Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Optimal Managed Fast-Charging Model for Electric Vehicle Fleets with High Utilization and Multiple Charge-Acceptance Curves

A predictive control/scheduling optimization model is proposed for managed charging of an electric vehicle (EV) fleet - under time-of-use energy and demand prices, high vehicle utilization frequency (short dwell times), multiple charge- acceptance curves (configurable charging rates), and flexible vehicle demand. This context is particularly relevant for flight schools (small electric aircraft) or other commercial facilities where an EV fleet performs multiple operating and fast-charging sessions on the same day. The proposed model performs both the operational and charging scheduling of the vehicles, which is not typically done for residential managed charging and significantly increases problem complexity. The problem is formulated as a MILP model and a case study of a small fast-charging station is presented. Results demonstrate a significant reduction in operating cost, mainly from peak shaving during high demand price periods, achieved by coordinating the operation of different vehicles, chargers and charging rates.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Toward a Synthetic Model for Distribution System Restoration and Crew Dispatch

Distribution service restoration (DSR) is critical for improving the resilience and reliability of modern distribution systems by strategically and sequentially energizing the system components and customer loads. Restoring electricity service to affected customers also requires multiple crews with different skill sets to perform multiple tasks that are procedurally interdependent with safety guaranteed. However, in existing DSR practices, switch operations and crew dispatch are scheduled separately, and their interdependence is not fully considered. As advanced technologies are enabling remote communication, control, and dispatch, utilities now desire an integrated DSR framework to achieve seamless coordination among multiple DSR tasks such as switch operation, crew dispatch, and component repair. In this paper, we introduce a synthetic model that integrates the service restoration model and the crew dispatch model based on a universal routing model. The proposed model can provide the estimated time of restoration for each load, the switching sequence for safely operating remotely/manually operated switches, and dispatch solutions for crews with different skill sets. The proposed synthetic model is formulated as a mixed-integer linear programming model, and its effectiveness is evaluated via the IEEE 123 bus test feeder and several large-scale test feeders (EPRI Ckt5, Ckt7, Ckt24, and IEEE 8500 node test feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AQDrop Quantum Service (AQDrop) v1.0

AQDrop is a job management system designed to streamline access to the Advanced Quantum Testbed (AQT) at NERSC (National Energy Research Scientific Computing Center). It serves as a centralized middleware layer between researchers and quantum processing hardware. Key Features: AQDrop provides a FastAPI-based server backed by PostgreSQL for job submission, queue management, and role-based access control (members, operators, and administrators). Users submit Qiskit circuits via JSON payloads, which are queued, dispatched to the QPU through the Qubic API, and returned as measurement counts. A Python client library and web dashboard round out the interface options. Primary Use: Researchers submit quantum circuit jobs from a laptop or login node; an operator client executes those jobs on the AQT's physical QPU and returns results — all coordinated through the central API. Advantages: Compared to ad-hoc or direct hardware access, AQDrop adds structured queue management, auditable job-status tracking and OAuth2 authentication — reducing scheduling conflicts and unauthorized access. Its containerized deployment also improves reproducibility and scalability. Overall, AQDrop functions as a purpose-built quantum job broker tailored to NERSC's specific hardware and institutional access requirements.

Caplinger, Evan [Lawrence Berkeley National Labora↗

Implementation Plan for the Deep Vadose Zone-Applied Field Research Center

The Long-Range Deep Vadose Zone Program Plan was published in October 2010. It summarized the U.S. Department of Energy’s (DOE’s) state-of-knowledge about the contaminant remediation challenges facing the deep vadose zone (DVZ) beneath the Central Plateau of the Hanford Site and their approach to solving those challenges. Developing an implementation plan is the next step to address the knowledge and capabilities required to solve DVZ challenges when needed. This multi-year plan (FY-11 through FY-20) identifies the short to long-term research, management, and execution plans required to solve those problems facing the DVZ-Applied Field Research Center (DVZ-AFRC). The schedule supporting implementation overlies existing activities and milestones from Hanford’s DOE-Environmental Management (EM) end-user projects. Success relies upon multi-project teams focused on coordinated subsurface projects undertaken across the DOE Complex combined with facilitated, problem-focused, research investments implemented through the DVZ-AFRC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The 4-D guidance of STOL aircraft in the terminal area

Advanced STOL aircraft for the improvement of the nation's air transportation system by the elimination of delays and congestions associated with today's air travel are discussed. A new guidance technique, referred to as 4-D guidance, is being developed for STOL aircraft. The 4-D guidance technique synthesizes complex three-dimensional flight paths from a minimum set of input and files the aircraft along the paths according to a prespecified time schedule. The two major elements of a 4-D guidance system are the trajectory synthesizer and the control law. Inputs to the trajectory synthesizer are the three-dimensional coordinates of way points, the turning radii, the speed ranges, the acceleration limits, and the arrival times at time control way points. First, the three-dimensional trajectory is computed by using circular arcs and straight lines. Then the airspeed profile, compensated for wind, is calculated to achieve the desired arrival times. The synthesized trajectory is stored as a time sequence of reference states which the aircraft is forced to track by using a linear feedback law.

