection Program (VPP) readiness and preparation. Management became more engaged by making more workplace visits and increasing their supervision of 'life critical work' or complex activities. Additional training became mandatory for first-line supervisors and front-line workers. Most recently, Fluor Idaho increased its injury and illness prevention initiatives extensively. In the last year, things have turned around in a dramatic way. This shift is directly attributable to the significant number of initiatives launched in late 2017 and 2018. These initiatives addressed safety performance in the five key areas of the DOE VPP and promoted sustainability of the company's safety culture. The five key areas are: management leadership, employee involvement, work-site analysis, hazard prevention and control, and safety and health training. Employees and managers alike recommitted to making safety the highest value. The result of this laser-like focus on safety and accident and injury prevention is that injuries and first aids are a fraction of what they were. During FY 2019, employees worked more than 4.2 million hours without a serious injury or lost work-day and 1 million hours without a recordable injury. Fluor Idaho is proud of its safety trend. The company invested significant resources in improving its safety record, and that investment is paying off. Other contractors in the DOE Complex can learn and benefit from this discussion of the challenges Fluor Idaho faced, as well as its innovative safety initiatives that are producing results that are being recognized by our U.S. Department of Energy (DOE) customer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RELAP5-3D Solutions to Exercise 1 of the OECD-NEA HTTF Benchmark

Discussion of RELAP5-3D solutions to Exercise 1 of the OECD-NEA High Temperature Test Facility (HTTF) Benchmark. Results from ongoing benchmark activities supported by the Advanced Reactor Technologies - Gas-Cooled Reactor Program with use of the High Performance Computing Center at Idaho National Laboratory. Also discussion of Ultra Safe Nuclear Corporation and BWXT plans for the decade, and issues of modern thermal hydraulic tools for prismatic HTGR modeling. Open discussion of verification and validation and ART-GCR campaign to spearhead the development of an HTGR thermal hydraulics benchmark based on the HTTF.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Physics-Based Limiter Redesign Drilling and Alternative Bit Design at The Geysers

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC, an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration with increased time on bottom for each bit. The project will leverage advances in oil and gas drilling technologies including PDC bits, along with the physics-based limiter redesign techniques championed in drilling demonstrations conducted at the Utah FORGE geothermal site. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. The wells are typically drilled to the top of the reservoir with mud and then air-drilled to total depth (TD) through fractured zones at temperatures ≥ 450°F. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate bit technologies. The first demonstration well has been completed, with a total of 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three hole sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges.

15 GEOTHERMAL ENERGY↗

Physics-Based Limiter Redesign and Bit Performance Analysis at The Geysers

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC (GPC), an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration, with increased footage on bottom for each bit coupled with increased bit life and time drilling. The project leverages advances in oil and gas drilling technologies including PDC bits, along with the physics-based limiter redesign techniques championed in drilling demonstrations conducted at the Utah FORGE geothermal site. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. The wells are typically drilled to the top of the reservoir with mud and then air-drilled to total depth (TD) through fractured zones at temperatures ≥ 450°F. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate rock reduction technologies. The first demonstration well has been completed, with 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However, in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges. This paper provides updates on drilling activities conducted since the Phase 1 demonstration well at GDC-36 which was drilled from November 2023-January 2024. Additional analysis of the bit performance has been conducted. Furthermore, in subsequent wells drilled by GPC, PDC bits have been used extensively, building on the gains realized at GDC-36. GPC has continued to work with bit vendors to identify designs that last longer in the harsh, air-drilled 8.5” portions of the wells. Planning for the Phase 2 demonstration at Prati-44 is ongoing.

15 GEOTHERMAL ENERGY↗

A Novel High-Temperature Generator/Motor Design: With Applications in Geothermal Drilling and Other Industries

The National Renewable Energy Laboratory (NREL), in partnership with Tetra Corporation and TPL Inc, has an ongoing ARPA-E project related to an advanced high-temperature geothermal drilling system, and the power electronics necessary for this system. As part of this work, NREL designed, built and tested a high-temperature generator for power generation in a 250 degrees Celsius downhole drilling environment. This design exceeded initial performance targets at elevated temperature. NREL is investigating alternative applications for this design, as either a generator or motor capable of efficient performance at high temperature.

alternator↗