Pecsvaradi, T.↗

Four-D guidance of STOL aircraft in the terminal area

The primary objective of advanced STOL aircraft is the improvement of the nation's air transportation system by the elimination of delays and congestions associated with today's air travel. A new guidance technique, referred to as 4-D guidance, is being developed to achieve this objective. The 4-D guidance technique synthesizes complex three-dimensional flight paths from a minimum set of input data and flies the aircraft along the paths according to a prespecified time schedule. The two major elements of a 4-D guidance system are the trajectory synthesizer and the control law. Inputs to the trajectory synthesizer are the three-dimensional coordinates of way points, the turning radii, the speed ranges, the acceleration limits, and the arrival times at time control way points. First, the three-dimensional trajectory is computed by using circular arcs and straight lines. Then the airspeed profile, compensated for wind, is calculated to achieve the desired arrival times. The synthesized trajectory is stored as a time sequence of reference states which the aircraft is forced to track by using a linear feedback law.

Pecsvaradi, T.↗

Design and Operational Evaluation of the Traffic Management Advisor at the Ft. Worth Air Route Traffic Control Center

NASA and the FAA have designed and developed and an automation tool known as the Traffic Management Advisor (TMA). The system was operationally evaluated at the Ft. Worth Air Route Traffic Control Center (ARTCC). The TMA is a time-based strategic planning tool that provides Traffic Management Coordinators and En Route Air Traffic Controllers the ability to efficiently optimize the capacity of a demand impacted airport. The TMA consists of trajectory prediction, constraint-based runway scheduling, traffic flow visualization and controllers advisories. The TMA was used and operationally evaluated for forty-one rush traffic periods during a one month period in the Summer of 1996. The evaluations included all shifts of air traffic operations as well as periods of inclement weather. Performance data was collected for engineering and human factor analysis and compared with similar operations without the TMA. The engineering data indicates that the operations with the TMA show a one to two minute per aircraft delay reduction during rush periods. The human factor data indicate a perceived reduction in en route controller workload as well as an increase in job satisfaction. Upon completion of the evaluation, the TMA has become part of the normal operations at the Ft. Worth ARTCC.

Swenson, Harry N.↗

NASA Tech Briefs, March 2010

Topics covered include: Software Tool Integrating Data Flow Diagrams and Petri Nets; Adaptive Nulling for Interferometric Detection of Planets; Reducing the Volume of NASA Earth-Science Data; Reception of Multiple Telemetry Signals via One Dish Antenna; Space-Qualified Traveling-Wave Tube; Smart Power Supply for Battery-Powered Systems; Parallel Processing of Broad-Band PPM Signals; Inexpensive Implementation of Many Strain Gauges; Constant-Differential-Pressure Two-Fluid Accumulator; Inflatable Tubular Structures Rigidized with Foams; Power Generator with Thermo-Differential Modules; Mechanical Extraction of Power From Ocean Currents and Tides; Nitrous Oxide/Paraffin Hybrid Rocket Engines; Optimized Li-Ion Electrolytes Containing Fluorinated Ester Co-Solvents; Probabilistic Multi-Factor Interaction Model for Complex Material Behavior; Foldable Instrumented Bits for Ultrasonic/Sonic Penetrators; Compact Rare Earth Emitter Hollow Cathode; High-Precision Shape Control of In-Space Deployable Large Membrane/Thin-Shell Reflectors; Rapid Active Sampling Package; Miniature Lightweight Ion Pump; Cryogenic Transport of High-Pressure-System Recharge Gas; Water-Vapor Raman Lidar System Reaches Higher Altitude; Compact Ku-Band T/R Module for High-Resolution Radar Imaging of Cold Land Processes; Wide-Field-of-View, High-Resolution, Stereoscopic Imager; Electrical Capacitance Volume Tomography with High-Contrast Dielectrics; Wavefront Control and Image Restoration with Less Computing; Polarization Imaging Apparatus; Stereoscopic Machine-Vision System Using Projected Circles; Metal Vapor Arcing Risk Assessment Tool; Performance Bounds on Two Concatenated, Interleaved Codes; Parameterizing Coefficients of a POD-Based Dynamical System; Confidence-Based Feature Acquisition; Algorithm for Lossless Compression of Calibrated Hyperspectral Imagery; Universal Decoder for PPM of any Order; Algorithm for Stabilizing a POD-Based Dynamical System; Mission Reliability Estimation for Repairable Robot Teams; Processing AIRS Scientific Data Through Level 3; Web-Based Requesting and Scheduling Use of Facilities; AutoGen Version 5.0; Time-Tag Generation Script; PPM Receiver Implemented in Software; Tropospheric Emission Spectrometer Product File Readers; Reporting Differences Between Spacecraft Sequence Files; Coordinating "Execute" Data for ISS and Space Shuttle; Database for Safety-Oriented Tracking of Chemicals; Apparatus for Cold, Pressurized Biogeochemical Experiments; Growing B Lymphocytes in a Three-Dimensional Culture System; Tissue-like 3D Assemblies of Human Broncho-Epithelial Cells; Isolation of Resistance-Bearing Microorganisms; Oscillating Cell Culture Bioreactor; and Liquid Cooling/Warming Garment.

Source record↗

IP-2 Steam Generator Lower Assembly Packaging, Transport and Disposal - 16510

WMG, Inc. led a team of industry experts in the first of its kind packaging, transportation and disposal of four (4) Steam Generator Lower Assemblies (SGLAs). The project had a number of significant challenges including qualifying the SGLAs as IP-2 packages, implementing roadway improvements and orchestrating the use of three different modes of transportation. In the end, these SGLAs would be the first large components disposed at the WCS Disposal facility in Andrews Texas. The client was re-purposing the SGLA storage mausoleum for 'Fukushima equipment' preparedness so it became necessary to dispose of the assemblies. The WMG team needed to: - Dismantle the mausoleum to allow removal of the SGLAs, - Design, fabricate, deliver and install IP-2 SGLA packaging, and - Transport the packaged SGLAs from the client to the WCS facility for disposal. After qualifying the packaging as IP-2 containers, the SGLAs were loaded onto special equipment for over-the-road transport to the harbor in Kewaunee, WI. Following trans-load, the SGLAs were barged down Lake Michigan through the Mississippi River to the Port of Houston for another trans-load. The SGLAs arrived by rail at WCS' Andrews TX facility. Each transport segment required coordination for transport clearances, proper marking, labeling and placarding for that particular mode of transport as well as coordination with the team involved in moving the large packages from one conveyance to another. The project was completed with zero safety issues, significantly below dose goals, ahead of schedule, and within budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Beyond Coordination: Joint Planning and Program Execution. The IHPRPT Materials Working Group

"Partnership is more than just coordination," stated then-Commander of the Air Force Research Laboratory (AFRL), Major General Dick Paul (USAF-Ret), at this year's National Space and Missile Materials Symposium. His comment referred to the example of the joint planning and program execution provided by the Integrated High Payoff Rocket Propulsion Technology (IHPRPT) Materials Working Group (IMWG). Most people agree that fiscal pressures imposed by shrinking budgets have made it extremely difficult to build upon our existing technical capabilities. In times of sufficient budgets, building advanced systems poses no major difficulties. However, with today's budgets, realizing enhanced capabilities and developing advanced systems often comes at an unaffordable cost. Overcoming this problem represents both a challenge and an opportunity to develop new business practices that allow us to develop advanced technologies within the restrictions imposed by current funding levels. Coordination of technology developments between different government agencies and organizations is a valuable tool for technology transfer. However, rarely do the newly developed technologies have direct applicability to other ongoing programs. Technology requirements are typically determined up-front during the program planning stage so that schedule risk can be minimized. The problem with this process is that the costs associated with the technology development are often borne by a single program. Additionally, the potential exists for duplication of technical effort. Changing this paradigm is a difficult process but one that can be extremely worthwhile should the right opportunity arise. The IMWG is one such example where NASA, the DoD, and industry have developed joint requirements that are intended to satisfy multiple program needs. More than mere coordination, the organizations comprising the group come together as partners, sharing information and resources, proceeding from a joint roadmap.

Stropki, Michael A.↗

Project Shuttle simulation math model coordination catalog, revision 1

A catalog is presented of subsystem and environment math models used or planned for space shuttle simulations. The purpose is to facilitate sharing of similar math models between shuttle simulations. It provides information on mach model requirements, formulations, schedules, and contact persons for further information.

Source record↗

Evaluation of Aggregated EV Flexibility With TSO-DSO Coordination

Electric vehicles (EVs) are becoming a promising source of grid ancillary services due to the temporal and spatial charging flexibility, quick response and storage capability. Such advantages are increasing with government policy promotion and technology improvement. However, the exploration of EV flexibility requires the coordination of both transmission system operators (TSOs) and distribution system operators (DSOs), to ensure the safe and reliable operation of power network. In this paper, we propose a coordinated evaluation method that determines the optimal utilization of EV temporal flexibility without compromising EV owners’ usage. At the distribution level, DSOs first evaluate EV aggregators’ operational boundaries to exploit distribution level services. At the transmission level, TSOs then determine EV charging schedules and ancillary service capacity simultaneously, taking into account the requirement from DSOs. Here, we validate the model in a case study using the IEEE 123 node test feeder and EV charging sessions obtained from a transportation simulation tool that uses real-world data.

33 ADVANCED PROPULSION SYSTEMS↗

International Space Station Medical Projects - Full Services to Mars

The International Space Station Medical Projects (ISSMP) Element provides planning, integration, and implementation services for HRP research studies for both spaceflight and flight analog research. Through the implementation of these two efforts, ISSMP offers an innovative way of guiding research decisions to meet the unique challenges of understanding the human risks to space exploration. Flight services provided by ISSMP include leading informed consent briefings, developing and validating in-flight crew procedures, providing ISS crew and ground-controller training, real-time experiment monitoring, on-orbit experiment and hardware operations and facilitating data transfer to investigators. For analog studies at the NASA Human Exploration Research Analog (HERA), the ISSMP team provides subject recruitment and screening, science requirements integration, data collection schedules, data sharing agreements, mission scenarios and facilities to support investigators. The ISSMP also serves as the HRP interface to external analog providers including the :envihab bed rest facility (Cologne, Germany), NEK isolation chamber (Moscow, Russia) and the Antarctica research stations. Investigators working in either spaceflight or analog environments requires a coordinated effort between NASA and the investigators. The interdisciplinary nature of both flight and analog research requires investigators to be aware of concurrent research studies and take into account potential confounding factors that may impact their research objectives. Investigators must define clear research requirements, participate in Investigator Working Group meetings, obtain human use approvals, and provide study-specific training, sample and data collection and procedures all while adhering to schedule deadlines. These science requirements define the technical, functional and performance operations to meet the research objectives. The ISSMP maintains an expert team of professionals with the knowledge and experience to guide investigators science through all aspects of mission planning, crew operations, and research integration. During this session, the ISSMP team will discuss best-practices approaches for successfully preparing and conducting studies in both the flight and analog environments. Critical tips and tricks will be shown to greatly improve your chances of successfully completing your research aboard the International Space Station and in Spaceflight Analogs.

Pietrzyk, R. A.↗

A simulation‐based integrated virtual testbed for dynamic optimization in smart manufacturing systems

Abstract In a manufacturing system, production control‐related decision‐making activities occur at different levels. At the process level, one of the main control activities is to tune the parameters of individual manufacturing equipment. At the system level, the main activity is to coordinate production resources and to route parts to appropriate workstations based on their processing requirement, priority indices, and control policy. At the factory level, the goal is to plan and schedule the processing of parts at different operations for the entire system in order to optimize certain objectives. Note that the results of such activities at different levels are closely coupled and affect the overall performance of the manufacturing system as a whole. Therefore, it is important to systematically integrate these control and optimization activities into one unified platform to ensure the goal of each individual activity is aligned with the overall performance of the system. In this paper, we develop a simulation‐based virtual testbed that implements dynamic optimization, automatic information exchange, and decision‐making from the process‐level, system‐level, and factory‐level of a manufacturing system into an integrated computation environment. This is demonstrated by connecting a Python‐based numerical computation program, discrete‐event simulation software (Simul8), and an optimization solver (CPLEX) via a third‐party master program. The application of this simulation‐based virtual testbed is illustrated by a case study in a machining shop.

Sun, Yuting↗

Fuel Cycle Research & Development Technical Monthly – May 2012

Management and Integration LANL - Initial coordination meetings with NE and NA-20 were held the first week of May. Additional meetings, to include NA-82 and the new Proliferation and Terrorism Risk Assessment task are scheduled for June. Work package planning as part of the NTD transition is ongoing. Microcalorimetry LANL - Some parts to attempt repair of a malfunctioning water chiller that has been holding up work on the current detector array have arrived. We will attempt to begin running the compressor/cryostat next week to resume work on commissioning the detector array. We have also been working on a backup plan to temporarily move our system to a different lab space. Completed data analysis and prepared a paper summarizing Pu measurements for peer-review journal. Two members of our team presented work at the SORMA West 2012 conference. Completed data analysis and prepared a milestone report summarizing the development of Monte Carlo tools to study systematic errors. Electrochemical Sensor INL - The second sensor test was stopped short due to the work stand-down. Some activities related to this work have resumed, but not all. The sensor used during the second test was removed from the furnace and it showed cracks and later crumbled when being rinsed for sample preparation. The sensor material will be submitted to SEM analysis once work is resumed in the facilities where analysis is performed. A third sensor test has started. Tests with different arrangements will continue and will be oriented based on post-test analysis of the first three sensor tests. Materials with different annealing temperatures will also be prepared for analysis. Lead slowing down spectrometer LANL - Continued work on perturbation method for LSDS analysis. We are running simulations to delineate issues and are checking additional data libraries to see whether there are differences in simulation results. Electrochemical sensor INL - The second sensor test was stopped short due to the work stand-down. Some activities related to this work have resumed, but not all. The sensor used during the second test was removed from the furnace and it showed cracks and later crumbled when being rinsed for sample preparation. The sensor material will be submitted to SEM analysis once work is resumed in the facilities where analysis is performed. A third sensor test has started. Tests with different arrangements will continue and will be oriented based on post-test analysis of the first three sensor tests. Materials with different annealing temperatures will also be prepared for analysis. Fast Neutron Multiplicity analysis INL - The University of Michigan team continues its work on the post-experiment analysis of the validation data from JRC ISPRA, as well as scoping studies using the simulation tool MCNPX-PoliMi. At INL, our new staff member working on this project is now working to model performance capabilities for the fast-neutrons scintillator design concepts. At INL our primary analysis approach is focused on the Feynman mean-to-variance approach. At the University of Michigan, the primary analysis approach is multiplicity coincidence analysis. Fast Neutron Imaging to Quantify Nuclear Materials ORNL - Completed additional measurements of the two 'trainer' configurations as well as calibration measurements with sources on an x-y stage. The imager was shipped to Pantex for an NA-22 obligation at the end of May. Lead Slowing Down Spectrometer LANL - Continued to look into He4 detector. A Swiss company was located that makes He4 detectors and associated electronics. Had a teleconference with them to assess the possible help we can get from them. We are also looking in to constructing one locally. Ongoing perturbation calculations are providing information on the fundamental systematic error limits of LSDS. In order to achieve separating the contribution of Pu and 235U to the signal, there will need to be tight controls on systematic errors. Multi-isotope Process Monitor PNNL - Attended a training call in advanced multivariate classification and analysis methods. These methods were applied to the multivariate analysis of fuel characteristics based on simulated gamma. Work continued on a computational framework to quantify the impact of gamma-ray counting statistical precision on principal component regression (PCR) analysis of a multi-component (i.e. multi-isotope) gammaray spectrum. Tests of the simulation framework are anticipated to begin in early June. Development of a proposal to instrument H-Canyon is being prepared in conjunction with SRNL and the NNSA's NGSI program is ongoing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Optical aurora and its relationship to measurements from satellites, VHF radar and incoherent scatter radars

Examples are given of coordinated programs in Alaska which involve satellites, radars, ground optical instrumentation, and other types of observing satellites for the study of atmospheric and magnetospheric geophysics. Programs include coincidence data acquisition, scheduled data acquisition, and planned experiments. The use of optical triangulation techniques to determine the position of the aurora in order to place the other measurements in the perspective of the overall auroral morphology is detailed.

Romick, G. J.↗

The advanced tracking and data relay satellite system - The next generation

NASA is currently performing cost and feasibility studies for the next generation of TDRSS spacecraft. These spacecraft are needed to replenish the current generation of spacecraft and will be available in the 1997 time frame. The next generation of NASA satellites will perform tracking and data relay functions well into the next century. The challenge facing NASA is to provide new services in an evolutionary way without disrupting services provided to current users. Furthermore, these new services must be carefully coordinated with other similar international data relay activities to facilitate efficient and cost effective operation and to avoid interference. This orderly evolution requires careful planning and coordination. This paper describes the reference architecture and the new services under consideration by NASA including data rates and selected frequencies of operation. The paper also describes the planned implementation schedule and defines the evolutionary process from the current TDRSS system through the Space Station Freedom era and the implementation of the Advanced TDRSS.

Brandel, Daniel↗